Professional Documents
Culture Documents
W E
M
AK
K
D
N
I
W
E1 1
AS ES
NK S
PH AS
TA NK
-06 RPH TA
09 -06
09 TE R
WA TE
WA
THIS DRAWING
E2
AS S
PH TANK
-07
09 TER
WA
QND
IUM 32.25
ITOR L =
AUD LEVE
04- R
FLOO
UND OPEN
ABOVE
GRO
T
DUC
. 90Ø
3 NOS ELV
ED &
POS
PRO TEL , DATA IED)
BUR
FOR CTLY
(DIRE
ED
OS
OP E
PR OR
ST
QND
NS 32.35
ASIO L =
OCC LEVE T
03- R DUC
UND
FLOO
. 150Ø CABLE
GRO 2 NOS MAIN
ED AL
+0.75
F.F.L
POS
PRO ELECTRIC IED)
GATE Y BUR
+0.30
S.S.L
+0.15
G.F.L
+0.75
F.F.L
+0.75
F.F.L
+0.15
G.F.L
RITY QND
+0.75
F.F.L
32.35
L=
SECU
ATE
LEVE
PRIV R
02- FLOO L=
ES
UND LEVE
+0.75
STOR R
F.F.L
F.F.L
QND
UND31.90
FHC GRO
A
10804.62
N
TIO
TA
+0.75
F.F.L
BS
09-06 PHASE 1
SU
FHC
E1
AS
PH
+0.30
-04
S.S.L
09
+0.75
F.F.L
+0.15
G.F.L
DING
BUIL QND
ON 32.25
RATI L=
INIST R LEVE
ADM FLOO
01-
UND
GRO
FHC
FHC
09-06 PHASE
TANKS1
FHC
FHC
381332.1
680
WATER TANKS
=
TATIO L
SPOR R LEVE
TRAN FLOOQND
06- UND
31.90
GRO
WATER TANKS
KEY PLAN
03- OCCASIONS ELV & DATA NETWORKS SYSTEM FOR THE PROPOSED
BUILDINGS SHALL BE CONNECTED TO THE EXISTING ELV &
GROUND FLOOR LEVEL = 32.35 QND DATA NETWORKS FROM THE NEAREST MANHOLES.
ALL THE CABLES, DUCTS & PIPES Etc. PASSING UNDER THE
PROPOSED BUILDINGS SHALL BE REROUTED / DIVERTED /
PROTECTED. CONTRACTOR SHALL PROPOSE SUITABLE
METHOD / DIVERSION ROUTE AND SHALL SUBMIT DETAILED
04- AUDITORIUM SHOP DRAWING FOR B.A.D. ENGINEERS APPROVAL BEFORE
GROUND FLOOR LEVEL = 32.25 QND STARTING EXCAVATION.
OPEN ABOVE
REVISIONS
OFFICE STAMP :
PROJECT :
GENERAL GUARDS DEPARTMENT
LOCATION :
+0.75
F.F.L
SALWA ROAD
DRAWING TITLE :
BA-808/ST-E-01
LAST PRINTED: Jun 10,2021 09:01am