Elem Load Part Axial Shear-y Shear-z Torsion Moment-y Moment-z

(tonf) (tonf) (tonf) (tonf·m) (tonf·m) (tonf·m)

1976 SW I[2538] -512.2 -6.41 56.88 -2.21 313.11 1.21


1976 SW 1 per 4 -528.21 -6.41 56.88 -2.21 199.35 14.04
1976 SW 2 per 4 -544.23 -6.41 56.88 -2.21 85.58 26.87
1976 SW 3 per 4 -560.25 -6.41 56.88 -2.21 -28.18 39.7
1976 SW J[2539] -576.27 -6.41 56.88 -2.21 -141.95 52.52
1977 SW I[2540] -1085.62 -1.15 115.81 -1.94 602.2 -4.55
1977 SW 1 per 4 -1100.63 -1.15 115.81 -1.94 385.05 -2.39
1977 SW 2 per 4 -1115.65 -1.15 115.81 -1.94 167.9 -0.23
1977 SW 3 per 4 -1130.67 -1.15 115.81 -1.94 -49.25 1.93
1977 SW J[2541] -1145.68 -1.15 115.81 -1.94 -266.4 4.09
1978 SW I[2542] -1080.32 0.32 115.86 1.9 602.03 5.55
1978 SW 1 per 4 -1095.33 0.32 115.86 1.9 384.8 4.96
1978 SW 2 per 4 -1110.35 0.32 115.86 1.9 167.57 4.36
1978 SW 3 per 4 -1125.37 0.32 115.86 1.9 -49.67 3.77
1978 SW J[2543] -1140.38 0.32 115.86 1.9 -266.9 3.17
1979 SW I[2544] -514.16 7.25 66.8 2.75 325.86 -3.73
1979 SW 1 per 4 -528.18 7.25 66.8 2.75 208.97 -16.41
1979 SW 2 per 4 -542.19 7.25 66.8 2.75 92.07 -29.1
1979 SW 3 per 4 -556.21 7.25 66.8 2.75 -24.82 -41.79
1979 SW J[2545] -570.22 7.25 66.8 2.75 -141.71 -54.47
1980 SW I[2546] -512.2 -6.41 -56.88 2.21 -313.11 1.21
1980 SW 1 per 4 -528.21 -6.41 -56.88 2.21 -199.35 14.04
1980 SW 2 per 4 -544.23 -6.41 -56.88 2.21 -85.58 26.87
1980 SW 3 per 4 -560.25 -6.41 -56.88 2.21 28.18 39.7
1980 SW J[2547] -576.27 -6.41 -56.88 2.21 141.95 52.52
1981 SW I[2548] -1085.62 -1.15 -115.81 1.94 -602.2 -4.55
1981 SW 1 per 4 -1100.63 -1.15 -115.81 1.94 -385.05 -2.39
1981 SW 2 per 4 -1115.65 -1.15 -115.81 1.94 -167.9 -0.23
1981 SW 3 per 4 -1130.67 -1.15 -115.81 1.94 49.25 1.93
1981 SW J[2549] -1145.68 -1.15 -115.81 1.94 266.4 4.09
1982 SW I[2550] -1080.32 0.32 -115.86 -1.9 -602.03 5.55
1982 SW 1 per 4 -1095.33 0.32 -115.86 -1.9 -384.8 4.96
1982 SW 2 per 4 -1110.35 0.32 -115.86 -1.9 -167.57 4.36
1982 SW 3 per 4 -1125.37 0.32 -115.86 -1.9 49.67 3.77
1982 SW J[2551] -1140.38 0.32 -115.86 -1.9 266.9 3.17
1983 SW I[2552] -514.16 7.25 -66.8 -2.75 -325.86 -3.73
1983 SW 1 per 4 -528.18 7.25 -66.8 -2.75 -208.97 -16.41
1983 SW 2 per 4 -542.19 7.25 -66.8 -2.75 -92.07 -29.1
1983 SW 3 per 4 -556.21 7.25 -66.8 -2.75 24.82 -41.79
1983 SW J[2553] -570.22 7.25 -66.8 -2.75 141.71 -54.47
Elem Load Part Axial Shear-y Shear-z Torsion Moment-y Moment-z
(tonf) (tonf) (tonf) (tonf·m) (tonf·m) (tonf·m)

1976 SDL I[2538] -37.12 -0.83 4.02 -0.22 22.14 -0.05


1976 SDL 1 per 4 -37.12 -0.83 4.02 -0.22 14.1 1.61
1976 SDL 2 per 4 -37.12 -0.83 4.02 -0.22 6.07 3.26
1976 SDL 3 per 4 -37.12 -0.83 4.02 -0.22 -1.97 4.92
1976 SDL J[2539] -37.12 -0.83 4.02 -0.22 -10.01 6.57
1977 SDL I[2540] -105.28 -0.14 11.12 -0.24 57.84 -0.55
1977 SDL 1 per 4 -105.28 -0.14 11.12 -0.24 36.98 -0.29
1977 SDL 2 per 4 -105.28 -0.14 11.12 -0.24 16.13 -0.04
1977 SDL 3 per 4 -105.28 -0.14 11.12 -0.24 -4.73 0.21
1977 SDL J[2541] -105.28 -0.14 11.12 -0.24 -25.58 0.47
1978 SDL I[2542] -104.7 0.03 11.12 0.24 57.8 0.67
1978 SDL 1 per 4 -104.7 0.03 11.12 0.24 36.95 0.61
1978 SDL 2 per 4 -104.7 0.03 11.12 0.24 16.09 0.55
1978 SDL 3 per 4 -104.7 0.03 11.12 0.24 -4.76 0.49
1978 SDL J[2543] -104.7 0.03 11.12 0.24 -25.62 0.43
1979 SDL I[2544] -37.36 0.93 4.74 0.28 23.12 -0.25
1979 SDL 1 per 4 -37.36 0.93 4.74 0.28 14.83 -1.88
1979 SDL 2 per 4 -37.36 0.93 4.74 0.28 6.54 -3.51
1979 SDL 3 per 4 -37.36 0.93 4.74 0.28 -1.74 -5.14
1979 SDL J[2545] -37.36 0.93 4.74 0.28 -10.03 -6.78
1980 SDL I[2546] -37.14 -0.83 -4.02 0.22 -22.12 -0.05
1980 SDL 1 per 4 -37.14 -0.83 -4.02 0.22 -14.09 1.61
1980 SDL 2 per 4 -37.14 -0.83 -4.02 0.22 -6.05 3.26
1980 SDL 3 per 4 -37.14 -0.83 -4.02 0.22 1.98 4.92
1980 SDL J[2547] -37.14 -0.83 -4.02 0.22 10.01 6.57
1981 SDL I[2548] -105.28 -0.14 -11.12 0.24 -57.85 -0.55
1981 SDL 1 per 4 -105.28 -0.14 -11.12 0.24 -36.99 -0.29
1981 SDL 2 per 4 -105.28 -0.14 -11.12 0.24 -16.13 -0.04
1981 SDL 3 per 4 -105.28 -0.14 -11.12 0.24 4.73 0.22
1981 SDL J[2549] -105.28 -0.14 -11.12 0.24 25.59 0.47
1982 SDL I[2550] -104.7 0.03 -11.12 -0.24 -57.79 0.67
1982 SDL 1 per 4 -104.7 0.03 -11.12 -0.24 -36.94 0.61
1982 SDL 2 per 4 -104.7 0.03 -11.12 -0.24 -16.09 0.55
1982 SDL 3 per 4 -104.7 0.03 -11.12 -0.24 4.76 0.49
1982 SDL J[2551] -104.7 0.03 -11.12 -0.24 25.61 0.44
1983 SDL I[2552] -37.35 0.93 -4.74 -0.27 -23.13 -0.25
1983 SDL 1 per 4 -37.35 0.93 -4.74 -0.27 -14.84 -1.88
1983 SDL 2 per 4 -37.35 0.93 -4.74 -0.27 -6.56 -3.51
1983 SDL 3 per 4 -37.35 0.93 -4.74 -0.27 1.73 -5.14
1983 SDL J[2553] -37.35 0.93 -4.74 -0.27 10.02 -6.77
Elem Load Part Axial Shear-y Shear-z Torsion Moment-y Moment-z
(tonf) (tonf) (tonf) (tonf·m) (tonf·m) (tonf·m)

1976 LL I[2538] -138.68 -3.09 9.63 -1.51 53.19 0.3


1976 LL 1 per 4 -138.68 -3.09 9.63 -1.51 33.94 6.47
1976 LL 2 per 4 -138.68 -3.09 9.63 -1.51 14.68 12.64
1976 LL 3 per 4 -138.68 -3.09 9.63 -1.51 -4.58 18.81
1976 LL J[2539] -138.68 -3.09 9.63 -1.51 -23.83 24.98
1977 LL I[2540] -395.31 -0.47 28.47 -0.68 148.79 -1.98
1977 LL 1 per 4 -395.31 -0.47 28.47 -0.68 95.41 -1.1
1977 LL 2 per 4 -395.31 -0.47 28.47 -0.68 42.03 -0.23
1977 LL 3 per 4 -395.31 -0.47 28.47 -0.68 -11.35 0.65
1977 LL J[2541] -395.31 -0.47 28.47 -0.68 -64.73 1.53
1978 LL I[2542] -393.2 0.07 28.4 0.7 148.24 2.44
1978 LL 1 per 4 -393.2 0.07 28.4 0.7 94.99 2.3
1978 LL 2 per 4 -393.2 0.07 28.4 0.7 41.74 2.16
1978 LL 3 per 4 -393.2 0.07 28.4 0.7 -11.51 2.02
1978 LL J[2543] -393.2 0.07 28.4 0.7 -64.76 1.88
1979 LL I[2544] -139.56 3.48 11.39 1.79 55.81 -1.4
1979 LL 1 per 4 -139.56 3.48 11.39 1.79 35.87 -7.5
1979 LL 2 per 4 -139.56 3.48 11.39 1.79 15.93 -13.59
1979 LL 3 per 4 -139.56 3.48 11.39 1.79 -4.02 -19.68
1979 LL J[2545] -139.56 3.48 11.39 1.79 -23.96 -25.78
1980 LL I[2546] -138.72 -3.09 -9.62 1.51 -53.12 0.3
1980 LL 1 per 4 -138.72 -3.09 -9.62 1.51 -33.88 6.47
1980 LL 2 per 4 -138.72 -3.09 -9.62 1.51 -14.63 12.64
1980 LL 3 per 4 -138.72 -3.09 -9.62 1.51 4.61 18.82
1980 LL J[2547] -138.72 -3.09 -9.62 1.51 23.86 24.99
1981 LL I[2548] -395.31 -0.47 -28.48 0.68 -148.83 -1.99
1981 LL 1 per 4 -395.31 -0.47 -28.48 0.68 -95.43 -1.11
1981 LL 2 per 4 -395.31 -0.47 -28.48 0.68 -42.03 -0.22
1981 LL 3 per 4 -395.31 -0.47 -28.48 0.68 11.37 0.66
1981 LL J[2549] -395.31 -0.47 -28.48 0.68 64.77 1.54
1982 LL I[2550] -393.2 0.07 -28.39 -0.7 -148.21 2.44
1982 LL 1 per 4 -393.2 0.07 -28.39 -0.7 -94.97 2.3
1982 LL 2 per 4 -393.2 0.07 -28.39 -0.7 -41.74 2.16
1982 LL 3 per 4 -393.2 0.07 -28.39 -0.7 11.5 2.03
1982 LL J[2551] -393.2 0.07 -28.39 -0.7 64.73 1.89
1983 LL I[2552] -139.52 3.48 -11.4 -1.79 -55.87 -1.4
1983 LL 1 per 4 -139.52 3.48 -11.4 -1.79 -35.92 -7.49
1983 LL 2 per 4 -139.52 3.48 -11.4 -1.79 -15.98 -13.58
1983 LL 3 per 4 -139.52 3.48 -11.4 -1.79 3.97 -19.68
1983 LL J[2553] -139.52 3.48 -11.4 -1.79 23.92 -25.77
Elem Load Part Axial Shear-y Shear-z Torsion Moment-y Moment-z
(tonf) (tonf) (tonf) (tonf·m) (tonf·m) (tonf·m)

1976 TRUK(max) I[2538] 4.17 0.53 11.78 2.7 67.52 1.58


1976 TRUK(max) 1 per 4 4.17 0.53 11.78 2.7 43.96 1.88
1976 TRUK(max) 2 per 4 4.17 0.53 11.78 2.7 20.39 4.39
1976 TRUK(max) 3 per 4 4.17 0.53 11.78 2.7 11.17 6.91
1976 TRUK(max) J[2539] 4.17 0.53 11.78 2.7 22.09 9.44
1977 TRUK(max) I[2540] 4.07 0.5 12.98 0.4 68.35 0.91
1977 TRUK(max) 1 per 4 4.07 0.5 12.98 0.4 44.01 0.62
1977 TRUK(max) 2 per 4 4.07 0.5 12.98 0.4 19.67 0.91
1977 TRUK(max) 3 per 4 4.07 0.5 12.98 0.4 6.76 1.84
1977 TRUK(max) J[2541] 4.07 0.5 12.98 0.4 19.39 2.78
1978 TRUK(max) I[2542] 3.95 0.47 13.13 0.59 69.08 2.44
1978 TRUK(max) 1 per 4 3.95 0.47 13.13 0.59 44.47 1.71
1978 TRUK(max) 2 per 4 3.95 0.47 13.13 0.59 19.86 1.6
1978 TRUK(max) 3 per 4 3.95 0.47 13.13 0.59 6.47 2.44
1978 TRUK(max) J[2543] 3.95 0.47 13.13 0.59 20.1 3.29
1979 TRUK(max) I[2544] 4.17 1.66 13.6 3.75 69.63 0.94
1979 TRUK(max) 1 per 4 4.17 1.66 13.6 3.75 45.83 0.56
1979 TRUK(max) 2 per 4 4.17 1.66 13.6 3.75 22.03 0.93
1979 TRUK(max) 3 per 4 4.17 1.66 13.6 3.75 12.64 2.27
1979 TRUK(max) J[2545] 4.17 1.66 13.6 3.75 24.34 3.6
1980 TRUK(max) I[2546] 4.17 0.53 7.81 3.35 50.95 1.58
1980 TRUK(max) 1 per 4 4.17 0.53 7.81 3.35 35.33 1.88
1980 TRUK(max) 2 per 4 4.17 0.53 7.81 3.35 19.72 4.39
1980 TRUK(max) 3 per 4 4.17 0.53 7.81 3.35 8.39 6.91
1980 TRUK(max) J[2547] 4.17 0.53 7.81 3.35 29 9.44
1981 TRUK(max) I[2548] 4.07 0.5 10 0.51 55.59 0.91
1981 TRUK(max) 1 per 4 4.07 0.5 10 0.51 36.85 0.62
1981 TRUK(max) 2 per 4 4.07 0.5 10 0.51 18.1 0.91
1981 TRUK(max) 3 per 4 4.07 0.5 10 0.51 7.32 1.84
1981 TRUK(max) J[2549] 4.07 0.5 10 0.51 29.04 2.78
1982 TRUK(max) I[2550] 3.95 0.47 10.26 0.55 56.86 2.44
1982 TRUK(max) 1 per 4 3.95 0.47 10.26 0.55 37.62 1.71
1982 TRUK(max) 2 per 4 3.95 0.47 10.26 0.55 18.38 1.6
1982 TRUK(max) 3 per 4 3.95 0.47 10.26 0.55 7.3 2.44
1982 TRUK(max) J[2551] 3.95 0.47 10.26 0.55 29.37 3.29
1983 TRUK(max) I[2552] 4.17 1.66 8.79 3.06 52.35 0.94
1983 TRUK(max) 1 per 4 4.17 1.66 8.79 3.06 36.98 0.56
1983 TRUK(max) 2 per 4 4.17 1.66 8.79 3.06 21.6 0.93
1983 TRUK(max) 3 per 4 4.17 1.66 8.79 3.06 8.64 2.27
1983 TRUK(max) J[2553] 4.17 1.66 8.79 3.06 29.95 3.6
1976 TRUK(min) I[2538] -54.01 -1.26 -7.81 -3.35 -50.95 -1.03
1976 TRUK(min) 1 per 4 -54.01 -1.26 -7.81 -3.35 -35.33 -0.55
1976 TRUK(min) 2 per 4 -54.01 -1.26 -7.81 -3.35 -19.72 -0.52
1976 TRUK(min) 3 per 4 -54.01 -1.26 -7.81 -3.35 -8.39 -1.57
1976 TRUK(min) J[2539] -54.01 -1.26 -7.81 -3.35 -29 -2.62
1977 TRUK(min) I[2540] -63.85 -0.5 -10 -0.51 -55.59 -1.24
1977 TRUK(min) 1 per 4 -63.85 -0.5 -10 -0.51 -36.85 -0.96
1977 TRUK(min) 2 per 4 -63.85 -0.5 -10 -0.51 -18.1 -1.4
1977 TRUK(min) 3 per 4 -63.85 -0.5 -10 -0.51 -7.32 -2.33
1977 TRUK(min) J[2541] -63.85 -0.5 -10 -0.51 -29.04 -3.26
1978 TRUK(min) I[2542] -63.67 -0.48 -10.26 -0.55 -56.86 -1.79
1978 TRUK(min) 1 per 4 -63.67 -0.48 -10.26 -0.55 -37.62 -1.17
1978 TRUK(min) 2 per 4 -63.67 -0.48 -10.26 -0.55 -18.38 -0.72
1978 TRUK(min) 3 per 4 -63.67 -0.48 -10.26 -0.55 -7.3 -1.48
1978 TRUK(min) J[2543] -63.67 -0.48 -10.26 -0.55 -29.37 -2.23
1979 TRUK(min) I[2544] -54.1 -0.76 -8.79 -3.06 -52.35 -1.75
1979 TRUK(min) 1 per 4 -54.1 -0.76 -8.79 -3.06 -36.98 -2.29
1979 TRUK(min) 2 per 4 -54.1 -0.76 -8.79 -3.06 -21.6 -5.19
1979 TRUK(min) 3 per 4 -54.1 -0.76 -8.79 -3.06 -8.64 -8.09
1979 TRUK(min) J[2545] -54.1 -0.76 -8.79 -3.06 -29.95 -10.99
1980 TRUK(min) I[2546] -54.01 -1.26 -11.78 -2.7 -67.52 -1.03
1980 TRUK(min) 1 per 4 -54.01 -1.26 -11.78 -2.7 -43.96 -0.55
1980 TRUK(min) 2 per 4 -54.01 -1.26 -11.78 -2.7 -20.39 -0.52
1980 TRUK(min) 3 per 4 -54.01 -1.26 -11.78 -2.7 -11.17 -1.57
1980 TRUK(min) J[2547] -54.01 -1.26 -11.78 -2.7 -22.09 -2.62
1981 TRUK(min) I[2548] -63.85 -0.5 -12.98 -0.4 -68.35 -1.24
1981 TRUK(min) 1 per 4 -63.85 -0.5 -12.98 -0.4 -44.01 -0.96
1981 TRUK(min) 2 per 4 -63.85 -0.5 -12.98 -0.4 -19.67 -1.4
1981 TRUK(min) 3 per 4 -63.85 -0.5 -12.98 -0.4 -6.76 -2.33
1981 TRUK(min) J[2549] -63.85 -0.5 -12.98 -0.4 -19.39 -3.26
1982 TRUK(min) I[2550] -63.67 -0.48 -13.13 -0.59 -69.08 -1.79
1982 TRUK(min) 1 per 4 -63.67 -0.48 -13.13 -0.59 -44.47 -1.17
1982 TRUK(min) 2 per 4 -63.67 -0.48 -13.13 -0.59 -19.86 -0.72
1982 TRUK(min) 3 per 4 -63.67 -0.48 -13.13 -0.59 -6.47 -1.48
1982 TRUK(min) J[2551] -63.67 -0.48 -13.13 -0.59 -20.1 -2.23
1983 TRUK(min) I[2552] -54.1 -0.76 -13.6 -3.75 -69.63 -1.75
1983 TRUK(min) 1 per 4 -54.1 -0.76 -13.6 -3.75 -45.83 -2.29
1983 TRUK(min) 2 per 4 -54.1 -0.76 -13.6 -3.75 -22.03 -5.19
1983 TRUK(min) 3 per 4 -54.1 -0.76 -13.6 -3.75 -12.64 -8.09
1983 TRUK(min) J[2553] -54.1 -0.76 -13.6 -3.75 -24.34 -10.99
Elem Load Part Axial Shear-y Shear-z Torsion Moment-y Moment-z
(tonf) (tonf) (tonf) (tonf·m) (tonf·m) (tonf·m)

1976 REM I[2538] 0.2 -22.51 -0.58 1.28 -3.28 -28.09


1976 REM 1 per 4 0.2 -22.51 -0.58 1.28 -2.12 16.92
1976 REM 2 per 4 0.2 -22.51 -0.58 1.28 -0.97 61.93
1976 REM 3 per 4 0.2 -22.51 -0.58 1.28 0.18 106.94
1976 REM J[2539] 0.2 -22.51 -0.58 1.28 1.34 151.95
1977 REM I[2540] 0.77 -30.64 -0.02 0.62 -0.16 -48.71
1977 REM 1 per 4 0.77 -30.64 -0.02 0.62 -0.11 8.73
1977 REM 2 per 4 0.77 -30.64 -0.02 0.62 -0.07 66.18
1977 REM 3 per 4 0.77 -30.64 -0.02 0.62 -0.02 123.62
1977 REM J[2541] 0.77 -30.64 -0.02 0.62 0.02 181.06
1978 REM I[2542] -0.84 -29.96 0.05 1 0.31 -45.67
1978 REM 1 per 4 -0.84 -29.96 0.05 1 0.21 10.51
1978 REM 2 per 4 -0.84 -29.96 0.05 1 0.12 66.68
1978 REM 3 per 4 -0.84 -29.96 0.05 1 0.02 122.86
1978 REM J[2543] -0.84 -29.96 0.05 1 -0.08 179.03
1979 REM I[2544] -0.13 -30.44 0.73 1.5 3.72 -26.96
1979 REM 1 per 4 -0.13 -30.44 0.73 1.5 2.44 26.31
1979 REM 2 per 4 -0.13 -30.44 0.73 1.5 1.16 79.58
1979 REM 3 per 4 -0.13 -30.44 0.73 1.5 -0.12 132.85
1979 REM J[2545] -0.13 -30.44 0.73 1.5 -1.4 186.12
1980 REM I[2546] 0.2 -22.51 0.58 -1.28 3.28 -28.09
1980 REM 1 per 4 0.2 -22.51 0.58 -1.28 2.12 16.92
1980 REM 2 per 4 0.2 -22.51 0.58 -1.28 0.97 61.93
1980 REM 3 per 4 0.2 -22.51 0.58 -1.28 -0.18 106.94
1980 REM J[2547] 0.2 -22.51 0.58 -1.28 -1.33 151.95
1981 REM I[2548] 0.77 -30.64 0.02 -0.62 0.16 -48.71
1981 REM 1 per 4 0.77 -30.64 0.02 -0.62 0.11 8.73
1981 REM 2 per 4 0.77 -30.64 0.02 -0.62 0.07 66.18
1981 REM 3 per 4 0.77 -30.64 0.02 -0.62 0.02 123.62
1981 REM J[2549] 0.77 -30.64 0.02 -0.62 -0.03 181.06
1982 REM I[2550] -0.84 -29.96 -0.05 -1 -0.31 -45.66
1982 REM 1 per 4 -0.84 -29.96 -0.05 -1 -0.21 10.51
1982 REM 2 per 4 -0.84 -29.96 -0.05 -1 -0.12 66.68
1982 REM 3 per 4 -0.84 -29.96 -0.05 -1 -0.02 122.86
1982 REM J[2551] -0.84 -29.96 -0.05 -1 0.08 179.03
1983 REM I[2552] -0.13 -30.44 -0.73 -1.5 -3.72 -26.96
1983 REM 1 per 4 -0.13 -30.44 -0.73 -1.5 -2.44 26.31
1983 REM 2 per 4 -0.13 -30.44 -0.73 -1.5 -1.16 79.58
1983 REM 3 per 4 -0.13 -30.44 -0.73 -1.5 0.12 132.85
1983 REM J[2553] -0.13 -30.44 -0.73 -1.5 1.4 186.12
Elem Load Part Axial Shear-y Shear-z Torsion Moment-y Moment-z
(tonf) (tonf) (tonf) (tonf·m) (tonf·m) (tonf·m)
1976 S.FUGAL I[2538] -0.05 0 0.12 0.01 0.39 0.01
1976 S.FUGAL 1 per 4 -0.05 0 0.12 0.01 0.14 0
1976 S.FUGAL 2 per 4 -0.05 0 0.12 0.01 -0.11 0
1976 S.FUGAL 3 per 4 -0.05 0 0.12 0.01 -0.35 0
1976 S.FUGAL J[2539] -0.05 0 0.12 0.01 -0.6 -0.01
1977 S.FUGAL I[2540] -0.07 0 0.19 0 0.57 0
1977 S.FUGAL 1 per 4 -0.07 0 0.19 0 0.22 0
1977 S.FUGAL 2 per 4 -0.07 0 0.19 0 -0.12 0
1977 S.FUGAL 3 per 4 -0.07 0 0.19 0 -0.47 0
1977 S.FUGAL J[2541] -0.07 0 0.19 0 -0.82 0
1978 S.FUGAL I[2542] -0.07 0 0.17 -0.01 0.52 -0.01
1978 S.FUGAL 1 per 4 -0.07 0 0.17 -0.01 0.2 0
1978 S.FUGAL 2 per 4 -0.07 0 0.17 -0.01 -0.12 0.01
1978 S.FUGAL 3 per 4 -0.07 0 0.17 -0.01 -0.44 0.01
1978 S.FUGAL J[2543] -0.07 0 0.17 -0.01 -0.77 0.02
1979 S.FUGAL I[2544] -0.05 -0.01 0.13 -0.01 0.34 -0.01
1979 S.FUGAL 1 per 4 -0.05 -0.01 0.13 -0.01 0.12 0
1979 S.FUGAL 2 per 4 -0.05 -0.01 0.13 -0.01 -0.11 0.01
1979 S.FUGAL 3 per 4 -0.05 -0.01 0.13 -0.01 -0.34 0.02
1979 S.FUGAL J[2545] -0.05 -0.01 0.13 -0.01 -0.56 0.03
1980 S.FUGAL I[2546] 0.05 0 0.12 0.01 0.39 -0.01
1980 S.FUGAL 1 per 4 0.05 0 0.12 0.01 0.14 0
1980 S.FUGAL 2 per 4 0.05 0 0.12 0.01 -0.11 0
1980 S.FUGAL 3 per 4 0.05 0 0.12 0.01 -0.35 0
1980 S.FUGAL J[2547] 0.05 0 0.12 0.01 -0.6 0.01
1981 S.FUGAL I[2548] 0.07 0 0.19 0 0.57 0
1981 S.FUGAL 1 per 4 0.07 0 0.19 0 0.22 0
1981 S.FUGAL 2 per 4 0.07 0 0.19 0 -0.12 0
1981 S.FUGAL 3 per 4 0.07 0 0.19 0 -0.47 0
1981 S.FUGAL J[2549] 0.07 0 0.19 0 -0.82 0
1982 S.FUGAL I[2550] 0.07 0 0.17 -0.01 0.52 0.01
1982 S.FUGAL 1 per 4 0.07 0 0.17 -0.01 0.2 0
1982 S.FUGAL 2 per 4 0.07 0 0.17 -0.01 -0.12 -0.01
1982 S.FUGAL 3 per 4 0.07 0 0.17 -0.01 -0.44 -0.01
1982 S.FUGAL J[2551] 0.07 0 0.17 -0.01 -0.77 -0.02
1983 S.FUGAL I[2552] 0.05 0.01 0.13 -0.01 0.34 0.01
1983 S.FUGAL 1 per 4 0.05 0.01 0.13 -0.01 0.12 0
1983 S.FUGAL 2 per 4 0.05 0.01 0.13 -0.01 -0.11 -0.01
1983 S.FUGAL 3 per 4 0.05 0.01 0.13 -0.01 -0.34 -0.02
1983 S.FUGAL J[2553] 0.05 0.01 0.13 -0.01 -0.56 -0.03
Elem Load Part Axial Shear-y Shear-z Torsion Moment-y Moment-z
(tonf) (tonf) (tonf) (tonf·m) (tonf·m) (tonf·m)

1976 ANGIN (LAYAN) I[2538] -1.83 0.08 4.79 0.23 15.14 0.26
1976 ANGIN (LAYAN) 1 per 4 -1.83 0.08 4.79 0.23 5.55 0.1
1976 ANGIN (LAYAN) 2 per 4 -1.83 0.08 4.79 0.23 -4.03 -0.05
1976 ANGIN (LAYAN) 3 per 4 -1.83 0.08 4.79 0.23 -13.62 -0.21
1976 ANGIN (LAYAN) J[2539] -1.83 0.08 4.79 0.23 -23.2 -0.36
1977 ANGIN (LAYAN) I[2540] -2.17 -0.02 7.25 0.04 22.56 -0.03
1977 ANGIN (LAYAN) 1 per 4 -2.17 -0.02 7.25 0.04 8.96 0.01
1977 ANGIN (LAYAN) 2 per 4 -2.17 -0.02 7.25 0.04 -4.64 0.05
1977 ANGIN (LAYAN) 3 per 4 -2.17 -0.02 7.25 0.04 -18.23 0.09
1977 ANGIN (LAYAN) J[2541] -2.17 -0.02 7.25 0.04 -31.83 0.13
1978 ANGIN (LAYAN) I[2542] -1.97 -0.13 6.75 -0.22 20.78 -0.28
1978 ANGIN (LAYAN) 1 per 4 -1.97 -0.13 6.75 -0.22 8.14 -0.04
1978 ANGIN (LAYAN) 2 per 4 -1.97 -0.13 6.75 -0.22 -4.51 0.2
1978 ANGIN (LAYAN) 3 per 4 -1.97 -0.13 6.75 -0.22 -17.16 0.45
1978 ANGIN (LAYAN) J[2543] -1.97 -0.13 6.75 -0.22 -29.81 0.69
1979 ANGIN (LAYAN) I[2544] -1.69 -0.26 5.03 -0.47 13.45 -0.52
1979 ANGIN (LAYAN) 1 per 4 -1.69 -0.26 5.03 -0.47 4.65 -0.06
1979 ANGIN (LAYAN) 2 per 4 -1.69 -0.26 5.03 -0.47 -4.16 0.39
1979 ANGIN (LAYAN) 3 per 4 -1.69 -0.26 5.03 -0.47 -12.96 0.85
1979 ANGIN (LAYAN) J[2545] -1.69 -0.26 5.03 -0.47 -21.77 1.3
1980 ANGIN (LAYAN) I[2546] 1.83 -0.05 4.88 0.27 15.61 -0.15
1980 ANGIN (LAYAN) 1 per 4 1.83 -0.05 4.88 0.27 5.84 -0.05
1980 ANGIN (LAYAN) 2 per 4 1.83 -0.05 4.88 0.27 -3.92 0.05
1980 ANGIN (LAYAN) 3 per 4 1.83 -0.05 4.88 0.27 -13.68 0.15
1980 ANGIN (LAYAN) J[2547] 1.83 -0.05 4.88 0.27 -23.44 0.25
1981 ANGIN (LAYAN) I[2548] 2.18 0.02 7.47 0.05 23.62 0.03
1981 ANGIN (LAYAN) 1 per 4 2.18 0.02 7.47 0.05 9.61 -0.01
1981 ANGIN (LAYAN) 2 per 4 2.18 0.02 7.47 0.05 -4.4 -0.05
1981 ANGIN (LAYAN) 3 per 4 2.18 0.02 7.47 0.05 -18.4 -0.1
1981 ANGIN (LAYAN) J[2549] 2.18 0.02 7.47 0.05 -32.41 -0.14
1982 ANGIN (LAYAN) I[2550] 1.97 0.13 6.97 -0.23 21.87 0.28
1982 ANGIN (LAYAN) 1 per 4 1.97 0.13 6.97 -0.23 8.81 0.04
1982 ANGIN (LAYAN) 2 per 4 1.97 0.13 6.97 -0.23 -4.26 -0.21
1982 ANGIN (LAYAN) 3 per 4 1.97 0.13 6.97 -0.23 -17.32 -0.45
1982 ANGIN (LAYAN) J[2551] 1.97 0.13 6.97 -0.23 -30.38 -0.69
1983 ANGIN (LAYAN) I[2552] 1.69 0.23 5.14 -0.52 13.93 0.42
1983 ANGIN (LAYAN) 1 per 4 1.69 0.23 5.14 -0.52 4.95 0.02
1983 ANGIN (LAYAN) 2 per 4 1.69 0.23 5.14 -0.52 -4.04 -0.38
1983 ANGIN (LAYAN) 3 per 4 1.69 0.23 5.14 -0.52 -13.03 -0.79
1983 ANGIN (LAYAN) J[2553] 1.69 0.23 5.14 -0.52 -22.01 -1.19
Elem Load Part Axial Shear-y Shear-z Torsion Moment-y Moment-z
(tonf) (tonf) (tonf) (tonf·m) (tonf·m) (tonf·m)

1976 Serv.1_1 (LL+B) I[2538] -1650.35 -235.06 97.44 22.28 627.44 105.17
1976 Serv.1_1 (LL+B) 1 per 4 -1666.37 -235.06 97.44 22.28 432.56 575.29
1976 Serv.1_1 (LL+B) 2 per 4 -1682.39 -235.06 97.44 22.28 237.68 1045.42
1976 Serv.1_1 (LL+B) 3 per 4 -1698.41 -235.06 97.44 22.28 42.81 1515.54
1976 Serv.1_1 (LL+B) J[2539] -1714.42 -235.06 97.44 22.28 -152.07 1985.67
1977 Serv.1_1 (LL+B) I[2540] -1290.58 -117.42 89.99 12.1 554.16 23.03
1977 Serv.1_1 (LL+B) 1 per 4 -1305.59 -117.42 89.99 12.1 385.42 243.19
1977 Serv.1_1 (LL+B) 2 per 4 -1320.61 -117.42 89.99 12.1 216.68 463.35
1977 Serv.1_1 (LL+B) 3 per 4 -1335.63 -117.42 89.99 12.1 47.94 683.51
1977 Serv.1_1 (LL+B) J[2541] -1350.64 -117.42 89.99 12.1 -120.81 903.67
1978 Serv.1_1 (LL+B) I[2542] -1292.33 39.23 86.69 -9.05 550.33 -56.6
1978 Serv.1_1 (LL+B) 1 per 4 -1307.35 39.23 86.69 -9.05 387.79 -130.15
1978 Serv.1_1 (LL+B) 2 per 4 -1322.37 39.23 86.69 -9.05 225.24 -203.71
1978 Serv.1_1 (LL+B) 3 per 4 -1337.38 39.23 86.69 -9.05 62.7 -277.27
1978 Serv.1_1 (LL+B) J[2543] -1352.4 39.23 86.69 -9.05 -99.84 -350.82
1979 Serv.1_1 (LL+B) I[2544] -1650.63 236.79 103.63 -23.4 634.01 -181.09
1979 Serv.1_1 (LL+B) 1 per 4 -1664.65 236.79 103.63 -23.4 452.65 -595.47
1979 Serv.1_1 (LL+B) 2 per 4 -1678.66 236.79 103.63 -23.4 271.3 -1009.85
1979 Serv.1_1 (LL+B) 3 per 4 -1692.68 236.79 103.63 -23.4 89.94 -1424.23
1979 Serv.1_1 (LL+B) J[2545] -1706.69 236.79 103.63 -23.4 -91.41 -1838.61
1980 Serv.1_1 (LL+B) I[2546] -1651.33 -234.91 -99.56 -22.66 -633.99 105.49
1980 Serv.1_1 (LL+B) 1 per 4 -1667.35 -234.91 -99.56 -22.66 -434.87 575.31
1980 Serv.1_1 (LL+B) 2 per 4 -1683.36 -234.91 -99.56 -22.66 -235.74 1045.14
1980 Serv.1_1 (LL+B) 3 per 4 -1699.38 -234.91 -99.56 -22.66 -36.62 1514.96
1980 Serv.1_1 (LL+B) J[2547] -1715.4 -234.91 -99.56 -22.66 162.5 1984.78
1981 Serv.1_1 (LL+B) I[2548] -1286.05 -117.61 -78.31 -11.95 -523.5 22.64
1981 Serv.1_1 (LL+B) 1 per 4 -1301.07 -117.61 -78.31 -11.95 -376.67 243.17
1981 Serv.1_1 (LL+B) 2 per 4 -1316.08 -117.61 -78.31 -11.95 -229.84 463.69
1981 Serv.1_1 (LL+B) 3 per 4 -1331.1 -117.61 -78.31 -11.95 -83 684.22
1981 Serv.1_1 (LL+B) J[2549] -1346.12 -117.61 -78.31 -11.95 63.83 904.75
1982 Serv.1_1 (LL+B) I[2550] -1291.74 39.32 -84.98 9.01 -545.7 -56.4
1982 Serv.1_1 (LL+B) 1 per 4 -1306.75 39.32 -84.98 9.01 -386.37 -130.13
1982 Serv.1_1 (LL+B) 2 per 4 -1321.77 39.32 -84.98 9.01 -227.04 -203.85
1982 Serv.1_1 (LL+B) 3 per 4 -1336.78 39.32 -84.98 9.01 -67.71 -277.58
1982 Serv.1_1 (LL+B) J[2551] -1351.8 39.32 -84.98 9.01 91.62 -351.3
1983 Serv.1_1 (LL+B) I[2552] -1650.02 236.52 -106.93 23.72 -625.35 -181.53
1983 Serv.1_1 (LL+B) 1 per 4 -1664.04 236.52 -106.93 23.72 -438.23 -595.43
1983 Serv.1_1 (LL+B) 2 per 4 -1678.05 236.52 -106.93 23.72 -251.11 -1009.34
1983 Serv.1_1 (LL+B) 3 per 4 -1692.07 236.52 -106.93 23.72 -63.98 -1423.24
1983 Serv.1_1 (LL+B) J[2553] -1706.08 236.52 -106.93 23.72 123.14 -1837.15
1976 Serv.1_2 (T+B)(max) I[2538] -1503.17 -238.66 99.65 26.42 642.13 97.03
1976 Serv.1_2 (T+B)(max) 1 per 4 -1519.19 -238.66 99.65 26.42 442.83 575.69
1976 Serv.1_2 (T+B)(max) 2 per 4 -1535.21 -238.66 99.65 26.42 243.53 1056.57
1976 Serv.1_2 (T+B)(max) 3 per 4 -1551.23 -238.66 99.65 26.42 58.56 1537.46
1976 Serv.1_2 (T+B)(max) J[2539] -1567.24 -238.66 99.65 26.42 -106.25 2018.35
1977 Serv.1_2 (T+B)(max) I[2540] -1073.86 -126.57 87.44 13.13 541.21 11.79
1977 Serv.1_2 (T+B)(max) 1 per 4 -1088.88 -126.57 87.44 13.13 377.27 249.76
1977 Serv.1_2 (T+B)(max) 2 per 4 -1103.9 -126.57 87.44 13.13 213.33 488.3
1977 Serv.1_2 (T+B)(max) 3 per 4 -1118.91 -126.57 87.44 13.13 60.83 727.5
1977 Serv.1_2 (T+B)(max) J[2541] -1133.93 -126.57 87.44 13.13 -66.14 966.69
1978 Serv.1_2 (T+B)(max) I[2542] -1075.93 29 83.76 -8.45 535.6 -76.83
1978 Serv.1_2 (T+B)(max) 1 per 4 -1090.94 29 83.76 -8.45 378.55 -131.06
1978 Serv.1_2 (T+B)(max) 2 per 4 -1105.96 29 83.76 -8.45 221.51 -184.67
1978 Serv.1_2 (T+B)(max) 3 per 4 -1120.98 29 83.76 -8.45 75.67 -237.32
1978 Serv.1_2 (T+B)(max) J[2543] -1135.99 29 83.76 -8.45 -43.14 -289.97
1979 Serv.1_2 (T+B)(max) I[2544] -1503.4 225.07 107.08 -20.55 654 -187.07
1979 Serv.1_2 (T+B)(max) 1 per 4 -1517.42 225.07 107.08 -20.55 466.61 -578.42
1979 Serv.1_2 (T+B)(max) 2 per 4 -1531.44 225.07 107.08 -20.55 279.22 -969.02
1979 Serv.1_2 (T+B)(max) 3 per 4 -1545.45 225.07 107.08 -20.55 106.24 -1358.65
1979 Serv.1_2 (T+B)(max) J[2545] -1559.47 225.07 107.08 -20.55 -45.65 -1748.28
1980 Serv.1_2 (T+B)(max) I[2546] -1504.1 -238.51 -82.19 -20.75 -530.3 97.35
1980 Serv.1_2 (T+B)(max) 1 per 4 -1520.12 -238.51 -82.19 -20.75 -365.91 575.71
1980 Serv.1_2 (T+B)(max) 2 per 4 -1536.14 -238.51 -82.19 -20.75 -201.52 1056.28
1980 Serv.1_2 (T+B)(max) 3 per 4 -1552.16 -238.51 -82.19 -20.75 -32.84 1536.87
1980 Serv.1_2 (T+B)(max) J[2547] -1568.18 -238.51 -82.19 -20.75 167.77 2017.46
1981 Serv.1_2 (T+B)(max) I[2548] -1069.38 -126.76 -52.75 -12.07 -386.5 11.41
1981 Serv.1_2 (T+B)(max) 1 per 4 -1084.39 -126.76 -52.75 -12.07 -287.6 249.74
1981 Serv.1_2 (T+B)(max) 2 per 4 -1099.41 -126.76 -52.75 -12.07 -188.7 488.65
1981 Serv.1_2 (T+B)(max) 3 per 4 -1114.43 -126.76 -52.75 -12.07 -81.84 728.2
1981 Serv.1_2 (T+B)(max) J[2549] -1129.44 -126.76 -52.75 -12.07 57.53 967.76
1982 Serv.1_2 (T+B)(max) I[2550] -1075.29 29.09 -58.68 9.55 -405.14 -76.63
1982 Serv.1_2 (T+B)(max) 1 per 4 -1090.31 29.09 -58.68 9.55 -295.11 -131.03
1982 Serv.1_2 (T+B)(max) 2 per 4 -1105.32 29.09 -58.68 9.55 -185.08 -184.81
1982 Serv.1_2 (T+B)(max) 3 per 4 -1120.34 29.09 -58.68 9.55 -66.89 -237.64
1982 Serv.1_2 (T+B)(max) J[2551] -1135.36 29.09 -58.68 9.55 84.45 -290.46
1983 Serv.1_2 (T+B)(max) I[2552] -1502.84 224.8 -87.98 27.68 -523.29 -187.52
1983 Serv.1_2 (T+B)(max) 1 per 4 -1516.86 224.8 -87.98 27.68 -369.32 -578.39
1983 Serv.1_2 (T+B)(max) 2 per 4 -1530.87 224.8 -87.98 27.68 -215.35 -968.51
1983 Serv.1_2 (T+B)(max) 3 per 4 -1544.89 224.8 -87.98 27.68 -58.97 -1357.67
1983 Serv.1_2 (T+B)(max) J[2553] -1558.9 224.8 -87.98 27.68 131.69 -1746.82
1976 Serv.1_3 (LL+S) I[2538] -1650.71 -220.02 97.93 21.42 630.02 123.92
1976 Serv.1_3 (LL+S) 1 per 4 -1666.73 -220.02 97.93 21.42 434.15 563.96
1976 Serv.1_3 (LL+S) 2 per 4 -1682.75 -220.02 97.93 21.42 238.28 1004.01
1976 Serv.1_3 (LL+S) 3 per 4 -1698.77 -220.02 97.93 21.42 42.41 1444.05
1976 Serv.1_3 (LL+S) J[2539] -1714.79 -220.02 97.93 21.42 -153.46 1884.09
1977 Serv.1_3 (LL+S) I[2540] -1290.59 -97.04 90.08 11.69 554.42 55.42
1977 Serv.1_3 (LL+S) 1 per 4 -1305.61 -97.04 90.08 11.69 385.51 237.38
1977 Serv.1_3 (LL+S) 2 per 4 -1320.63 -97.04 90.08 11.69 216.6 419.34
1977 Serv.1_3 (LL+S) 3 per 4 -1335.64 -97.04 90.08 11.69 47.69 601.29
1977 Serv.1_3 (LL+S) J[2541] -1350.66 -97.04 90.08 11.69 -121.22 783.25
1978 Serv.1_3 (LL+S) I[2542] -1292.36 59.16 86.79 -9.72 550.61 -26.22
1978 Serv.1_3 (LL+S) 1 per 4 -1307.38 59.16 86.79 -9.72 387.88 -137.14
1978 Serv.1_3 (LL+S) 2 per 4 -1322.39 59.16 86.79 -9.72 225.14 -248.06
1978 Serv.1_3 (LL+S) 3 per 4 -1337.41 59.16 86.79 -9.72 62.4 -358.98
1978 Serv.1_3 (LL+S) J[2543] -1352.43 59.16 86.79 -9.72 -100.33 -469.9
1979 Serv.1_3 (LL+S) I[2544] -1650.39 257.13 103.22 -24.4 631.69 -163.1
1979 Serv.1_3 (LL+S) 1 per 4 -1664.41 257.13 103.22 -24.4 451.05 -613.08
1979 Serv.1_3 (LL+S) 2 per 4 -1678.42 257.13 103.22 -24.4 270.41 -1063.07
1979 Serv.1_3 (LL+S) 3 per 4 -1692.44 257.13 103.22 -24.4 89.77 -1513.05
1979 Serv.1_3 (LL+S) J[2545] -1706.45 257.13 103.22 -24.4 -90.87 -1963.03
1980 Serv.1_3 (LL+S) I[2546] -1651.61 -219.87 -99.87 -21.8 -635.98 124.24
1980 Serv.1_3 (LL+S) 1 per 4 -1667.63 -219.87 -99.87 -21.8 -436.24 563.98
1980 Serv.1_3 (LL+S) 2 per 4 -1683.65 -219.87 -99.87 -21.8 -236.5 1003.72
1980 Serv.1_3 (LL+S) 3 per 4 -1699.66 -219.87 -99.87 -21.8 -36.76 1443.46
1980 Serv.1_3 (LL+S) J[2547] -1715.68 -219.87 -99.87 -21.8 162.98 1883.2
1981 Serv.1_3 (LL+S) I[2548] -1285.98 -97.24 -78.18 -11.54 -523.08 55.04
1981 Serv.1_3 (LL+S) 1 per 4 -1300.99 -97.24 -78.18 -11.54 -376.5 237.36
1981 Serv.1_3 (LL+S) 2 per 4 -1316.01 -97.24 -78.18 -11.54 -229.91 419.68
1981 Serv.1_3 (LL+S) 3 per 4 -1331.03 -97.24 -78.18 -11.54 -83.33 601.99
1981 Serv.1_3 (LL+S) J[2549] -1346.04 -97.24 -78.18 -11.54 63.26 784.31
1982 Serv.1_3 (LL+S) I[2550] -1291.68 59.25 -84.88 9.67 -545.37 -26.02
1982 Serv.1_3 (LL+S) 1 per 4 -1306.69 59.25 -84.88 9.67 -386.23 -137.12
1982 Serv.1_3 (LL+S) 2 per 4 -1321.71 59.25 -84.88 9.67 -227.08 -248.21
1982 Serv.1_3 (LL+S) 3 per 4 -1336.73 59.25 -84.88 9.67 -67.93 -359.31
1982 Serv.1_3 (LL+S) J[2551] -1351.74 59.25 -84.88 9.67 91.21 -470.4
1983 Serv.1_3 (LL+S) I[2552] -1649.71 256.87 -106.32 24.71 -622.51 -163.53
1983 Serv.1_3 (LL+S) 1 per 4 -1663.72 256.87 -106.32 24.71 -436.45 -613.05
1983 Serv.1_3 (LL+S) 2 per 4 -1677.74 256.87 -106.32 24.71 -250.39 -1062.56
1983 Serv.1_3 (LL+S) 3 per 4 -1691.76 256.87 -106.32 24.71 -64.34 -1512.08
1983 Serv.1_3 (LL+S) J[2553] -1705.77 256.87 -106.32 24.71 121.72 -1961.6
1976 Serv.1_4 (T+S)(max) I[2538] -1503.43 -216.15 100.35 25.14 645.79 125.13
1976 Serv.1_4 (T+S)(max) 1 per 4 -1519.45 -216.15 100.35 25.14 445.09 558.78
1976 Serv.1_4 (T+S)(max) 2 per 4 -1535.46 -216.15 100.35 25.14 244.39 994.64
1976 Serv.1_4 (T+S)(max) 3 per 4 -1551.48 -216.15 100.35 25.14 58.03 1430.51
1976 Serv.1_4 (T+S)(max) J[2539] -1567.5 -216.15 100.35 25.14 -108.19 1866.39
1977 Serv.1_4 (T+S)(max) I[2540] -1074.71 -95.94 87.65 12.51 541.94 60.5
1977 Serv.1_4 (T+S)(max) 1 per 4 -1089.73 -95.94 87.65 12.51 377.61 241.03
1977 Serv.1_4 (T+S)(max) 2 per 4 -1104.74 -95.94 87.65 12.51 213.28 422.13
1977 Serv.1_4 (T+S)(max) 3 per 4 -1119.76 -95.94 87.65 12.51 60.38 603.88
1977 Serv.1_4 (T+S)(max) J[2541] -1134.78 -95.94 87.65 12.51 -66.98 785.64
1978 Serv.1_4 (T+S)(max) I[2542] -1075.15 58.96 83.88 -9.46 535.82 -31.17
1978 Serv.1_4 (T+S)(max) 1 per 4 -1090.17 58.96 83.88 -9.46 378.54 -141.57
1978 Serv.1_4 (T+S)(max) 2 per 4 -1105.18 58.96 83.88 -9.46 221.27 -251.34
1978 Serv.1_4 (T+S)(max) 3 per 4 -1120.2 58.96 83.88 -9.46 75.21 -360.17
1978 Serv.1_4 (T+S)(max) J[2543] -1135.22 58.96 83.88 -9.46 -43.83 -468.99
1979 Serv.1_4 (T+S)(max) I[2544] -1503.33 255.5 106.48 -22.06 650.62 -160.13
1979 Serv.1_4 (T+S)(max) 1 per 4 -1517.34 255.5 106.48 -22.06 464.28 -604.74
1979 Serv.1_4 (T+S)(max) 2 per 4 -1531.36 255.5 106.48 -22.06 277.95 -1048.59
1979 Serv.1_4 (T+S)(max) 3 per 4 -1545.37 255.5 106.48 -22.06 106.02 -1491.48
1979 Serv.1_4 (T+S)(max) J[2545] -1559.39 255.5 106.48 -22.06 -44.81 -1934.37
1980 Serv.1_4 (T+S)(max) I[2546] -1504.25 -216 -82.65 -19.46 -533.19 125.44
1980 Serv.1_4 (T+S)(max) 1 per 4 -1520.27 -216 -82.65 -19.46 -367.89 558.79
1980 Serv.1_4 (T+S)(max) 2 per 4 -1536.29 -216 -82.65 -19.46 -202.6 994.35
1980 Serv.1_4 (T+S)(max) 3 per 4 -1552.3 -216 -82.65 -19.46 -33.01 1429.93
1980 Serv.1_4 (T+S)(max) J[2547] -1568.32 -216 -82.65 -19.46 168.51 1865.51
1981 Serv.1_4 (T+S)(max) I[2548] -1070.07 -96.13 -52.59 -11.45 -386.09 60.12
1981 Serv.1_4 (T+S)(max) 1 per 4 -1085.09 -96.13 -52.59 -11.45 -287.49 241.01
1981 Serv.1_4 (T+S)(max) 2 per 4 -1100.11 -96.13 -52.59 -11.45 -188.89 422.47
1981 Serv.1_4 (T+S)(max) 3 per 4 -1115.12 -96.13 -52.59 -11.45 -82.33 604.58
1981 Serv.1_4 (T+S)(max) J[2549] -1130.14 -96.13 -52.59 -11.45 56.73 786.7
1982 Serv.1_4 (T+S)(max) I[2550] -1074.38 59.06 -58.46 10.54 -404.31 -30.96
1982 Serv.1_4 (T+S)(max) 1 per 4 -1089.39 59.06 -58.46 10.54 -294.7 -141.54
1982 Serv.1_4 (T+S)(max) 2 per 4 -1104.41 59.06 -58.46 10.54 -185.08 -251.5
1982 Serv.1_4 (T+S)(max) 3 per 4 -1119.43 59.06 -58.46 10.54 -67.31 -360.51
1982 Serv.1_4 (T+S)(max) J[2551] -1134.44 59.06 -58.46 10.54 83.6 -469.51
1983 Serv.1_4 (T+S)(max) I[2552] -1502.66 255.24 -87.12 29.16 -519.23 -160.55
1983 Serv.1_4 (T+S)(max) 1 per 4 -1516.68 255.24 -87.12 29.16 -366.77 -604.7
1983 Serv.1_4 (T+S)(max) 2 per 4 -1530.69 255.24 -87.12 29.16 -214.3 -1048.1
1983 Serv.1_4 (T+S)(max) 3 per 4 -1544.71 255.24 -87.12 29.16 -59.43 -1490.54
1983 Serv.1_4 (T+S)(max) J[2553] -1558.72 255.24 -87.12 29.16 129.72 -1932.98
1976 Serv.3 (TEMP.) I[2538] -1505.2 -142.93 114.01 18.13 647.79 215.26
1976 Serv.3 (TEMP.) 1 per 4 -1521.22 -142.93 114.01 18.13 419.77 501.12
1976 Serv.3 (TEMP.) 2 per 4 -1537.23 -142.93 114.01 18.13 191.75 786.99
1976 Serv.3 (TEMP.) 3 per 4 -1553.25 -142.93 114.01 18.13 -36.26 1072.85
1976 Serv.3 (TEMP.) J[2539] -1569.27 -142.93 114.01 18.13 -264.28 1358.72
1977 Serv.3 (TEMP.) I[2540] -1082.29 -58.64 105.01 11.33 550.83 119.71
1977 Serv.3 (TEMP.) 1 per 4 -1097.31 -58.64 105.01 11.33 353.95 229.67
1977 Serv.3 (TEMP.) 2 per 4 -1112.32 -58.64 105.01 11.33 157.06 339.63
1977 Serv.3 (TEMP.) 3 per 4 -1127.34 -58.64 105.01 11.33 -39.82 449.59
1977 Serv.3 (TEMP.) J[2541] -1142.36 -58.64 105.01 11.33 -236.71 559.55
1978 Serv.3 (TEMP.) I[2542] -1079.53 34.3 100.66 -9.17 541.87 -70.37
1978 Serv.3 (TEMP.) 1 per 4 -1094.55 34.3 100.66 -9.17 353.14 -134.68
1978 Serv.3 (TEMP.) 2 per 4 -1109.57 34.3 100.66 -9.17 164.4 -198.99
1978 Serv.3 (TEMP.) 3 per 4 -1124.58 34.3 100.66 -9.17 -24.34 -263.3
1978 Serv.3 (TEMP.) J[2543] -1139.6 34.3 100.66 -9.17 -213.08 -327.6
1979 Serv.3 (TEMP.) I[2544] -1505.71 166.51 127.9 -21.36 660.05 -238.21
1979 Serv.3 (TEMP.) 1 per 4 -1519.72 166.51 127.9 -21.36 436.22 -529.6
1979 Serv.3 (TEMP.) 2 per 4 -1533.74 166.51 127.9 -21.36 212.4 -820.99
1979 Serv.3 (TEMP.) 3 per 4 -1547.75 166.51 127.9 -21.36 -11.42 -1112.39
1979 Serv.3 (TEMP.) J[2545] -1561.77 166.51 127.9 -21.36 -235.25 -1403.78
1980 Serv.3 (TEMP.) I[2546] -1506.13 -142.78 -116.14 -18.51 -654.42 215.58
1980 Serv.3 (TEMP.) 1 per 4 -1522.15 -142.78 -116.14 -18.51 -422.14 501.14
1980 Serv.3 (TEMP.) 2 per 4 -1538.17 -142.78 -116.14 -18.51 -189.86 786.7
1980 Serv.3 (TEMP.) 3 per 4 -1554.18 -142.78 -116.14 -18.51 42.42 1072.26
1980 Serv.3 (TEMP.) J[2547] -1570.2 -142.78 -116.14 -18.51 274.7 1357.82
1981 Serv.3 (TEMP.) I[2548] -1077.8 -58.84 -93.3 -11.18 -520.07 119.33
1981 Serv.3 (TEMP.) 1 per 4 -1092.82 -58.84 -93.3 -11.18 -345.13 229.65
1981 Serv.3 (TEMP.) 2 per 4 -1107.84 -58.84 -93.3 -11.18 -170.2 339.97
1981 Serv.3 (TEMP.) 3 per 4 -1122.85 -58.84 -93.3 -11.18 4.73 450.29
1981 Serv.3 (TEMP.) J[2549] -1137.87 -58.84 -93.3 -11.18 179.67 560.61
1982 Serv.3 (TEMP.) I[2550] -1078.9 34.39 -98.97 9.13 -537.36 -70.18
1982 Serv.3 (TEMP.) 1 per 4 -1093.91 34.39 -98.97 9.13 -351.79 -134.66
1982 Serv.3 (TEMP.) 2 per 4 -1108.93 34.39 -98.97 9.13 -166.22 -199.14
1982 Serv.3 (TEMP.) 3 per 4 -1123.95 34.39 -98.97 9.13 19.35 -263.61
1982 Serv.3 (TEMP.) J[2551] -1138.96 34.39 -98.97 9.13 204.92 -328.09
1983 Serv.3 (TEMP.) I[2552] -1505.14 166.24 -131.19 21.67 -651.32 -238.65
1983 Serv.3 (TEMP.) 1 per 4 -1519.16 166.24 -131.19 21.67 -421.74 -529.57
1983 Serv.3 (TEMP.) 2 per 4 -1533.17 166.24 -131.19 21.67 -192.16 -820.49
1983 Serv.3 (TEMP.) 3 per 4 -1547.19 166.24 -131.19 21.67 37.41 -1111.41
1983 Serv.3 (TEMP.) J[2553] -1561.2 166.24 -131.19 21.67 266.99 -1402.32
1976 Serv.5 (W) I[2538] -1509.38 -216.6 93.24 22.67 593.02 123.8
1976 Serv.5 (W) 1 per 4 -1525.39 -216.6 93.24 22.67 406.55 557
1976 Serv.5 (W) 2 per 4 -1541.41 -216.6 93.24 22.67 220.07 990.2
1976 Serv.5 (W) 3 per 4 -1557.43 -216.6 93.24 22.67 33.59 1423.39
1976 Serv.5 (W) J[2539] -1573.45 -216.6 93.24 22.67 -152.89 1856.59
1977 Serv.5 (W) I[2540] -1080.88 -96.46 81.73 12.15 495.58 59.56
1977 Serv.5 (W) 1 per 4 -1095.89 -96.46 81.73 12.15 342.34 240.41
1977 Serv.5 (W) 2 per 4 -1110.91 -96.46 81.73 12.15 189.1 421.27
1977 Serv.5 (W) 3 per 4 -1125.93 -96.46 81.73 12.15 35.86 602.13
1977 Serv.5 (W) J[2541] -1140.94 -96.46 81.73 12.15 -117.38 782.98
1978 Serv.5 (W) I[2542] -1081 58.36 77.33 -10.27 486.99 -33.88
1978 Serv.5 (W) 1 per 4 -1096.02 58.36 77.33 -10.27 342 -143.31
1978 Serv.5 (W) 2 per 4 -1111.04 58.36 77.33 -10.27 197.01 -252.74
1978 Serv.5 (W) 3 per 4 -1126.05 58.36 77.33 -10.27 52.02 -362.18
1978 Serv.5 (W) J[2543] -1141.07 58.36 77.33 -10.27 -92.97 -471.61
1979 Serv.5 (W) I[2544] -1509.14 253.59 97.78 -26.27 594.1 -161.57
1979 Serv.5 (W) 1 per 4 -1523.16 253.59 97.78 -26.27 422.99 -605.36
1979 Serv.5 (W) 2 per 4 -1537.17 253.59 97.78 -26.27 251.87 -1049.14
1979 Serv.5 (W) 3 per 4 -1551.19 253.59 97.78 -26.27 80.76 -1492.92
1979 Serv.5 (W) J[2545] -1565.2 253.59 97.78 -26.27 -90.36 -1936.7
1980 Serv.5 (W) I[2546] -1506.64 -216.57 -85.7 -22.55 -568.91 123.71
1980 Serv.5 (W) 1 per 4 -1522.66 -216.57 -85.7 -22.55 -397.52 556.86
1980 Serv.5 (W) 2 per 4 -1538.68 -216.57 -85.7 -22.55 -226.13 990.01
1980 Serv.5 (W) 3 per 4 -1554.7 -216.57 -85.7 -22.55 -54.73 1423.16
1980 Serv.5 (W) J[2547] -1570.71 -216.57 -85.7 -22.55 116.66 1856.31
1981 Serv.5 (W) I[2548] -1072.04 -96.61 -55.3 -11.91 -418.64 59.24
1981 Serv.5 (W) 1 per 4 -1087.06 -96.61 -55.3 -11.91 -314.95 240.38
1981 Serv.5 (W) 2 per 4 -1102.07 -96.61 -55.3 -11.91 -211.27 421.51
1981 Serv.5 (W) 3 per 4 -1117.09 -96.61 -55.3 -11.91 -107.58 602.65
1981 Serv.5 (W) J[2549] -1132.11 -96.61 -55.3 -11.91 -3.89 783.78
1982 Serv.5 (W) I[2550] -1076.42 58.71 -61.93 9.77 -439.82 -33.12
1982 Serv.5 (W) 1 per 4 -1091.44 58.71 -61.93 9.77 -323.71 -143.21
1982 Serv.5 (W) 2 per 4 -1106.46 58.71 -61.93 9.77 -207.6 -253.3
1982 Serv.5 (W) 3 per 4 -1121.47 58.71 -61.93 9.77 -91.49 -363.39
1982 Serv.5 (W) J[2551] -1136.49 58.71 -61.93 9.77 24.63 -473.48
1983 Serv.5 (W) I[2552] -1505.2 253.81 -90.9 25.6 -557.99 -161.08
1983 Serv.5 (W) 1 per 4 -1519.21 253.81 -90.9 25.6 -398.91 -605.24
1983 Serv.5 (W) 2 per 4 -1533.23 253.81 -90.9 25.6 -239.84 -1049.41
1983 Serv.5 (W) 3 per 4 -1547.24 253.81 -90.9 25.6 -80.76 -1493.57
1983 Serv.5 (W) J[2553] -1561.26 253.81 -90.9 25.6 78.32 -1937.74
1976 Serv.1_2 (T+B)(min) I[2538] -1561.35 -240.45 80.06 20.37 523.66 94.42
1976 Serv.1_2 (T+B)(min) 1 per 4 -1577.37 -240.45 80.06 20.37 363.54 573.26
1976 Serv.1_2 (T+B)(min) 2 per 4 -1593.38 -240.45 80.06 20.37 203.41 1051.66
1976 Serv.1_2 (T+B)(min) 3 per 4 -1609.4 -240.45 80.06 20.37 39 1528.98
1976 Serv.1_2 (T+B)(min) J[2539] -1625.42 -240.45 80.06 20.37 -157.35 2006.29
1977 Serv.1_2 (T+B)(min) I[2540] -1141.79 -127.57 64.45 12.22 417.27 9.65
1977 Serv.1_2 (T+B)(min) 1 per 4 -1156.8 -127.57 64.45 12.22 296.42 248.18
1977 Serv.1_2 (T+B)(min) 2 per 4 -1171.82 -127.57 64.45 12.22 175.56 486
1977 Serv.1_2 (T+B)(min) 3 per 4 -1186.84 -127.57 64.45 12.22 46.75 723.33
1977 Serv.1_2 (T+B)(min) J[2541] -1201.85 -127.57 64.45 12.22 -114.57 960.65
1978 Serv.1_2 (T+B)(min) I[2542] -1143.54 28.06 60.37 -9.59 409.66 -81.06
1978 Serv.1_2 (T+B)(min) 1 per 4 -1158.56 28.06 60.37 -9.59 296.46 -133.94
1978 Serv.1_2 (T+B)(min) 2 per 4 -1173.58 28.06 60.37 -9.59 183.26 -186.99
1978 Serv.1_2 (T+B)(min) 3 per 4 -1188.59 28.06 60.37 -9.59 61.9 -241.24
1978 Serv.1_2 (T+B)(min) J[2543] -1203.61 28.06 60.37 -9.59 -92.61 -295.49
1979 Serv.1_2 (T+B)(min) I[2544] -1561.68 222.65 84.69 -27.36 532.02 -189.76
1979 Serv.1_2 (T+B)(min) 1 per 4 -1575.7 222.65 84.69 -27.36 383.8 -581.27
1979 Serv.1_2 (T+B)(min) 2 per 4 -1589.71 222.65 84.69 -27.36 235.59 -975.13
1979 Serv.1_2 (T+B)(min) 3 per 4 -1603.73 222.65 84.69 -27.36 84.96 -1369
1979 Serv.1_2 (T+B)(min) J[2545] -1617.74 222.65 84.69 -27.36 -99.94 -1762.87
1980 Serv.1_2 (T+B)(min) I[2546] -1562.28 -240.29 -101.78 -26.8 -648.76 94.74
1980 Serv.1_2 (T+B)(min) 1 per 4 -1578.3 -240.29 -101.78 -26.8 -445.2 573.28
1980 Serv.1_2 (T+B)(min) 2 per 4 -1594.32 -240.29 -101.78 -26.8 -241.63 1051.37
1980 Serv.1_2 (T+B)(min) 3 per 4 -1610.33 -240.29 -101.78 -26.8 -52.4 1528.39
1980 Serv.1_2 (T+B)(min) J[2547] -1626.35 -240.29 -101.78 -26.8 116.68 2005.4
1981 Serv.1_2 (T+B)(min) I[2548] -1137.3 -127.76 -75.73 -12.98 -510.45 9.26
1981 Serv.1_2 (T+B)(min) 1 per 4 -1152.32 -127.76 -75.73 -12.98 -368.46 248.16
1981 Serv.1_2 (T+B)(min) 2 per 4 -1167.33 -127.76 -75.73 -12.98 -226.47 486.34
1981 Serv.1_2 (T+B)(min) 3 per 4 -1182.35 -127.76 -75.73 -12.98 -95.92 724.03
1981 Serv.1_2 (T+B)(min) J[2549] -1197.37 -127.76 -75.73 -12.98 9.1 961.72
1982 Serv.1_2 (T+B)(min) I[2550] -1142.91 28.15 -82.07 8.41 -531.08 -80.86
1982 Serv.1_2 (T+B)(min) 1 per 4 -1157.92 28.15 -82.07 8.41 -377.2 -133.92
1982 Serv.1_2 (T+B)(min) 2 per 4 -1172.94 28.15 -82.07 8.41 -223.32 -187.13
1982 Serv.1_2 (T+B)(min) 3 per 4 -1187.96 28.15 -82.07 8.41 -80.66 -241.56
1982 Serv.1_2 (T+B)(min) J[2551] -1202.97 28.15 -82.07 8.41 34.98 -295.98
1983 Serv.1_2 (T+B)(min) I[2552] -1561.12 222.37 -110.37 20.87 -645.27 -190.2
1983 Serv.1_2 (T+B)(min) 1 per 4 -1575.13 222.37 -110.37 20.87 -452.13 -581.24
1983 Serv.1_2 (T+B)(min) 2 per 4 -1589.15 222.37 -110.37 20.87 -258.98 -974.63
1983 Serv.1_2 (T+B)(min) 3 per 4 -1603.16 222.37 -110.37 20.87 -80.25 -1368.02
1983 Serv.1_2 (T+B)(min) J[2553] -1617.18 222.37 -110.37 20.87 77.4 -1761.42
1976 Serv.1_4 (T+S)(min) I[2538] -1561.6 -217.94 80.76 19.09 527.33 122.52
1976 Serv.1_4 (T+S)(min) 1 per 4 -1577.62 -217.94 80.76 19.09 365.8 556.35
1976 Serv.1_4 (T+S)(min) 2 per 4 -1593.64 -217.94 80.76 19.09 204.28 989.73
1976 Serv.1_4 (T+S)(min) 3 per 4 -1609.66 -217.94 80.76 19.09 38.46 1422.03
1976 Serv.1_4 (T+S)(min) J[2539] -1625.68 -217.94 80.76 19.09 -159.28 1854.33
1977 Serv.1_4 (T+S)(min) I[2540] -1142.63 -96.94 64.66 11.6 418 58.35
1977 Serv.1_4 (T+S)(min) 1 per 4 -1157.65 -96.94 64.66 11.6 296.75 239.45
1977 Serv.1_4 (T+S)(min) 2 per 4 -1172.67 -96.94 64.66 11.6 175.51 419.83
1977 Serv.1_4 (T+S)(min) 3 per 4 -1187.68 -96.94 64.66 11.6 46.3 599.71
1977 Serv.1_4 (T+S)(min) J[2541] -1202.7 -96.94 64.66 11.6 -115.41 779.6
1978 Serv.1_4 (T+S)(min) I[2542] -1142.77 58.01 60.49 -10.6 409.87 -35.4
1978 Serv.1_4 (T+S)(min) 1 per 4 -1157.79 58.01 60.49 -10.6 296.45 -144.45
1978 Serv.1_4 (T+S)(min) 2 per 4 -1172.8 58.01 60.49 -10.6 183.02 -253.67
1978 Serv.1_4 (T+S)(min) 3 per 4 -1187.82 58.01 60.49 -10.6 61.44 -364.09
1978 Serv.1_4 (T+S)(min) J[2543] -1202.84 58.01 60.49 -10.6 -93.3 -474.51
1979 Serv.1_4 (T+S)(min) I[2544] -1561.6 253.08 84.09 -28.87 528.64 -162.81
1979 Serv.1_4 (T+S)(min) 1 per 4 -1575.62 253.08 84.09 -28.87 381.48 -607.58
1979 Serv.1_4 (T+S)(min) 2 per 4 -1589.63 253.08 84.09 -28.87 234.32 -1054.71
1979 Serv.1_4 (T+S)(min) 3 per 4 -1603.65 253.08 84.09 -28.87 84.74 -1501.84
1979 Serv.1_4 (T+S)(min) J[2545] -1617.66 253.08 84.09 -28.87 -99.1 -1948.97
1980 Serv.1_4 (T+S)(min) I[2546] -1562.43 -217.79 -102.24 -25.51 -651.65 122.83
1980 Serv.1_4 (T+S)(min) 1 per 4 -1578.45 -217.79 -102.24 -25.51 -447.18 556.36
1980 Serv.1_4 (T+S)(min) 2 per 4 -1594.46 -217.79 -102.24 -25.51 -242.71 989.44
1980 Serv.1_4 (T+S)(min) 3 per 4 -1610.48 -217.79 -102.24 -25.51 -52.57 1421.45
1980 Serv.1_4 (T+S)(min) J[2547] -1626.5 -217.79 -102.24 -25.51 117.42 1853.45
1981 Serv.1_4 (T+S)(min) I[2548] -1138 -97.13 -75.57 -12.35 -510.04 57.97
1981 Serv.1_4 (T+S)(min) 1 per 4 -1153.01 -97.13 -75.57 -12.35 -368.35 239.42
1981 Serv.1_4 (T+S)(min) 2 per 4 -1168.03 -97.13 -75.57 -12.35 -226.66 420.16
1981 Serv.1_4 (T+S)(min) 3 per 4 -1183.05 -97.13 -75.57 -12.35 -96.41 600.41
1981 Serv.1_4 (T+S)(min) J[2549] -1198.06 -97.13 -75.57 -12.35 8.3 780.65
1982 Serv.1_4 (T+S)(min) I[2550] -1142 58.11 -81.85 9.4 -530.25 -35.19
1982 Serv.1_4 (T+S)(min) 1 per 4 -1157.01 58.11 -81.85 9.4 -376.79 -144.42
1982 Serv.1_4 (T+S)(min) 2 per 4 -1172.03 58.11 -81.85 9.4 -223.33 -253.82
1982 Serv.1_4 (T+S)(min) 3 per 4 -1187.04 58.11 -81.85 9.4 -81.09 -364.43
1982 Serv.1_4 (T+S)(min) J[2551] -1202.06 58.11 -81.85 9.4 34.14 -475.03
1983 Serv.1_4 (T+S)(min) I[2552] -1560.94 252.82 -109.51 22.35 -641.21 -163.23
1983 Serv.1_4 (T+S)(min) 1 per 4 -1574.95 252.82 -109.51 22.35 -449.57 -607.55
1983 Serv.1_4 (T+S)(min) 2 per 4 -1588.97 252.82 -109.51 22.35 -257.93 -1054.22
1983 Serv.1_4 (T+S)(min) 3 per 4 -1602.98 252.82 -109.51 22.35 -80.71 -1500.9
1983 Serv.1_4 (T+S)(min) J[2553] -1617 252.82 -109.51 22.35 75.43 -1947.57
Elem Load Part Axial Shear-y Shear-z Torsion Moment-y Moment-z
(tonf) (tonf) (tonf) (tonf·m) (tonf·m) (tonf·m)

1976 ULT.1_1 (LL+B) I[2538] -1553.5 -91.28 104.36 3.15 607 -144.42
1976 ULT.1_1 (LL+B) 1 per 4 -1574.32 -91.28 104.36 3.15 398.28 38.14
1976 ULT.1_1 (LL+B) 2 per 4 -1595.14 -91.28 104.36 3.15 189.56 220.71
1976 ULT.1_1 (LL+B) 3 per 4 -1615.97 -91.28 104.36 3.15 -19.16 403.27
1976 ULT.1_1 (LL+B) J[2539] -1636.79 -91.28 104.36 3.15 -227.87 585.84
1977 ULT.1_1 (LL+B) I[2540] -2016.62 -61.71 154.8 -1.3 839.19 -106.62
1977 ULT.1_1 (LL+B) 1 per 4 -2036.14 -61.71 154.8 -1.3 548.94 9.08
1977 ULT.1_1 (LL+B) 2 per 4 -2055.66 -61.71 154.8 -1.3 258.68 124.78
1977 ULT.1_1 (LL+B) 3 per 4 -2075.19 -61.71 154.8 -1.3 -31.58 240.48
1977 ULT.1_1 (LL+B) J[2541] -2094.71 -61.71 154.8 -1.3 -321.84 356.18
1978 ULT.1_1 (LL+B) I[2542] -2015.14 -26.74 156.73 2.89 852.32 -24.62
1978 ULT.1_1 (LL+B) 1 per 4 -2034.66 -26.74 156.73 2.89 558.44 25.52
1978 ULT.1_1 (LL+B) 2 per 4 -2054.19 -26.74 156.73 2.89 264.57 75.66
1978 ULT.1_1 (LL+B) 3 per 4 -2073.71 -26.74 156.73 2.89 -29.31 125.8
1978 ULT.1_1 (LL+B) J[2543] -2093.23 -26.74 156.73 2.89 -323.18 175.94
1979 ULT.1_1 (LL+B) I[2544] -1555.72 29.44 118.08 1.36 624.25 57.45
1979 ULT.1_1 (LL+B) 1 per 4 -1573.94 29.44 118.08 1.36 417.62 5.93
1979 ULT.1_1 (LL+B) 2 per 4 -1592.16 29.44 118.08 1.36 210.98 -45.59
1979 ULT.1_1 (LL+B) 3 per 4 -1610.38 29.44 118.08 1.36 4.35 -97.12
1979 ULT.1_1 (LL+B) J[2545] -1628.6 29.44 118.08 1.36 -202.29 -148.64
1980 ULT.1_1 (LL+B) I[2546] -1553.41 -91.13 -103.91 -3.28 -605.46 -144.11
1980 ULT.1_1 (LL+B) 1 per 4 -1574.23 -91.13 -103.91 -3.28 -397.64 38.16
1980 ULT.1_1 (LL+B) 2 per 4 -1595.05 -91.13 -103.91 -3.28 -189.83 220.42
1980 ULT.1_1 (LL+B) 3 per 4 -1615.87 -91.13 -103.91 -3.28 17.99 402.69
1980 ULT.1_1 (LL+B) J[2547] -1636.7 -91.13 -103.91 -3.28 225.81 584.96
1981 ULT.1_1 (LL+B) I[2548] -2016.62 -61.5 -155 1.11 -839.88 -106.19
1981 ULT.1_1 (LL+B) 1 per 4 -2036.14 -61.5 -155 1.11 -549.25 9.12
1981 ULT.1_1 (LL+B) 2 per 4 -2055.66 -61.5 -155 1.11 -258.63 124.44
1981 ULT.1_1 (LL+B) 3 per 4 -2075.18 -61.5 -155 1.11 32 239.75
1981 ULT.1_1 (LL+B) J[2549] -2094.7 -61.5 -155 1.11 322.62 355.06
1982 ULT.1_1 (LL+B) I[2550] -2015.9 -26.48 -158.1 -3.27 -856.38 -24.05
1982 ULT.1_1 (LL+B) 1 per 4 -2035.42 -26.48 -158.1 -3.27 -559.94 25.6
1982 ULT.1_1 (LL+B) 2 per 4 -2054.94 -26.48 -158.1 -3.27 -263.5 75.24
1982 ULT.1_1 (LL+B) 3 per 4 -2074.46 -26.48 -158.1 -3.27 32.94 124.88
1982 ULT.1_1 (LL+B) J[2551] -2093.98 -26.48 -158.1 -3.27 329.38 174.52
1983 ULT.1_1 (LL+B) I[2552] -1553.72 29.65 -116.96 -1.96 -609.96 57.49
1983 ULT.1_1 (LL+B) 1 per 4 -1571.94 29.65 -116.96 -1.96 -405.28 5.61
1983 ULT.1_1 (LL+B) 2 per 4 -1590.16 29.65 -116.96 -1.96 -200.6 -46.27
1983 ULT.1_1 (LL+B) 3 per 4 -1608.38 29.65 -116.96 -1.96 4.09 -98.16
1983 ULT.1_1 (LL+B) J[2553] -1626.6 29.65 -116.96 -1.96 208.77 -150.04
1976 ULT.1_2 (T+B)(max) I[2538] -1257.31 -98.06 114.44 12.65 669.08 -159.65
1976 ULT.1_2 (T+B)(max) 1 per 4 -1278.13 -98.06 114.44 12.65 440.2 39.93
1976 ULT.1_2 (T+B)(max) 2 per 4 -1298.95 -98.06 114.44 12.65 211.32 245.21
1976 ULT.1_2 (T+B)(max) 3 per 4 -1319.78 -98.06 114.44 12.65 19.34 450.53
1976 ULT.1_2 (T+B)(max) J[2539] -1340.6 -98.06 114.44 12.65 -120.77 655.84
1977 ULT.1_2 (T+B)(max) I[2540] -1582.45 -79.5 156 1.02 846.67 -128.17
1977 ULT.1_2 (T+B)(max) 1 per 4 -1601.97 -79.5 156 1.02 554.17 22.56
1977 ULT.1_2 (T+B)(max) 2 per 4 -1621.49 -79.5 156 1.02 261.69 174.78
1977 ULT.1_2 (T+B)(max) 3 per 4 -1641.01 -79.5 156 1.02 -1.36 328.67
1977 ULT.1_2 (T+B)(max) J[2541] -1660.53 -79.5 156 1.02 -198.69 482.55
1978 ULT.1_2 (T+B)(max) I[2542] -1580.67 -46.74 156.84 4.39 854.46 -63.43
1978 ULT.1_2 (T+B)(max) 1 per 4 -1600.2 -46.74 156.84 4.39 560.38 24.6
1978 ULT.1_2 (T+B)(max) 2 per 4 -1619.72 -46.74 156.84 4.39 266.31 114.23
1978 ULT.1_2 (T+B)(max) 3 per 4 -1639.24 -46.74 156.84 4.39 1.11 206.31
1978 ULT.1_2 (T+B)(max) J[2543] -1658.76 -46.74 156.84 4.39 -194.56 298.4
1979 ULT.1_2 (T+B)(max) I[2544] -1260.43 7.19 132.04 9.44 700.62 46.22
1979 ULT.1_2 (T+B)(max) 1 per 4 -1278.65 7.19 132.04 9.44 469.55 40.13
1979 ULT.1_2 (T+B)(max) 2 per 4 -1296.87 7.19 132.04 9.44 238.47 35.98
1979 ULT.1_2 (T+B)(max) 3 per 4 -1315.09 7.19 132.04 9.44 44.49 34.31
1979 ULT.1_2 (T+B)(max) J[2545] -1333.31 7.19 132.04 9.44 -95.21 32.65
1980 ULT.1_2 (T+B)(max) I[2546] -1257.13 -97.91 -63.59 2.78 -362.79 -159.34
1980 ULT.1_2 (T+B)(max) 1 per 4 -1277.95 -97.91 -63.59 2.78 -235.61 39.94
1980 ULT.1_2 (T+B)(max) 2 per 4 -1298.77 -97.91 -63.59 2.78 -108.42 244.91
1980 ULT.1_2 (T+B)(max) 3 per 4 -1319.59 -97.91 -63.59 2.78 29.8 449.93
1980 ULT.1_2 (T+B)(max) J[2547] -1340.42 -97.91 -63.59 2.78 250.21 654.96
1981 ULT.1_2 (T+B)(max) I[2548] -1582.52 -79.29 -96.99 1.12 -528.1 -127.73
1981 ULT.1_2 (T+B)(max) 1 per 4 -1602.04 -79.29 -96.99 1.12 -346.23 22.6
1981 ULT.1_2 (T+B)(max) 2 per 4 -1621.56 -79.29 -96.99 1.12 -164.37 174.42
1981 ULT.1_2 (T+B)(max) 3 per 4 -1641.08 -79.29 -96.99 1.12 37.99 327.92
1981 ULT.1_2 (T+B)(max) J[2549] -1660.61 -79.29 -96.99 1.12 324 481.41
1982 ULT.1_2 (T+B)(max) I[2550] -1581.35 -46.48 -98.06 -1.86 -534.55 -62.85
1982 ULT.1_2 (T+B)(max) 1 per 4 -1600.87 -46.48 -98.06 -1.86 -350.7 24.67
1982 ULT.1_2 (T+B)(max) 2 per 4 -1620.4 -46.48 -98.06 -1.86 -166.84 113.79
1982 ULT.1_2 (T+B)(max) 3 per 4 -1639.92 -46.48 -98.06 -1.86 38.02 205.37
1982 ULT.1_2 (T+B)(max) J[2551] -1659.44 -46.48 -98.06 -1.86 328.19 296.96
1983 ULT.1_2 (T+B)(max) I[2552] -1258.52 7.4 -73.29 7.49 -372.22 46.27
1983 ULT.1_2 (T+B)(max) 1 per 4 -1276.74 7.4 -73.29 7.49 -243.96 39.81
1983 ULT.1_2 (T+B)(max) 2 per 4 -1294.96 7.4 -73.29 7.49 -115.69 35.29
1983 ULT.1_2 (T+B)(max) 3 per 4 -1313.18 7.4 -73.29 7.49 18.79 33.26
1983 ULT.1_2 (T+B)(max) J[2553] -1331.4 7.4 -73.29 7.49 241.48 31.23
1976 ULT.1_3 (LL+S) I[2538] -1554.21 -61.5 105.34 1.45 612.1 -107.29
1976 ULT.1_3 (LL+S) 1 per 4 -1575.04 -61.5 105.34 1.45 401.42 15.71
1976 ULT.1_3 (LL+S) 2 per 4 -1595.86 -61.5 105.34 1.45 190.73 138.71
1976 ULT.1_3 (LL+S) 3 per 4 -1616.68 -61.5 105.34 1.45 -19.95 261.71
1976 ULT.1_3 (LL+S) J[2539] -1637.51 -61.5 105.34 1.45 -230.64 384.71
1977 ULT.1_3 (LL+S) I[2540] -2016.65 -21.36 154.98 -2.13 839.71 -42.47
1977 ULT.1_3 (LL+S) 1 per 4 -2036.17 -21.36 154.98 -2.13 549.12 -2.42
1977 ULT.1_3 (LL+S) 2 per 4 -2055.7 -21.36 154.98 -2.13 258.53 37.64
1977 ULT.1_3 (LL+S) 3 per 4 -2075.22 -21.36 154.98 -2.13 -32.06 77.69
1977 ULT.1_3 (LL+S) J[2541] -2094.74 -21.36 154.98 -2.13 -322.65 117.75
1978 ULT.1_3 (LL+S) I[2542] -2015.19 12.71 156.94 1.57 852.88 35.52
1978 ULT.1_3 (LL+S) 1 per 4 -2034.71 12.71 156.94 1.57 558.62 11.68
1978 ULT.1_3 (LL+S) 2 per 4 -2054.24 12.71 156.94 1.57 264.36 -12.16
1978 ULT.1_3 (LL+S) 3 per 4 -2073.76 12.71 156.94 1.57 -29.9 -36
1978 ULT.1_3 (LL+S) J[2543] -2093.28 12.71 156.94 1.57 -324.16 -59.84
1979 ULT.1_3 (LL+S) I[2544] -1555.25 69.72 117.27 -0.62 619.66 93.07
1979 ULT.1_3 (LL+S) 1 per 4 -1573.47 69.72 117.27 -0.62 414.44 -28.95
1979 ULT.1_3 (LL+S) 2 per 4 -1591.69 69.72 117.27 -0.62 209.23 -150.96
1979 ULT.1_3 (LL+S) 3 per 4 -1609.91 69.72 117.27 -0.62 4.01 -272.98
1979 ULT.1_3 (LL+S) J[2545] -1628.13 69.72 117.27 -0.62 -201.21 -394.99
1980 ULT.1_3 (LL+S) I[2546] -1553.96 -61.35 -104.52 -1.59 -609.4 -106.98
1980 ULT.1_3 (LL+S) 1 per 4 -1574.78 -61.35 -104.52 -1.59 -400.36 15.72
1980 ULT.1_3 (LL+S) 2 per 4 -1595.61 -61.35 -104.52 -1.59 -191.32 138.42
1980 ULT.1_3 (LL+S) 3 per 4 -1616.43 -61.35 -104.52 -1.59 17.72 261.13
1980 ULT.1_3 (LL+S) J[2547] -1637.25 -61.35 -104.52 -1.59 226.76 383.83
1981 ULT.1_3 (LL+S) I[2548] -2016.47 -21.15 -154.74 1.92 -839.05 -42.03
1981 ULT.1_3 (LL+S) 1 per 4 -2035.99 -21.15 -154.74 1.92 -548.91 -2.38
1981 ULT.1_3 (LL+S) 2 per 4 -2055.51 -21.15 -154.74 1.92 -258.77 37.28
1981 ULT.1_3 (LL+S) 3 per 4 -2075.03 -21.15 -154.74 1.92 31.36 76.94
1981 ULT.1_3 (LL+S) J[2549] -2094.56 -21.15 -154.74 1.92 321.5 116.6
1982 ULT.1_3 (LL+S) I[2550] -2015.78 12.99 -157.91 -1.96 -855.73 36.11
1982 ULT.1_3 (LL+S) 1 per 4 -2035.3 12.99 -157.91 -1.96 -559.65 11.76
1982 ULT.1_3 (LL+S) 2 per 4 -2054.83 12.99 -157.91 -1.96 -263.58 -12.59
1982 ULT.1_3 (LL+S) 3 per 4 -2074.35 12.99 -157.91 -1.96 32.5 -36.94
1982 ULT.1_3 (LL+S) J[2551] -2093.87 12.99 -157.91 -1.96 328.57 -61.29
1983 ULT.1_3 (LL+S) I[2552] -1553.09 69.94 -115.76 0.01 -604.33 93.14
1983 ULT.1_3 (LL+S) 1 per 4 -1571.31 69.94 -115.76 0.01 -401.75 -29.26
1983 ULT.1_3 (LL+S) 2 per 4 -1589.53 69.94 -115.76 0.01 -199.18 -151.66
1983 ULT.1_3 (LL+S) 3 per 4 -1607.76 69.94 -115.76 0.01 3.39 -274.05
1983 ULT.1_3 (LL+S) J[2553] -1625.98 69.94 -115.76 0.01 205.96 -396.45
1976 ULT.1_4 (T+S)(max) I[2538] -1257.81 -53.49 115.82 10.12 676.33 -104.01
1976 ULT.1_4 (T+S)(max) 1 per 4 -1278.64 -53.49 115.82 10.12 444.68 6.44
1976 ULT.1_4 (T+S)(max) 2 per 4 -1299.46 -53.49 115.82 10.12 213.03 122.58
1976 ULT.1_4 (T+S)(max) 3 per 4 -1320.28 -53.49 115.82 10.12 18.28 238.77
1976 ULT.1_4 (T+S)(max) J[2539] -1341.1 -53.49 115.82 10.12 -124.61 354.96
1977 ULT.1_4 (T+S)(max) I[2540] -1584.12 -18.85 156.42 -0.21 848.11 -31.73
1977 ULT.1_4 (T+S)(max) 1 per 4 -1603.64 -18.85 156.42 -0.21 554.84 5.27
1977 ULT.1_4 (T+S)(max) 2 per 4 -1623.17 -18.85 156.42 -0.21 261.58 43.75
1977 ULT.1_4 (T+S)(max) 3 per 4 -1642.69 -18.85 156.42 -0.21 -2.25 83.91
1977 ULT.1_4 (T+S)(max) J[2541] -1662.21 -18.85 156.42 -0.21 -200.36 124.06
1978 ULT.1_4 (T+S)(max) I[2542] -1579.14 12.57 157.08 2.41 854.88 26.97
1978 ULT.1_4 (T+S)(max) 1 per 4 -1598.66 12.57 157.08 2.41 560.36 3.79
1978 ULT.1_4 (T+S)(max) 2 per 4 -1618.18 12.57 157.08 2.41 265.84 -17.8
1978 ULT.1_4 (T+S)(max) 3 per 4 -1637.71 12.57 157.08 2.41 0.19 -36.93
1978 ULT.1_4 (T+S)(max) J[2543] -1657.23 12.57 157.08 2.41 -195.92 -56.06
1979 ULT.1_4 (T+S)(max) I[2544] -1260.28 67.45 130.85 6.46 693.94 99.58
1979 ULT.1_4 (T+S)(max) 1 per 4 -1278.5 67.45 130.85 6.46 464.95 -11.97
1979 ULT.1_4 (T+S)(max) 2 per 4 -1296.72 67.45 130.85 6.46 235.96 -121.58
1979 ULT.1_4 (T+S)(max) 3 per 4 -1314.94 67.45 130.85 6.46 44.06 -228.69
1979 ULT.1_4 (T+S)(max) J[2545] -1333.16 67.45 130.85 6.46 -93.55 -335.81
1980 ULT.1_4 (T+S)(max) I[2546] -1257.42 -53.35 -64.49 5.33 -368.51 -103.73
1980 ULT.1_4 (T+S)(max) 1 per 4 -1278.24 -53.35 -64.49 5.33 -239.54 6.43
1980 ULT.1_4 (T+S)(max) 2 per 4 -1299.06 -53.35 -64.49 5.33 -110.56 122.29
1980 ULT.1_4 (T+S)(max) 3 per 4 -1319.89 -53.35 -64.49 5.33 29.46 238.2
1980 ULT.1_4 (T+S)(max) J[2547] -1340.71 -53.35 -64.49 5.33 251.67 354.1
1981 ULT.1_4 (T+S)(max) I[2548] -1583.9 -18.63 -96.68 2.35 -527.29 -31.29
1981 ULT.1_4 (T+S)(max) 1 per 4 -1603.42 -18.63 -96.68 2.35 -346.02 5.31
1981 ULT.1_4 (T+S)(max) 2 per 4 -1622.94 -18.63 -96.68 2.35 -164.75 43.39
1981 ULT.1_4 (T+S)(max) 3 per 4 -1642.47 -18.63 -96.68 2.35 37.02 83.15
1981 ULT.1_4 (T+S)(max) J[2549] -1661.99 -18.63 -96.68 2.35 322.43 122.91
1982 ULT.1_4 (T+S)(max) I[2550] -1579.55 12.85 -97.61 0.11 -532.9 27.58
1982 ULT.1_4 (T+S)(max) 1 per 4 -1599.07 12.85 -97.61 0.11 -349.88 3.87
1982 ULT.1_4 (T+S)(max) 2 per 4 -1618.59 12.85 -97.61 0.11 -166.85 -18.25
1982 ULT.1_4 (T+S)(max) 3 per 4 -1638.11 12.85 -97.61 0.11 37.17 -37.91
1982 ULT.1_4 (T+S)(max) J[2551] -1657.63 12.85 -97.61 0.11 326.52 -57.57
1983 ULT.1_4 (T+S)(max) I[2552] -1258.16 67.68 -71.59 10.43 -364.18 99.67
1983 ULT.1_4 (T+S)(max) 1 per 4 -1276.38 67.68 -71.59 10.43 -238.9 -12.29
1983 ULT.1_4 (T+S)(max) 2 per 4 -1294.6 67.68 -71.59 10.43 -113.62 -122.3
1983 ULT.1_4 (T+S)(max) 3 per 4 -1312.82 67.68 -71.59 10.43 17.88 -229.83
1983 ULT.1_4 (T+S)(max) J[2553] -1331.04 67.68 -71.59 10.43 237.59 -337.35
1976 ULT.4 (W) I[2538] -1270.85 -54.74 91.58 3.47 521.76 -107.75
1976 ULT.4 (W) 1 per 4 -1291.67 -54.74 91.58 3.47 338.59 1.73
1976 ULT.4 (W) 2 per 4 -1312.5 -54.74 91.58 3.47 155.42 111.22
1976 ULT.4 (W) 3 per 4 -1333.32 -54.74 91.58 3.47 -27.74 220.71
1976 ULT.4 (W) J[2539] -1354.14 -54.74 91.58 3.47 -210.91 330.2
1977 ULT.4 (W) I[2540] -1597.32 -20.16 132.2 -1.19 700.82 -34.11
1977 ULT.4 (W) 1 per 4 -1616.84 -20.16 132.2 -1.19 452.95 3.68
1977 ULT.4 (W) 2 per 4 -1636.36 -20.16 132.2 -1.19 205.08 41.48
1977 ULT.4 (W) 3 per 4 -1655.88 -20.16 132.2 -1.19 -42.79 79.28
1977 ULT.4 (W) J[2541] -1675.41 -20.16 132.2 -1.19 -290.67 117.08
1978 ULT.4 (W) I[2542] -1591.77 11.2 131.86 0.61 703.46 20.34
1978 ULT.4 (W) 1 per 4 -1611.3 11.2 131.86 0.61 456.23 -0.66
1978 ULT.4 (W) 2 per 4 -1630.82 11.2 131.86 0.61 208.99 -21.65
1978 ULT.4 (W) 3 per 4 -1650.34 11.2 131.86 0.61 -38.24 -42.65
1978 ULT.4 (W) J[2543] -1669.86 11.2 131.86 0.61 -285.48 -63.64
1979 ULT.4 (W) I[2544] -1273.15 62.85 102.23 -3.8 531.8 96.5
1979 ULT.4 (W) 1 per 4 -1291.38 62.85 102.23 -3.8 352.9 -13.48
1979 ULT.4 (W) 2 per 4 -1309.6 62.85 102.23 -3.8 173.99 -123.46
1979 ULT.4 (W) 3 per 4 -1327.82 62.85 102.23 -3.8 -4.91 -233.45
1979 ULT.4 (W) J[2545] -1346.04 62.85 102.23 -3.8 -183.82 -343.43
1980 ULT.4 (W) I[2546] -1265.83 -54.76 -78.38 -2.95 -479.81 -108
1980 ULT.4 (W) 1 per 4 -1286.66 -54.76 -78.38 -2.95 -323.04 1.53
1980 ULT.4 (W) 2 per 4 -1307.48 -54.76 -78.38 -2.95 -166.27 111.06
1980 ULT.4 (W) 3 per 4 -1328.3 -54.76 -78.38 -2.95 -9.51 220.59
1980 ULT.4 (W) J[2547] -1349.13 -54.76 -78.38 -2.95 147.26 330.12
1981 ULT.4 (W) I[2548] -1591.65 -19.89 -112.92 1.11 -640.34 -33.59
1981 ULT.4 (W) 1 per 4 -1611.17 -19.89 -112.92 1.11 -428.62 3.7
1981 ULT.4 (W) 2 per 4 -1630.69 -19.89 -112.92 1.11 -216.9 40.99
1981 ULT.4 (W) 3 per 4 -1650.22 -19.89 -112.92 1.11 -5.19 78.29
1981 ULT.4 (W) J[2549] -1669.74 -19.89 -112.92 1.11 206.53 115.58
1982 ULT.4 (W) I[2550] -1587.25 11.81 -115.17 -1.59 -651.43 21.65
1982 ULT.4 (W) 1 per 4 -1606.77 11.81 -115.17 -1.59 -435.49 -0.49
1982 ULT.4 (W) 2 per 4 -1626.29 11.81 -115.17 -1.59 -219.54 -22.63
1982 ULT.4 (W) 3 per 4 -1645.81 11.81 -115.17 -1.59 -3.6 -44.77
1982 ULT.4 (W) J[2551] -1665.33 11.81 -115.17 -1.59 212.35 -66.91
1983 ULT.4 (W) I[2552] -1266.78 63.7 -87.68 1.9 -481.23 97.78
1983 ULT.4 (W) 1 per 4 -1285 63.7 -87.68 1.9 -327.78 -13.7
1983 ULT.4 (W) 2 per 4 -1303.22 63.7 -87.68 1.9 -174.34 -125.18
1983 ULT.4 (W) 3 per 4 -1321.44 63.7 -87.68 1.9 -20.89 -236.66
1983 ULT.4 (W) J[2553] -1339.66 63.7 -87.68 1.9 132.55 -348.14
1976 ULT.5 (EQ) I[2538] -1268.4 -53.28 85.3 3.26 502.02 -106.14
1976 ULT.5 (EQ) 1 per 4 -1289.22 -53.28 85.3 3.26 331.42 2.78
1976 ULT.5 (EQ) 2 per 4 -1310.05 -53.28 85.3 3.26 160.82 115.61
1976 ULT.5 (EQ) 3 per 4 -1330.87 -53.28 85.3 3.26 -9.75 228.44
1976 ULT.5 (EQ) J[2539] -1351.69 -53.28 85.3 3.26 -180.18 341.28
1977 ULT.5 (EQ) I[2540] -1594.37 -17.99 122.64 -1.2 671.1 -30.67
1977 ULT.5 (EQ) 1 per 4 -1613.89 -17.99 122.64 -1.2 441.15 4.29
1977 ULT.5 (EQ) 2 per 4 -1633.42 -17.99 122.64 -1.2 211.21 46.03
1977 ULT.5 (EQ) 3 per 4 -1652.94 -17.99 122.64 -1.2 -18.72 87.78
1977 ULT.5 (EQ) J[2541] -1672.46 -17.99 122.64 -1.2 -248.63 129.53
1978 ULT.5 (EQ) I[2542] -1589.08 13.46 122.96 0.97 676.08 23.88
1978 ULT.5 (EQ) 1 per 4 -1608.6 13.46 122.96 0.97 445.52 0.12
1978 ULT.5 (EQ) 2 per 4 -1628.12 13.46 122.96 0.97 214.97 -17.27
1978 ULT.5 (EQ) 3 per 4 -1647.65 13.46 122.96 0.97 -15.59 -34.66
1978 ULT.5 (EQ) J[2543] -1667.17 13.46 122.96 0.97 -246.11 -52.06
1979 ULT.5 (EQ) I[2544] -1270.89 65.31 95.64 -3.07 514.32 99.07
1979 ULT.5 (EQ) 1 per 4 -1289.11 65.31 95.64 -3.07 346.95 -11.56
1979 ULT.5 (EQ) 2 per 4 -1307.33 65.31 95.64 -3.07 179.57 -118.43
1979 ULT.5 (EQ) 3 per 4 -1325.55 65.31 95.64 -3.07 12.21 -225.3
1979 ULT.5 (EQ) J[2545] -1343.77 65.31 95.64 -3.07 -154.98 -332.18
1980 ULT.5 (EQ) I[2546] -1268.22 -53.13 -84.78 -3.22 -500.17 -105.83
1980 ULT.5 (EQ) 1 per 4 -1289.04 -53.13 -84.78 -3.22 -330.6 2.78
1980 ULT.5 (EQ) 2 per 4 -1309.86 -53.13 -84.78 -3.22 -161.03 115.32
1980 ULT.5 (EQ) 3 per 4 -1330.69 -53.13 -84.78 -3.22 8.57 227.85
1980 ULT.5 (EQ) J[2547] -1351.51 -53.13 -84.78 -3.22 178.3 340.39
1981 ULT.5 (EQ) I[2548] -1594.45 -17.78 -122.77 1.09 -671.46 -30.23
1981 ULT.5 (EQ) 1 per 4 -1613.97 -17.78 -122.77 1.09 -441.28 4.33
1981 ULT.5 (EQ) 2 per 4 -1633.49 -17.78 -122.77 1.09 -211.09 45.68
1981 ULT.5 (EQ) 3 per 4 -1653.01 -17.78 -122.77 1.09 19.11 87.04
1981 ULT.5 (EQ) J[2549] -1672.53 -17.78 -122.77 1.09 249.33 128.39
1982 ULT.5 (EQ) I[2550] -1589.76 13.73 -124.36 -1.23 -680.24 24.46
1982 ULT.5 (EQ) 1 per 4 -1609.28 13.73 -124.36 -1.23 -447.08 0.2
1982 ULT.5 (EQ) 2 per 4 -1628.8 13.73 -124.36 -1.23 -213.91 -17.7
1982 ULT.5 (EQ) 3 per 4 -1648.32 13.73 -124.36 -1.23 19.26 -35.6
1982 ULT.5 (EQ) J[2551] -1667.85 13.73 -124.36 -1.23 252.47 -53.5
1983 ULT.5 (EQ) I[2552] -1268.97 65.52 -94.41 2.68 -499.35 99.11
1983 ULT.5 (EQ) 1 per 4 -1287.19 65.52 -94.41 2.68 -334.13 -11.89
1983 ULT.5 (EQ) 2 per 4 -1305.41 65.52 -94.41 2.68 -168.92 -119.12
1983 ULT.5 (EQ) 3 per 4 -1323.63 65.52 -94.41 2.68 -3.69 -226.36
1983 ULT.5 (EQ) J[2553] -1341.85 65.52 -94.41 2.68 161.71 -333.59
1976 ULT.1_2 (T+B)(min) I[2538] -1407.05 -102.66 64.02 -2.92 364.16 -166.37
1976 ULT.1_2 (T+B)(min) 1 per 4 -1427.87 -102.66 64.02 -2.92 236.12 33.68
1976 ULT.1_2 (T+B)(min) 2 per 4 -1448.7 -102.66 64.02 -2.92 108.07 232.57
1976 ULT.1_2 (T+B)(min) 3 per 4 -1469.52 -102.66 64.02 -2.92 -31.01 428.69
1976 ULT.1_2 (T+B)(min) J[2539] -1490.34 -102.66 64.02 -2.92 -252.28 624.8
1977 ULT.1_2 (T+B)(min) I[2540] -1757.28 -82.07 96.84 -1.32 527.63 -133.7
1977 ULT.1_2 (T+B)(min) 1 per 4 -1776.8 -82.07 96.84 -1.32 346.05 18.49
1977 ULT.1_2 (T+B)(min) 2 per 4 -1796.32 -82.07 96.84 -1.32 164.47 168.85
1977 ULT.1_2 (T+B)(min) 3 per 4 -1815.84 -82.07 96.84 -1.32 -37.62 317.93
1977 ULT.1_2 (T+B)(min) J[2541] -1835.37 -82.07 96.84 -1.32 -323.35 467.01
1978 ULT.1_2 (T+B)(min) I[2542] -1754.72 -49.18 96.65 1.47 530.29 -74.33
1978 ULT.1_2 (T+B)(min) 1 per 4 -1774.25 -49.18 96.65 1.47 349.08 17.18
1978 ULT.1_2 (T+B)(min) 2 per 4 -1793.77 -49.18 96.65 1.47 167.87 108.25
1978 ULT.1_2 (T+B)(min) 3 per 4 -1813.29 -49.18 96.65 1.47 -34.35 196.22
1978 ULT.1_2 (T+B)(min) J[2543] -1832.81 -49.18 96.65 1.47 -321.88 284.2
1979 ULT.1_2 (T+B)(min) I[2544] -1410.43 0.95 74.42 -8.09 386.65 39.31
1979 ULT.1_2 (T+B)(min) 1 per 4 -1428.65 0.95 74.42 -8.09 256.41 32.81
1979 ULT.1_2 (T+B)(min) 2 per 4 -1446.87 0.95 74.42 -8.09 126.17 20.24
1979 ULT.1_2 (T+B)(min) 3 per 4 -1465.09 0.95 74.42 -8.09 -10.29 7.66
1979 ULT.1_2 (T+B)(min) J[2545] -1483.31 0.95 74.42 -8.09 -234.96 -4.93
1980 ULT.1_2 (T+B)(min) I[2546] -1406.87 -102.51 -114.01 -12.79 -667.71 -166.06
1980 ULT.1_2 (T+B)(min) 1 per 4 -1427.69 -102.51 -114.01 -12.79 -439.69 33.69
1980 ULT.1_2 (T+B)(min) 2 per 4 -1448.52 -102.51 -114.01 -12.79 -211.67 232.28
1980 ULT.1_2 (T+B)(min) 3 per 4 -1469.34 -102.51 -114.01 -12.79 -20.56 428.1
1980 ULT.1_2 (T+B)(min) J[2547] -1490.16 -102.51 -114.01 -12.79 118.7 623.91
1981 ULT.1_2 (T+B)(min) I[2548] -1757.35 -81.86 -156.15 -1.22 -847.13 -133.26
1981 ULT.1_2 (T+B)(min) 1 per 4 -1776.87 -81.86 -156.15 -1.22 -554.36 18.53
1981 ULT.1_2 (T+B)(min) 2 per 4 -1796.4 -81.86 -156.15 -1.22 -261.59 168.49
1981 ULT.1_2 (T+B)(min) 3 per 4 -1815.92 -81.86 -156.15 -1.22 1.74 317.18
1981 ULT.1_2 (T+B)(min) J[2549] -1835.44 -81.86 -156.15 -1.22 199.35 465.87
1982 ULT.1_2 (T+B)(min) I[2550] -1755.4 -48.91 -158.25 -4.79 -858.73 -73.75
1982 ULT.1_2 (T+B)(min) 1 per 4 -1774.92 -48.91 -158.25 -4.79 -562 17.25
1982 ULT.1_2 (T+B)(min) 2 per 4 -1794.45 -48.91 -158.25 -4.79 -265.29 107.82
1982 ULT.1_2 (T+B)(min) 3 per 4 -1813.97 -48.91 -158.25 -4.79 2.56 195.29
1982 ULT.1_2 (T+B)(min) J[2551] -1833.49 -48.91 -158.25 -4.79 200.86 282.75
1983 ULT.1_2 (T+B)(min) I[2552] -1408.52 1.16 -130.91 -10.04 -686.2 39.35
1983 ULT.1_2 (T+B)(min) 1 per 4 -1426.74 1.16 -130.91 -10.04 -457.09 32.48
1983 ULT.1_2 (T+B)(min) 2 per 4 -1444.96 1.16 -130.91 -10.04 -227.99 19.55
1983 ULT.1_2 (T+B)(min) 3 per 4 -1463.18 1.16 -130.91 -10.04 -35.98 6.6
1983 ULT.1_2 (T+B)(min) J[2553] -1481.4 1.16 -130.91 -10.04 101.74 -6.35
1976 ULT.1_4 (T+S)(min) I[2538] -1407.56 -58.09 65.41 -5.45 371.41 -110.73
1976 ULT.1_4 (T+S)(min) 1 per 4 -1428.38 -58.09 65.41 -5.45 240.6 0.19
1976 ULT.1_4 (T+S)(min) 2 per 4 -1449.2 -58.09 65.41 -5.45 109.78 109.95
1976 ULT.1_4 (T+S)(min) 3 per 4 -1470.03 -58.09 65.41 -5.45 -32.07 216.94
1976 ULT.1_4 (T+S)(min) J[2539] -1490.85 -58.09 65.41 -5.45 -256.12 323.92
1977 ULT.1_4 (T+S)(min) I[2540] -1758.96 -21.42 97.26 -2.54 529.08 -37.26
1977 ULT.1_4 (T+S)(min) 1 per 4 -1778.48 -21.42 97.26 -2.54 346.72 1.2
1977 ULT.1_4 (T+S)(min) 2 per 4 -1798 -21.42 97.26 -2.54 164.35 37.82
1977 ULT.1_4 (T+S)(min) 3 per 4 -1817.52 -21.42 97.26 -2.54 -38.51 73.17
1977 ULT.1_4 (T+S)(min) J[2541] -1837.04 -21.42 97.26 -2.54 -325.01 108.52
1978 ULT.1_4 (T+S)(min) I[2542] -1753.19 10.14 96.88 -0.52 530.71 16.07
1978 ULT.1_4 (T+S)(min) 1 per 4 -1772.71 10.14 96.88 -0.52 349.05 -3.63
1978 ULT.1_4 (T+S)(min) 2 per 4 -1792.23 10.14 96.88 -0.52 167.4 -23.78
1978 ULT.1_4 (T+S)(min) 3 per 4 -1811.76 10.14 96.88 -0.52 -35.27 -47.02
1978 ULT.1_4 (T+S)(min) J[2543] -1831.28 10.14 96.88 -0.52 -323.24 -70.26
1979 ULT.1_4 (T+S)(min) I[2544] -1410.28 61.21 73.23 -11.08 379.97 92.66
1979 ULT.1_4 (T+S)(min) 1 per 4 -1428.5 61.21 73.23 -11.08 251.81 -19.29
1979 ULT.1_4 (T+S)(min) 2 per 4 -1446.72 61.21 73.23 -11.08 123.66 -137.31
1979 ULT.1_4 (T+S)(min) 3 per 4 -1464.94 61.21 73.23 -11.08 -10.71 -255.35
1979 ULT.1_4 (T+S)(min) J[2545] -1483.16 61.21 73.23 -11.08 -233.3 -373.39
1980 ULT.1_4 (T+S)(min) I[2546] -1407.16 -57.95 -114.91 -10.24 -673.43 -110.45
1980 ULT.1_4 (T+S)(min) 1 per 4 -1427.98 -57.95 -114.91 -10.24 -443.62 0.19
1980 ULT.1_4 (T+S)(min) 2 per 4 -1448.81 -57.95 -114.91 -10.24 -213.81 109.66
1980 ULT.1_4 (T+S)(min) 3 per 4 -1469.63 -57.95 -114.91 -10.24 -20.89 216.36
1980 ULT.1_4 (T+S)(min) J[2547] -1490.45 -57.95 -114.91 -10.24 120.16 323.06
1981 ULT.1_4 (T+S)(min) I[2548] -1758.73 -21.2 -155.83 0.01 -846.32 -36.82
1981 ULT.1_4 (T+S)(min) 1 per 4 -1778.25 -21.2 -155.83 0.01 -554.14 1.24
1981 ULT.1_4 (T+S)(min) 2 per 4 -1797.78 -21.2 -155.83 0.01 -261.97 37.46
1981 ULT.1_4 (T+S)(min) 3 per 4 -1817.3 -21.2 -155.83 0.01 0.76 72.41
1981 ULT.1_4 (T+S)(min) J[2549] -1836.82 -21.2 -155.83 0.01 197.78 107.36
1982 ULT.1_4 (T+S)(min) I[2550] -1753.6 10.42 -157.81 -2.82 -857.08 16.68
1982 ULT.1_4 (T+S)(min) 1 per 4 -1773.12 10.42 -157.81 -2.82 -561.18 -3.56
1982 ULT.1_4 (T+S)(min) 2 per 4 -1792.64 10.42 -157.81 -2.82 -265.3 -24.23
1982 ULT.1_4 (T+S)(min) 3 per 4 -1812.16 10.42 -157.81 -2.82 1.72 -48
1982 ULT.1_4 (T+S)(min) J[2551] -1831.68 10.42 -157.81 -2.82 199.19 -71.77
1983 ULT.1_4 (T+S)(min) I[2552] -1408.16 61.44 -129.21 -7.1 -678.16 92.75
1983 ULT.1_4 (T+S)(min) 1 per 4 -1426.38 61.44 -129.21 -7.1 -452.04 -19.61
1983 ULT.1_4 (T+S)(min) 2 per 4 -1444.6 61.44 -129.21 -7.1 -225.92 -138.04
1983 ULT.1_4 (T+S)(min) 3 per 4 -1462.82 61.44 -129.21 -7.1 -36.89 -256.48
1983 ULT.1_4 (T+S)(min) J[2553] -1481.04 61.44 -129.21 -7.1 97.84 -374.93