You are on page 1of 1

CLIENT :

C C
PT. MRT JAKARTA
WISMA NUSANTARA 21th FLOOR
JL. MH. THAMRIN 59, JAKARTA 10350
INDONESIA

NOTES

910
950
950
950
950

CONCOURSE-LEVEL CONCOURSE-LEVEL
SFL -4.450 SFL -4.450

NO REVISION DATE APP

PROJECT TITLE :

CP201 - UNDERGROUND AND TUNNELS


950

JAKARTA MASS RAPID TRANSIT PROJECT


3650 PHASE 2 (BUNDARAN HI - KOTA)

ENGINEERS :

225 925 1550 725 225


OCG - JIC - PCKK - CHODAI - NK JV
950

CONTRACTORS :
930

SHIMIZU - ADHI KARYA JOINT VENTURE

TAKUZO SATO
970

THIRD PARTY VERIFIER :

SINOTECH ENGINEERING
CONSULTANT, INC.

LAI CHIEN MING


950

ARCHITECT :

SHIMIZU - ADHI KARYA JOINT VENTURE


1000

ALDEN QUIAMBAO
DRAWING TITLE :
PLATFORM LEVEL PLATFORM-LEVEL
100

FFL -10.500 SFL -10.550 MONAS STATION


ELEVATOR 3
ELEVATION 1

SCALE
NAME DATE

DRAWN

ENG CHECK Checker

ELEVATION 1 ARC_SAJV_MON_B2_Elevator3Elevation1Frames DRAWING NUMBER


APPROVED

SCALE 1 : 25 (A1) SCALE 1 : 25 (A1) 1:100 (A3)


CP201-SAJV-MON-ALL-DRW-ARC-06742
CAD FILE NAME REV. STATUS

Autodesk Docs://IDN_MRT
CP201/CP201-SAJV-MON-XX-3DM-ARC-03001.rvt

1/16/2024 6:21:32
PM