Professional Documents
Culture Documents
11-Detention Basin Grading Plan PDF
11-Detention Basin Grading Plan PDF
11
"CAM10" "H"
17
F 21
TOP OF SOIL
EXISTING POWER POLE 9
CEMENT LINING 6
(PROTECT IN PLACE)
4
2
3
5
"OUT"
14
APPROXIMATE 15
LIMITS OF
GRADING
19
22 10
STEPPED INFLOW
4:1 F
SPILLWAY #2
APPROXIMATE LIMITS
1800 PSI MIN 30
OF GRADING
13 12
8
5.0%
= 8628’06"
R = 60.40’
L = 91.16’ 20’
19
T = 56.79’ 4:1
16
STEPPED INFLOW
SPILLWAY #1
1800 PSI MIN AS-BUILT
Based on Contractor
Supplied Information Which
Has Not Been Field Verified By
G G The Louis Berger Group, Inc.
30 30
LEGEND
EARTHEN BOTTOM
HIGH STRENGTH
DETENTION BASIN
SOIL CEMENT LINING
LOW STRENGTH
APPROXIMATE SOIL CEMENT LINING
LIMITS OF GRADING
"EMB"
BASIS OF BEARING
18
SOUTH 8912’35" EAST, BEING THE NORTH LINE OF
THE NW 1/4 OF SECTION 26, T 19 S, R 59 E MDM,
CLARK COUNTY, NEVADA PER A RECORD OF SURVEY
TOP OF SOIL ON FILE WITH THE CLARK COUNTY RECORDER IN
14 FILE 88, PAGE 8.
CEMENT LINING
7
BENCHMARK
CLARK COUNTY BENCHMARK #1C9925SSW6, BEING A
RIVET AND SQUARE ALUMINUM PLATE IN NORTHEAST
D CORNER OF A CONCRETE BASE FOR A LARGE POWER
POLE (#40-80) AT THE WEST END OF ANN RD.
E 4:1
E 30 14
ELEV = 880.421 METERS (2888.51 FEET) NAVD 1988
30 30
4:1
CONSTRUCTION ITEMS
SEE SHEET 12
15
14
D
APPROXIMATE
30
LIMITS OF GRADING
2:1
TOP OF SOIL
CEMENT LINING
10:1
10:1
21’ 1
100 50 0 100 200
21’
2:1
Call Call
Before You Before You
Overhead D g DRAWING NO.
11
1-702-593-6111 1-800-227-2600
731-79 37