Professional Documents
Culture Documents
299.37
381332.1680
215401.5730
15.2
0
BUILD UP AREA:
0
15.0
PROPOSED
MOSQUE
GROUND FLR = 270 SQ.M.
PHASE-2
100.00
12.06
STORES BUILDING
2.00
5.80 2.00 17.58 2.00 5.80
2.00
5.80 2.00 17.58 2.00 5.80
25.00
2.63
2.00
5.20 15.00
PROPOSED
18.00
RAMP UP
STORE
2.63
AUDITORIUM & OFFICER'S CLUB
25.00 A
HATCH
ACCESS
ACCESS HATCH
20.00
ACCESS HATCH
ACCESS HATCH
F.F.L.
DIA G.V. + 0.30
DIA G.V.
QNB ATM
DIA G.V.
54 mm 54 mm
54 mm ROOF
09-701-00
09-701-00
ROOF
1.90x4.30
AFS-1
DIA G.V.
DIA G.V. DIA G.V.
54mm
54mm 54mm
Y-STRAINER
80mm G.V. PN16
80mm G.V PN-16
76.1mm DIA DIA G.V.
DIA G.V. DIA G.V.
54 mm
54 mm 54 mm
Y-STRAINER
80mm G.V. PN16
2.63
TH
"INDICATIVE DRAWING ONLY"
R
2.00
O
5.20 15.00
N
PROPOSED NO. DATE BY DESCREPTION
18.00
RAMP UP
REVISIONS
2 KEY PLAN
ST A01 SCALE NTS
OFFICE STAMP :
2.63
MINISTRY OF INTERIOR
GENERAL DIRECTORATE OF LOGISTICS
PROJECT :
PROPOSED ONE STOREY
STORE ROOM AT
GUARDS DEPARTMENT
LOCATION :
AL SALWA
DRAWING TITLE :
TH
DATE : 02-25-2021
BA-808-ST-A01
LAST PRINTED: May 26,2021 09:17am