Professional Documents
Culture Documents
Gerbang
Masuk
BM.0
Gedung Kantor
Jembatan
Y= 10.114,012 Timbang
130,0
135,0
X= 10.095,442
135,0
2
T.2
0
0,
z= 90,02 .33
125,0
4
90,0
10
T. 2
2
120,0
128
,0
T.1
115,0
.13 BM.4
120 ,0
105
,0
133
3
T.3
125 ,0
115
=10.100
95,
.00
110
T.2
,0
Y= 9.750,106
T.4
100
110,0
92.94 7 .5
130,0
138
T.2
90.02
96.61 X= 10.066,825
.33 z= 102,73
105,0
91.27 87.41 110
5
T.2
9 .8 1
.75 134 .1
128 6 135
87.60 .6
142
1
85,0 84.14
T.2
3 .7
80.78 102
80.76 27.
81
1 .28
128
Program Studi Rekayasa Infrastruktur Lingkungan
85,0 85.72 90.56
Fakultas Teknik Sipil dan Lingkungan
84.90 .05 21
.22 140 25. 1
101 .15
90,0 86.41 145
Institut Teknologi Bandung
T.5
90.16
.80
.07 136
90.21 .37 130
124
.71
100
93.81 100.27
Tugas Asistensi Pra Rancang Landfill
106.76
IPST
105.36
106.33
105.61
104.97
105.36
103.43
107.77
0
T.2
.32
105
91 T.6
.48
=10.000 Gambar
105.14
.56
C
Site Plan TPA Kab. Muna
94
Zon
.14
.72
100,0
PEMBKARAN GASBIO
94
96
.37
a
89
96.44
.99
.51
1
90
96
9
6.2
.19
4
1
2.3
6.3
Dosen
10
.65
93
.44
9
11
2
T.1
10
.69
1.8
98
87
.56
,0
.57
90 ,0
80
11
80
85
.92
.34 91
91.28
B
91
Prof. Dr. Ir. Enri Damanhuri
Zon
85,0 95,0
80
.33 7
90,0
a
92 T.
.39
.43
.41
87
.82
.32
A
a
90
92
.23
.39
91
81
Dr. Mochammad Chaerul S.T., M.T.
81
90
T.1 .98
90
1
88.81
.29
.39
86
8
80.72
T.1
93
80.51
.14
Kania Salmaa
93
.99
.61
,0
.54
2 0
90
89
T.1 9
mat
799.24
87
85 .41
87.26 B
wet
.14
7
A
.82
.89
89.83
799.84
.78
.68
T
X=9.900
.29
7
89.08 79.85
88
79.82
6
3
8 .6
6
T.1
Instalasi Skala
.64
90
Satuan
7
,0
T.1
89
,0
6
85.8
95
T.9 6.96
.25 T.14
Pengolahan 85.3
6
9
.83
85
T
Lindi
T.1 5
BM.2
78
.60
0
.0
80 5,0
96
83
Y= 10.169,737
,0
8
meter
95,0
.26
X= 9.901,563 1:1500
,0
84
U
80
S
z= 94,78
.66
85
5 83
,0
B
T.1
.62
BM.3
6
T.1
83
0 1 2 3 4 5 CM Jumlah Gambar
Y= 9.860,637
X= 9.838,228
No. Gambar
0 SKALA 1 : 1500 75 M z= 83,62
Y=9.800
Y=10.100
Y=10.000
Y=9.900
1 7
X=9.800
KETERANGAN GAMBAR
Fill
Gambar
POTONGAN MEMANJANG A-A
Dosen
+91.28
+88.81
Satuan
+87.54
+87.26
+80.72
+79.41
+79.24
+85.14
+85.84
+79.84
+88.29
+90.39
+79.68
+91.39
+93.39
+92.39
ELEVASI (m)
1:1000 meter
2 7
Sel Sampah
KETERANGAN GAMBAR
Gali
Pagar TPA
Tugas Asistensi Pra Rancang Landfill
Fill
Gambar
POTONGAN MELINTANG B-B
Dosen
Datum ±70.00
Jarak (m) 4.5000 4.5000 3.5000 15.8000 4.7000 11.0000 9.5000 Prof. Dr. Ir. Enri Damanhuri
+91.50
Dr. I Made Wahyu Widyarsana S.T., M.T.
+91.00
+88.00
+88.50
+89.00
+90.00
+90.50
ELEVASI (m)
Dr. Mochammad Chaerul S.T., M.T.
Asisten : Elprida A Sianturi S.T.
Kania Salmaa
Skala Satuan
1:500 meter
3 7
KETERANGAN GAMBAR
Gambar
POTONGAN MELINTANG C-C
Dosen
94.56
93.19
Dikerjakan oleh : Kelompok B
94
ELEVASI (m)
93
Skala Satuan
1:300 meter
4 7
KETERANGAN GAMBAR
1.2000
Gambar
PROYEKSI
Dosen
+91.50
Satuan
+91.00
+88.00
+88.50
+89.00
+90.00
+90.50
ELEVASI (m)
1:300 meter
5 7
KETERANGAN GAMBAR
90
50
SETIAP 5 M DIISI BATU
SEPANJANG 60 CM LAPISAN GEOMEMBRANE
SEBAGAI PENAHAN
60
Program Studi Rekayasa Infrastruktur Lingkungan
DASAR DILUBANGI
Fakultas Teknik Sipil dan Lingkungan
(PERFORATED) Institut Teknologi Bandung
ALTERNATIF 1 TEKNIS TYPIKAL ANCHOR LINER Tugas Asistensi Pra Rancang Landfill
SKALA 1:15
Nama Gambar:
TYPIKAL ANCHOR LINER
50 90 Dosen
20 50 20 Prof. Dr. Ir. Enri Damanhuri
Dr. I Made Wahyu Widyarsana S.T., M.T.
Dr. Mochammad Chaerul S.T., M.T.
Asisten : Elprida A Sianturi S.T.
Kania Salmaa
LAPISAN
75
GEOMEMBRANE
Dikerjakan oleh : Kelompok B
96
Tanggal Pengumpulan : 25 April 2018
Skala Satuan
1 : 15 CM
PASIR URUG
LAPISAN GEOTEXTILE
No. Gambar Jumlah Gambar
Skala Satuan
TYPIKALPENUTUP AKHIR
SKALA 1:15 1:15 CM
7 7