DAFTAR HARGA BAHAN & UPAH KERJA


KABUPATEN GOWA TA.2014

with link

NO URAIAN SATUANKODE ANALISA HARGA SATUAN HARGA SATUAN HARGA SATUAN

DATARAN TINGGI DATARAN TINGGI


DATARAN RENDAH KOTA DESA
A. UPAH KERJA th 2014
1 Kepala Tukang Hari L- 073 Rp. 95,000 95,000 95,000
2 Mandor Hari L- 061 Rp. 115,000 115,000 115,000
3 Mekanik Terampil Hari L- 071 Rp. 95,000 95,000 95,000
4 Mekanik Semi Terampil Hari L- 072 Rp. 75,000 75,000 75,000
5 Operator Terampil Hari L- 081 Rp. 135,000 135,000 135,000
6 Operator Semi Terampil Hari L- 082 Rp. 105,000 105,000 105,000
7 Pembantu Operator Hari L- 083 Rp. 100,000 100,000 100,000
8 Sopir Terampil Hari L- 091 Rp. 95,000 95,000 95,000
9 Sopir Pribadi Hari L- 092 Rp. 95,000 95,000 95,000
10 Pembantu Sopir Hari L- 099 Rp. 72,500 72,500 72,500
12 Pekerja Kasar / Buruh Hari L- 101 Rp. 70,000 70,000 70,000
12 Pekerja Semi Terampil Hari L- 103 Rp. 72,500 72,500 72,500
13 PekerjaTerampil /pembantu instalatur Hari L- 106 Rp. 75,000 75,000 75,000
14 Tukang Batu Hari L- 079 Rp. 90,000 90,000 90,000
15 Tukang Kayu Hari L- 079 Rp. 90,000 90,000 90,000
16 Tukang Besi Hari L- 079 Rp. 90,000 90,000 90,000
17 Tukang Cat Hari L- 079 Rp. 90,000 90,000 90,000
18 Tukang Paving Hari L- 079 Rp. 90,000 90,000 90,000
19 Tukang Pipa Hari L- 079 Rp. 90,000 90,000 90,000
20 Tukang Las Hari L- 079 Rp. 90,000 90,000 90,000
21 Tukang Aluminium Hari L- 080 Rp. 90,000 90,000 90,000
22 Instalatur listrik Hari L- 079 Rp. 105,000 105,000 105,000

B. HARGA BAHAN
1 Asbes Lbr Rp. 56,000 58,800 61,740
2 Asbes Nok Lbr Rp. 51,500 54,075 56,779
3 Acuan dari kayu M3 M-180 Rp. 3,050,000 3,202,500 3,362,625
4 Agregat halus /Pasir Bersih M3 M 041 Rp. 148,500 182,350 191,468
5 Alat - alat kerja ( 3 set ) Setiap set M 170 Rp. 250,000 262,500 275,625
6 Atap Metal Sakura Roof Lbr Rp. 41,000 43,870 46,064
7 Atap Multi Roof Lbr Rp. 81,700 85,785 90,074
8 Atap Surya Roof Lbr Rp. 48,100 51,467 54,040
9 Atap Policarbonat M² Rp. 58,200 62,274 65,388
10 Long Spandek Type G550 AZ-100 T=0,4 mm, Lbr = 80 C M² 93,500
11 Nok Long Spandek Type G550 AZ-100 T=0.4 mm M' 61,500 -
12 Baja gulungan ukuran ringan Kg M161 Rp. 25,000 27,000 28,350
13 Baja anyaman bronjong Kg M162 Rp. 27,500 28,875 30,319
14 Baja baut- baut Kg M163 Rp. 36,750 38,588 40,517
15 Baja galvanisir Kg M-164 Rp. 46,725 49,061 51,514
16 Baja struktur Kg M-165 Rp. 20,570 21,670 22,754
17 Baja paku - paku jembatan Kg M-166 Rp. 23,730 24,917 26,162
19 Batu Bata Buah Rp. 600 624 655
20 Batu Tela Uk. 20x30x10 Buah Rp. 3,500 3,675 3,859
21 Batu batako 20 x 40 x 10 Buah Rp. 4,480 4,704 4,939
22 Batu Gunung M3 MR 010 Rp. 147,200 154,560 162,288
23 Batu Kali Besar M3 MR- 013 Rp. 146,900 154,245 161,957
24 Batu kali Kecil M3 M 014 Rp. 143,700 150,885 158,429
25 Batu Kapur Bongkahan M3 M- 082 Rp. 111,700 119,485 125,459
26 Abu Batu (Batu Pecah/Split 0,5 - 1 cm) M3 M-026 Rp. 294,250 308,963 324,411
27 Batu Pecah/Split 1 - 2 cm (chipping) M3 M- 025 Rp. 253,000 265,650 278,933
28 Batu Pecah/Split 2 - 3 cm M3 M- 024 Rp. 245,000 257,250 270,113
29 Batu Pecah 3 - 5 M3 M- 023 Rp. 243,000 255,150 267,908
30 Batu Pecah 5 - 7 M3 M- 022 Rp. 211,000 221,550 232,628
31 Batu Pecah 7 -10 M3 M- 021 Rp. 172,000 180,600 189,630
32 Batu Pecah 10 -15 M3 M- 020 Rp. 160,000 168,000 176,400
38 Bak Mandi Fibre Glass 70X70X66 bh Rp. 275,000 294,250 308,963
39 Bak Reservoir Fibre Glasskap.1000 lt bh Rp. 1,330,000 1,423,100 1,494,255
40 Bak Cuci Stailess Stell bh Rp. 495,000 529,650 556,133
41 Bak Wastafell+kran air Ex Toto unit Rp. 450,000 472,500 496,125
42 Buis Beton 1/2 Dia 20 cm bh Rp. 48,000 50,400 52,920
43 Besi Beton Polos Kg M- 167 Rp. 14,300 15,015 15,766
44 Besi Beton Ulir Kg Rp. 14,750 15,488 16,262
45 besi dia 6 - 12 m bt Rp. 29,000 31,030 32,582
46 besi dia 8 - 12 m bt Rp. 46,000 49,220 51,681
47 besi dia 10 - 12 m bt Rp. 68,300 73,081 76,735
48 besi dia 12 - 12 m bt Rp. 100,000 107,000 112,350
49 besi ulir dia.13 - bt Rp. 135,000 144,450 151,673
50 Besi Hollow 40.40.0.7 mm P=6 m M1 Rp. 24,640 25,872 27,166
51 Besi Hollow 20.40 0.7 mm P=6 m M1 Rp. 19,787 20,776 21,815
NO URAIAN SATUANKODE ANALISA HARGA SATUAN HARGA SATUAN HARGA SATUAN

DATARAN TINGGI DATARAN TINGGI


DATARAN RENDAH KOTA DESA
52 Besi Siku L 40.40.4-(6m) bt Rp. 12,133 12,740 13,377
53 Besi Streep (30x3 mm) m' Rp. 36,900 38,745 40,682
54 Beton Roster Buah Rp. 19,500 20,865 21,908
55 Bitumen ( Asphalt AC 60/70 ) Kg M 061 Rp. 13,110 13,220 13,440
55 Bitumen Asbuton ton M 062 Rp. 1,058,400 1,111,320 1,166,886
56 Bubungan Metal Sakura Roof Buah Rp. 47,300 49,665 52,148
57 Bubungan Multi Roof Buah Rp. 50,850 53,393 56,062
58 Bubungan Nok Genteng Beton Buah Rp. 27,500 29,425 30,896
59 Bubungan Surya Roof Buah Rp. 52,250 54,863 57,606
60 Cat Besi /baja Kg M- 090 Rp. 68,000 71,400 74,970
61 Cat Genteng Bias AGA 4 kg Kg Rp. 38,013 39,913 41,909
62 Cat Kayu Kg Rp. 56,373 59,192 62,152
63 Cat Meni Kg Rp. 21,964 23,063 24,216
64 Cat Tembok Aries Kg 15,300 16,065 16,868
65 Cat Tembok mETROLITE 5 kg Kg Rp. 21,560 22,638 23,770
66 Cat Tembok mowilex 2,5 kg Kg Rp. 57,200 60,060 63,063
67 Closet Duduk ex TOTO Lengkap Accessories Warna Putih Buah Rp. 1,732,800 2,889,000 3,033,450
68 Closet Duduk Ex KIA Lengkap (putih) Tangki Batu Buah Rp. 1,540,000 1,617,000 1,697,850
69 Closet Jongkok ex KIA Buah Rp. 210,000 224,700 235,935
70 Dempul Kayu Kucing Kg Rp. 23,400 24,610 25,841
71 Dop PVC Ø 4" Buah Rp. 29,800 31,290 32,855
72 Dop PVC Ø 3" Buah Rp. 20,200 21,210 22,271
73 Dop PVCt Ø 2" Buah Rp. 8,100 8,505 8,930
74 Elastomer Bearing Pad TYPE I (300+350+36) Buah Rp. 535,000 561,750 589,838
75 Elastomer Bearing Pad TYPE 2 (300+350+36) Buah Rp. 696,000 730,800 767,340
76 Elastomer Bearing Pad TYPE 3 (300+350+36) Buah Rp. 990,000 1,039,500 1,091,475
77 Engsel Jendela Biasa 777 Psg Rp. 29,700 31,779 33,368
78 Engsel Pintu 4" SES Psg Rp. 33,000 35,310 37,076
79 Eternit 1 x 1 Tabusmen Lbr Rp. 18,000 19,260 20,223
80 Expantion Joint M1 - Rp. 115,500 121,275 127,339
81 Amplas bh Rp. 1,440 1,512 1,588
82 Floor Drain Bh Rp. 27,000 28,890 30,335
83 Flux Oil ( untuk emulsi ) Liter M-063/064 Rp. 25,000 26,750 28,088
84 Hollow aluminium untuk rangka plafond m' Rp. 5,800 6,206 6,516
85 Hollow aluminium rangka plafond 40 x 40 x 2 mm m' Rp. 5,017 5,268 5,531
86 Hollow aluminium rangka plafond 40 x 20 x 2 mm m' Rp. 3,867 4,060 4,263
87 Hollow aluminium rangka plafond 40 x 40 x 8 mm m' Rp. 6,417 6,738 7,074
88 Hollow aluminium rangka plafond 40 x 20 x 8 mm m' Rp. 4,308 4,524 4,750
89 Kawat Penggantung Hollow aluminium m' Rp. 1,000 1,070 1,124
90 Aluminium Plat tipis lembar Rp. 10,000 10,700 11,235
91 Gemuk (Greese) Ltr Rp. 25,100 26,857 28,200
92 Genteng Beton Buah Rp. 11,500 12,075 12,679
93 Genteng Keramik KIA Buah Rp. 15,400 16,170 16,979
94 Genteng Metal Buah Rp. 58,100 62,167 65,275
95 Gorong - Gorong Beton dia. 30 (tanpa tulangan) M1 Rp. 100,000 105,000 110,250
96 Gorong - Gorong Beton dia. 40 (tanpa tulangan) M1 Rp. 137,500 144,375 151,594
97 Gorong - Gorong Beton dia 60 (tanpa tulangan) M1 M- 031 Rp. 154,300 162,015 170,116
98 Gorong - Gorong Beton dia 80 (tanpa tulangan) M1 M- 032 Rp. 168,400 176,820 185,661
99 Gorong - Gorong Beton dia. 100 (tanpa tulangan) M1 M- 033 Rp. 225,000 236,250 248,063
100 Grendel Jendela Buah Rp. 8,900 9,345 9,812
101 Grendel Pintu Buah Rp. 22,750 23,888 25,082
102 Gypsum Lbr Rp. 61,600 64,680 67,914
103 Les gypsum polos M Rp. 17,000 17,850 18,743
104 IJUK ikat Rp. 20,500 21,525 22,601
105 Kaca Polos 3 mm M2 Rp. 109,100 114,555 120,283
106 Kaca Polos 5 mm M2 Rp. 122,900 129,045 135,497
107 Kaca Rayben 3 mm M2 Rp. 115,000 120,750 126,788
108 Kaca Rayben 5 mm M2 Rp. 133,100 139,755 146,743
109 Kapur Hidrasi M3 M- 081 Rp. 170,625 179,156 188,114
110 Karet Alas Genteng 90 cm M' Rp. 11,600 12,180 12,789
111 Karet Pelapis double (kaca) kg Rp. 5,000 5,350 5,618
112 KaLSIBOARD 3,5 x 1200 x 2400 Lbr Rp. 64,260 67,473 70,847
113 KaLSIBOARD 4,5 x 1200 x 2400 Lbr Rp. 65,600 68,880 72,324
114 Kalsifuring CR 50 X 25 X 4000 (4 M) UNIT Rp. 42,360 44,478 46,702
115 Kalsifuring MR 38 X 13 X 4000 (4 M) UNIT Rp. 37,990 40,649 42,682
116 Kalsiscrew 6 x 20 (1500/dos) Dos Rp. 132,000 141,240 148,302
117 Kalsiscrew 8 ~ `10 (1000/dos) Dos Rp. 117,000 125,190 131,450
118 Kalsinail 3~4,5 (kait pada kayu) 2000/dos Dos Rp. 69,500 74,365 78,083
119 Kawat Beton /Bindrat Kg M- 168 Rp. 24,800 25,252 26,515
120 Kawat Las kg Rp. 25,200 26,964 28,312
121 Kawat Ram Ayakan M Rp. 28,100 30,067 31,570
122 Kayu Kls I (Balok) Sensow M3 Rp. 8,800,000 9,240,000 9,702,000
123 Kayu Kls I (Balok) Sawmil M3 Rp. 13,100,000 13,755,000 14,442,750
124 Kayu Kls I ( Papan ) Sawmil (bayam) M3 Rp. 15,000,000 15,750,000 16,537,500
NO URAIAN SATUANKODE ANALISA HARGA SATUAN HARGA SATUAN HARGA SATUAN

DATARAN TINGGI DATARAN TINGGI


DATARAN RENDAH KOTA DESA
125 Kayu Kls II (Balok) sawmill M3 Rp. 3,110,000 3,265,500 3,428,775
126 Kayu Kls II (Papan) sawmill M3 Rp. 3,780,000 3,969,000 4,167,450
127 Kayu Kls III (Balok) Lokal M3 Rp. 2,085,000 2,189,250 2,298,713
128 Kayu Kls III (Papan) Mal 2/30, 2/40 M3 Rp. 2,182,000 2,291,100 2,405,655
129 Kayu Balok Mall 4/6 M3 Rp. 1,450,000 1,522,500 1,598,625
130 Kayu les Profil 3x3 (4m) m' Rp. 5,250 8,325 8,741
131 Kayu les Profil 4x4 (4m) m' Rp. 6,500 9,950 10,448
132 Kayu les Profil 5x5 (4m) m' Rp. 9,000 13,200 13,860
133 Kayu Struktur M3 M-181 Rp. 7,350,000 7,717,500 8,103,375
134 Kayu Bakar M3 M-070 Rp. 178,000 186,900 196,245
135 Kayu Perancah 5/10-4 bt Rp. 41,700 44,619 46,850
136 Kayu Balok 3/5 bt Rp. 17,500 18,725 19,661
137 Kayu Balok 4/6 bt Rp. 29,000 31,030 32,582
138 Kayu Balok 5/7 bt Rp. 35,000 37,450 39,323
139 Kayu Balok 5/10 bt Rp. 51,700 55,319 58,085
140 Kayu Balok 5/12 bt Rp. 60,617 64,860 68,103
141 Kayu Balok 6/12 bt Rp. 78,400 82,320 86,436
142 Kayu Papan 2/20 lbr Rp. 50,400 52,920 55,566
143 Kerikil Berpasir Alami (Sirtu Royalti) M3 MR- 042 Rp. 105,000 110,250 115,763
144 Kerikil Sirtu M3 MR -011 Rp. 115,600 121,380 127,449
145 Kerosine ( Minyak Tanah ) Liter M-065 Rp. 10,000 11,123 11,679
146 Kertas Gosok Lbr Rp. 3,500 3,675 3,859
147 Kosen Aluminium BROWN 3" m' Rp. 22,550 23,678 24,861
148 Kosen Aluminium BROWN 4" m' Rp. 24,292 25,506 26,782
149 Aluminium Slimar 4″ Brown untuk Daun Jendela bt Rp. 173,250 181,913 191,008
150 Aluminium Slimar 3″ Brown untuk Daun Jendela bt Rp. 191,400 224,700 235,935
151 Kran Air SKL 1/2 Inci Buah Rp. 19,000 20,330 21,347
152 Kansteen beton k.300 (40/30/15) Buah Rp. 21,280 22,344 23,461
153 Kran Air SKL 3/4 Inci Buah Rp. 22,000 23,540 24,717
154 Kunci Tanam Yale 1 x Putar Buah Rp. 150,000 160,500 168,525
155 Kunci Tanam Yale 2 x Putar Buah Rp. 200,000 214,000 224,700
156 kunci Grendel Pintu Tanam (Expanyolet) Buah Rp. 100,000 107,000 112,350
157 Lambriziring t;:4 mm, (4 m’) lembar Rp. 14,000 14,980 15,729
158 Lampu hemat energy 8 Watt Buah Rp. 57,750 60,638 63,669
159 Lampu hemat energy 14 Watt Buah Rp. 51,249 53,811 56,502
160 Lampu hemat energy 18 Watt Buah Rp. 51,150 53,708 56,393
161 Lampu hemat energy 23 Watt Buah Rp. 63,259 66,422 69,743
162 Lampu TL 1 x 10 Watt Buah Rp. 45,000 47,250 49,613
163 Lampu TL 1 x 20 Watt Buah Rp. 50,000 52,500 55,125
164 Lampu TL 1 x 40 Watt Buah Rp. 60,000 63,000 66,150
165 Lampu TL 2 x 20 Watt Buah Rp. 100,000 105,000 110,250
166 Lem Kayu fox tube Rp. 16,000 17,120 17,976
167 Les Plafond Datar M1 Rp. 14,100 15,087 15,841
168 Les Plafont Profil M1 Rp. 15,600 16,692 17,527
169 Minyak Cat Ltr Rp. 29,150 30,608 32,138
170 Minyak Pelumas Liter M-185 Rp. 40,500 43,314 45,479
171 Mur Baut 5/8 Buah Rp. 5,100 5,457 5,730
172 Nok Genteng Surya ,pjg 40 cm bh Rp. 37,550 39,428 41,399
173 Paku 10, 7, 5, 4 cm Kg Rp. 18,978 19,927 20,923
174 Paku 2,5 , 2, 3 cm Kg Rp. 23,000 24,610 25,841
175 Paku Gypsun Kg Rp. 29,000 31,030 32,582
176 Paku Klem Kg Rp. 22,000 23,540 24,717
177 Paku Ramset bh Rp. 1,000 1,070 1,124
178 Paku Seng Kg Rp. 29,000 31,030 32,582
179 Paku Skrup biji Rp. 600 630 662
180 Paku Beton 8-10 dos Rp. 15,500 16,275 17,089
181 Pasir Beton M3 M 041 Rp. 148,500 182,350 191,468
182 Pasir Pasangan M3 M 043 Rp. 151,300 182,350 191,468
183 Pasir Timbunan/pasir alas/pengikat pilihan M3 M 040 Rp. 84,000 88,200 92,610
184 Paving Blok Kotak/ Bata T.8 cm K.225. Biji Rp. 1,500 1,605 1,685
185 Paving Blok Kotak/ Bata T.8 cm K.250. Biji Rp. 1,630 1,744 1,831
186 Paving Blok Kotak/ Bata T.8 cm K.300. Biji Rp. 1,750 1,873 1,966
187 Paving Blok Kotak/ Bata T.8 cm K.350. Biji Rp. 1,900 2,033 2,135
188 Paving Blok warna Biji Rp. 3,200 3,360 3,528
189 Pipa Besi GIP dia. 1/2" (Medium A) 6 M m' Rp. 33,467 35,809 37,600
190 Pipa Besi GIP dia. 3/4" (Medium A) 6 M m' Rp. 44,667 47,793 50,183
191 Pipa Besi GIP dia. 1" (Medium A) 4 M m' 83750 Rp. 55,000 89,613 94,093
192 Pipa Besi GIP dia. 1 1/2" (Medium A)6 M m' Rp. 140,500 150,335 157,852
193 Pipa Besi GIP dia. 2" (Medium A) 6M m' Rp. 170,000 178,500 187,425
194 Pipa Besi GIP dia. 2 1/2" (Medium A) 6 M m' Rp. 175,000 187,250 196,613
195 Pipa Besi GIP dia. 3" (Medium A) 6 M m' Rp. 264,000 277,200 291,060
196 Pipa Besi GIP dia. 4" (Medium A) 6 M m' Rp. 319,800 342,186 359,295
197 Pipa PVC dia. 1/2" AW 4 M m' 3,375 Rp. 7,800 8,346 8,763
198 Pipa PVC dia. 3/4" AW 4 M m' 4,125 Rp. 9,500 10,165 10,673
199 Pipa PVC dia. 1" AW 4 M m' 5,375 Rp. 12,000 12,600 13,230
200 Pipa PVC dia. 1 1/2" 4 M D m' 12,375 Rp. 12,200 12,810 13,451
201 Pipa PVC dia. 2" 4 M D m' 17,700 Rp. 13,700 14,385 15,104
NO URAIAN SATUANKODE ANALISA HARGA SATUAN HARGA SATUAN HARGA SATUAN

DATARAN TINGGI DATARAN TINGGI


DATARAN RENDAH KOTA DESA
202 Pipa PVC dia. 2 1/2" 4 M D m' Rp. 16,550 17,378 18,246
203 Pipa PVC dia.3" 4 M D m' 39,850 Rp. 20,875 21,919 23,015
204 Pipa PVC dia. 4" 4 M D m' 58,350 Rp. 36,300 38,115 40,021
205 Pipa PVC dia. 8" 4 M D m' Rp. 253,000 265,650 278,933
206 Plamur Kayu Kg Rp. 50,000 53,500 56,175
207 Plamur Tembok boyo dan setara (5kg) Kg Rp. 11,140 11,697 12,282
208 Plat besi lbr Rp. 425,000 446,250 468,563
209 Politur Teak Oil Kg Rp. 46,500 49,755 52,243
210 Plastik Tipis m2 Rp. 6,200 6,510 6,836
211 Pompa Air Sanyo 1 Unit Rp. 450,000 481,500 505,575
212 Pompa Tangan Buah Rp. 400,300 428,321 449,737
213 Premium Liter M-184 Rp. 6,600 6,955 7,303
214 Residu kayu Kg Rp. 50,100 53,607 56,287
215 Sambungan Pipa Keni 1 Inci PVC Buah Rp. 4,000 4,280 4,494
216 Sambungan Pipa Keni 1/2 Inci PVC Buah Rp. 3,000 3,210 3,371
217 Sambungan Pipa Keni 3/4 Inci PVC Buah Rp. 3,000 3,210 3,371
218 Sambungan Pipa Keni 2 Inci PVC Buah Rp. 25,450 26,723 28,059
219 Sambungan Pipa lurus 1/2" PVC Buah Rp. 4,000 4,200 4,410
220 Sambungan Pipa L . 1/2 Inci PVC Buah Rp. 4,000 4,200 4,410
221 Saringan Air Besi m2 Rp. 45,000 47,250 49,613
222 Saringan Air Plastik m2 Rp. 42,000 44,100 46,305
223 Sealent tube Rp. 50,500 53,500 56,175
224 Seal Tape roll Rp. 5,000 5,350 5,618
225 Semen Bosowa @ 50 kg Zak M- 080 Rp. 50,000 53,500 56,175
226 Semen Tonasa @ 50 kg Zak M- 080 Rp. 57,867 60,760 63,798
227 Semen Bosowa @ 40 kg Zak M- 080 Rp. 44,000 47,080 49,434
228 Semen Tonasa @ 40 kg Zak M- 080 Rp. 51,500 54,075 56,779
229 Semen Warna Kg Rp. 15,000 15,750 16,538
230 Sendi dan Roll Psg - Rp. 6,120,000 6,426,000 6,747,300
231 Seng Gelombang BJLS 0,20 (6 kaki) Kaki Rp. 8,000 8,400 8,820
232 Seng Gelombang BJLS 0,25 (6 kaki) Kaki Rp. 10,550 11,078 11,631
233 Seng Gelombang BJLS 0,30 (6 kaki) Kaki Rp. 12,500 13,375 14,044
234 Seng Gelombang BJLS 0,35 (6 kaki) Kaki Rp. 13,900 14,873 15,617
235 Seng Plat BJLS 0,20 30 CM 6kk Lbr Rp. 48,000 51,360 53,928
236 Seng Plat BJLS 0,22 6 kk Lbr Rp. 52,800 56,496 59,321
237 Seng Plat BJLS 0,30 6 kk Lbr Rp. 58,000 62,060 65,163
238 Seng Plat BJLS 0,35 6 kk Lbr Rp. 61,000 65,270 68,534
239 Kerikil Sungai royalti (tidak disaring) M3 MR-012 Rp. 104,000 141,500 148,575
240 Kerikil Sungai Tersaring M3 K 016 Rp. 125,000 170,000 178,500
241 Skrup beton / fixer bh Rp. 1,100 1,177 1,236
242 Solar Industri (Non Subsidi) Ltr M - 184 Rp. 13,250 13,913 14,608
243 Solar Subsidi Ltr M - 183 Rp. 5,800 6,090 6,395
244 Stand Nako Psg Rp. 135,100 144,557 156,122
245 Stop Kran dia. 1" Buah Rp. 67,600 72,332 78,119
246 Tanah Timbunan M3 M 050 Rp. 87,500 89,167 96,300
247 Tangki Air Fiber 1 m Excel
3
Buah Rp. 1,150,000 1,230,500 1,328,940
248 Tangki Air Fiber 2 m3 Excel Buah Rp. 2,800,000 2,996,000 3,235,680
249 Teakwood 120 x 240 /3 mm Lbr Rp. 89,000 95,230 102,848
250 Tee Gip Ø 1/2 Buah Rp. 6,700 7,169 7,743
251 Tee GIP Ø 2 " Buah Rp. 26,000 27,820 30,046
252 Tee GIP Ø 3/4 " Buah Rp. 6,000 6,300 6,804
253 Tee PVC Ø 1/2 " Buah Rp. 3,000 3,210 3,467
254 Tee PVC Ø 3/4 " Buah Rp. 3,000 3,210 3,467
255 Tee PVC Ø 1" Buah Rp. 4,000 4,280 4,622
256 Tee PVC Ø 1 1/4" Buah Rp. 7,500 8,025 8,667
257 Tee PVC Ø 1 1/2 " Buah Rp. 8,000 8,560 9,245
258 Tee PVC Ø 2" Buah Rp. 9,000 9,630 10,400
259 Tee PVC Ø 3" Buah Rp. 12,000 12,840 13,867
260 Tee PVC Ø 4" Buah Rp. 15,000 16,050 17,334
261 Tegel Keramik 20 x 20 dus Rp. 58,987 61,936 66,891
262 Tegel Keramik 20 x 25 dus Rp. 61,787 64,876 70,066
263 Tegel Keramik 30 x 30 dus Rp. 59,500 62,475 67,473
264 Tegel Keramik 40 x 40 dus Rp. 66,080 69,384 74,935
265 Tegel Keramik 60 x 60 dus Rp. 181,067 190,120 205,330
266 Tegel Keramik Anti Slip 20 x 20 dus Rp. 47,500 50,825 54,891
267 Tegel Keramik Anti Slip 30 x 30 dus Rp. 52,500 56,175 60,669
268 Tegel Perselin 10 x 20 dus Rp. 54,100 57,887 62,518
269 Tripleks 3 mm Lbr Rp. 51,500 54,075 58,401
270 Tripleks 4 mm Lbr Rp. 64,300 67,515 72,916
271 Tripleks 6 mm Lbr Rp. 78,800 89,880 97,070
272 Tripleks 9 mm Lbr Rp. 120,000 128,400 138,672
273 Urinoir Keramik Standar Buah Rp. 484,000 508,200 548,856
274 V. KNIE 3/4" (besi) Buah Rp. 8,050 8,453 9,129
275 V. KNIE 1" (besi) Buah Rp. 11,150 11,708 12,644
276 V Neple 3/4" (besi) Buah Rp. 7,150 7,508 8,108
277 V Neple 1" (besi) Buah Rp. 7,950 8,348 9,015
278 Wastafel Buah Rp. 402,500 422,625 456,435
279 C Aplus   Galvanis   CNP 75 tebal 0.75   m' Rp. 17,155 18,356 19,825
280 C Aplus   Galvalume CNP 75 tebal 0.75  m' Rp. 17,255 18,463 19,940
NO URAIAN SATUANKODE ANALISA HARGA SATUAN HARGA SATUAN HARGA SATUAN

DATARAN TINGGI DATARAN TINGGI


DATARAN RENDAH KOTA DESA
281 Reng Aplus Galvalume  Reng 33 tebal 0.45  m' Rp. 5,900 6,313 6,818
282 Screw Reng ( 1 pack/500 pcs )WT 10x16  pcs Rp. 350 368 397
283 Dynabolt/pcs 10x80  bh Rp. 1,550 1,659 1,791
284 Alumunium foil single/roll 50m x 1.2 m (PxL)  roll Rp. 310,300 332,021 358,583
285 Lakban foil / roll   roll Rp. 12,300 13,161 14,214
286 Genteng Metal Berpasir/m 2x4 daun tebal 0.25 jarak ren bh Rp. 56,300 60,241 65,060
287 Genteng Metal Colour/m   2x4 daun tebal 0.25 jarak reng 38.bh Rp. 48,900 52,323 56,509
288 NOK " C " Batuan / pcs Tebal 0.25 panjang 100cm  bh Rp. 33,300 35,631 38,481
289 NOK " C " Colour/ pcs  Tebal 0.25 panjang 75 cm    bh Rp. 25,300 27,071 29,237
290 Bondex (110cmx700cm) bh Rp. 95,300 101,971 110,129
291 NYY 4 x 6 MM² m' Rp. 57,300 17,120 18,490
292 NYY 2 x 1.5 MM² m' Rp. 7,000 7,490 8,089
293 NYM 3 x 2.5 MM² m' Rp. 10,800 11,340 12,247
294 NYM 2 x 1.5 MM² m' Rp. 8,450 8,873 9,582
295 NYM 2 x4 MM m' Rp. 10,800 11,340 12,247
296 NYM HY 4 x 1.5 MM² m' Rp. 8,000 8,400 9,072
297 NYM HY 3 x 1,5 MM² m' Rp. 13,500 14,445 15,601
298 NYM HY 3 x 2,5 MM² m' Rp. 7,500 8,025 8,667
299 Trafo Son T 400 w m' Rp. 579,100 608,055 656,699
300 Trafo Son T 250 w bh Rp. 368,500 386,925 417,879
301 Trafo Son T 150 w bh Rp. 253,000 265,650 286,902
302 Saklar Tunggal / saklaR Engkel in Clipsal bh Rp. 27,700 29,085 31,412
303 Saklar Tunggal / saklaR Engkel inBroco bh Rp. 16,500 38,520 41,602
304 Saklar Ganda / Serie in Clipsal bh Rp. 35,500 37,275 40,257
305 Saklar Ganda / Serie in Broco bh Rp. 23,100 24,255 26,195
306 Stop Kontak broco bh Rp. 19,250 20,213 21,830
307 Stop Kontak clipsal bh Rp. 27,800 29,190 31,525
308 Fitting ( elbow ,male bush, Joint coupling) bh Rp. 17,250 18,113 19,562
309 pipa dia 5/8"- 4m (jenis C untuk instalasi listrik) bt Rp. 10,000 10,700 11,556
310 pipa dia. 3/4"-4 m (jenis C untuk instalasi listrik) bt Rp. 32,000 34,240 36,979
311 klem kabel Meet Clips no.10 bh Rp. 5,000 5,350 5,778
312 klem kabel Meet Clips no.12 bh Rp. 7,000 7,490 8,089
313 inbow dos bh Rp. 3,500 3,745 4,045
314 dop PVC 3/4:" bh Rp. 3,450 3,623 3,912
315 Isolasi Unibel roll Rp. 8,400 8,820 9,526
316 Hausing Lampu bh Rp. 12,600 13,482 14,561
317 MCB 20 A 1 Phase bh Rp. 67,800 71,190 76,885
318 Panel SDP 250 A bh Rp. 45,000 48,150 52,002
319 Kabel Instalasi m' Rp. 16,750 17,588 18,995
320 Tee Dus 5/8 bh Rp. 12,000 12,600 13,608
321 Isolasi Gypsum Roll Rp. 35,000
322 Kait Angin Bh Rp. 20,000
323 Granit Lantai Type Starwhite, t = 2 cm M2 Rp. 420,000
324 Pek. Pas. Lampu RM 2 x 36 Bh Rp. 615,000
325 Pek. Pas. Lampu Downlight DL 9 Watt Bh Rp. 170,000
326 Woodplank T. 20 x 200 x 4000 mm M' Rp. 80,000
327 HPL Uk. 120 x 240 M2 Rp. 145,000
328 Teakwood Uk. 120x 240 x 3 mm lmbr Rp. 85,000
329 Cansteen Beton, Uk. 60 x 30 x 15 Bh Rp. 62,000

Makassar, 18 Oktober 2014

Konsultan Perencana
CV. MALLOMO ENGINEERING

S J A M S I R, ST.
Direktur
DAFTAR ANALISA
DATARAN RENDAH KAB.GOWA TA.2014

PEKERJAAN PERSIAPAN
1m' Pagar sementara dari kayu tinggi 2 mtr
Bahan
1.250 btg Kayu Perancah 5/10 x Rp. 41,700.00 Rp. 52,125.00
0.063 Kg Semen portland x Rp. 51,500.00 Rp. 3,218.75
0.005 m3 Pasir beton x Rp. 148,500.00 Rp. 742.50
0.009 m3 Koral beton x Rp. 243,000.00 Rp. 2,187.00
0.072 m3 Kayu 5/7 x Rp. 35,000.00 Rp. 2,520.00
0.060 kg Paku biasa 2" - 5" x Rp. 23,000.00 Rp. 1,380.00
0.400 ltr Residu kayu x Rp. 50,100.00 Rp. 20,040.00
Tenaga
0.200 oh Tukang kayu x Rp. 90,000.00 Rp. 18,000.00
0.400 oh Pekerja x Rp. 70,000.00 Rp. 28,000.00
0.020 oh Kepala Tukang x Rp. 95,000.00 Rp. 1,900.00
0.020 oh Mandor x Rp. 115,000.00 Rp. 2,300.00
Rp. 132,413.25

1 m' Pagar Sementara Dari Seng Gelombang Tinggi 2 m (6 kk)


Bahan
1.250 Btg Kayu Perancah 5/10 x Rp. 41,700.00 Rp. 52,125.00
0.063 Kg Semen Portland x Rp. 51,500.00 Rp. 3,218.75
12.000 ft Seng Gelombang BJLS 0,2 (6 kk) x Rp. 8,000.00 Rp. 96,000.00
0.005 M3 Pasir Beton x Rp. 148,500.00 Rp. 742.50
0.009 M3 Koral Beton x Rp. 243,000.00 Rp. 2,187.00
0.072 M3 Kayu 5/7 x Rp. 35,000.00 Rp. 2,520.00
0.060 Kg Paku Biasa 2"-5" x Rp. 23,000.00 Rp. 1,380.00
0.450 Kg Meni Besi x Rp. 21,964.29 Rp. 9,883.93
Tenaga 1 lbr
0.200 oh Tukang kayu x Rp. 90,000.00 Rp. 18,000.00
0.400 oh Pekerja x Rp. 70,000.00 Rp. 28,000.00
0.020 oh Kepala Tukang x Rp. 95,000.00 Rp. 1,900.00
0.020 oh Mandor x Rp. 115,000.00 Rp. 2,300.00
Rp. 218,257.18

1 m' Pengukuran dan pemasangan bowplank


Bahan
0.012 M3 Kayu Kelas II balok x Rp. 3,110,000.00 Rp. 37,320.00
0.020 kg Paku Biasa 2"-5" x Rp. 23,000.00 Rp. 460.00
0.007 M3 Kayu Kelas II Papan x Rp. 3,780,000.00 Rp. 26,460.00
Tenaga Tenaga
0.100 oh Tukang kayu x Rp. 90,000.00 Rp. 9,000.00
0.100 oh Pekerja x Rp. 70,000.00 Rp. 7,000.00
0.010 oh Kepala Tukang x Rp. 95,000.00 Rp. 950.00
0.005 oh Mandor x Rp. 115,000.00 Rp. 575.00
Rp. 81,765.00

1 m2 Pembuatan Kantor Sementara, Dengan lantai Pelesteran


Bahan
1.250 Btg Kayu Perancah 5/10 x Rp. 51,699.67 Rp. 64,624.58
0.180 M3 Kayu x Rp. 2,085,000.00 Rp. 375,300.00
0.850 Kg Kayu Biasa x Rp. Rp. -
1.100 Kg Besi Strip x Rp. 36,900.00 Rp. 40,590.00
0.875 Kg Semen PC x Rp. 51,500.00 Rp. 45,062.50
0.150 M3 Pasir Pasangan x Rp. 151,300.00 Rp. 22,695.00
0.100 M3 Pasir beton x Rp. 148,500.00 Rp. 14,850.00
0.150 M3 Koral Beton x Rp. 243,000.00 Rp. 36,450.00
30.000 Bh Bata Merah x Rp. 600.00 Rp. 18,000.00
0.250 Lbr Seng Plat x Rp. 48,000.00 Rp. 12,000.00
2.000 Bh Jendela Naco x Rp. 20,500.00 Rp. 41,000.00
0.080 M2 Kaca Polos x Rp. 109,100.00 Rp. 8,728.00
0.150 bh Kunci tanam x Rp. 100,000.00 Rp. 15,000.00
0.060 lbr Polywood 4 mm x Rp. 64,300.00 Rp. 3,858.00

TRIWULAN IV(Keempat )

- hal 1 -

6
Tenaga
2.000 oh Tukang Kayu x Rp. 90,000.00 Rp. 180,000.00
1.000 oh Tukang Batu x Rp. 90,000.00 Rp. 90,000.00
2.000 oh Pekerja x Rp. 70,000.00 Rp. 140,000.00
0.300 oh Kepala Tukang x Rp. 95,000.00 Rp. 28,500.00
0.050 oh Mandor x Rp. 115,000.00 Rp. 5,750.00
Rp. 1,142,408.08

1 m2 Pembuatan Gudang semen dan Alat-alat


Bahan
1.700 Btg Kayu Perancah 5/10 x Rp. 51,699.67 Rp. 87,889.43
0.210 M3 Kayu Kelas II balok x Rp. 3,110,000.00 Rp. 653,100.00
0.300 Kg Paku Biasa x Rp. 18,977.78 Rp. 5,693.33
0.263 Kg Semen PC x Rp. 51,500.00 Rp. 13,518.75
0.030 M3 Pasir beton x Rp. 148,500.00 Rp. 4,455.00
0.050 M3 Koral Beton x Rp. 243,000.00 Rp. 12,150.00
0.250 Lbr Seng Gelombang Bjl 32 x Rp. 13,900.00 Rp. 3,475.00
Tenaga
2.000 oh Tukang kayu x Rp. 90,000.00 Rp. 180,000.00
1.000 oh Pekerja x Rp. 70,000.00 Rp. 70,000.00
0.200 oh Kepala Tukang x Rp. 95,000.00 Rp. 19,000.00
0.050 oh Mandor x Rp. 115,000.00 Rp. 5,750.00
Rp. 1,055,031.52

1 m2 Pembuatan Rumah jaga / konstruksi kayu


Bahan
3.000 btg Kayu Perancah 5/10 x Rp. 51,699.67 Rp. 155,099.00
0.276 M3 Kayu Kelas II balok x Rp. 3,110,000.00 Rp. 858,360.00
0.700 kg Paku Biasa x Rp. 18,977.78 Rp. 13,284.44
1.500 lbr Seng Gelombang Bjl 32 x Rp. 13,900.00 Rp. 20,850.00
Tenaga
1.500 oh Tukang kayu x Rp. 90,000.00 Rp. 135,000.00
1.000 oh Pekerja x Rp. 70,000.00 Rp. 70,000.00
0.150 oh Kepala Tukang x Rp. 95,000.00 Rp. 14,250.00
0.050 oh Mandor x Rp. 115,000.00 Rp. 5,750.00
Rp. 1,272,593.44

1 m2 Pembersihan Lapangan dan Peralatan


Tenaga
0.100 oh Pekerja x Rp. 70,000.00 Rp. 7,000.00
0.050 oh Mandor x Rp. 115,000.00 Rp. 5,750.00
Rp. 12,750.00

1 m2 Pembuatan bedeng buruh


Bahan
1.250 M3 Kayu Perancah 5/10 x Rp. 51,699.67 Rp. 64,624.58
0.186 M3 Kayu Kelas II balok x Rp. 3,110,000.00 Rp. 578,460.00
0.300 kg Paku Biasa x Rp. 18,977.78 Rp. 5,693.33
0.450 kg Semen PC x Rp. 51,500.00 Rp. 23,175.00
0.030 M3 Pasir beton x Rp. 148,500.00 Rp. 4,455.00
0.050 M3 Koral Beton x Rp. 243,000.00 Rp. 12,150.00
1.500 lbr Seng Gelombang Bjl 32 x Rp. 13,900.00 Rp. 20,850.00
1.350 lbr Polywood 4 mm x Rp. 64,300.00 Rp. 86,805.00
Tenaga
2.000 oh Tukang kayu x Rp. 90,000.00 Rp. 180,000.00
1.000 oh Pekerja x Rp. 70,000.00 Rp. 70,000.00
0.200 oh Kepala Tukang x Rp. 95,000.00 Rp. 19,000.00
0.050 oh Mandor x Rp. 115,000.00 Rp. 5,750.00
Rp. 1,070,962.92

1 m2 Pembuatan jalan sementara


Bahan
0.150 M3 Batu belah 15/20 x Rp. 146,900.00 Rp. 22,035.00
0.090 M3 Batu pecah 5/7 x Rp. 211,000.00 Rp. 18,990.00
0.010 M3 Pasir pasang x Rp. 151,300.00 Rp. 1,513.00
Tenaga
1.000 oh Pekerja x Rp. 70,000.00 Rp. 70,000.00
0.050 oh Mandor x Rp. 115,000.00 Rp. 5,750.00
Rp. 118,288.00

TRIWULAN IV(Keempat )

- hal 2 -
1 m2 Pekerjaan Kantor Direksi Keet ###
Bahan

7
0.100 m3 Kayu kls II (balok) x Rp. 3,110,000.00 Rp. 311,000.00
0.250 kg Paku Biasa 2"-5" x Rp. 23,000.00 Rp. 5,750.00
0.183 lbr seng gelombang x Rp. 8,000.00 Rp. 1,466.67
1.440 lbr Tripleks 3 mm x Rp. 51,500.00 Rp. 74,160.00
5.000 kg Semen PC x Rp. 51,500.00 Rp. 257,500.00
0.250 m3 Pasir pasangan x Rp. 151,300.00 Rp. 37,825.00
70.000 bh Bata merah x Rp. 600.00 Rp. 42,000.00
0.020 ls Peralatan x Rp. 100,000.00 Rp. 2,000.00
0.150 ls Ongkos x Rp. 50,000.00 Rp. 7,500.00

Tenaga
0.1000 oh Tukang Kayu x Rp. 90,000.00 Rp. 9,000.00
0.1000 oh Pekerja x Rp. 70,000.00 Rp. 7,000.00
0.0100 oh Kepala Tukang x Rp. 95,000.00 Rp. 950.00
0.0050 oh Mandor x Rp. 115,000.00 Rp. 575.00
Rp. 756,726.67

PEKERJAAN TANAH
Timbunan Tanah 1 m3

1.2 m3 Tanah Timbunan x Rp. 87,500.00 Rp. 105,000.00

0.3000 Pekerja x Rp. 70,000.00 Rp. 21,000.00


0.0100 Mandor x Rp. 115,000.00 Rp. 1,150.00
Jumlah Rp. 127,150.00

Menggali 1 m3 tanah biasa


0.7500 Pekerja x Rp. 70,000.00 Rp. 52,500.00
0.0250 Mandor x Rp. 115,000.00 Rp. 2,875.00
Jumlah Rp. 55,375.00

SNI 2835:2008
Menggali 1 m3 tanah biasa sedalam 2 meter
0.9000 Pekerja x Rp. 70,000.00 Rp. 63,000.00
0.0450 Mandor x Rp. 115,000.00 Rp. 5,175.00
Jumlah Rp. 68,175.00

SNI 2835:2008
Menggali 1 m3 tanah biasa sedalam 3 meter
1.0500 Pekerja x Rp. 70,000.00 Rp. 73,500.00
0.0670 Mandor x Rp. 115,000.00 Rp. 7,705.00
Jumlah Rp. 81,205.00

SNI 2835:2008
Menggali 1 m3 tanah keras sedalam 1 meter
1.0000 Pekerja x Rp. 70,000.00 Rp. 70,000.00
0.0320 Mandor x Rp. 115,000.00 Rp. 3,680.00
Jumlah Rp. 73,680.00

SNI 2835:2008
Menggali 1 m3 tanah lumpur sedalam 1 meter
1.2000 Pekerja x Rp. 70,000.00 Rp. 84,000.00
0.0450 Mandor x Rp. 115,000.00 Rp. 5,175.00
Jumlah Rp. 89,175.00

SNI 2835:2008
Menggali 1 m3 Tanah cadas sedalam 1 meter
1.5000 Pekerja x Rp. 70,000.00 Rp. 105,000.00
0.0600 Mandor x Rp. 115,000.00 Rp. 6,900.00
Jumlah Rp. 111,900.00

SNI 2835:2008
Mengerjakan 1 m2 Stripping tebing setinggi 1 meter
0.0500 Pekerja x Rp. 70,000.00 Rp. 3,500.00
0.0050 Mandor x Rp. 115,000.00 Rp. 575.00
Jumlah Rp. 4,075.00

SNI 2835:2008
Membuang 1 m3 Tanah sejauh 15 meter
0.3300 Pekerja x Rp. 70,000.00 Rp. 23,100.00
0.0100 Mandor x Rp. 115,000.00 Rp. 1,150.00
Jumlah Rp. 24,250.00

TRIWULAN IV(Keempat )
0
- hal 3 -
SNI 2835:2008 ###
Mengurug Kembali 1 m3 galian (1/3 indeks pek.Galian)
0.2500 Pekerja x Rp. 70,000.00 Rp. 17,500.00

8
0.0083 Mandor x Rp. 115,000.00 Rp. 958.33
Jumlah Rp. 18,458.33

SNI 2835:2008
Memadatkan 1 m3 tanah (per 20 cm)
0.5000 Pekerja x Rp. 70,000.00 Rp. 35,000.00
0.0500 Mandor x Rp. 115,000.00 Rp. 5,750.00
Jumlah Rp. 40,750.00

SNI 2835:2008
Mengurug 1 m3 Pasir Urug
1.2000 M3 Pasir Timbunan x Rp. 84,000.00 Rp. 100,800.00
0.3000 Pekerja x Rp. 70,000.00 Rp. 21,000.00
0.0100 Mandor x Rp. 115,000.00 Rp. 1,150.00
Jumlah Rp. 122,950.000

1 m3 Pek. Timbunan Sirtu


1.2000 M3 Sirtu x Rp. 104,000.00 Rp. 124,800.00
0.3000 Pekerja x Rp. 70,000.00 Rp. 21,000.00
0.0100 Mandor x Rp. 115,000.00 Rp. 1,150.00
Jumlah Rp. 146,950.00

SNI 2835:2008
Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan
1.2000 M3 Sirtu x Rp. 104,000.00 Rp. 124,800.00
0.2500 Pekerja x Rp. 70,000.00 Rp. 17,500.00
0.0250 Mandor x Rp. 115,000.00 Rp. 2,875.00
Jumlah Rp. 145,175.00

1 m3 Pembuangan tanah sejauh 150 meter


Tenaga
0.516 Oh Pekerja x Rp. 70,000.00 Rp. 36,120.00
0.050 Oh Mandor x Rp. 115,000.00 Rp. 5,750.00
Rp. 41,870.00

1 m2 Pembuatan jalan sementara, tebal 25 cm


Bahan
0.275 M3 Batu belah 15/20 x Rp. 146,900.00 Rp. 40,397.50
0.030 M3 Kerikil x Rp. 146,900.00 Rp. 4,407.00
0.050 M3 Pasir x Rp. 84,000.00 Rp. 4,200.00
Tenaga
1.000 oh Pekerja x Rp. 70,000.00 Rp. 70,000.00
0.100 oh Mandor x Rp. 115,000.00 Rp. 11,500.00
Rp. 130,504.50

PEKERJAAN PONDASI

1 m3 Pasangan Pondasi siklop 40% batu kali


Bahan
75.000 kg Besi beton x Rp. 14,300.00 Rp. 1,072,500.00
5.050 kg Semen Pc x Rp. 51,500.00 Rp. 260,075.00
0.320 M3 Pasir beton x Rp. 148,500.00 Rp. 47,520.00
0.490 M3 Koral beton x Rp. 243,000.00 Rp. 119,070.00
0.800 kg Kawat beton x Rp. 24,800.00 Rp. 19,840.00

Tenaga
3.000 oh Pekerja x Rp. 70,000.00 Rp. 210,000.00
0.850 oh Tukang Batu x Rp. 90,000.00 Rp. 76,500.00
0.085 oh Kepala Tukang x Rp. 95,000.00 Rp. 8,075.00
0.150 oh Mandor x Rp. 115,000.00 Rp. 17,250.00
Rp. 1,830,830.00

1 m3 Pasangan Pondasi Sumuran diameter 100 cm


Bahan
0.450 M3 Batu Belah 15/20 x Rp. 146,900.00 Rp. 66,105.00
7.000 kg Semen Pc x Rp. 51,500.00 Rp. 360,500.00
0.450 M3 Pasir beton x Rp. 148,500.00 Rp. 66,825.00
0.670 M3 Koral beton x Rp. 146,900.00 Rp. 98,423.00

TRIWULAN IV(Keempat )
0
- hal 4 -
Tenaga
2.380 oh Pekerja x Rp. 70,000.00 Rp. 166,600.00
0.300 oh Tukang Batu x Rp. 90,000.00 Rp. 27,000.00
0.030 oh Kepala Tukang x Rp. 95,000.00 Rp. 2,850.00

9
0.080 oh Mandor x Rp. 115,000.00 Rp. 9,200.00
Rp. 797,503.00

1 m1 Pembuatan tiang pancang (35x35) cm, beton bertulang


Bahan
0.016 M3 Pasir urug darat x Rp. 84,000.00 Rp. 1,344.00
0.080 M3 Pasir beton x Rp. 148,500.00 Rp. 11,880.00
0.125 M3 Koral beton x Rp. 243,000.00 Rp. 30,375.00
1.225 kg Semen Pc x Rp. 51,500.00 Rp. 63,087.50
34.500 kg Besi beton x Rp. 14,300.00 Rp. 493,350.00
0.700 kg Kawat beton x Rp. 24,800.00 Rp. 17,360.00
0.027 M3 Kayu kaso 5/7 x Rp. 35,000.00 Rp. 945.00
0.120 kg Paku x Rp. 23,000.00 Rp. 2,760.00
0.090 ltr Minyak bekisting x Rp. 40,500.00 Rp. 3,645.00
0.200 kg Plamur tembok x Rp. 11,140.00 Rp. 2,228.00
Tenaga ###
0.800 oh Pekerja x Rp. 70,000.00 Rp. 56,000.00
0.500 oh Tukang Batu x Rp. 90,000.00 Rp. 45,000.00
0.050 oh Kepala Tukang x Rp. 95,000.00 Rp. 4,750.00
0.040 oh Mandor x Rp. 115,000.00 Rp. 4,600.00
Rp. 737,324.50

1 m3 Pek. Urugan Pasir Bawah Pondasi / Lantai


1.2000 M3 Pasir Urug x Rp. 84,000.00 Rp. 100,800.00
0.3000 Pekerja x Rp. 70,000.00 Rp. 21,000.00
0.0100 Mandor x Rp. 115,000.00 Rp. 1,150.00
Jumlah Rp. 122,950.00

SNI 2836:2008
Memasang 1 m3 batu kosong (anstamping)
1.2000 M3 Batu Kali (batu belah 15/20 cm x Rp. 146,900.00 Rp. 176,280.00
0.4320 M3 Pair Uurg x Rp. 84,000.00 Rp. 36,288.00
0.7800 Pekerja x Rp. 70,000.00 Rp. 54,600.00
0.3900 Tukang Batu x Rp. 90,000.00 Rp. 35,100.00
0.0390 Kepala Tukang x Rp. 95,000.00 Rp. 3,705.00
0.0390 Mandor x Rp. 115,000.00 Rp. 4,485.00
Jumlah Rp. 310,458.00

SNI 2836:2008
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 PP
1.2000 M3 Batu Kali (batu belah 15/20 cm x Rp. 146,900.00 Rp. 176,280.00
4.0400 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 233,781.33
0.4850 M3 Pasir Pasangan x Rp. 151,300.00 Rp. 73,380.50
0.7500 Tukang Batu x Rp. 90,000.00 Rp. 67,500.00
0.0750 Kepala Tukang x Rp. 95,000.00 Rp. 7,125.00
1.5000 Pekerja x Rp. 70,000.00 Rp. 105,000.00
0.0750 Mandor x Rp. 115,000.00 Rp. 8,625.00
Jumlah Rp. 671,691.83

SNI 2836:2008
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP
1.2000 M3 Batu Kali (batu belah 15/20 cm x Rp. 146,900.00 Rp. 176,280.00
3.2600 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 188,645.33
0.5220 M3 Pasir Pasangan x Rp. 151,300.00 Rp. 78,978.60
0.7500 Tukang Batu x Rp. 90,000.00 Rp. 67,500.00
0.0750 Kepala Tukang x Rp. 95,000.00 Rp. 7,125.00
1.5000 Pekerja x Rp. 70,000.00 Rp. 105,000.00
0.0750 Mandor x Rp. 115,000.00 Rp. 8,625.00
Jumlah Rp. 632,153.93

SNI 2836:2008
Memasang 1 m3 Pondasi batu belah, campuran 1 PC : 5 PP
1.2000 M3 Batu Kali (batu belah 15/20 cm x Rp. 146,900.00 Rp. 176,280.00
2.7200 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 157,397.33
0.5440 M3 Pasir Pasangan x Rp. 151,300.00 Rp. 82,307.20
0.7500 Tukang Batu x Rp. 90,000.00 Rp. 67,500.00
0.0750 Kepala Tukang x Rp. 95,000.00 Rp. 7,125.00
1.5000 Pekerja x Rp. 70,000.00 Rp. 105,000.00
0.0750 Mandor x Rp. 115,000.00 Rp. 8,625.00
Jumlah Rp. 604,234.53

TRIWULAN IV(Keempat )
0
- hal 5 -

PEKERJAAN DINDING ###

1 m3 Pasangan Batu Bata 1 Pc:3 Ps


Bahan SNI 2836:200

10
800.000 bh Bata Merah x Rp. 600.00 Rp. 480,000.00
3.936 ZAK Semen PC 50 KG x Rp. 57,866.67 Rp. 227,763.20
0.378 m3 Pasir Pasangan x Rp. 151,300.00 Rp. 57,191.40
Tenaga ###
4.500 oh Pekerja x Rp. 70,000.00 Rp. 315,000.00
1.500 oh Tukang Batu x Rp. 90,000.00 Rp. 135,000.00
0.150 oh Kepala Tukang x Rp. 95,000.00 Rp. 14,250.00
0.225 oh Mandor x Rp. 115,000.00 Rp. 25,875.00
Rp. 1,255,079.60

1 m3 Pasangan Batu Bata 1 Pc:5 Ps


Bahan
800.000 bh Bata Merah x Rp. 600.00 Rp. 480,000.00
1.972 kg Semen PC 50 KG x Rp. 57,866.67 Rp. 114,113.07
0.396 m3 Pasir Pasangan x Rp. 151,300.00 Rp. 59,914.80
Tenaga
4.500 oh Pekerja x Rp. 70,000.00 Rp. 315,000.00
1.500 oh Tukang Batu x Rp. 90,000.00 Rp. 135,000.00
0.150 oh Kepala Tukang x Rp. 95,000.00 Rp. 14,250.00
0.225 oh Mandor x Rp. 115,000.00 Rp. 25,875.00
Rp. 1,144,152.87

1 m3 Pasangan Trasraam Batu Bata 1 pc:2 psr


Bahan
800.000 bh Bata Merah x Rp. 600.00 Rp. 480,000.00
4.120 kg Semen PC 50 KG x Rp. 57,866.67 Rp. 238,410.67
0.333 m3 Pasir Pasangan x Rp. 151,300.00 Rp. 50,428.29
Tenaga
4.500 oh Pekerja x Rp. 70,000.00 Rp. 315,000.00
1.500 oh Tukang Batu x Rp. 90,000.00 Rp. 135,000.00
0.150 oh Kepala Tukang x Rp. 95,000.00 Rp. 14,250.00
0.225 oh Mandor x Rp. 115,000.00 Rp. 25,875.00
Rp. 1,258,963.96

1 m3 Pasangan Trasraam Batu Bata 1 pc:4 psr


Bahan
800.000 bh Bata Merah x Rp. 600.00 Rp. 480,000.00
2.530 kg Semen PC 50 KG x Rp. 57,866.67 Rp. 146,402.67
0.406 m3 Pasir Pasangan x Rp. 151,300.00 Rp. 61,427.80
Tenaga
4.500 oh Pekerja x Rp. 70,000.00 Rp. 315,000.00
1.500 oh Tukang Batu x Rp. 90,000.00 Rp. 135,000.00
0.150 oh Kepala Tukang x Rp. 95,000.00 Rp. 14,250.00
0.225 oh Mandor x Rp. 115,000.00 Rp. 25,875.00
Rp. 1,177,955.47

1 m2 Pasangan dinding roster / terawang (12x11x24) cm


Bahan
36.000 bh Roster/terawang x Rp. 19,500.00 Rp. 702,000.00
0.320 kg Semen PC x Rp. 51,500.00 Rp. 16,480.00
0.035 m3 Pasir Pasangan x Rp. 151,300.00 Rp. 5,295.50
Tenaga
0.300 oh Pekerja x Rp. 70,000.00 Rp. 21,000.00
0.100 oh Tukang Batu x Rp. 90,000.00 Rp. 9,000.00
0.010 oh Kepala Tukang x Rp. 95,000.00 Rp. 950.00
0.015 oh Mandor x Rp. 115,000.00 Rp. 1,725.00
Rp. 756,450.50

SNI 6987:2008
Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata, Campuran spesi 1 PC : 2 PP
70.0000 Biji Batu Bata x Rp. 600.00 Rp. 42,000.00
0.3790 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 21,931.47
0.0380 M3 Pasir Pasangan x Rp. 151,300.00 Rp. 5,749.40
0.1000 Tukang Batu x Rp. 90,000.00 Rp. 9,000.00
0.0100 Kepala Tukang x Rp. 95,000.00 Rp. 950.00
0.3000 Pekerja x Rp. 70,000.00 Rp. 21,000.00
0.0150 Mandor x Rp. 115,000.00 Rp. 1,725.00
Jumlah Rp. 102,355.87

TRIWULAN IV(Keempat )
0
- hal 6 -
SNI 6987:2008
Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata, Campuran spesi 1 PC : 4 PP
70.0000 Biji Batu Bata x Rp. 600.00 Rp. 42,000.00
0.2300 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 13,309.33
0.0430 M3 Pasir Pasangan x Rp. 151,300.00 Rp. 6,505.90
0.1000 Tukang Batu x Rp. 90,000.00 Rp. 9,000.00
0.0100 Kepala Tukang x Rp. 95,000.00 Rp. 950.00

11
0.3000 Pekerja x Rp. 70,000.00 Rp. 21,000.00
0.0150 Mandor x Rp. 115,000.00 Rp. 1,725.00
Jumlah Rp. 94,490.23

SNI 6987:2008 ###


Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata, Campuran spesi 1 PC : 3 PP
70.0000 Biji Batu Bata x Rp. 600.00 Rp. 42,000.00
0.2874 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 16,630.88
0.0400 M3 Pasir Pasangan x Rp. 151,300.00 Rp. 6,052.00
0.1000 Tukang Batu x Rp. 90,000.00 Rp. 9,000.00
0.0100 Kepala Tukang x Rp. 95,000.00 Rp. 950.00
0.3000 Pekerja x Rp. 70,000.00 Rp. 21,000.00
0.0150 Mandor x Rp. 115,000.00 Rp. 1,725.00
Jumlah Rp. 97,357.88

SNI 6987:2008
Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata, Campuran spesi 1 PC : 5 PP
70.0000 Biji Batu Bata x Rp. 600.00 Rp. 42,000.00
0.1936 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 11,202.99
0.0450 M3 Pasir Pasangan x Rp. 151,300.00 Rp. 6,808.50
0.1000 Tukang Batu x Rp. 90,000.00 Rp. 9,000.00
0.0100 Kepala Tukang x Rp. 95,000.00 Rp. 950.00
0.3000 Pekerja x Rp. 70,000.00 Rp. 21,000.00
0.0150 Mandor x Rp. 115,000.00 Rp. 1,725.00
Jumlah 92,686.49

SNI 6987:2008
Memasang 1 m2 dinding Concrete Block 20, Campuran 1 PC : 3 PP
12.5000 Biji Batu Batako x Rp. 4,480.00 Rp. 56,000.00
0.6064 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 35,090.35
0.7280 M3 Pasir Pasangan x Rp. 151,300.00 Rp. 110,146.40
0.1500 Tukang Batu x Rp. 90,000.00 Rp. 13,500.00
0.0150 Kepala Tukang x Rp. 95,000.00 Rp. 1,425.00
0.3500 Pekerja x Rp. 70,000.00 Rp. 24,500.00
0.0180 Mandor x Rp. 115,000.00 Rp. 2,070.00
Jumlah Rp. 242,731.75

SNI 6987:2008
Memasang 1 m2 dinding Concrete Block 20, Campuran 1 PC : 4 PP
12.5000 Biji Batu Batako x Rp. 4,480.00 Rp. 56,000.00
0.4852 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 28,076.91
0.7720 M3 Pasir Pasangan x Rp. 151,300.00 Rp. 116,803.60
0.1500 Tukang Batu x Rp. 90,000.00 Rp. 13,500.00
0.0150 Kepala Tukang x Rp. 95,000.00 Rp. 1,425.00
0.3500 Pekerja x Rp. 70,000.00 Rp. 24,500.00
0.0180 Mandor x Rp. 115,000.00 Rp. 2,070.00
Jumlah 242,375.51

PEKERJAAN PLESTERAN
SNI 2837:2008
Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm
0.1555 Zak Semen Pc 50 Kg x Rp. 57,866.67 Rp. 8,999.42
0.0230 M3 Pasir Pasangan x Rp. 151,300.00 Rp. 3,479.90
0.1500 Tukang Batu x Rp. 90,000.00 Rp. 13,500.00
0.0150 Kepala Tukang x Rp. 95,000.00 Rp. 1,425.00
0.3000 Pekerja x Rp. 70,000.00 Rp. 21,000.00
0.0150 Mandor x Rp. 115,000.00 Rp. 1,725.00
Jumlah Rp. 50,129.32

SNI 2837:2008
Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm
0.1248 Zak Semen Pc. 50 Kg x Rp. 57,866.67 Rp. 7,221.76
0.0240 M3 Pasir Pasangan x Rp. 151,300.00 Rp. 3,631.20
0.1500 Tukang Batu x Rp. 90,000.00 Rp. 13,500.00
0.0150 Kepala tukang x Rp. 95,000.00 Rp. 1,425.00
0.3000 Pekerja x Rp. 70,000.00 Rp. 21,000.00
0.0150 Mandor x Rp. 115,000.00 Rp. 1,725.00
Jumlah Rp. 48,502.96

TRIWULAN IV(Keempat )

- hal 7 -
SNI 2837:2008 ###
Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm
0.1168 Zak Semen Pc. 50 Kg x Rp. 57,866.67 Rp. 6,758.83
0.0260 M3 Pasir Pasangan x Rp. 151,300.00 Rp. 3,933.80
0.1500 Tukang Batu x Rp. 90,000.00 Rp. 13,500.00
0.0150 Kepala Tukang x Rp. 95,000.00 Rp. 1,425.00
0.3000 Pekerja x Rp. 70,000.00 Rp. 21,000.00
0.0150 Mandor x Rp. 115,000.00 Rp. 1,725.00

12
Jumlah Rp. 48,342.63

SNI 2837:2008
Memasang 1 m2 finishing siar pasangan dinding batu bata (=20 m')
0.0622 Zak Semen Pc. 50 Kg x Rp. 57,866.67 Rp. 3,596.99
0.0750 Tukang Batu x Rp. 90,000.00 Rp. 6,750.00
0.0080 Kepala Tukang x Rp. 95,000.00 Rp. 760.00
0.1500 Pekerja x Rp. 70,000.00 Rp. 10,500.00
0.0080 Mandor x Rp. 115,000.00 Rp. 920.00
Jumlah Rp. 22,526.99

SNI 2837:2008
Memasang 1 m2 finishing siar Pasangan dinding conblock expose (=8m')
0.0320 Zak Semen Pc. 50 Kg x Rp. 57,866.67 Rp. 1,851.73
0.0350 Tukang Batu x Rp. 90,000.00 Rp. 3,150.00
0.0040 Kepala Tukang x Rp. 95,000.00 Rp. 380.00
0.0700 Pekerja x Rp. 70,000.00 Rp. 4,900.00
0.0040 Mandor x Rp. 115,000.00 Rp. 460.00
Jumlah Rp. 10,741.73

SNI 2837:2008
Memasang 1 m2 finishing siar pasangan batu kali adukan 1 PC:2 PP
0.1268 Zak Semen Pc. 50 Kg x Rp. 57,866.67 Rp. 7,337.49
0.0120 m3 Pasir Pasangan x Rp. 151,300.00 Rp. 1,815.60
0.1500 Tukang Batu x Rp. 90,000.00 Rp. 13,500.00
0.0150 Kepala Tukang x Rp. 95,000.00 Rp. 1,425.00
0.3000 Pekerja x Rp. 70,000.00 Rp. 21,000.00
0.0150 Mandor x Rp. 115,000.00 Rp. 1,725.00
Jumlah Rp. 46,803.09

SNI 2837:2008
Memasang 1m2 acian
0.0650 Zak Semen 50 kg x Rp. 57,866.67 Rp. 3,761.33
0.1000 Tukang Batu x Rp. 90,000.00 Rp. 9,000.00
0.0100 Kepala Tukang x Rp. 95,000.00 Rp. 950.00
0.2000 Pekerja x Rp. 70,000.00 Rp. 14,000.00
0.0100 Mandor x Rp. 115,000.00 Rp. 1,150.00
Jumlah Rp. 28,861.33

PEKERJAAN BETON
SNI 7394:2008
Membuat 1 m3 lantai kerja beton mutu f'c =7,4 Mpa (K100) slump (3-6) cm, w/c = 0,87
4.6000 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 266,186.67
0.6379 M3 Pasir Beton / Kasar x Rp. 148,500.00 Rp. 94,721.79
0.7607 M3 Batu Pecah 2-3 x Rp. 245,000.00 Rp. 186,381.48
200 Air x Rp. 100.00 Rp. 20,000.00
0.2000 Tukang Batu x Rp. 90,000.00 Rp. 18,000.00
0.0200 Kepala Tukang x Rp. 95,000.00 Rp. 1,900.00
1.2000 Pekerja x Rp. 70,000.00 Rp. 84,000.00
0.0600 Mandor x Rp. 115,000.00 Rp. 6,900.00
Jumlah 678,089.93

SNI 7394:2008
Membuat 1 m3 beton mutu f'c =7,4 Mpa (K100) slump (12+-2) cm, w/c = 0,87
4.9400 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 285,861.33
0.6207 M3 Pasir Beton / Kasar x Rp. 148,500.00 Rp. 92,176.07
0.7400 M3 Batu Pecah 2-3 x Rp. 245,000.00 Rp. 181,300.00
200 Air x Rp. 100.00 Rp. 20,000.00
0.2750 Tukang Batu x Rp. 90,000.00 Rp. 24,750.00
0.0280 Kepala Tukang x Rp. 95,000.00 Rp. 2,660.00
1.6500 Pekerja x Rp. 70,000.00 Rp. 115,500.00
0.0830 Mandor x Rp. 115,000.00 Rp. 9,545.00
Jumlah 731,792.40

TRIWULAN IV(Keempat )
0
- hal 8 -
SNI 7394:2008 ###
Membuat 1 m3 beton mutu f'c =9,8 Mpa (K125) slump (12+-2) cm, w/c = 0,78
5.5200 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 319,424.00
0.5914 M3 Pasir Beton / Kasar x Rp. 148,500.00 Rp. 87,827.14
0.7496 M3 Batu Pecah 2-3 x Rp. 245,000.00 Rp. 183,659.26
200 Air x Rp. 100.00 Rp. 20,000.00
0.2750 Tukang Batu x Rp. 90,000.00 Rp. 24,750.00
0.0280 Kepala Tukang x Rp. 95,000.00 Rp. 2,660.00
1.6500 Pekerja x Rp. 70,000.00 Rp. 115,500.00

13
0.0830 Mandor x Rp. 115,000.00 Rp. 9,545.00
Jumlah 763,365.40

SNI 7394:2008
Membuat 1 m3 beton mutu f'c =12,2 Mpa (K150) slump (12+-2) cm, w/c = 0,72
5.9800 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 346,042.67
0.5707 M3 Pasir Beton / Kasar x Rp. 148,500.00 Rp. 84,751.07
0.7533 M3 Batu Pecah 2-3 x Rp. 245,000.00 Rp. 184,566.67
200 Air x Rp. 100.00 Rp. 20,000.00
0.2750 Tukang Batu x Rp. 90,000.00 Rp. 24,750.00
0.0280 Kepala Tukang x Rp. 95,000.00 Rp. 2,660.00
1.6500 Pekerja x Rp. 70,000.00 Rp. 115,500.00
0.0830 Mandor x Rp. 115,000.00 Rp. 9,545.00
Jumlah 787,815.40

SNI 7394:2008
Membuat 1 m3 beton mutu f'c =14,5 Mpa (K175) slump (12+-2) cm, w/c = 0,66
6.5200 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 377,290.67
0.5429 M3 Pasir Beton / Kasar x Rp. 148,500.00 Rp. 80,614.29
0.7622 M3 Batu Pecah 2-3 x Rp. 245,000.00 Rp. 186,744.44
215 Air x Rp. 100.00 Rp. 21,500.00
0.2750 Tukang Batu x Rp. 90,000.00 Rp. 24,750.00
0.0280 Kepala Tukang x Rp. 95,000.00 Rp. 2,660.00
1.6500 Pekerja x Rp. 70,000.00 Rp. 115,500.00
0.0830 Mandor x Rp. 115,000.00 Rp. 9,545.00
Jumlah 818,604.40

SNI 7394:2008
Membuat 1 m3 beton mutu f'c =16,9 Mpa (K200) slump (12+-2) cm, w/c = 0,61
7.0400 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 407,381.33
0.5221 M3 Pasir Beton / Kasar x Rp. 148,500.00 Rp. 77,538.21
0.7637 M3 Batu Pecah 2-3 x Rp. 245,000.00 Rp. 187,107.41
215 Air x Rp. 100.00 Rp. 21,500.00
0.2750 Tukang Batu x Rp. 90,000.00 Rp. 24,750.00
0.0280 Kepala Tukang x Rp. 95,000.00 Rp. 2,660.00
1.6500 Pekerja x Rp. 70,000.00 Rp. 115,500.00
0.0830 Mandor x Rp. 115,000.00 Rp. 9,545.00
Jumlah 845,981.96

SNI 7394:2008
Membuat 1 m3 beton mutu f'c =19,3 Mpa (K225) slump (12+-2) cm, w/c = 0,58
7.4200 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 429,370.67
0.4986 M3 Pasir Beton / Kasar x Rp. 148,500.00 Rp. 74,037.86
0.7756 M3 Batu Pecah 2-3 x Rp. 245,000.00 Rp. 190,011.11
215 Air x Rp. 100.00 Rp. 21,500.00
0.2750 Tukang Batu x Rp. 90,000.00 Rp. 24,750.00
0.0280 Kepala Tukang x Rp. 95,000.00 Rp. 2,660.00
1.6500 Pekerja x Rp. 70,000.00 Rp. 115,500.00
0.0830 Mandor x Rp. 115,000.00 Rp. 9,545.00
Jumlah 867,374.63

SNI 7394:2008
Membuat 1 m3 beton mutu f'c =21,7 Mpa (K250) slump (12+-2) cm, w/c = 0,56
7.6800 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 444,416.00
0.4943 M3 Pasir Beton / Kasar x Rp. 148,500.00 Rp. 73,401.43
0.7696 M3 Batu Pecah 2-3 x Rp. 245,000.00 Rp. 188,559.26
215 Air x Rp. 100.00 Rp. 21,500.00
0.2750 Tukang Batu x Rp. 90,000.00 Rp. 24,750.00
0.0280 Kepala Tukang x Rp. 95,000.00 Rp. 2,660.00
1.6500 Pekerja x Rp. 70,000.00 Rp. 115,500.00
0.0830 Mandor x Rp. 115,000.00 Rp. 9,545.00
Jumlah 880,331.69

TRIWULAN IV(Keempat )
0
- hal 9 -
SNI 7394:2008 ###
Membuat 1 m3 beton mutu f'c =24 Mpa (K275) slump (12+-2) cm, w/c = 0,53
8.1200 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 469,877.33
0.4886 M3 Pasir Beton / Kasar x Rp. 148,500.00 Rp. 72,552.86
0.7600 M3 Batu Pecah 2-3 x Rp. 245,000.00 Rp. 186,200.00
215 Air x Rp. 100.00 Rp. 21,500.00
0.2750 Tukang Batu x Rp. 90,000.00 Rp. 24,750.00
0.0280 Kepala Tukang x Rp. 95,000.00 Rp. 2,660.00
1.6500 Pekerja x Rp. 70,000.00 Rp. 115,500.00
0.0830 Mandor x Rp. 115,000.00 Rp. 9,545.00

14
Jumlah 902,585.19
SNI 7394:2008
Membuat 1 m3 beton mutu f'c =26,4 Mpa (K300) slump (12+-2) cm, w/c = 0,52
8.2600 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 477,978.67
0.4864 M3 Pasir Beton / Kasar x Rp. 148,500.00 Rp. 72,234.64
0.7563 M3 Batu Pecah 2-3 x Rp. 245,000.00 Rp. 185,292.59
215 Air x Rp. 100.00 Rp. 21,500.00
0.2750 Tukang Batu x Rp. 90,000.00 Rp. 24,750.00
0.0280 Kepala Tukang x Rp. 95,000.00 Rp. 2,660.00
1.6500 Pekerja x Rp. 70,000.00 Rp. 115,500.00
0.0830 Mandor x Rp. 115,000.00 Rp. 9,545.00
Jumlah 909,460.90

SNI 7394:2008
Membuat 1 m3 beton mutu f'c =28,8 Mpa (K325) slump (12+-2) cm, w/c = 0,49
8.7800 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 508,069.33
0.4786 M3 Pasir Beton / Kasar x Rp. 148,500.00 Rp. 71,067.86
0.7452 M3 Batu Pecah 2-3 x Rp. 245,000.00 Rp. 182,570.37
215 Air x Rp. 100.00 Rp. 21,500.00
0.3500 Tukang Batu x Rp. 90,000.00 Rp. 31,500.00
0.0350 Kepala Tukang x Rp. 95,000.00 Rp. 3,325.00
2.1000 Pekerja x Rp. 70,000.00 Rp. 147,000.00
0.1050 Mandor x Rp. 115,000.00 Rp. 12,075.00
Jumlah 977,107.56

SNI 7394:2008
Membuat 1 m3 beton mutu f'c =31,2 Mpa (K350) slump (12+-2) cm, w/c = 0,52 (A)
8.9600 Zak Semen 50 Kg x Rp. 57,866.67 Rp. 518,485.33
0.4764 M3 Pasir Beton / Kasar x Rp. 148,500.00 Rp. 70,749.64
0.7407 M3 Batu Pecah 2-3 x Rp. 245,000.00 Rp. 181,481.48
215 Air x Rp. 100.00 Rp. 21,500.00
0.3500 Tukang Batu x Rp. 90,000.00 Rp. 31,500.00
0.0350 Kepala Tukang x Rp. 95,000.00 Rp. 3,325.00
2.1000 Pekerja x Rp. 70,000.00 Rp. 147,000.00
0.1050 Mandor x Rp. 115,000.00 Rp. 12,075.00
Jumlah 986,116.46

SNI 7394:2008
Pembesian 10 kg dengan besi polos atau besi ulir (B) besi
10.5000 Kg Besi Beton x Rp. 14,300.00 Rp. 150,150.00
0.1500 Kg Kawat Beton x Rp. 24,800.00 Rp. 3,720.00
0.0700 Tukang Besi x Rp. 90,000.00 Rp. 6,300.00
0.0070 Kepala Tukang x Rp. 95,000.00 Rp. 665.00
0.0700 Pekerja x Rp. 70,000.00 Rp. 4,900.00
0.0040 Mandor x Rp. 115,000.00 Rp. 460.00
Jumlah 10 kg Rp. 166,195.00
1 kg Rp. 16,619.50

SNI 7394:2008
Bahan Bekesting (Cetakan) ( C )
Memasang 1 m2 bekesting untuk pondasi
0.0400 M3 Kayu Balok Kls III x Rp. 2,085,000.00 Rp. 83,400.00
0.3000 kg Paku 5 cm- 10 cm x Rp. 18,977.78 5,693.33
0.1000 ltr Minyak bekesting x Rp. 13,250.00 1,325.00
0.2600 Tukang Kayu x Rp. 90,000.00 Rp. 23,400.00
0.0260 Kepala Tukang x Rp. 95,000.00 Rp. 2,470.00
0.5200 Pekerja x Rp. 70,000.00 Rp. 36,400.00
0.0260 Mandor x Rp. 115,000.00 Rp. 2,990.00
Jumlah Rp. 155,678.33

TRIWULAN IV(Keempat )
0
- hal 10 -
SNI 7394:2008 ###
Memasang 1 m2 bekesting untuk Sloof
0.0450 M3 Kayu Balok Kls III x Rp. 2,085,000.00 Rp. 93,825.00
0.3000 kg Paku 5 cm- 10 cm x Rp. 18,977.78 5,693.33
0.1000 ltr Minyak bekesting x Rp. 13,250.00 1,325.00
0.2600 Tukang Kayu x Rp. 90,000.00 Rp. 23,400.00
0.0260 Kepala Tukang x Rp. 95,000.00 Rp. 2,470.00
0.5200 Pekerja x Rp. 70,000.00 Rp. 36,400.00
0.0260 Mandor x Rp. 115,000.00 Rp. 2,990.00
Jumlah Rp. 166,103.33
###

15
SNI 7394:2008
Memasang 1 m2 bekesting untuk Kolom
0.0400 M3 Kayu Balok Kls III x Rp. 2,085,000.00 Rp. 83,400.00
0.4000 kg Paku 5 cm- 12 cm x Rp. 18,977.78 Rp. 7,591.11
0.2000 ltr Minyak bekesting x Rp. 13,250.00 Rp. 2,650.00
0.0150 m3 Balok Kayu Kals II x Rp. 3,110,000.00 Rp. 46,650.00
0.3500 lbr Plywood tebal 9 mm x Rp. 120,000.00 Rp. 42,000.00
2.0000 Btg Kayu Perancah 5/10 x Rp. 41,700.00 Rp. 83,400.00
0.3300 Tukang Kayu x Rp. 90,000.00 Rp. 29,700.00
0.0330 Kepala Tukang x Rp. 95,000.00 Rp. 3,135.00
0.6600 Pekerja x Rp. 70,000.00 Rp. 46,200.00
0.0330 Mandor x Rp. 115,000.00 Rp. 3,795.00
Jumlah Rp. 348,521.11

SNI 7394:2008
Memasang 1 m2 bekesting untuk Balok
0.0400 M3 Kayu Balok Kls III x Rp. 2,085,000.00 Rp. 83,400.00
0.4000 kg Paku 5 cm- 12 cm x Rp. 18,977.78 Rp. 7,591.11
0.2000 ltr Minyak bekesting x Rp. 13,250.00 Rp. 2,650.00
0.0180 m3 Balok Kayu Kals II x Rp. 3,110,000.00 Rp. 55,980.00
0.3500 lbr Plywood tebal 9 mm x Rp. 120,000.00 Rp. 42,000.00
2.0000 Btg Kayu Perancah 5/10 x Rp. 41,700.00 Rp. 83,400.00
0.3300 Tukang Kayu x Rp. 90,000.00 Rp. 29,700.00
0.0330 Kepala Tukang x Rp. 95,000.00 Rp. 3,135.00
0.6600 Pekerja x Rp. 70,000.00 Rp. 46,200.00
0.0330 Mandor x Rp. 115,000.00 Rp. 3,795.00
Jumlah Rp. 357,851.11
SNI 7394:2008
Memasang 1 m2 bekesting untuk plat lantai
0.0400 M3 Kayu Balok Kls III x Rp. 2,085,000.00 Rp. 83,400.00
0.4000 kg Paku 5 cm- 12 cm x Rp. 18,977.78 Rp. 7,591.11
0.2000 ltr Minyak bekesting x Rp. 13,250.00 Rp. 2,650.00
0.0150 m3 Balok Kayu Kals II x Rp. 3,110,000.00 Rp. 46,650.00
0.3500 lbr Plywood tebal 9 mm x Rp. 120,000.00 Rp. 42,000.00
6.0000 Btg Kayu Perancah 5/10 x Rp. 41,700.00 Rp. 250,200.00
0.3300 Tukang Kayu x Rp. 90,000.00 Rp. 29,700.00
0.0330 Kepala Tukang x Rp. 95,000.00 Rp. 3,135.00
0.6600 Pekerja x Rp. 70,000.00 Rp. 46,200.00
0.0330 Mandor x Rp. 115,000.00 Rp. 3,795.00
Jumlah Rp. 515,321.11
SNI 7394:2008
Memasang 1 m2 bekesting untuk dinding
0.0300 M3 Kayu Balok Kls III x Rp. 2,085,000.00 Rp. 62,550.00
0.4000 kg Paku 5 cm- 12 cm x Rp. 18,977.78 Rp. 7,591.11
0.2000 ltr Minyak bekesting x Rp. 13,250.00 Rp. 2,650.00
0.0200 m3 Balok Kayu Kals II x Rp. 3,110,000.00 Rp. 62,200.00
0.3500 lbr Plywood tebal 9 mm x Rp. 120,000.00 Rp. 42,000.00
3.0000 Btg Kayu Perancah 5/10 x Rp. 41,700.00 Rp. 125,100.00
0.3300 Tukang Kayu x Rp. 90,000.00 Rp. 29,700.00
0.0330 Kepala Tukang x Rp. 95,000.00 Rp. 3,135.00
0.6600 Pekerja x Rp. 70,000.00 Rp. 46,200.00
0.0330 Mandor x Rp. 115,000.00 Rp. 3,795.00
Jumlah Rp. 384,921.11
SNI 7394:2008 ###
Memasang 1 m2 bekesting untuk tangga
0.0300 M3 Kayu Balok Kls III x Rp. 2,085,000.00 Rp. 62,550.00
0.4000 kg Paku 5 cm- 12 cm x Rp. 18,977.78 Rp. 7,591.11
0.1500 ltr Minyak bekesting x Rp. 13,250.00 Rp. 1,987.50
0.0150 m3 Balok Kayu Kals II x Rp. 3,110,000.00 Rp. 46,650.00
0.3500 lbr Plywood tebal 9 mm x Rp. 120,000.00 Rp. 42,000.00
2.0000 Btg Kayu Perancah 5/10 x Rp. 41,700.00 Rp. 83,400.00
0.3300 Tukang Kayu x Rp. 90,000.00 Rp. 29,700.00
0.0330 Kepala Tukang x Rp. 95,000.00 Rp. 3,135.00
0.6600 Pekerja x Rp. 70,000.00 Rp. 46,200.00
0.0330 Mandor x Rp. 115,000.00 Rp. 3,795.00
Jumlah Rp. 327,008.61

TRIWULAN IV(Keempat )
0
- hal 11 -
SNI 7394:2008
Memasang 1 m2 Jembatan untuk Pengecoran beton
0.0264 M3 Kayu Balok Kls III x Rp. 2,085,000.00 Rp. 55,044.00
0.6000 kg Paku 5 cm- 12 cm x Rp. 18,977.78 Rp. 11,386.67
0.1500 ltr Minyak bekesting x Rp. 13,250.00 Rp. 1,987.50
0.5000 Btg Kayu Perancah 5/10 x Rp. 41,700.00 Rp. 20,850.00
0.0500 Tukang Kayu x Rp. 90,000.00 Rp. 4,500.00
0.0050 Kepala Tukang x Rp. 95,000.00 Rp. 475.00
0.1500 Pekerja x Rp. 70,000.00 Rp. 10,500.00
0.0080 Mandor x Rp. 115,000.00 Rp. 920.00
Jumlah Rp. 105,663.17

16
SNI 7394:2008
Membuat 1 m3 pondasi beton bertulang (150 kg besi+bekesting
Beton
bahan
6.7200 zak Semen 50 Kg x Rp. 57,866.67 Rp. 388,864.00
0.5400 m3 Pasir beton' x Rp. 148,500.00 Rp. 80,190.00
0.8100 m3 kerikil x Rp. 245,000.00 Rp. 198,450.00
upah
0.2750 Tukang Batu x Rp. 90,000.00 Rp. 24,750.00
0.2620 Kepala Tukang x Rp. 95,000.00 Rp. 24,890.00
5.3000 Pekerja x Rp. 70,000.00 Rp. 371,000.00
0.2650 Mandor x Rp. 115,000.00 Rp. 30,475.00
Rp. 1,118,619.00
Besi 150 kg
bahan
157.5000 kg Besi beton polos x Rp. 14,300.00 Rp. 2,252,250.00
2.2500 kg kawat beton x Rp. 24,800.00 Rp. 55,800.00
Upah
1.0500 Tukang Besi x Rp. 90,000.00 Rp. 94,500.00
Rp. 2,402,550.00

Bekesting
bahan
0.2000 M3 Kayu Balok Kls III x Rp. 2,085,000.00 Rp. 417,000.00
1.5000 kg Paku 5 cm- 12 cm x Rp. 18,977.78 Rp. 28,466.67
0.4000 ltr Minyak bekesting x Rp. 13,250.00 Rp. 5,300.00
Upah Rp.
1.3000 Tukang Kayu x Rp. 90,000.00 Rp. 117,000.00
Rp. 567,766.67
Jumlah Total 4,088,935.67

SNI 7394:2008
Membuat 1 m3 sloof beton bertulang (200 kg besi+bekesting)
Beton
bahan
6.7200 zak Semen 50 Kg x Rp. 57,866.67 Rp. 388,864.00
0.5400 m3 Pasir beton' x Rp. 148,500.00 Rp. 80,190.00
0.8100 m3 kerikil x Rp. 245,000.00 Rp. 198,450.00
upah
0.2750 Tukang Batu x Rp. 90,000.00 Rp. 24,750.00
0.3230 Kepala Tukang x Rp. 95,000.00 Rp. 30,685.00
5.6500 Pekerja x Rp. 70,000.00 Rp. 395,500.00
0.2830 Mandor x Rp. 115,000.00 Rp. 32,545.00
Rp. 1,150,984.00
Besi 200 kg ###
bahan
210.0000 kg Besi beton polos x Rp. 14,300.00 Rp. 3,003,000.00
3.0000 kg kawat beton x Rp. 24,800.00 Rp. 74,400.00
Upah
1.4000 Tukang Besi x Rp. 90,000.00 Rp. 126,000.00
Rp. 3,203,400.00

Bekesting
bahan
0.2000 M3 Kayu Balok Kls III x Rp. 2,085,000.00 Rp. 417,000.00
1.5000 kg Paku 5 cm- 12 cm x Rp. 18,977.78 Rp. 28,466.67
0.4000 ltr Minyak bekesting x Rp. 13,250.00 Rp. 5,300.00
Upah Rp.
1.3000 Tukang Kayu x Rp. 90,000.00 Rp. 117,000.00
Rp. 567,766.67
###
Jumlah Total 4,922,150.67

TRIWULAN IV(Keempat )
0
- hal 12 -
SNI 7394:2008
Membuat 1 m3 balok beton bertulang (200 kg besi+bekesting)
Beton
bahan
6.7200 zak Semen 50 Kg x Rp. 57,866.67 Rp. 388,864.00
0.5400 m3 Pasir beton' x Rp. 148,500.00 Rp. 80,190.00
0.8100 m3 kerikil x Rp. 245,000.00 Rp. 198,450.00
0.2750 Tukang Batu x Rp. 90,000.00 Rp. 24,750.00
0.3330 Kepala Tukang x Rp. 95,000.00 Rp. 31,635.00
6.3500 Pekerja x Rp. 70,000.00 Rp. 444,500.00
0.3180 Mandor x Rp. 115,000.00 Rp. 36,570.00
Rp. 1,204,959.00

17
Besi 200 kg ###
bahan
210.0000 kg Besi beton polos x Rp. 14,300.00 Rp. 3,003,000.00
3.0000 kg kawat beton x Rp. 24,800.00 Rp. 74,400.00
Upah
1.4000 Tukang Besi x Rp. 90,000.00 Rp. 126,000.00
Rp. 3,203,400.00
Bekesting
bahan
0.15 Kayu Klas II x Rp. 3,110,000.00 Rp. 466,500.00
0.3000 M3 Kayu Balok Kls III x Rp. 2,085,000.00 Rp. 625,500.00
4.0000 kg Paku 5 cm- 12 cm x Rp. 18,977.78 Rp. 75,911.11
2.0000 ltr Minyak bekesting x Rp. 13,250.00 Rp. 26,500.00
1.6500 Tukang Kayu x Rp. 90,000.00 Rp. 148,500.00
Rp. 1,342,911.11
Jumlah Total 5,751,270.11
SNI 7394:2008
Membuat 1 m3 Plat beton bertulang (150 kg besi+bekesting)
Beton
bahan
6.7200 zak Semen 50 Kg x Rp. 57,866.67 Rp. 388,864.00
0.5400 m3 Pasir beton' x Rp. 148,500.00 Rp. 80,190.00
0.8100 m3 kerikil x Rp. 245,000.00 Rp. 198,450.00
upah
0.2750 Tukang Batu x Rp. 90,000.00 Rp. 24,750.00
0.2650 Kepala Tukang x Rp. 95,000.00 Rp. 25,175.00
5.3000 Pekerja x Rp. 70,000.00 Rp. 371,000.00
0.2650 Mandor x Rp. 115,000.00 Rp. 30,475.00
Rp. 1,118,904.00
Besi 200 kg
bahan
157.5000 kg Besi beton polos x Rp. 14,300.00 Rp. 2,252,250.00
2.2500 kg kawat beton x Rp. 24,800.00 Rp. 55,800.00
Upah
1.0500 Tukang Besi x Rp. 90,000.00 Rp. 94,500.00
Rp. 2,402,550.00
Bekesting
bahan
0.15 Kayu Klas II x Rp. 3,110,000.00 Rp. 466,500.00
0.3000 M3 Kayu Balok Kls III x Rp. 2,085,000.00 Rp. 625,500.00
4.0000 kg Paku 5 cm- 12 cm x Rp. 18,977.78 Rp. 75,911.11
2.0000 ltr Minyak bekesting x Rp. 13,250.00 Rp. 26,500.00
Upah
1.6500 Tukang Kayu x Rp. 90,000.00 Rp. 148,500.00
Rp. 1,342,911.11
Jumlah Total 4,864,365.11
SNI 7394:2008
Membuat 1 m' kolom praktis beton bertulang (11x11) cm
bahan
0.002 m3 Kayu kelas III x Rp 2,085,000.00 Rp. 4,170.00
0.01 kg Paku 5 cm – 12 cm x Rp 18,977.78 Rp. 189.78
3 kg Besi beton polos x Rp 14,300.00 Rp. 42,900.00
0.045 kg Kawat beton x Rp 24,800.00 Rp. 1,116.00
4 kg Portland cement x Rp 51,500.00 Rp. 206,000.00
0.006 m3 Pasir beton x Rp 148,500.00 Rp. 891.00
0.009 m3 Kerikil x Rp 245,000.00 Rp. 2,205.00
upah
0.18 OH Pekerja x Rp 70,000.00 Rp. 12,600.00
0.02 OH Tukang batu x Rp 90,000.00 Rp. 1,800.00
0.02 OH Tukang kayu x Rp 90,000.00 Rp. 1,800.00
0.02 OH Tukang besi x Rp 90,000.00 Rp. 1,800.00
0.006 OH Kepala Tukang x Rp 95,000.00 Rp. 570.00
0.009 OH Mandor x Rp 115,000.00 Rp. 1,035.00
Rp. 277,076.78
TRIWULAN IV(Keempat )
0
- hal 13 -
SNI 7394:2008
Membuat 1 m3 Dinding beton bertulang (150 kg besi+bekesting)
Beton
bahan
6.7200 zak Semen 50 Kg x Rp. 57,866.67 Rp. 388,864.00
0.5400 m3 Pasir beton' x Rp. 148,500.00 Rp. 80,190.00
0.8100 m3 kerikil x Rp. 245,000.00 Rp. 198,450.00
upah
0.2750 Tukang Batu x Rp. 90,000.00 Rp. 24,750.00
0.2620 Kepala Tukang x Rp. 95,000.00 Rp. 24,890.00
5.3000 Pekerja x Rp. 70,000.00 Rp. 371,000.00
0.2650 Mandor x Rp. 115,000.00 Rp. 30,475.00
Rp. 1,118,619.00
Besi 200 kg ###

18
bahan
157.5000 kg Besi beton polos x Rp. 14,300.00 Rp. 2,252,250.00
2.2500 kg kawat beton x Rp. 24,800.00 Rp. 55,800.00
Upah
1.0500 Tukang Besi x Rp. 90,000.00 Rp. 94,500.00
Rp. 2,402,550.00
Bekesting
bahan
0.16 Kayu Klas II x Rp. 3,110,000.00 Rp. 497,600.00
0.2400 M3 Kayu Balok Kls III x Rp. 2,085,000.00 Rp. 500,400.00
3.2000 kg Paku 5 cm- 12 cm x Rp. 18,977.78 Rp. 60,728.89
1.6000 ltr Minyak bekesting x Rp. 13,250.00 Rp. 21,200.00
Upah -
1.3000 Tukang Kayu x Rp. 90,000.00 Rp. 117,000.00
Rp. 1,196,928.89

Jumlah Total 4,718,097.89

1 m2 Pek. Paving Block


50.0000 Bh Paving Block 8 cm x Rp. 1,900.00 Rp. 95,000.00
0.1000 M3 Pasir Pasangan x Rp. 151,300.00 Rp. 15,130.00
0.1500 Tukang Batu x Rp. 90,000.00 Rp. 13,500.00
0.6000 Pekerja x Rp. 70,000.00 Rp. 42,000.00
Jumlah Rp. 165,630.00
mandor
1 m' Pek.kansteen ###

2.50 bh Kansteen beton k.300 (40/30/15) x Rp. 21,280 Rp. 53,200


0.10 zak Semen 50 Kg x Rp. 57,867 Rp. 5,787
0.04 m3 pasir pasangan x Rp. 151,300 Rp. 6,355

0.10 oh pekerja x Rp. 70,000 Rp. 7,000


0.25 oh tukang batu x Rp. 90,000 Rp. 22,500
0.01 oh kepala tukang x Rp. 95,000 Rp. 950
0.001 oh mandor x Rp. 115,000 Rp. 115
Rp. 95,906

PEKERJAAN KAYU
1 m2 Membuat dan Memasang Daun Pintu dan Jendela Jalusi Kayu Klas I
Bahan
0.064 m3 Kayu Klas I, Papan x Rp. 15,000,000.00 Rp. 960,000.00
Tenaga
1.000 Oh Pekerja x Rp. 70,000.00 Rp. 70,000.00
3.000 Oh Tukang kayu x Rp. 90,000.00 Rp. 270,000.00
0.300 Oh Kepala Tukang x Rp. 95,000.00 Rp. 28,500.00
0.050 Oh Mandor x Rp. 115,000.00 Rp. 5,750.00
Rp. 1,334,250.00
1 m2 Daun Jendela ###
Bahan ###
0.035 m3 Kayu Kls I, Papan x Rp. 15,000,000.00 Rp. 525,000.00
0.050 kg Paku x Rp. 18,977.78 Rp. 948.89
0.800 m2 Kaca Bening 5 mm x Rp. 122,900.00 Rp. 98,320.00
Tenaga
0.800 Oh Pekerja x Rp. 70,000.00 Rp. 56,000.00
2.000 Oh Tukang kayu x Rp. 90,000.00 Rp. 180,000.00
0.200 Oh Kepala Tukang x Rp. 95,000.00 Rp. 19,000.00
0.040 Oh Mandor x Rp. 115,000.00 Rp. 4,600.00
Rp. 883,868.89

TRIWULAN IV(Keempat )
0
- hal 14 -
1 m2 Pasang Pintu Plywood Rangkap, Rangka Kayu Klas I
Bahan
0.0196 m3 Kayu Klas I, Papan x Rp. 15,000,000.00 Rp. 294,000.00
0.030 Kg Paku Biasa 1/2"-1" x Rp. 18,977.78 Rp. 569.33
0.300 Ltr Lem Kayu x Rp. 16,000.00 Rp. 4,800.00
1.000 Lbr Plywood 4' x 3' x 4 mm x Rp. 64,300.00 Rp. 64,300.00
Tenaga
0.600 Oh Pekerja x Rp. 70,000.00 Rp. 42,000.00
2.000 Oh Tukang kayu x Rp. 90,000.00 Rp. 180,000.00
0.200 Oh Kepala Tukang x Rp. 95,000.00 Rp. 19,000.00
0.030 Oh Mandor x Rp. 115,000.00 Rp. 3,450.00
Rp. 608,119.33

1 m2 Pasang Jalusi Mati Kusen Kayu Klas I


Bahan
0.060 m3 Kayu Klas I, Papan x Rp. 15,000,000.00 Rp. 900,000.00

19
0.150 kg Paku Biasa 1/2"-1" x Rp. 18,977.78 Rp. 2,846.67
Tenaga
0.500 Oh Pekerja x Rp. 70,000.00 Rp. 35,000.00
2.000 Oh Tukang kayu x Rp. 90,000.00 Rp. 180,000.00
0.200 Oh Kepala Tukang x Rp. 95,000.00 Rp. 19,000.00
0.025 Oh Mandor x Rp. 115,000.00 Rp. 2,875.00
Rp. 1,139,721.67

1 m2 Pasang Pintu Teakwood Rangkap, Rangka Kayu Klas I


Bahan
0.0196 m3 Kayu Klas I, Papan x Rp. 15,000,000.00 Rp. 294,000.00
0.030 Kg Paku Biasa 1/2"-1" x Rp. 18,977.78 Rp. 569.33
0.300 Ltr Lem Kayu x Rp. 16,000.00 Rp. 4,800.00
1.000 Lbr Plywood 4' x 8' x 4 mm x Rp. 64,300.00 Rp. 64,300.00

Tenaga
0.600 Oh Pekerja x Rp. 70,000.00 Rp. 42,000.00
2.000 Oh Tukang kayu x Rp. 90,000.00 Rp. 180,000.00
0.200 Oh Kepala Tukang x Rp. 95,000.00 Rp. 19,000.00
0.030 Oh Mandor x Rp. 115,000.00 Rp. 3,450.00
Rp. 608,119.33

1 m2 Pasang Pintu Teakwood Kayu Klas II ###


Bahan
0.020 m3 Kayu Kls II, Balok x Rp. 3,110,000.00 Rp. 62,200.00
2.000 Lbr Teakwood Ukuran Pintu x Rp. 89,000.00 Rp. 178,000.00
0.030 Kg Paku x Rp. 18,977.78 Rp. 569.33

Tenaga
0.600 Oh Pekerja x Rp. 70,000.00 Rp. 42,000.00
2.000 Oh Tukang kayu x Rp. 90,000.00 Rp. 180,000.00
0.200 Oh Kepala Tukang x Rp. 95,000.00 Rp. 19,000.00
0.030 Oh Mandor x Rp. 115,000.00 Rp. 3,450.00
Rp. 485,219.33

SNI 3434:2008
Membuat dan Memasang 1 m3 Kusen Pintu dan kusen jendela kayu klas I
1.1000 M3 Balok Kayu x Rp. 8,800,000.00 Rp. 9,680,000.00
1.2500 kg pAku 10 cm x Rp. 18,977.78 Rp. 23,722.22
1.0000 kg Lem Kayu x Rp. 20,000.00 Rp. 20,000.00
21.0000 Tukang Kayu x Rp. 90,000.00 Rp. 1,890,000.00
2.1000 Kepala Tukang x Rp. 95,000.00 Rp. 199,500.00
7.0000 Pekerja x Rp. 70,000.00 Rp. 490,000.00
0.3500 Mandor x Rp. 115,000.00 Rp. 40,250.00
Jumlah Rp. 12,343,472.22

SNI 3434:2008
Membuat dan Memasang 1 m3 Kusen Pintu dan kusen jendela kayu klas II
1.2000 M3 Kayu klas II x Rp. 3,110,000.00 Rp. 3,732,000.00
1.2500 kg pAku 10 cm x Rp. 18,977.78 Rp. 23,722.22
1.0000 kg Lem Kayu x Rp. 20,000.00 Rp. 20,000.00
18.0000 Tukang Kayu x Rp. 90,000.00 Rp. 1,620,000.00
1.8000 Kepala Tukang x Rp. 95,000.00 Rp. 171,000.00
6.0000 Pekerja x Rp. 70,000.00 Rp. 420,000.00
0.3000 Mandor x Rp. 115,000.00 Rp. 34,500.00
Jumlah Rp. 6,021,222.22

TRIWULAN IV(Keempat )
0
- hal 15 -
SNI 3434:2008
Membuat dan Memasang 1 m2 Daun Pintu Panel, Kayu Klas I
0.0400 M3 Papan kayu Klas I x Rp. 15,000,000.00 Rp. 600,000.00
0.5000 kg Lem Kayu x Rp. 20,000.00 Rp. 10,000.00
3.0000 Tukang Kayu x Rp. 90,000.00 Rp. 270,000.00
0.3000 Kepala Tukang x Rp. 95,000.00 Rp. 28,500.00
1.0000 Pekerja x Rp. 70,000.00 Rp. 70,000.00
0.0500 Mandor x Rp. 95,000.00 Rp. 4,750.00
Jumlah Rp. 983,250.00

SNI 3434:2008
Membuat dan Memasang 1 m2 Daun Pintu Panel, Kayu Klas II
0.0400 M3 Papan kayu Klas II x Rp. 3,780,000.00 Rp. 151,200.00
0.5000 kg Lem Kayu x Rp. 20,000.00 Rp. 10,000.00
3.0000 Tukang Kayu x Rp. 90,000.00 Rp. 270,000.00
0.3000 Kepala Tukang x Rp. 95,000.00 Rp. 28,500.00
1.0000 Pekerja x Rp. 70,000.00 Rp. 70,000.00

20
0.0500 Mandor x Rp. 95,000.00 Rp. 4,750.00
Jumlah Rp. 534,450.00

SNI 3434:2008
Memasang 1 m2 dinding lambriziring dari papan klas I
0.0070 Lbr Papan kayu x Rp. 15,000,000.00 Rp. 105,000.00
0.1000 kg Paku 5 cm dan 10 cm x Rp. 18,977.78 Rp. 1,897.78
0.1500 lbr Paku Skrup 10 cm x Rp. 22,000.00 Rp. 3,300.00
1.8000 Tukang Kayu x Rp. 90,000.00 Rp. 162,000.00
0.1800 Kepala Tukang x Rp. 95,000.00 Rp. 17,100.00
0.6000 Pekerja x Rp. 70,000.00 Rp. 42,000.00
0.0300 Mandor x Rp. 95,000.00 Rp. 2,850.00
Jumlah Rp. 334,147.78

SNI 3434:2008
Memasang 1 m2 dinding pemisah Plywood rangkap, rangka kayu klas II
0.0280 Lbr balok kayu (6x12)cm x Rp. 3,110,000.00 Rp. 87,080.00
0.1500 kg Paku 5 cm dan 10 cm x Rp. 18,977.78 Rp. 2,846.67
0.8600 lbr Teakwood tebal 4 mm (120x240) x Rp. 89,000.00 Rp. 76,540.00
0.5600 Kg Lem Kayu x Rp. 20,000.00 Rp. 11,200.00
0.6000 Tukang Kayu x Rp. 90,000.00 Rp. 54,000.00
0.0600 Kepala Tukang x Rp. 95,000.00 Rp. 5,700.00
0.2000 Pekerja x Rp. 70,000.00 Rp. 14,000.00
0.0100 Mandor x Rp. 95,000.00 Rp. 950.00
Rp. 252,316.67

1 M2 Pasang rangka dinding pemisah kayu KK I Bayam


Bahan
0.0195 m3 Kayu Kls. I Bayam (balok) Sawmill x Rp. 13,100,000.00 Rp. 255,450.00
0.007 m3 Kayu Kls. I Bayam (papan) x Rp. 15,000,000.00 Rp. 105,000.00
0.100 kg Paku 4-10 cm x Rp. 18,977.78 Rp. 1,897.78
Upah x Rp. Rp. -
0.150 Pekerja x Rp. 70,000.00 Rp. 10,500.00
0.450 Tukang kayu x Rp. 90,000.00 Rp. 40,500.00
0.045 Kepala tukang x Rp. 95,000.00 Rp. 4,275.00
0.075 Mandor x Rp. 95,000.00 Rp. 7,125.00
Rp. 424,747.78

1 m3 Pek. Tiang Penyangga / Pemikul Kelas I


1.1000 M3 Kayu Bayam Kls I x Rp. 13,100,000.00 Rp. 14,410,000.00
24.0000 Tukang Kayu x Rp. 90,000.00 Rp. 2,160,000.00
2.4000 Kepala Tukang x Rp. 95,000.00 Rp. 228,000.00
8.0000 Pekerja x Rp. 70,000.00 Rp. 560,000.00
0.4000 Mandor x Rp. 115,000.00 Rp. 46,000.00
Jumlah Rp. 17,404,000.00

1 m3 Pek. Tiang Penyangga / Pemikul Kls II


1.1000 M3 Kayu Kls II Samarinda x Rp. 3,110,000.00 Rp. 3,421,000.00
24.0000 Tukang Kayu x Rp. 90,000.00 Rp. 2,160,000.00
2.4000 Kepala Tukang x Rp. 95,000.00 Rp. 216,000.00
8.0000 Pekerja x Rp. 70,000.00 Rp. 560,000.00
0.4000 Mandor x Rp. 115,000.00 Rp. 46,000.00
Jumlah Rp. 6,403,000.00

TRIWULAN IV(Keempat )
0
- hal 16 -

1 m2 Memasang Dinding Pemisah / Partisi Tripleks Double


Bahan
0.0195 m3 Kayu Kls III, balok x Rp. 2,085,000.00 Rp. 40,657.50
1.000 lbr Tripleks x Rp. 51,500.00 Rp. 51,500.00
0.020 ltr Lem Kayu x Rp. 16,000.00 Rp. 320.00
0.010 kg Paku Biasa x Rp. 18,977.78 Rp. 189.78
Tenaga
0.200 Oh Pekerja x Rp. 70,000.00 Rp. 14,000.00
0.600 Oh Tukang Kayu x Rp. 90,000.00 Rp. 54,000.00
0.060 Oh Kepala Tukang x Rp. 95,000.00 Rp. 5,700.00
0.010 Oh Mandor x Rp. 115,000.00 Rp. 1,150.00
Rp. 167,517.28

1 m2 Memasang Sekat / Partisi Multipleks Double


Bahan

21
0.9500 m3 Multipleks x Rp. 120,000.00 Rp. 114,000.00
0.020 kg Paku x Rp. 18,977.78 Rp. 379.56
Tenaga 0.030 Oh Pekerja x Rp. 70,000.00 Rp. 2,100.00
0.070 Oh Tukang Kayu x Rp. 90,000.00 Rp. 6,300.00
0.007 Oh Kepala Tukang x Rp. 95,000.00 Rp. 665.00
0.0015 Oh Mandor x Rp. 115,000.00 Rp. 172.50
Rp. 123,617.06

1 m2 Pasang Rangka Dinding Lamriziring dari papan jati


Bahan
0.007 m3 Kayu Jati, Balok x Rp. 13,100,000.00 Rp. 91,700.00
0.100 Kg Paku Biasa 2"-5" x Rp. 18,977.78 Rp. 1,897.78
0.150 Kg Paku Skrup 3.5" x Rp. 600.00 Rp. 90.00
Tenaga
0.600 Oh Pekerja x Rp. 70,000.00 Rp. 42,000.00
1.800 Oh Tukang kayu x Rp. 90,000.00 Rp. 162,000.00
0.180 Oh Kepala Tukang x Rp. 95,000.00 Rp. 17,100.00
0.030 Oh Mandor x Rp. 115,000.00 Rp. 3,450.00
Rp. 318,237.78

1 m2 Pasang Plywood tebal 4 mm, untuk Dinding ###


Bahan
0.400 lbr Plywood 4' x 8' x 4 mm x Rp. 64,300.00 Rp. 25,720.00
0.050 Kg Paku Biasa 1/2"-1" x Rp. 18,977.78 Rp. 948.89
Tenaga
0.025 Oh Pekerja x Rp. 70,000.00 Rp. 1,750.00
0.075 Oh Tukang kayu x Rp. 90,000.00 Rp. 6,750.00
0.0075 Oh Kepala Tukang x Rp. 95,000.00 Rp. 712.50
0.0013 Oh Mandor x Rp. 115,000.00 Rp. 149.50
Rp. 36,030.89

PEKERJAAN ATAP
SNI 3434:2008
Memasang 1 m2 rangka rangka atap genteng keramik, kayu klas II
0.0140 M3 Kaso-kaso (5x7) cm x Rp. 3,110,000.00 Rp. 43,540.00
0.0036 M3 Reng (2x3) cm x Rp. 3,110,000.00 Rp. 11,196.00
0.2500 Kg Paku x Rp. 18,977.78 Rp. 4,744.44
0.1000 Tukang Kayu x Rp. 90,000.00 Rp. 9,000.00
0.0100 Kepala Tukang x Rp. 95,000.00 Rp. 950.00
0.1000 Pekerja x Rp. 70,000.00 Rp. 7,000.00
0.0050 Mandor x Rp. 115,000.00 Rp. 575.00
Jumlah Rp. 77,005.44

SNI 3434:2008
Memasang 1 m2 rangka rangka atap gentengbeton, kayu klas II
0.0140 M3 Kaso-kaso (5x7) cm x Rp. 3,110,000.00 Rp. 43,540.00
0.0072 M3 Reng (2x3) cm x Rp. 3,110,000.00 Rp. 22,392.00
0.2500 Kg Paku x Rp. 18,977.78 Rp. 4,744.44
0.1000 Tukang Kayu x Rp. 90,000.00 Rp. 9,000.00
0.0100 Kepala Tukang x Rp. 95,000.00 Rp. 950.00
0.1000 Pekerja x Rp. 70,000.00 Rp. 7,000.00
0.0050 Mandor x Rp. 115,000.00 Rp. 575.00
Jumlah Rp. 88,201.44

TRIWULAN IV(Keempat )
0
- hal 17 -
SNI 3434:2008
Memasang 1 m3 Konstruksi kuda2 konvensional, kayu klas II
1.1000 M3 Balok klas II x Rp. 3,110,000.00 Rp. 3,421,000.00
15.0000 kg Besi srip tebal 5 mm x Rp. 425,000.00 Rp. 6,375,000.00
5.6000 kg Paku 12 cm x Rp. 18,977.78 Rp. 106,275.56
12.0000 Tukang Kayu x Rp. 90,000.00 Rp. 1,080,000.00
1.2000 Kepala Tukang x Rp. 95,000.00 Rp. 114,000.00
4.0000 Pekerja x Rp. 70,000.00 Rp. 280,000.00
0.2000 Mandor x Rp. 115,000.00 Rp. 23,000.00
Jumlah Rp. 11,399,275.56

SNI 3434:2008
Memasang 1 m3 Konstruksi kuda2 konvensional, kayu klas I
1.2000 M3 Kayu Kls I x Rp. 8,800,000.00 Rp. 10,560,000.00
15.0000 kg Besi srip tebal 5 mm x Rp. 425,000.00 Rp. 6,375,000.00
5.6000 kg Paku 12 cm x Rp. 18,977.78 Rp. 106,275.56
20.1000 Tukang Kayu x Rp. 90,000.00 Rp. 1,809,000.00
2.0100 Kepala Tukang x Rp. 95,000.00 Rp. 190,950.00
6.7000 Pekerja x Rp. 70,000.00 Rp. 469,000.00

22
0.3350 Mandor x Rp. 115,000.00 Rp. 38,525.00
Jumlah Rp. 19,548,750.56

SNI 3434:2008 ###


Memasang 1 m3 Konstruksi Gording , kayu klas II
1.1000 M3 Kayu Kls II x Rp. 3,110,000.00 Rp. 3,421,000.00
15.0000 kg Besi srip tebal 5 mm x Rp. 425,000.00 Rp. 6,375,000.00
3.0000 kg Paku 12 cm x Rp. 18,977.78 Rp. 56,933.33
7.2000 Tukang Kayu x Rp. 90,000.00 Rp. 648,000.00
0.7200 Kepala Tukang x Rp. 95,000.00 Rp. 68,400.00
2.4000 Pekerja x Rp. 70,000.00 Rp. 168,000.00
0.1200 Mandor x Rp. 115,000.00 Rp. 13,800.00
Jumlah Rp. 10,751,133.33

1 m3 Konstruksi Kuda-Kuda & Gording Kayu Kls II


Bahan
1.100 m3 Kayu Kls II, Balok x Rp. 3,110,000.00 Rp. 3,421,000.00
15.000 Kg Besi Strip x Rp. 36,900.00 Rp. 553,500.00
0.800 Kg Paku Biasa x Rp. 18,977.78 Rp. 15,182.22
Tenaga ###
4.000 Oh Pekerja x Rp. 70,000.00 Rp. 280,000.00
12.000 Oh Tukang kayu x Rp. 90,000.00 Rp. 1,080,000.00
1.200 Oh Kepala Tukang x Rp. 95,000.00 Rp. 114,000.00
0.200 Oh Mandor x Rp. 115,000.00 Rp. 23,000.00
Rp. 5,486,682.22

main tyruss c
1 m3 Konstruksi Kuda-Kuda & Gording Kayu Kls I roof beton ren
Bahan SELF DRILLI
1.100 m3 Kayu Kls I, Balok x Rp. 13,100,000.00 Rp. 14,410,000.00
15.000 Kg Besi Strip x Rp. 36,900.00 Rp. 553,500.00
0.800 Kg Paku Biasa x Rp. 18,977.78 Rp. 15,182.22
Tenaga Tukang besi
8.000 Oh Pekerja x Rp. 70,000.00 Rp. 560,000.00
24.000 Oh Tukang kayu x Rp. 90,000.00 Rp. 2,160,000.00
2.400 Oh Kepala Tukang x Rp. 95,000.00 Rp. 228,000.00
0.400 Oh Mandor x Rp. 115,000.00 Rp. 46,000.00
Rp. 17,972,682.22
###
1 m2 Rangka Atap ###
Bahan
0.020 m3 Kayu Kls II x Rp. 3,110,000.00 Rp. 62,200.00
0.100 kg Paku Reng x Rp. 23,000.00 Rp. 2,300.00

Tenaga
0.150 Oh Pekerja x Rp. 70,000.00 Rp. 10,500.00
0.100 Oh Tukang Kayu x Rp. 90,000.00 Rp. 9,000.00
0.020 Oh Kepala Tukang x Rp. 95,000.00 Rp. 1,900.00
0.008 Oh Mandor x Rp. 115,000.00 Rp. 920.00
Rp. 86,820.00

TRIWULAN IV(Keempat )
0
- hal 18 -

SNI 3434:2008 ###


Memasang 1 m' lisplank ukuran (2x20) cm. Kayu klas II
0.0108 M3 Kayu Klas II x Rp. 3,110,000.00 Rp. 33,588.00
0.1000 Kg Paku x Rp. 18,977.78 Rp. 1,897.78
0.2000 Tukang Kayu x Rp. 90,000.00 Rp. 18,000.00
0.0200 Kepala Tukang x Rp. 95,000.00 Rp. 1,900.00
0.1000 Pekerja x Rp. 70,000.00 Rp. 7,000.00
0.0050 Mandor x Rp. 115,000.00 Rp. 575.00
Jumlah Rp. 62,960.78

1 m' Pasang Listplank Kayu Bayam


Bahan
0.011 m3 Kayu Kls I x Rp. 13,100,000.00 Rp. 144,100.00
0.200 Kg Paku Biasa x Rp. 18,977.78 Rp. 3,795.56
Tenaga
0.100 Oh Pekerja x Rp. 70,000.00 Rp. 7,000.00
0.200 Oh Tukang kayu x Rp. 90,000.00 Rp. 18,000.00
0.025 Oh Kepala Tukang x Rp. 95,000.00 Rp. 2,375.00
0.005 Oh Mandor x Rp. 115,000.00 Rp. 575.00
Rp. 175,845.56

23
1 m' Pasang Listplank ukuran (3x30) cm Kayu Jati
Bahan
0.011 m3 Kayu Jati, Papan x Rp. 15,000,000.00 Rp. 165,000.00
0.050 Kg Paku Biasa 2"-5" x Rp. 23,000.00 Rp. 1,150.00
Tenaga
0.110 Oh Pekerja x Rp. 70,000.00 Rp. 7,700.00
0.220 Oh Tukang kayu x Rp. 90,000.00 Rp. 19,800.00
0.022 Oh Kepala Tukang x Rp. 95,000.00 Rp. 2,090.00
0.005 Oh Mandor x Rp. 115,000.00 Rp. 575.00
Rp. 196,315.00

1 m2 Pek. Atap Seng BJLS 20


6.0000 Kk Seng BJLS 20 (6kk) x Rp. 8,000.00 Rp. 48,000.00
0.0400 Kg Paku Seng x Rp. 29,000.00 Rp. 1,160.00
0.2000 Tukang Kayu x Rp. 90,000.00 Rp. 18,000.00
0.0200 Kepala Tukang x Rp. 95,000.00 Rp. 1,900.00
0.1000 Pekerja x Rp. 70,000.00 Rp. 7,000.00
0.0500 Mandor x Rp. 115,000.00 Rp. 5,750.00
Jumlah Rp. 81,810.00

1 m2 Pek. Atap Seng BJLS 0,35


6.0000 Kk Seng BJLS 0,35 x Rp. 13,900.00 RP. 83,400.00
0.0400 Kg Paku Seng x Rp. 29,000.00 RP. 1,160.00
0.2000 Tukang Kayu x Rp. 90,000.00 RP. 18,000.00
0.0200 Kepala Tukang x Rp. 95,000.00 RP. 1,900.00
0.1000 Pekerja x Rp. 70,000.00 RP. 7,000.00
0.0500 Mandor x Rp. 115,000.00 RP. 5,750.00
Jumlah RP. 117,210.00

1 m1 Pek. Bumbungan Seng ###


0.3000 Lbr Seng Plat BJLS 20 x Rp. 48,000.00 Rp. 14,400.00
0.0200 Kg Paku Seng x Rp. 29,000.00 Rp. 580.00
0.0250 Tukang Kayu x Rp. 90,000.00 Rp. 2,250.00
0.0250 Pekerja x Rp. 70,000.00 Rp. 1,750.00
0.0025 Mandor x Rp. 115,000.00 Rp. 287.50
Jumlah Rp. 19,267.50

1 m2 Pek. Atap Genteng Beton


9.0000 Bh Genteng Beton x Rp. 11,500.00 Rp. 103,500.00
0.1000 Tukang Kayu x Rp. 90,000.00 Rp. 9,000.00
0.0100 Kepala Tukang x Rp. 95,000.00 Rp. 950.00
0.2000 Pekerja x Rp. 70,000.00 Rp. 14,000.00
0.0100 Mandor x Rp. 115,000.00 Rp. 1,150.00
Jumlah Rp. 128,600.00

TRIWULAN IV(Keempat )
0
- hal 19 -
1 m1 Pek. Bumbungan Genteng Beton
3.0000 Bh Bumbungan Genteng Beton x Rp. 27,500.00 Rp. 82,500.00
0.0100 Tukang Kayu x Rp. 90,000.00 Rp. 900.00
0.0200 Pekerja x Rp. 75,000.00 Rp. 1,500.00
0.0200 Mandor x Rp. 115,000.00 Rp. 2,300.00
Jumlah Rp. 87,200.00

1 m2 Pek. Atap Metal Sakura Roof


1.6000 lbr Atap Metal Sakura Roof x Rp. 41,000.00 Rp. 65,600.00
0.0400 Kg Paku Seng x Rp. 29,000.00 Rp. 1,160.00
0.2500 Tukang Kayu x Rp. 90,000.00 Rp. 22,500.00
0.0250 Kepala Tukang x Rp. 95,000.00 Rp. 2,375.00
0.1500 Pekerja x Rp. 70,000.00 Rp. 10,500.00
0.0750 Mandor x Rp. 115,000.00 Rp. 8,625.00
Jumlah Rp. 110,760.00

1 m1 Pek. Bumbungan Metal Sakura Roof


1.3000 bh Bumbungan Metal Sakura Roof x Rp. 47,300.00 Rp. 61,490.00
0.0200 Kg Paku Seng x Rp. 29,000.00 Rp. 580.00
0.2500 Tukang Kayu x Rp. 90,000.00 Rp. 22,500.00
0.0250 Kepala Tukang x Rp. 95,000.00 Rp. 2,375.00

24
0.1500 Pekerja x Rp. 70,000.00 Rp. 10,500.00
0.0750 Mandor x Rp. 115,000.00 Rp. 8,625.00
Jumlah Rp. 106,070.00

1 m2 Pek. Atap Multi Roof


1.6000 lbr Atap Multi Roof x Rp. 81,700.00 Rp. 130,720.00
0.0400 Kg Paku Seng x Rp. 29,000.00 Rp. 1,160.00
0.2500 Tukang Kayu x Rp. 90,000.00 Rp. 22,500.00
0.0250 Kepala Tukang x Rp. 95,000.00 Rp. 2,375.00
0.1500 Pekerja x Rp. 70,000.00 Rp. 10,500.00
0.0750 Mandor x Rp. 115,000.00 Rp. 8,625.00
Jumlah Rp. 175,880.00
###
1 m1 Pek. Bumbungan Multi Roof ###
1.3000 bh Bumbungan Multi Roof x Rp. 50,850.00 Rp. 66,105.00
0.0200 Kg Paku Seng x Rp. 29,000.00 Rp. 580.00
0.2500 Tukang Kayu x Rp. 90,000.00 Rp. 22,500.00
0.0250 Kepala Tukang x Rp. 95,000.00 Rp. 2,375.00
0.1500 Pekerja x Rp. 70,000.00 Rp. 10,500.00
0.0750 Mandor x Rp. 115,000.00 Rp. 8,625.00
Jumlah Rp. 110,685.00
###
1 m2 Pek. Atap Surya Roof ###
1.6000 lbr Atap Surya Roof x Rp. 48,100.00 Rp. 76,960.00
0.0400 Kg Paku Seng x Rp. 29,000.00 Rp. 1,160.00
0.2500 Tukang Kayu x Rp. 90,000.00 Rp. 22,500.00
0.0250 Kepala Tukang x Rp. 95,000.00 Rp. 2,375.00
0.1500 Pekerja x Rp. 70,000.00 Rp. 10,500.00
0.0750 Mandor x Rp. 115,000.00 Rp. 8,625.00
Jumlah Rp. 122,120.00

1 m1 Pek. Bumbungan Surya Roof ###


1.3000 bh Bumbungan Surya Roof x Rp. 52,250.00 Rp. 67,925.00
0.0200 Kg Paku Seng x Rp. 29,000.00 Rp. 580.00
0.2500 Tukang Kayu x Rp. 90,000.00 Rp. 22,500.00
0.0250 Kepala Tukang x Rp. 95,000.00 Rp. 2,375.00
0.1500 Pekerja x Rp. 70,000.00 Rp. 10,500.00
0.0750 Mandor x Rp. 115,000.00 Rp. 8,625.00
Jumlah Rp. 112,505.00

1 m 2 Pek. Pasangan Karet Pelapis.


1.0000 m² Karet Pelapis. x Rp. 11,600.00 Rp. 11,600.00
0.1000 Tukang Kayu x Rp. 90,000.00 Rp. 9,000.00
0.1000 Pekerja x Rp. 75,000.00 Rp. 7,500.00
Jumlah Rp. 28,100.00

1 m2 Pek. Pasangan Atap Policarbonat.


1.0000 m² Atap Policarbonat x Rp. 48,000.00 Rp. 48,000.00
0.0300 Kg Paku biasa. x Rp. 23,000.00 Rp. 690.00
0.0800 Tukang Kayu x Rp. 90,000.00 Rp. 7,200.00
0.0100 Kepala Tukang x Rp. 95,000.00 Rp. 950.00
0.1500 Pekerja x Rp. 70,000.00 Rp. 10,500.00
0.0100 Mandor x Rp. 115,000.00 Rp. 1,150.00
Jumlah Rp. 68,490.00

TRIWULAN IV(Keempat )
0
- hal 20 -

PASANGAN PLAFOND
1 m2 Pasang Rangka Plafond
Bahan
0.012 m3 Kayu Kls II, Balok x Rp. 3,110,000.00 Rp. 37,320.00
0.100 Kg Paku Biasa x Rp. 18,977.78 Rp. 1,897.78
Tenaga ###
0.150 Oh Pekerja x Rp. 70,000.00 Rp. 10,500.00
0.250 Oh Tukang kayu x Rp. 90,000.00 Rp. 22,500.00
0.025 Oh Kepala Tukang x Rp. 95,000.00 Rp. 2,375.00
0.075 Oh Mandor x Rp. 115,000.00 Rp. 8,625.00
Rp. 83,217.78
Jumlah
1 m' Pasang List Plafond - Kayu Profil
Bahan
1.050 m' Kayu Profil x Rp. 5,250.00 Rp. 5,512.50
Tenaga ###
0.021 Oh Pekerja x Rp. 70,000.00 Rp. 1,470.00
0.021 Oh Tukang kayu x Rp. 90,000.00 Rp. 1,890.00
0.002 Oh Kepala Tukang x Rp. 95,000.00 Rp. 190.00
0.001 Oh Mandor x Rp. 115,000.00 Rp. 115.00

25
Rp. 9,177.50
Jumlah
- hal 20 -
1 m2 Pasang Plafond Tripleks 4 mm + Rangka
Bahan
0.012 m3 Kayu Kls II, Balok x Rp. 3,110,000.00 Rp. 37,320.00
0.336 Lbr Tripleks 4 mm x Rp. 64,300.00 Rp. 21,604.80
0.100 Kg Paku Biasa 2"-5" x Rp. 18,977.78 Rp. 1,897.78
Tenaga ###
0.150 Oh Pekerja x Rp. 70,000.00 Rp. 10,500.00
0.250 Oh Tukang kayu x Rp. 90,000.00 Rp. 22,500.00
0.025 Oh Kepala Tukang x Rp. 95,000.00 Rp. 2,375.00
0.075 Oh Mandor x Rp. 115,000.00 Rp. 8,625.00
Rp. 104,822.58

1 m2 Pasang Plafond Papan Lambrizing


Bahan
1.100 m' Papan lambrizing x Rp. 14,000.00 Rp. 15,400.00
0.020 m3 Rangka Kayu Kls ii x Rp. 3,110,000.00 Rp. 62,200.00
0.100 Kg Paku Biasa 2"-5" x Rp. 18,977.78 Rp. 1,897.78
0.150 Kg Paku Sekrup 3 - 5" x Rp. 600.00 Rp. 90.00
Tenaga
0.200 Oh Pekerja x Rp. 70,000.00 Rp. 14,000.00
0.600 Oh Tukang kayu x Rp. 90,000.00 Rp. 54,000.00
0.060 Oh Kepala Tukang x Rp. 95,000.00 Rp. 5,700.00
0.010 Oh Mandor x Rp. 115,000.00 Rp. 1,150.00
Rp. 154,437.78

1 m2 Pasang rangka dan penutup Plafond Kalsiboard 4,5 mm


0.381 lbr kalsiboard 4,5 x 1200x 2400 x Rp. 65,600.00 Rp. 24,993.60
0.81 m' Hallow 40 x 40 x Rp. 24,640.00 Rp. 19,958.40
0.003 bh Sekrup (1500/dos) x Rp. 130,650.00 Rp. 348.40
0.15 Tukang Kayu x Rp. 90,000.00 Rp. 13,500.00
0.25 Kepala Tukang x Rp. 95,000.00 Rp. 23,750.00
0.025 Pekerja x Rp. 70,000.00 Rp. 1,750.00
0.075 Mandor x Rp. 115,000.00 Rp. 8,625.00
Jumlah Rp. 92,925.40

1 M2 PAS.PLAFOND ETERNIT
1.100 LB Eternit x Rp. 18,000.00 Rp. 19,800.00
0.010 kg Paku triplek x Rp. 29,000.00 Rp. 290.00
0.003 Uph Mandor x Rp. 115,000.00 Rp. 287.50
0.075 Uph Tukang kayu x Rp. 90,000.00 Rp. 6,750.00
0.038 Uph Pembantu tukang/laden Jumlah 70,000.00 Rp. 2,625.00
Rp. 29,752.50

TRIWULAN IV(Keempat )
0 - hal 21-

SNI 2839:2008
Memasang 1 m2 langit-langit gypsum board ukuran (1200x2400x9) mm
0.3640 Lbr Gypsum board x Rp. 61,600.00 Rp. 22,422.40
0.1100 Kg Paku Skrup x Rp. 29,000.00 Rp. 3,190.00
0.0500 Tukang Kayu x Rp. 90,000.00 Rp. 4,500.00
0.0050 Kepala Tukang x Rp. 95,000.00 Rp. 475.00
0.1000 Pekerja x Rp. 70,000.00 Rp. 7,000.00
0.0050 Mandor x Rp. 115,000.00 Rp. 575.00
Jumlah Rp. 38,162.40
###
SNI 2839:2008
Memasang 1 m2 langit-langit lambriziring kayu , tebal 9 mm
0.0150 Lbr Kayu papan x Rp. 3,780,000.00 Rp. 56,700.00
0.0100 Kg paku tripleks x Rp. 29,000.00 Rp. 290.00
0.8000 Tukang Kayu x Rp. 90,000.00 Rp. 72,000.00
0.0800 Kepala Tukang x Rp. 95,000.00 Rp. 7,600.00
0.8000 Pekerja x Rp. 70,000.00 Rp. 56,000.00
0.0400 Mandor x Rp. 115,000.00 Rp. 4,600.00
Jumlah Rp. 197,190.00

SNI 2839:2008 ###


Memasang 1 m2 langit2 tripleks ukuran (120x240) cm , tebal 3 mm , 4 mm ###
0.3750 Lbr Tripleks 3 mm x Rp. 51,500.00 Rp. 19,312.50

26
0.0300 Kg Paku tripleks x Rp. 23,000.00 Rp. 690.00
0.1000 Tukang Kayu x Rp. 90,000.00 Rp. 9,000.00
0.0100 Kepala Tukang x Rp. 95,000.00 Rp. 950.00
0.1000 Pekerja x Rp. 70,000.00 Rp. 7,000.00
0.0050 Mandor x Rp. 115,000.00 Rp. 575.00
Jumlah Rp. 37,527.50

1 m2 Kalsiboard plafond 4 mm
Bahan
0.364 m2 Plafond Kalsiboard t=4 mm x Rp. 65,600.00 Rp. 23,878.40
0.010 Kg Paku x Rp. 29,000.00 Rp. 290.00
Tenaga
0.030 Oh Pekerja x Rp. 70,000.00 Rp. 2,100.00
0.070 Oh Tukang kayu x Rp. 90,000.00 Rp. 6,300.00
0.007 Oh Kepala Tukang x Rp. 95,000.00 Rp. 665.00
0.002 Oh Mandor x Rp. 115,000.00 Rp. 230.00
Rp. 33,463.40
1 m' Pasang List Gypsumboard
Bahan
1.200 m' Gypsumboard list x Rp. 15,600.00 Rp. 18,720.00
0.010 kg Paku x Rp. 29,000.00 Rp. 290.00
Tenaga 0.050 Oh Pekerja x Rp. 70,000.00 Rp. 3,500.00
0.050 Oh Tukang Kayu x Rp. 90,000.00 Rp. 4,500.00
Rp. 27,010.00

PEKERJAAN SANITASI
RSNI T-15-2002
Memasang 1bh Urinoir
Bahan
1.000 Bh Urinoir x Rp. 484,000.00 Rp. 484,000.00
- Bh Perlengkapan (30% x hrg Urinoir) x Rp. 145,200.00 Rp. 145,200.00
0.150 Kg Semen Pc x Rp. 51,500.00 Rp. 7,725.00
0.010 m3 Pasir pasang x Rp. 151,300.00 Rp. 1,513.00
Tenaga ###
1.000 Oh Pekerja x Rp. 70,000.00 Rp. 70,000.00
1.000 Oh Tukang Batu x Rp. 90,000.00 Rp. 90,000.00
0.100 Oh Kepala Tukang x Rp. 95,000.00 Rp. 9,500.00
0.100 Oh Mandor x Rp. 115,000.00 Rp. 11,500.00
Rp. 819,438.00
RSNI T-15-2002 Rp.
Memasang 1 bh Kloset Duduk /monoblok
Bahan
1.000 Bh Kloset Duduk / Monoblok x Rp. 1,540,000.00 Rp. 1,540,000.00
- Bh Perlengkapan (6%x Hrg. Kloset) x Rp. 92,400.00 Rp. 92,400.00
Tenaga
3.300 Oh Pekerja x Rp. 70,000.00 Rp. 231,000.00
1.100 Oh Tukang Batu x Rp. 90,000.00 Rp. 99,000.00
0.001 Oh Kepala Tukang x Rp. 95,000.00 Rp. 95.00
0.160 Oh Mandor x Rp. 115,000.00 Rp. 18,400.00
Rp. 1,980,895.00

TRIWULAN IV(Keempat )
0
- hal 22 -

Memasang 1 bh Kloset Jongkok Porselen ###


Bahan
1.000 Bh Kloset Jongkok Porselen x Rp. 210,000.00 Rp. 210,000.00
0.150 Kg Semen Pc x Rp. 51,500.00 Rp. 7,725.00
0.010 m3 Pasir pasang x Rp. 151,300.00 Rp. 1,513.00
Tenaga
1.000 Oh Pekerja x Rp. 70,000.00 Rp. 70,000.00
1.500 Oh Tukang Batu x Rp. 90,000.00 Rp. 135,000.00
1.500 Oh Kepala Tukang x Rp. 95,000.00 Rp. 142,500.00
0.160 Oh Mandor x Rp. 115,000.00 Rp. 18,400.00
Rp. 585,138.00

Memasang 1 bh Bak mandi Fiber Glass Volume 0.30 m2


Bahan
1.000 Bh Bak Fiber Glass x Rp. 275,000.00 Rp. 275,000.00
- Bh Perlengkapan (18%x Hrg. Bak) x Rp. 49,500.00 Rp. 49,500.00
Tenaga
1.800 Oh Pekerja x Rp. 70,000.00 Rp. 126,000.00
2.700 Oh Tukang Batu x Rp. 90,000.00 Rp. 243,000.00
0.540 Oh Kepala Tukang x Rp. 95,000.00 Rp. 51,300.00
0.110 Oh Mandor x Rp. 115,000.00 Rp. 12,650.00

27
Rp. 757,450.00
RSNI T-15-2002
Memasang 1 bh Washtafel
Bahan
1.000 Bh Washtafel x Rp. 450,000.00 Rp. 450,000.00
Perlengkapan (12%x Hrg. Bak) x Rp. 54,000.00 Rp. 54,000.00
6.000 Kg Semen Abu-abu x Rp. 15,000.00 Rp. 90,000.00
0.010 m3 Pasir pasang x Rp. 151,300.00 Rp. 1,513.00
Tenaga
1.200 Oh Pekerja x Rp. 70,000.00 Rp. 84,000.00
1.450 Oh Tukang Batu x Rp. 90,000.00 Rp. 130,500.00
0.150 Oh Kepala Tukang x Rp. 95,000.00 Rp. 14,250.00
0.100 Oh Mandor x Rp. 115,000.00 Rp. 11,500.00
Rp. 835,763.00

RSNI T-15-2002
Memasang 1 m' Pipa Penyalur Air Limbah Jenis Pipa Tanah, dia 15 cm
Bahan
1.600 Bh Pipa Tanah x Rp. 50,000.00 Rp. 80,000.00
0.022 Kg Semen Pc x Rp. 51,500.00 Rp. 1,120.13
0.014 m3 Pasir Pasang x Rp. 151,300.00 Rp. 2,118.20
0.014 m3 Pasir Urug x Rp. 84,000.00 Rp. 1,176.00
Tenaga
0.060 Oh pembantu tukang x Rp. 72,500.00 Rp. 4,350.00
0.030 Oh Tukang Batu x Rp. 90,000.00 Rp. 2,700.00
0.003 Oh Kepala Tukang x Rp. 95,000.00 Rp. 285.00
0.0025 Oh Mandor x Rp. 115,000.00 Rp. 287.50
Rp. 92,036.83

Memasang 1 m' Pipa Beton, dia 15 cm - 20 cm


Bahan
1.100 Bh Pipa Beton x Rp. 100,000.00 Rp. 110,000.00
0.027 Bh Batu Bata x Rp. 600.00 Rp. 16.20
0.098 Kg Semen Pc x Rp. 51,500.00 Rp. 5,047.00
0.056 m3 Pasir Pasang x Rp. 151,300.00 Rp. 8,472.80
0.024 m3 Pasir Urug x Rp. 84,000.00 Rp. 2,016.00
Tenaga
0.140 Oh pembantu tukang x Rp. 72,500.00 Rp. 10,150.00
0.070 Oh Tukang Batu x Rp. 90,000.00 Rp. 6,300.00
0.007 Oh Kepala Tukang x Rp. 95,000.00 Rp. 665.00
0.007 Oh Mandor x Rp. 115,000.00 Rp. 805.00
Rp. 143,472.00

TRIWULAN IV(Keempat )
0
- hal 23 -
RSNI T-15-2002
Memasang 1 m' Pipa Beton, dia 30 cm - 100 cm ###
Bahan
1.100 Bh Pipa Beton x Rp. 154,300.00 Rp. 169,730.00
0.550 Bh Batu Bata x Rp. 600.00 Rp. 330.00
0.258 Kg Semen Pc x Rp. 51,500.00 Rp. 13,261.25
0.061 m3 Pasir Pasang x Rp. 151,300.00 Rp. 9,229.30
0.069 m3 Pasir Urug x Rp. 84,000.00 Rp. 5,796.00
Tenaga
0.380 Oh Pekerja x Rp. 72,500.00 Rp. 27,550.00
0.190 Oh Tukang Batu x Rp. 90,000.00 Rp. 17,100.00
0.019 Oh Kepala Tukang x Rp. 95,000.00 Rp. 1,805.00
0.019 Oh Mandor x Rp. 115,000.00 Rp. 2,185.00
Rp. 246,986.55

RSNI T-15-2002
Memasang 1 Bh Bak Kontrol Pasangan Batu bata Ukuran (30 x 30) cm, tinggi 50 cm
Bahan
0.145 Bh Batu Bata x Rp. 600.00 Rp. 87.00
1.100 Kg Semen Pc x Rp. 51,500.00 Rp. 56,650.00
0.070 m3 Pasir Pasang x Rp. 151,300.00 Rp. 10,591.00
0.070 m3 Batu Kerikil x Rp. 143,700.00 Rp. 10,059.00
1.600 Kg Besi Beton x Rp. 14,300.00 Rp. 22,880.00
0.060 m3 Pasir Beton x Rp. 148,500.00 Rp. 8,910.00
Tenaga

28
3.200 Oh Pekerja x Rp. 72,500.00 Rp. 232,000.00
1.015 Oh Tukang Batu x Rp. 90,000.00 Rp. 91,350.00
0.0015 Oh Kepala Tukang x Rp. 95,000.00 Rp. 142.50
0.016 Oh Mandor x Rp. 115,000.00 Rp. 1,840.00
Rp. 434,509.50
RSNI T-15-2002
Memasang 1 m' Pipa Galvanis dia 1/2"
Bahan
1.200 m' Pipa Galvanis x Rp. 33,466.67 Rp. 40,160.00
0.000 ls Perlengkapan(35%xHarga Pipa) x Rp. 4,016.00 Rp. 4,016.00
Tenaga
0.054 Oh Pekerja x Rp. 72,500.00 Rp. 3,915.00
0.090 Oh Tukang Batu x Rp. 90,000.00 Rp. 8,100.00
0.009 Oh Kepala Tukang x Rp. 95,000.00 Rp. 855.00
0.027 Oh Mandor x Rp. 115,000.00 Rp. 3,105.00
Rp. 60,151.00
RSNI T-15-2002
Memasang 1 m' Pipa Galvanis dia 3/4"
Bahan
1.200 m' Pipa Galvanis x Rp. 44,666.67 Rp. 53,600.00
0.000 ls Perlengkapan ( 35% x Harga Pipa) x Rp. 15,633.33 Rp. 15,633.33
Tenaga 0.054 Oh Pekerja x Rp. 72,500.00 Rp. 3,915.00
0.090 Oh Tukang Batu x Rp. 90,000.00 Rp. 8,100.00
0.009 Oh Kepala Tukang x Rp. 95,000.00 Rp. 855.00
0.027 Oh Mandor x Rp. 115,000.00 Rp. 3,105.00
Rp. 85,208.33
RSNI T-15-2002
Memasang 1 m' Pipa Galvanis dia 1"
Bahan
1.200 m' Pipa Galvanis x Rp. 55,000.00 Rp. 66,000.00
0.000 ls Perlengkapan ( 35% x Harga Pipa) x Rp. 19,250.00 Rp. 19,250.00
Tenaga
0.054 Oh Pekerja x Rp. 72,500.00 Rp. 3,915.00
0.090 Oh Tukang Batu x Rp. 90,000.00 Rp. 8,100.00
0.009 Oh Kepala Tukang x Rp. 95,000.00 Rp. 855.00
0.027 Oh Mandor x Rp. 115,000.00 Rp. 3,105.00
Rp. 101,225.00
RSNI T-15-2002
Memasang 1 m' Pipa Galvanis dia 1 1/2"
Bahan
1.200 m' Pipa Galvanis x Rp. 140,500.00 Rp. 168,600.00
0.000 ls Perlengkapan ( 35% x Harga Pipa) x Rp. 49,175.00 Rp. 49,175.00
Tenaga 0.108 Oh Pekerja x Rp. 72,500.00 Rp. 7,830.00
0.180 Oh Tukang Batu x Rp. 90,000.00 Rp. 16,200.00
0.018 Oh Kepala Tukang x Rp. 95,000.00 Rp. 1,710.00
0.0054 Oh Mandor x Rp. 115,000.00 Rp. 621.00
Rp. 244,136.00

TRIWULAN IV(Keempat )
0
- hal 24 -
RSNI T-15-2002
Memasang 1 m' Pipa Galvanis dia 3" ###
Bahan
1.200 m' Pipa Galvanis x Rp. 264,000.00 Rp. 316,800.00
0.000 ls Perlengkapan ( 35% x Harga Pipa) x Rp. 92,400.00 Rp. 92,400.00
Tenaga
0.108 Oh Pekerja x Rp. 72,500.00 Rp. 7,830.00
0.180 Oh Tukang Batu x Rp. 90,000.00 Rp. 16,200.00
0.018 Oh Kepala Tukang x Rp. 95,000.00 Rp. 1,710.00
0.0054 Oh Mandor x Rp. 115,000.00 Rp. 621.00
Rp. 435,561.00
RSNI T-15-2002
Memasang 1 m' Pipa Galvanis dia 4"
Bahan
1.200 m' Pipa Galvanis x Rp. 319,800.00 Rp. 383,760.00
0.000 ls Perlengkapan ( 35% x Harga Pipa) x Rp. 111,930.00 Rp. 111,930.00
Tenaga
0.135 Oh Pekerja x Rp. 72,500.00 Rp. 9,787.50
0.225 Oh Tukang Batu x Rp. 90,000.00 Rp. 20,250.00
0.0225 Oh Kepala Tukang x Rp. 95,000.00 Rp. 2,137.50
0.0068 Oh Mandor x Rp. 115,000.00 Rp. 782.00
Rp. 528,647.00
RSNI T-15-2002
Memasang 1 m' Pipa PVC tipe AW dia 1/2"
Bahan
1.200 m' Pipa PVC x Rp. 7,800.00 Rp. 9,360.00

29
0.000 ls Perlengkapan ( 35% x Harga Pipa) x Rp. 2,730.00 Rp. 2,730.00

Tenaga
0.036 Oh Pekerja x Rp. 72,500.00 Rp. 2,610.00
0.060 Oh Tukang Batu x Rp. 90,000.00 Rp. 5,400.00
0.006 Oh Kepala Tukang x Rp. 95,000.00 Rp. 570.00
0.0018 Oh Mandor x Rp. 115,000.00 Rp. 207.00
RSNI T-15-2002 Rp. 20,877.00
Memasang 1 m' Pipa PVC tipe AW dia 3/4"
Bahan
1.200 m' Pipa PVC x Rp. 9,500.00 Rp. 11,400.00
0.000 ls Perlengkapan ( 35% x Harga Pipa) x Rp. 3,325.00 Rp. 3,325.00
Tenaga
0.036 Oh Pekerja x Rp. 72,500.00 Rp. 2,610.00
0.060 Oh Tukang Batu x Rp. 90,000.00 Rp. 5,400.00
0.006 Oh Kepala Tukang x Rp. 95,000.00 Rp. 570.00
0.0018 Oh Mandor x Rp. 115,000.00 Rp. 207.00
Rp. 23,512.00
RSNI T-15-2002
Memasang 1 m' Pipa PVC tipe AW dia 1"
Bahan
1.200 m' Pipa PVC x Rp. 12,000.00 Rp. 14,400.00
0.000 ls Perlengkapan ( 35% x Harga Pipa) x Rp. 4,200.00 Rp. 4,200.00
Tenaga
0.036 Oh Pekerja x Rp. 72,500.00 Rp. 2,610.00
0.060 Oh Tukang Batu x Rp. 90,000.00 Rp. 5,400.00
0.006 Oh Kepala Tukang x Rp. 95,000.00 Rp. 570.00
0.0018 Oh Mandor x Rp. 115,000.00 Rp. 207.00
Rp. 27,387.00

Memasang 1 m' Pipa PVC tipe D dia 1 ½"


Bahan
1.200 m' Pipa PVC x Rp. 12,200.00 Rp. 14,640.00
0.000 ls Perlengkapan ( 35% x Harga Pipa) x Rp. 4,270.00 Rp. 4,270.00
Tenaga
0.036 Oh Pekerja x Rp. 72,500.00 Rp. 2,610.00
0.060 Oh Tukang Batu x Rp. 90,000.00 Rp. 5,400.00
0.006 Oh Kepala Tukang x Rp. 95,000.00 Rp. 570.00
0.0018 Oh Mandor x Rp. 115,000.00 Rp. 207.00
Rp. 27,697.00

Memasang 1 m' Pipa PVC tipe D dia 2" ###


Bahan
1.200 m' Pipa PVC x Rp. 13,700.00 Rp. 16,440.00
0.000 ls Perlengkapan ( 35% x Harga Pipa) x Rp. 4,795.00 Rp. 4,795.00
Tenaga
0.054 Oh Pekerja x Rp. 72,500.00 Rp. 3,915.00
0.090 Oh Tukang Batu x Rp. 90,000.00 Rp. 8,100.00
0.009 Oh Kepala Tukang x Rp. 95,000.00 Rp. 855.00
0.0027 Oh Mandor x Rp. 115,000.00 Rp. 310.50
Rp. 34,415.50

TRIWULAN IV(Keempat )
0
- hal 25 -

Memasang 1 m' Pipa PVC tipe D dia 2 ½"


Bahan
1.200 m' Pipa PVC x Rp. 16,550.00 Rp. 19,860.00
0.000 ls Perlengkapan ( 35% x Harga Pipa) x Rp. 5,792.50 Rp. 5,792.50
Tenaga
0.036 Oh Pekerja x Rp. 72,500.00 Rp. 2,610.00
0.060 Oh Tukang Batu x Rp. 90,000.00 Rp. 5,400.00
0.006 Oh Kepala Tukang x Rp. 95,000.00 Rp. 570.00
0.0018 Oh Mandor x Rp. 115,000.00 Rp. 207.00
Rp. 34,439.50

Memasang 1 m' Pipa PVC tipe D dia 3"


Bahan
1.200 m' Pipa PVC x Rp. 20,875.00 Rp. 25,050.00
0.000 ls Perlengkapan ( 35% x Harga Pipa) x Rp. 7,306.25 Rp. 7,306.25
Tenaga
0.081 Oh Pekerja x Rp. 72,500.00 Rp. 5,872.50
0.135 Oh Tukang Batu x Rp. 90,000.00 Rp. 12,150.00
0.0135 Oh Kepala Tukang x Rp. 95,000.00 Rp. 1,282.50
0.0041 Oh Mandor x Rp. 115,000.00 Rp. 471.50
Rp. 52,132.75
RSNI T-15-2002
Memasang 1 m' Pipa PVC tipe AW dia 4"
Bahan
1.200 m' Pipa PVC x Rp. 36,300.00 Rp. 43,560.00
0.000 ls Perlengkapan ( 35% x Harga Pipa) x Rp. 12,705.00 Rp. 12,705.00

30
Tenaga
0.081 Oh Pekerja x Rp. 72,500.00 Rp. 5,872.50
0.135 Oh Tukang Batu x Rp. 90,000.00 Rp. 12,150.00
0.0135 Oh Kepala Tukang x Rp. 95,000.00 Rp. 1,282.50
0.0041 Oh Mandor x Rp. 115,000.00 Rp. 471.50
Rp. 76,041.50
RSNI T-15-2002
Memasang 1 Bh Bak Cuci Piring Stainless Steel
Bahan
1.000 Bh Bak Cuci Stainless Steel x Rp. 495,000.00 Rp. 495,000.00
1.000 Set Water Drain + Asesories x Rp. 173,250.00 Rp. 173,250.00
Tenaga
0.000 Oh Pekerja x Rp. 72,500.00 Rp. -
0.300 Oh Tukang Batu x Rp. 90,000.00 Rp. 27,000.00
0.030 Oh Kepala Tukang x Rp. 95,000.00 Rp. 2,850.00
0.0000 Oh Mandor x Rp. 115,000.00 Rp. -

RSNI T-15-2002 Rp. 698,100.00


Memasang 1 Bh Kran dia 3/4" atau 1/2"
Bahan
1.000 Bh Kran Air x Rp. 19,000.00 Rp. 19,000.00
0.025 Bh Seal Tape x Rp. 5,000.00 Rp. 125.00
Tenaga ###
0.000 Oh Pekerja x Rp. 72,500.00 Rp. -
0.100 Oh Tukang Batu x Rp. 90,000.00 Rp. 9,000.00
0.010 Oh Kepala Tukang x Rp. 95,000.00 Rp. 950.00
0.000 Oh Mandor x Rp. 115,000.00 Rp. -
Rp. 29,075.00
RSNI T-15-2002
Memasang 1 Bh Floor Drain ###
Bahan
1.000 Bh Floor Drain x Rp. 27,000.00 Rp. 27,000.00
Tenaga
0.000 Oh Pekerja x Rp. 72,500.00 Rp. -
0.100 Oh Tukang Batu x Rp. 90,000.00 Rp. 9,000.00
0.010 Oh Kepala Tukang x Rp. 95,000.00 Rp. 950.00
0.000 Oh Mandor x Rp. 115,000.00 Rp. -
Rp. 36,950.00

###
###
###
###

###
###

TRIWULAN IV(Keempat )
0
- hal 26 -

BESI DAN ALUMUNIUM ###

1 m2 pekerjaan konstruksi BAJA RINGAN


BAHAN harga
2.8 M' Main Trus C 75-75 x Rp. 17,155.17 Rp. 48,034.48
5.1 M' Roof Bottom/Reng R 33-0.45 x Rp. 5,900.00 Rp. 30,090.00
25 bh Screw dia-6 x 20 mm (truss screew) 350.00 Rp. 8,750.00
35 bh Screw dia-4 x 16 mm (Roof Batten screew) 350.00 Rp. 12,250.00
1 bh Dynabolt dia 12 x 120 mm x Rp. 1,550.00 Rp. 1,550.00
UPAH gent. metal
0.247 oh Tukang x Rp. 70,000.00 Rp. 17,290.00
0.176 oh Tukang Besi Profil x Rp. 90,000.00 Rp. 15,840.00
0.117 oh Kepala Tukang Besi Profil x Rp. 95,000.00 Rp. 11,115.00
ALAT genteng
1 Ls Mobilisasi Ls 10,000.00 Rp. 10,000.00
1 ls Alat bantu (mesin bor listrik) / genset 4,500.00 Rp. 4,500.00
1 m2 Gambar Desain x Rp. 2,500.00 Rp. 2,500.00

Total 161,919.48
Keuntangan maz 10 % 16,191.95
178,111.43

1 m2 Pasang Jendela Naco & Tralis


Bahan
1.100 m2 Jendela Nako x Rp. 20,500.00 Rp. 22,550.00
0.020 Kg Paku Biasa x Rp. 23,000.00 Rp. 460.00

31
0.025 Kg Besi Strip x Rp. 36,900.00 Rp. 922.50
Tenaga
0.200 Oh Pekerja x Rp. 70,000.00 Rp. 14,000.00
0.200 Oh Tukang Kayu x Rp. 90,000.00 Rp. 18,000.00
0.020 Oh Kepala Tukang x Rp. 95,000.00 Rp. 1,900.00
0.001 Oh Mandor x Rp. 115,000.00 Rp. 115.00
Rp. 57,947.50

1 m' Pasang Talang Datar, Seng Bjls 28


Bahan
0.500 m2 Seng Plat 3" x 6" Bjls 28 x Rp. 58,000.00 Rp. 29,000.00
0.015 Kg Paku Biasa x Rp. 23,000.00 Rp. 345.00
0.0096 m3 Kayu Borneo, Papan x Rp. 3,780,000.00 Rp. 36,288.00
0.250 Kg Flincote / Meni Besi x Rp. 21,964.29 Rp. 5,491.07
Tenaga ###
0.150 Oh Pekerja x Rp. 70,000.00 Rp. 10,500.00
0.400 Oh Tukang Kayu x Rp. 90,000.00 Rp. 36,000.00
0.025 Oh Kepala Tukang x Rp. 95,000.00 Rp. 2,375.00
0.00125 Oh Mandor x Rp. 115,000.00 Rp. 143.75
Rp. 120,142.82

1 m' Pasang Talang Miring, Seng Bjls 28 ###


Bahan
0.500 m2 Seng Plat 3" x 6" Bjls 28 x Rp. 58,000.00 Rp. 29,000.00
0.015 Kg Paku Biasa x Rp. 23,000.00 Rp. 345.00
0.019 m3 Kayu Borneo, Papan x Rp. 3,780,000.00 Rp. 71,820.00
0.300 Kg Flincote / Meni Besi x Rp. 21,964.29 Rp. 6,589.29
Tenaga ###
0.040 Oh Pekerja x Rp. 70,000.00 Rp. 2,800.00
0.400 Oh Tukang Kayu x Rp. 90,000.00 Rp. 36,000.00
0.025 Oh Kepala Tukang x Rp. 95,000.00 Rp. 2,375.00
0.00125 Oh Mandor x Rp. 115,000.00 Rp. 143.75
Rp. 149,073.04

1 m' Pasang Talang 1/2 Lingkaran D - 10 cm, Seng Bjls 28


Bahan ###
0.300 m2 Seng Plat 3" x 6" Bjls 28 x Rp. 58,000.00 Rp. 17,400.00
0.100 Kg Paku Biasa x Rp. 23,000.00 Rp. 2,300.00
0.010 m3 Kayu Borneo, Papan x Rp. 3,780,000.00 Rp. 37,800.00
0.500 Kg Besi Strip x Rp. 21,964.29 Rp. 10,982.14
Tenaga
0.150 Oh Pekerja x Rp. 70,000.00 Rp. 10,500.00
0.250 Oh Tukang Kayu x Rp. 90,000.00 Rp. 22,500.00
0.025 Oh Kepala Tukang x Rp. 95,000.00 Rp. 2,375.00
0.00125 Oh Mandor x Rp. 115,000.00 Rp. 143.75
Rp. 104,000.89

TRIWULAN IV(Keempat )
0 - hal 27 -

1 m' Pasang Talang 1/2 Lingkaran D - 10 cm, Seng Bjls 24 ###


Bahan ###
0.300 m2 Seng Plat 3" x 6" Bjls 24 x Rp. 58,000.00 Rp. 17,400.00
0.100 Kg Paku Biasa x Rp. 23,000.00 Rp. 2,300.00
0.010 m3 Kayu Borneo, Papan x Rp. 3,780,000.00 Rp. 37,800.00
0.500 Kg Besi Strip x Rp. 21,964.29 Rp. 10,982.14
Tenaga
0.150 Oh Pekerja x Rp. 70,000.00 Rp. 10,500.00
0.250 Oh Tukang Kayu x Rp. 90,000.00 Rp. 22,500.00
0.025 Oh Kepala Tukang x Rp. 95,000.00 Rp. 2,375.00
0.00125 Oh Mandor x Rp. 115,000.00 Rp. 143.75
Rp. 104,000.89

1 m2 Pasangan Rangka Plafond Aluminium Hollow


Bahan
1.770 m1 Rangka Hollow 2x4 x Rp. 19,786.67 Rp. 35,022.40
1.350 m1 Rangka Hollow 4x4 x Rp. 24,640.00 Rp. 33,264.00
6.000 Bh Paku Ramset x Rp. 1,000.00 Rp. 6,000.00
Tenaga ###
0.600 Oh Pekerja x Rp. 70,000.00 Rp. 42,000.00
0.300 Oh Tukang Aluminium x Rp. 90,000.00 Rp. 27,000.00
0.030 Oh Kepala Tukang x Rp. 95,000.00 Rp. 2,850.00
0.030 Oh Mandor x Rp. 115,000.00 Rp. 3,450.00
Rp. 149,586.40

1 m2 Pasangan Rangka Plafond Aluminium Hollow ###


Bahan
1.200 m2 Hollow x Rp. 24,640.00 Rp. 29,568.00

32
0.025 Kg Paku Biasa x Rp. 23,000.00 Rp. 575.00
Tenaga ###
0.150 Oh Pekerja x Rp. 70,000.00 Rp. 10,500.00
0.250 Oh Tukang Aluminium x Rp. 90,000.00 Rp. 22,500.00
0.025 Oh Kepala Tukang x Rp. 95,000.00 Rp. 2,375.00
0.075 Oh Mandor x Rp. 115,000.00 Rp. 8,625.00
Rp. 74,143.00
Rp.
1 m' Pasang Kusen Jendela Pintu Aluminium
Bahan
1.000 m' Kusen Aluminium x Rp. 24,291.67 Rp. 24,291.67
Tenaga YKK Brown 4" ###
0.263 Oh Pekerja x Rp. 70,000.00 Rp. 18,410.00
0.263 Oh Tukang Las x Rp. 90,000.00 Rp. 23,670.00
0.026 Oh Kepala Tukang x Rp. 95,000.00 Rp. 2,470.00
0.0013 Oh Mandor x Rp. 115,000.00 Rp. 149.50
Rp. 68,991.17
###

PASANGAN KUNCI DAN KACA


1 m2 Pek. Jendela Bingkai Kaca
0.0114 M3 Papan Bayam Kls I x Rp. 15,000,000.00 Rp. 171,000.00
0.7569 M2 Kaca Polos 5 mm x Rp. 122,900.00 Rp. 93,023.01
1.0000 Tukang Kayu x Rp. 90,000.00 Rp. 90,000.00
0.6000 Kepala Tukang x Rp. 95,000.00 Rp. 57,000.00
2.0000 Pekerja x Rp. 70,000.00 Rp. 140,000.00
0.1000 Mandor x Rp. 115,000.00 Rp. 11,500.00
Jumlah Rp. 562,523.01
1 m2 Kaca Tebal, 3 mm
Bahan
1.100 m2 Kaca Bening 3 mm x Rp. 109,100.00 Rp. 120,010.00
Tenaga
0.015 oh Pekerja x Rp. 70,000.00 Rp. 1,050.00
0.150 oh Tukang kayu x Rp. 90,000.00 Rp. 13,500.00
0.015 oh Kepala Tukang x Rp. 95,000.00 Rp. 1,425.00
0.00075 oh Mandor x Rp. 115,000.00 Rp. 86.25
Rp. 136,071.25

TRIWULAN IV(Keempat )
0
- hal 28 -
1 m2 Kaca Tebal, 5 mm
Bahan
1.100 m2 Kaca Bening 5 mm x Rp. 122,900.00 Rp. 135,190.00
4.000 kg Karet Pelapis double x Rp. 5,000.00 Rp. 20,000.00

Tenaga ###
0.015 oh Pekerja x Rp. 70,000.00 Rp. 1,050.00
0.150 oh Tukang kayu x Rp. 90,000.00 Rp. 13,500.00
0.015 oh Kepala Tukang x Rp. 95,000.00 Rp. 1,425.00
0.00075 oh Mandor x Rp. 115,000.00 Rp. 86.25
Rp. 171,251.25

1 m2 Pasang Kaca, Tebal 5 mm


Bahan ###
1.000 m2 Kaca Bening 5 mm x Rp. 122,900.00 Rp. 122,900.00
1.000 m2 kaca Ryben x Rp. 115,000.00 Rp. 115,000.00
###
Tenaga ###
0.015 oh Pekerja x Rp. 70,000.00 Rp. 1,050.00
0.150 oh Tukang Kayu x Rp. 90,000.00 Rp. 13,500.00
0.0150 oh Kepala Tukang x Rp. 95,000.00 Rp. 1,425.00
0.00075 oh Mandor x Rp. 115,000.00 Rp. 86.25
Rp. 253,961.25

1 m2 Kaca Mati 3mm


Bahan
0.001 m3 Kayu Kls II, Papan x Rp. 3,780,000.00 Rp. 3,780.00
0.010 kg Paku x Rp. 23,000.00 Rp. 230.00
1.100 m2 Kaca Bening 3 mm x Rp. 109,100.00 Rp. 120,010.00

33
Tenaga
0.800 oh Pekerja x Rp. 70,000.00 Rp. 56,000.00
2.000 oh Tukang kayu x Rp. 90,000.00 Rp. 180,000.00
0.200 oh Kepala Tukang x Rp. 95,000.00 Rp. 19,000.00
0.040 oh Mandor x Rp. 115,000.00 Rp. 4,600.00
Rp. 383,620.00

1 m2 Pek. Kaca Mati 5 mm


1.0000 M2 Kaca Mati x Rp. 122,900.00 Rp. 122,900.00
0.0300 Kg Paku x Rp. 23,000.00 Rp. 690.00
4.0000 M Kayu Les x Rp. 14,100.00 Rp. 56,400.00
0.5000 oh Tukang kayu x Rp. 90,000.00 Rp. 45,000.00
0.0250 oh Kepala Tukang x Rp. 95,000.00 Rp. 2,375.00
Jumlah Rp. 227,365.00

SNI 7393:2008
memasang 1 m2 jendela nako & trails
1.1000 M2 Kaca 5 mm+ rangka x Rp. 122,900.00 Rp. 135,190.00
10.0000 Daun paku skrup x Rp. 600.00 Rp. 6,000.00
7.0000 Besi strip x Rp. 425,000.00 2,975,000.00
0.2000 Tukang Kayu x Rp. 90,000.00 Rp. 18,000.00
0.0200 Kepala Tukang x Rp. 95,000.00 Rp. 1,900.00
0.2000 Pekerja x Rp. 70,000.00 Rp. 14,000.00
0.0010 Mandor x Rp. 115,000.00 Rp. 115.00
Jumlah Rp. 3,150,205.00

1 Bh Pasang Kunci Tanam Biasa


Bahan
1.000 Bh Kunci Tanam Biasa x Rp. 100,000.00 Rp. 100,000.00
Tenaga
0.010 Oh Pekerja x Rp. 70,000.00 Rp. 700.00
0.500 Oh Tukang Kayu x Rp. 90,000.00 Rp. 45,000.00
0.010 Oh Kepala Tukang x Rp. 95,000.00 Rp. 950.00
0.005 Oh Mandor x Rp. 115,000.00 Rp. 575.00
Rp. 147,225.00

1 Bh Pasang Kunci Tanam Kamar Mandi


Bahan
1.000 Bh Kunci Tanam Kamar Mandi x Rp. 100,000.00 Rp. 100,000.00

Tenaga
0.005 Oh Pekerja x Rp. 70,000.00 Rp. 350.00
0.500 Oh Tukang Kayu x Rp. 90,000.00 Rp. 45,000.00
0.005 Oh Kepala Tukang x Rp. 95,000.00 Rp. 475.00
0.0025 Oh Mandor x Rp. 115,000.00 Rp. 287.50
Rp. 146,112.50

TRIWULAN IV(Keempat )
0
- hal 29 -
1 Bh Pasang Engsel Pintu
Bahan
1.000 Bh Engsel Pintu x Rp. 33,000.00 Rp. 33,000.00

Tenaga
0.015 Oh Pekerja x Rp. 70,000.00 Rp. 1,050.00
0.150 Oh Tukang Kayu x Rp. 90,000.00 Rp. 13,500.00
0.015 Oh Kepala Tukang x Rp. 95,000.00 Rp. 1,425.00
0.00075 Oh Mandor x Rp. 115,000.00 Rp. 86.25
Rp. 49,061.25

1 Bh Pasang Engsel Jendela Kupu-kupu


Bahan
1.000 Bh Engsel Jendela x Rp. 29,700.00 Rp. 29,700.00

Tenaga
0.020 Oh Pekerja x Rp. 70,000.00 Rp. 1,400.00
0.200 Oh Tukang Kayu x Rp. 90,000.00 Rp. 18,000.00
0.020 Oh Kepala Tukang x Rp. 95,000.00 Rp. 1,900.00
0.010 Oh Mandor x Rp. 115,000.00 Rp. 1,150.00
Rp. 52,150.00

1 Bh Pasang Kait Angin


Bahan
1.000 Bh Kait Angin x Rp. 17,000.00 Rp. 17,000.00

Tenaga
0.015 Oh Pekerja x Rp. 70,000.00 Rp. 1,050.00
0.150 Oh Tukang Kayu x Rp. 90,000.00 Rp. 13,500.00
0.015 Oh Kepala Tukang x Rp. 95,000.00 Rp. 1,425.00
0.00075 Oh Mandor x Rp. 115,000.00 Rp. 86.25

34
Rp. 33,061.25

PENUTUP LANTAI DAN DINDING

SNI 7395:2008 ###


Memasang 1 m2 Lantai Keramik ukuran (40x40) cm

1.0000 dus Ubin keramik x Rp. 66,080.00 Rp. 66,080.00


0.0250 M3 Pasir Pasangan x Rp. 151,300.00 Rp. 3,782.50
0.1250 Zak Semen 50 kg x Rp. 57,866.67 Rp. 7,233.33
0.2500 Tukang Batu x Rp. 90,000.00 Rp. 22,500.00
0.0250 Kepala Tukang x Rp. 95,000.00 Rp. 2,375.00
0.5000 Pekerja x Rp. 70,000.00 Rp. 35,000.00
0.0250 Mandor x Rp. 115,000.00 Rp. 2,875.00
Jumlah Rp. 139,845.83
###
SNI 7395:2008
Memasang 1 m2 Lantai Keramik ukuran (30x30) cm
1.0791 dus Ubin keramik x Rp. 59,500.00 Rp. 64,205.91
0.0450 M3 Pasir Pasangan x Rp. 151,300.00 Rp. 6,808.50
0.2000 Zak Semen 50 kg x Rp. 57,866.67 Rp. 11,573.33
1.5000 kg Semen warna x Rp. 15,000.00 Rp. 22,500.00
0.3500 Tukang Batu x Rp. 90,000.00 Rp. 31,500.00
0.0350 Kepala Tukang x Rp. 95,000.00 Rp. 3,325.00
0.7000 Pekerja x Rp. 70,000.00 Rp. 49,000.00
0.0350 Mandor x Rp. 115,000.00 Rp. 4,025.00
Jumlah Rp. 192,937.74

###
SNI 7395:2008 ###
Memasang 1 m2 Lantai Keramik ukuran (20x20) cm
1.0600 dus Ubin keramik x Rp. 58,986.67 Rp. 62,525.87
0.0450 M3 Pasir Pasangan x Rp. 151,300.00 Rp. 6,808.50
0.2080 Zak Semen 50 kg x Rp. 57,866.67 Rp. 12,036.27
1.6200 kg Semen warna x Rp. 15,000.00 Rp. 24,300.00
0.3500 Tukang Batu x Rp. 90,000.00 Rp. 31,500.00
0.0350 Kepala Tukang x Rp. 95,000.00 Rp. 3,325.00
0.7000 Pekerja x Rp. 70,000.00 Rp. 49,000.00
0.0350 Mandor x Rp. 115,000.00 Rp. 4,025.00
Jumlah Rp. 193,520.63

TRIWULAN IV(Keempat )
0 - hal 30 -

SNI 7395:2008 ###


Memasang 1 m2 dinding porselin ukuran (10x20) cm
1.0600 dus porselin x Rp. 54,100.00 Rp. 57,346.00
0.0180 M3 Pasir Pasangan x Rp. 151,300.00 Rp. 2,723.40
0.1860 Zak Semen 50 kg x Rp. 52,800.00 Rp. 9,820.80
0.4500 Tukang Batu x Rp. 51,500.00 Rp. 23,175.00
0.0450 Kepala Tukang x Rp. 70,000.00 Rp. 3,150.00
0.9000 Pekerja x Rp. 56,000.00 Rp. 50,400.00
0.0450 Mandor x Rp. 115,000.00 Rp. 5,175.00
Jumlah Rp. 151,790.20

SNI 7395:2008 ###


Memasang 1 m2 dinding keramik ukuran (20x20) cm
1.0600 dus Tegel 20 x 20 x Rp. 58,986.67 Rp. 62,525.87
0.0180 M3 Pasir Pasangan x Rp. 151,300.00 Rp. 2,723.40
0.1860 Zak Semen 50 kg x Rp. 52,800.00 Rp. 9,820.80
1.9400 Semen Warna x Rp. 15,000.00 Rp. 29,100.00
0.4500 Tukang Batu x Rp. 51,500.00 Rp. 23,175.00
0.0450 Kepala Tukang x Rp. 70,000.00 Rp. 3,150.00
0.9000 Pekerja x Rp. 56,000.00 Rp. 50,400.00
0.0450 Mandor x Rp. 115,000.00 Rp. 5,175.00
Jumlah Rp. 186,070.07
###
PENGECATAN
1 m2 Residu
1.0000 Kg Cat Residu x Rp. 50,100.00 Rp. 50,100.00
0.1000 Pekerja x Rp. 70,000.00 Rp. 7,000.00
0.0050 Mandor x Rp. 115,000.00 Rp. 575.00
Jumlah Rp. 57,675.00

35
1 m2 Pek. Cat Atap Genteng
0.1250 Kg Cat Genteng x Rp. 38,012.50 Rp. 4,751.56
0.0750 Tukang Cat x Rp. 90,000.00 Rp. 6,750.00
0.0750 Kepala Tukang x Rp. 95,000.00 Rp. 7,125.00
0.0500 Pekerja x Rp. 70,000.00 Rp. 3,500.00
0.0025 Mandor x Rp. 115,000.00 Rp. 287.50
Jumlah Rp. 22,414.06

1 m2Pek. Cat Atap Seng


0.1250 Kg Cat Meni x Rp. 21,964.29 Rp. 2,745.54
0.0750 Tukang Cat x Rp. 90,000.00 Rp. 6,750.00
0.0750 Kepala Tukang x Rp. 95,000.00 Rp. 7,125.00
0.0500 Pekerja x Rp. 70,000.00 Rp. 3,500.00
0.0025 Mandor x Rp. 115,000.00 Rp. 287.50
Jumlah Rp. 20,408.04

1 m2 Cat Meni ###


0.3000 Kg Cat Meni x Rp. 21,964.29 Rp. 6,589.29
0.0250 Pekerja x Rp. 70,000.00 Rp. 1,750.00
0.0013 Mandor x Rp. 115,000.00 Rp. 149.50
Jumlah Rp. 8,488.79

1 m2 Pengecatan kayu Dengan Cat Mengkilap 3 x


0.3000 Kg Cat kayu x Rp. 56,373.33 Rp. 16,912.00
0.1500 Kg Cat Dasar x Rp. 21,964.29 Rp. 3,294.64
0.1000 Kg Plamur x Rp. 50,000.00 Rp. 5,000.00
0.0750 Ltr Minyak Cat x Rp. 29,150.00 Rp. 2,186.25
0.1000 Lbr Kertas Gosok x Rp. 3,500.00 Rp. 350.00
0.0750 Tukang Cat x Rp. 90,000.00 Rp. 6,750.00
0.0075 Kepala Tukang x Rp. 95,000.00 Rp. 712.50
0.0500 Pekerja x Rp. 70,000.00 Rp. 3,500.00
0.0025 Mandor x Rp. 115,000.00 Rp. 287.50
Jumlah Rp. 38,992.89

TRIWULAN IV(Keempat )
0
- hal 31 -

1 m2 Pengecatan Plafon Eternit


0.3000 Kg Cat Tembok x Rp. 15,300.00 Rp. 4,590.00
0.0750 Tukang Cat x Rp. 90,000.00 Rp. 6,750.00
0.0075 Kepala Tukang x Rp. 95,000.00 Rp. 712.50
0.0500 Pekerja x Rp. 70,000.00 Rp. 3,500.00
0.0025 Mandor x Rp. 115,000.00 Rp. 287.50
Jumlah Rp. 15,840.00

1 m2 Pengecatan Dinding Tembok


0.3000 Kg Cat Tembok x Rp. 15,300.00 Rp. 4,590.00
0.1000 Kg Plamur x Rp. 11,140.00 Rp. 1,114.00
0.1000 Lbr Kertas Gosok x Rp. 3,500.00 Rp. 350.00
0.0750 Tukang Cat x Rp. 90,000.00 Rp. 6,750.00
0.0075 Kepala Tukang x Rp. 95,000.00 Rp. 712.50
0.0500 Pekerja x Rp. 70,000.00 Rp. 3,500.00
0.0025 Mandor x Rp. 115,000.00 Rp. 287.50
Jumlah Rp. 17,304.00

1 m2 Pek. Pengapuran Dinding Tembok 3 x


0.0011 M3 Kapur x Rp. 170,625.00 Rp. 187.69
0.0100 Tukang Cat x Rp. 90,000.00 Rp. 900.00
0.0150 Kepala Tukang x Rp. 95,000.00 Rp. 1,425.00
0.0660 Pekerja x Rp. 70,000.00 Rp. 4,620.00
Jumlah Rp. 7,132.69

PEKERJAAN LISTRIK

memasang 1 titik Lampu Pijar sl 18 watt


Bahan

36
1.000 Bh Lampu SL 18 Watt x Rp. 51,150.00 Rp. 51,150.00
1.000 Bh Fitting Lampu x Rp. 17,250.00 Rp. 17,250.00
Rp. 68,400.00
Tenaga
0.500 Oh Tukang instalatur x Rp. 105,000.00 Rp. 52,500.00
0.500 Oh Pembantu tukang instalatur x Rp. 75,000.00 Rp. 37,500.00
Rp. 90,000.00

1 titik mengerjakan instalasi penerangan ###


Bahan
20.000 m' Kabel NYM (2x2.5) mm x Rp. 10,800.00 Rp. 216,000.00
40.000 bh Klem kabel no. 10 x Rp. 5,000.00 Rp. 200,000.00
1.000 btg Pipa PVC 5/8" x Rp. 10,000.00 Rp. 10,000.00
1.000 bh Inbow dus x Rp. 3,500.00 Rp. 3,500.00
4.000 bh Las Dop x Rp. 3,450.00 Rp. 13,800.00
4.000 roll Isolasi x Rp. 8,400.00 Rp. 33,600.00
1.000 bh Tee dus 5/8 x Rp. 12,000.00 Rp. 12,000.00
1.000 ls Alat bantu x Rp. 50,000.00 Rp. 50,000.00
Tenaga
0.500 Oh Tukang instalatur x Rp. 105,000.00 Rp. 52,500.00
0.500 Oh Pembantu tukang instalatur x Rp. 75,000.00 Rp. 37,500.00
Rp. 628,900.00

1 Titik Pemasangan Instalasi Saklar Tunggal


Bahan
1.000 bh Saklar Tunggal x Rp. 27,700.00 Rp. 27,700.00
1.000 bh Inbow Dus x Rp. 3,500.00 Rp. 3,500.00
1.000 ls Bahan Lainnya x Rp. 50,000.00 Rp. 50,000.00
VEGER PUT
Tenaga VEGER KUN
1.000 Oh Tukang instalatur x Rp. 105,000.00 Rp. 105,000.00
0.060 Oh Pembantu tukang instalatur x Rp. 75,000.00 Rp. 4,500.00
Rp. 190,700.00

1 Titik Pemasangan Instalasi Saklar Ganda


Bahan KS
1.000 bh Saklar Ganda x Rp. 35,500.00 Rp. 35,500.00
1.000 bh Inbow Dus x Rp. 3,500.00 Rp. 3,500.00
1.000 ls Bahan Lainnya x Rp. 50,000.00 Rp. 50,000.00
###
Tenaga
1.000 Oh Tukang instalatur x Rp. 105,000.00 Rp. 105,000.00
0.060 Oh Pembantu tukang instalatur x Rp. 75,000.00 Rp. 4,500.00
Rp. 198,500.00

TRIWULAN IV(Keempat )
0
- hal 32 -

37
1 titik instalasi stop kontak
Bahan
2.500 m Kabel NYM (3x2.5) mm x Rp. 10,800.00 Rp. 27,000.00
1.000 bh Stop Kontak x Rp. 27,800.00 Rp. 27,800.00
1.000 bh Inbow dus x Rp. 3,500.00 Rp. 3,500.00
2.000 btg Pipa Konduit x Rp. 10,000.00 Rp. 20,000.00
1.000 ls Tee dus x Rp. 12,000.00 Rp. 12,000.00
1.000 ls Bahan Lainnya x Rp. 50,000.00 Rp. 50,000.00
Tenaga
1.000 Oh Tukang instalatur x Rp. 105,000.00 Rp. 105,000.00
0.060 Oh Pembantu tukang instalatur x Rp. 75,000.00 Rp. 4,500.00
Rp. 249,800.00

Memasang Kabel Tray / Tranking Kabel


Bahan
2.000 m' Besi Siku 40.40.4 x Rp. 12,133.33 Rp. 24,266.67
3.000 m' Besi Strip 40.4 x Rp. 36,900.00 Rp. 110,700.00
Tenaga
0.040 Oh Pekerja x Rp. 70,000.00 Rp. 2,800.00
0.130 Oh Tukang Besi x Rp. 90,000.00 Rp. 11,700.00
0.010 Oh Kepala Tukang x Rp. 95,000.00 Rp. 950.00
0.010 Oh Mandor x Rp. 115,000.00 Rp. 1,150.00
Rp. 151,566.67

PEKERJAAN BONGKARAN dan PEMBERSIHAN


1 m3 Membongkar Beton
12.000 Oh Pekerja x Rp. 70,000.00 Rp. 840,000.00
1.200 Oh Mandor x Rp. 115,000.00 Rp. 138,000.00
Rp. 978,000.00
1 m3 Membongkar Dinding Tembok
2.000 Oh Pekerja x Rp. 70,000.00 Rp. 140,000.00
0.100 Oh Mandor x Rp. 115,000.00 Rp. 11,500.00
Rp. 151,500.00
1 m2 Membongkar Lantai
1.000 Oh Pekerja x Rp. 70,000.00 Rp. 70,000.00
0.100 Oh Mandor x Rp. 115,000.00 Rp. 11,500.00
Rp. 81,500.00

1 m2 Mengupas plesteran lama


0.500 Oh Pekerja x Rp. 70,000.00 Rp. 35,000.00
0.025 Oh Mandor x Rp. 115,000.00 Rp. 2,875.00
Rp. 37,875.00

1 m2 Menurunkan atap seng


0.500 Oh Pekerja x Rp. 70,000.00 Rp. 35,000.00
0.100 Oh Mandor x Rp. 115,000.00 Rp. 11,500.00
Rp. 46,500.00

1 m2 Membongkar Rangka Plafond


0.200 Oh Pekerja x Rp. 70,000.00 Rp. 14,000.00
0.050 Oh Tukang Kayu x Rp. 90,000.00 Rp. 4,500.00
0.005 Oh Kepala Tukang x Rp. 95,000.00 Rp. 475.00
0.010 Oh Mandor x Rp. 115,000.00 Rp. 1,150.00
Rp. 20,125.00

1 m3 Membongkar kayu atap ###


2.000 Oh Pekerja x Rp. 70,000.00 Rp. 140,000.00
4.000 Oh Tukang Kayu x Rp. 90,000.00 Rp. 360,000.00
0.400 Oh Kepala Tukang x Rp. 95,000.00 Rp. 38,000.00
0.133 Oh Mandor x Rp. 115,000.00 Rp. 15,295.00
Rp. 553,295.00

1 m2 Membersihkan Lap. & Perataan


0.100 Oh Pekerja x Rp. 70,000.00 Rp. 7,000.00
0.050 Oh Mandor x Rp. 115,000.00 Rp. 5,750.00
Rp. 12,750.00

38
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN KOLAM RENANG
PROVINSI SULAWESI SELATAN

PEKERJAAN : PEMBANGUNAN KANTOR PENGELOLA


ANGGARAN : TAHUN 2014

NO JENIS PEKERJAAN TOTAL HARGA (Rp.)

A PEKERJAAN PERSIAPAN
I PEK. PERSIAPAN Rp. #REF!

B PEKERJAAN BANGUNAN
I PEK. TANAH DAN PONDASI Rp. #REF!
II PEK. STRUKTUR BETON Rp. #REF!
III PEKERJAAN DINDING Rp. #REF!
IV PEKERJAAN PINTU DAN JENDELA Rp. #REF!
V PEKERJAAN LANTAI Rp. #REF!
VI PEK. PENGECATAN Rp. #REF!
VII PEK. INSTALASI LISTRIK Rp. #REF!
VIII PEK. SANITASI DAN INSTALASI Rp. #REF!
IX PEK. KUDA-KUDA BAJA RINGAN DAN ATAP Rp. #REF!

REAL COST TOTAL Rp. #REF!


PPN 10% Rp. #REF!
TOTAL COST Rp. #REF!
DIBULATKAN Rp. #REF!
#REF!
TERBILANG : Empat milyar sembilan ratus lima puluh empat juta sembilan ratus enam ribu rupiah,-

Makassar, 2014

Diketahui/Disetujui
KABID PENATAAN BANGUNAN DAN LINGKUNGAN
DINAS TATA RUANG DAN PERMUKIMAM
PROVINSI SULAWESI SELATAN

###
###
### RENCANA ANGGARAN BIAYA (RAB)

### PEMBANGUNAN KOLAM RENANG


PROVINSI SULAWESI SELATAN

PEKERJAAN : PEMBANGUNAN KANTOR PENGELOLA


ANGGARAN : TAHUN 2014

NO URAIAN PEKERJAAN VOL. SAT HRG. SAT. (Rp.) JML. HARGA


A. PEKERJAAN PERSIAPAN
I PEK. PERSIAPAN
1. Pek. Pengukuran dan Pas. Bowplank 160.00 M' #REF! #REF!
2. Pek. Penyediaan P3K, Listrik Dan Air Kerja 1.00 Ls 5,000,000.00 5,000,000.00
3. Pek. Kantor Sementara Dengan Lantai Plesteran/Direksi 12.00 M2 #REF! #REF!
4. Pek. Papan Nama Proyek 1.00 Ls 600,000.00 600,000.00
5. Administrasi, Dokumentasi Dan Quality Control 1.00 Ls 6,781,500.00 6,781,500.00
Jumlah #REF!

B. PEKERJAAN BANGUNAN
I PEK. TANAH DAN PONDASI
1. Pek. Galian Tanah Pondasi Garis 78.00 m3 #REF! #REF!
2. Pek. Urugan Tanah Kembali (Pondasi Garis) 15.60 m3 #REF! #REF!
3. Pek. Urugan Pasir Bawah Pondasi Garis 6.40 m3 #REF! #REF!
4. Pek. Pas. Batu Kosong 12.80 m3 #REF! #REF!
5. Pek. Pas. Pondasi Batu Gunung, Camp. 1pc : 5ps 43.20 m3 #REF! #REF!
Jumlah #REF!
### II PEK. STRUKTUR BETON
1. Pek. Sloef Beton
a. Sloef Beton Type S1, Uk. 25 x 35
-Beton K.225 4.00 m3 #REF! #REF!
-Besi Beton ### Kg #REF! #REF!
-Bekisting 2x Pakai 40.00 m2 #REF! #REF!
2. Pek. Kolom
a. Type Kolom K1 (20x25 )
-Beton K.225 9.62 m3 #REF! #REF!
-Besi Beton 538.92 Kg #REF! #REF!
-Bekisting 2x Pakai 44.10 m2 #REF! #REF!
b. Type Kolom K2 (25x25 )
-Beton K.225 4.81 m3 #REF! #REF!
-Besi Beton 328.67 Kg #REF! #REF!
-Bekisting 2x Pakai 24.50 m2 #REF! #REF!
c. Type Kolom Praktis (KP 15x15)
-Beton K.225 0.24 m3 #REF! #REF!
-Besi Beton 53.17 Kg #REF! #REF!
-Bekisting 2x Pakai 6.30 m2 #REF! #REF!
3 Pekerjaan Ringbalk
a. Type Ringbalk RB1 (20x25 )
-Beton K.225 - m3 #REF! #REF!
-Besi Beton - Kg #REF! #REF!
-Bekisting 2x Pakai - m2 #REF! #REF!
b. Type Ringbalk RB2 (15x20 )
-Beton K.225 - m3 #REF! #REF!
-Besi Beton - Kg #REF! #REF!
-Bekisting 2x Pakai - m2 #REF! #REF!
#REF!
III PEKERJAAN DINDING
1. Pas. Pasangan Batu 1/2 Bata (1:4) 117.60 m2 #REF! #REF!
NO URAIAN PEKERJAAN VOL. SAT HRG. SAT. (Rp.) JML. HARGA
2. Pek. Plesteran Biasa( 1 : 5 ) 668.12 m2 #REF! #REF!
3. Pek. Plesteran Beton ( 1 : 3 ) 50.40 m2 #REF! #REF!
4. Pek. Acian 718.52 m2 #REF! #REF!
5. Partisi Dinding WC (Bahan Cubicle) m' -
Jumlah #REF!
IV PEKERJAAN PINTU DAN JENDELA
1. Pek. Kusen Aluminium 4" x 1 3/4" 445.72 m' #REF! #REF!
2. Pek. Bingkai Pintu Aluminium 4" x 1 1/2" 102.08 m' #REF! #REF!
6. Pek. Pintu PVC (Toilet/Km) 2.00 Bh #REF! #REF!
7. Pek. Pas. Kaca 5 mm Daun Pintu Dan Daun Jendela 91.02 m2 #REF! #REF!
9. Pas. Floring Ensel 4.00 Psg #REF! #REF!
10. Pas. Engsel Pintu (Tiap Daun pintu Aluminium = 3 bh engsel) 51.00 Bh #REF! #REF!
11. Pas. Engsel Expanyolet 16.00 Set #REF! #REF!
12. Pas. Tarikan Stainless 32.00 Bh #REF! #REF!
13. Pas. Kunci Pelor 5.00 Set #REF! #REF!
15. Pas. Kunci Silinder 8.00 Set #REF! #REF!
Jumlah #REF!
V PEKERJAAN LANTAI
1. Pek. Urugan Pasir Di Bawah Lantai 73.13 m3 #REF! #REF!
2. Pek. Lantai Kerja Beton Tebal 5 cm 365.64 m2 #REF! #REF!
3. Pek. Lantai Keramik 40/40 cm 365.64 m2 #REF! #REF!
5. Pek. Plint Lantai Uk. 10 x 40 157.00 m' #REF! #REF!
6. Pek. Lantai Keramik Toilet/KM/WC, Uk. 20 x 20 3.96 m2 #REF! #REF!
7. Pek. Keramik Dinding Toilet/KM/WC, Uk. 20 x 25 19.12 m2 #REF! #REF!
Jumlah #REF!

VI PEKERJAAN PLAFOND
1. Pek. Plafond Gypsum 9 mm + Rangka Hollow - m2 #REF! #REF!
Jumlah #REF!

VI PEK. PENGECATAN
1. Pek. Cat Tembok 718.52 m2 #REF! #REF!
2. Pek. Cat Plafond
Jumlah #REF!

VII PEK. INSTALASI LISTRIK


1. Pek. Instalasi Titik Mata Lampu 69.00 ttk #REF! #REF!
2. Pek. Instalasi Titik Stop Kontak 87.00 ttk #REF! #REF!
3. Pek. Pas. Lampu RM 2 x 36 30.00 Bh #REF! #REF!
4. Pek. Pas. Lampu Downlight DL 9 Watt 37.00 Bh #REF! #REF!
5. Pek. Pas. Lampu SL 9 Watt 2.00 Bh #REF! #REF!
7. Pas. Saklar Tunggal 11.00 Bh #REF! #REF!
8. Pas. Saklar Ganda 8.00 Bh #REF! #REF!
9. Pas. Stop Kontak 69.00 Bh #REF! #REF!
10. Pas. Stop Kontak AC 18.00 Bh #REF! #REF!
11. Pas. Panel Induk + MCB, Lengkap 1.00 Unit 17,000,000.00 17,000,000.00
Jumlah #REF!
VIII PEK. SANITASI DAN INSTALASI
1. Pas. Klosed Duduk + Acs, Lengkap 2.00 Set #REF! #REF!
2. Pas. Washtafel + Kaca, Acs Lengkap 3.00 Set #REF! #REF!
5. Pas. Kran Air Biasa 2.00 Bh #REF! #REF!
6. Pas. Floordrain Stainless 3.00 Bh #REF! #REF!
7. Pas. Stop Kran 2.00 Bh #REF! #REF!
8. Pek. Pas. Pipa Air Bersih AW 1 1/4"AB 20.00 m' #REF! #REF!
9. Pek. Pas. Pipa Air Bersih AW 3/4" (Distribusi) 30.00 m' #REF! #REF!
10. Pek. Pas. Pipa Air Bersih AW 1/2" (Distribusi) 30.00 m' #REF! #REF!
NO URAIAN PEKERJAAN VOL. SAT HRG. SAT. (Rp.) JML. HARGA
11. Pek. Pipa Buangan Air Washtafel/Washbasin Dia. 2" (AW 20.00 m' #REF! #REF!
12. Pek. Pipa Buangan Air Mandi Dia. 3" (D) 25.00 m' #REF! #REF!
13. Pek. Pipa Buangan Air Kotor Dia. 4" (D) 30.00 m' #REF! #REF!
14. Pek. Pas. Reservoir stainless Kap. 1 m3 1.00 Bh 1,650,000.00 1,650,000.00
15. Pas. Pompa Air 1.00 Unit 2,500,000.00 2,500,000.00
16. Pek. Septic tank + Peresapan 1.00 Unit 15,000,000.00 15,000,000.00
Jumlah #REF!

IX PEK. KUDA-KUDA BAJA RINGAN DAN ATAP


1. Pek. Kuda-kuda baja ringan 234.10 m' #REF! #REF!
2. Pek. Atap Spandek 0.6 cm ### m' #REF! #REF!
3. Pek. Listplank Woodplank 130.80 m' #REF! #REF!
Jumlah #REF!

IX PEK. LAIN-LAIN
1. Tanah Urug Di Bawah Rabat Keliling Bangunan
2. Lantai Rabat Beton Keliling Bangunan tebal = 7cm
3. Saluran Air Keliling Bangunan
~Galian Tanah
~Pasir Urug
~Pas. 1/2 Bata Trassram (1:3)
~Plesteran Saluran (1:3)
~Acian Semen
4

Realcost #REF!
REKAPITULASI ANGGARAN BIAYA
PERENCANAAN KONSTRUKSI RENOVASI PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
BP-PAUD DAN DIKMAS PROVINSI SULAWESI SELATAN

KEGIATAN : PERENCANAAN KONSTRUKSI RENOVASI PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
LOKASI : KOTA MAKASSAR
TAHUN : 2016

NO JENIS PEKERJAAN TOTAL HARGA (Rp.)

I REHABILITASI GEDUNG ASRAMA G3 (BANTIMURUNG) Rp. 2,036,327,000.00

II REHABILITASI GEDUNG AULA ANGING MAMMIRI Rp. 1,328,901,000.00

III REHABILITASI LAPANGAN TENNIS Rp. 1,498,281,000.00

IV REHABILITASI RUANG MAKAN LT. II (RUANG MUSIK DAN FITNES) Rp. 836,491,000.00

V REHABILITASI GEDUNG AKSARA LONTARA Rp. 1,117,189,000.00

VI REHABILITASI TOTAL GEDUNG ASRAMA KAYANGAN Rp. 1,511,811,000.00

Total Cost + PPN 10% Rp. 8,329,000,000.00


Dibulatkan Rp. 8,329,000,000.00
Terbilang : Delapan milyar tiga ratus dua puluh sembilan juta rupiah,-

Makassar,……………………………………..2016

Disetujui/DiKetahui Oleh : Konsultan Perencana :


PEJABAT PEMBUAT KOMITMEN CV. MALLOMO ENGINEERING
(PPK)

Drs. ARMAN AGUNG, M.Pd. SJAMSIR, ST


Nip. 19691011 200112 1 002 Direktur

Mengetahui : Mengetahui :
KABID PENATAAN BANGUNAN DAN LINGKUNGAN KEPALA BALAI BP - PAUD DAN DIKMAS
DINAS TATA RUANG DAN PERMUKIMAN PROVINSI SULAWESI SELATAN
PROVINSI SULAWESI SELATAN

Dr. Ir. H. JUMRAS, M.Si PRIA GUNAWAN, SH., M.Si.


Nip. 19620707 199203 1 012 Nip. 19620320 199203 1 001
REKAPITULASI ANGGARAN BIAYA
PERENCANAAN KONSTRUKSI RENOVASI PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
BP-PAUD DAN DIKMAS PROVINSI SULAWESI SELATAN

KEGIATAN : PERENCANAAN KONSTRUKSI RENOVASI PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
LOKASI : KOTA MAKASSAR
TAHUN : 2016

NO JENIS PEKERJAAN TOTAL HARGA (Rp.)

I REHABILITASI GEDUNG ASRAMA G3 (BANTIMURUNG) Rp. 2,036,327,000.00

II REHABILITASI GEDUNG AULA ANGING MAMMIRI Rp. 1,328,901,000.00

III REHABILITASI LAPANGAN TENNIS Rp. 1,498,281,000.00

IV REHABILITASI RUANG MAKAN LT. II (RUANG MUSIK DAN FITNES) Rp. 836,491,000.00

V REHABILITASI GEDUNG AKSARA LONTARA Rp. 1,117,189,000.00

VI REHABILITASI TOTAL GEDUNG ASRAMA KAYANGAN Rp. 1,511,811,000.00

Total Cost + PPN 10% Rp. 8,329,000,000.00


Dibulatkan Rp. 8,329,000,000.00
Terbilang : Delapan milyar tiga ratus dua puluh sembilan juta rupiah,-

Makassar,……………………………………..2016

Disetujui/DiKetahui Oleh : Konsultan Perencana :


PEJABAT PEMBUAT KOMITMEN CV. MALLOMO ENGINEERING
(PPK)

Drs. ARMAN AGUNG, M.Pd. SJAMSIR, ST


Nip. 19691011 200112 1 002 Direktur

Mengetahui :
KEPALA BALAI BP - PAUD DAN DIKMAS
PROVINSI SULAWESI SELATAN

PRIA GUNAWAN, SH., M.Si.


Nip. 19620320 199203 1 001
REKAPITULASI ANGGARAN BIAYA
PERENCANAAN KONSTRUKSI RENOVASI PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
BP-PAUD DAN DIKMAS PROVINSI SULAWESI SELATAN

PEKERJAAN : REHABILITASI TOTAL GEDUNG ASRAMA G3 (BANTIMURUNG)


LOKASI : KOTA MAKASSAR
TAHUN : 2016

NO JENIS PEKERJAAN TOTAL HARGA (Rp.)

I PEKERJAAN PERSIAPAN Rp. 47,152,809.85


II PEKERJAAN GEDUNG LANTAI 01 (DASAR)
A. PEKERJAAN TANAH DAN PONDASI Rp. 86,510,246.51
B. PEKERJAAN STRUKTUR BETON Rp. 153,504,285.68
C. PEKERJAAN DINDING Rp. 129,775,940.01
D. PEKERJAAN PINTU DAN JENDELA Rp. 91,325,266.77
E. PEKERJAAN PLAFOND Rp. 42,243,850.77
F. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING Rp. 134,294,548.75
G. PEKERJAAN PENGECATAN Rp. 51,828,102.08
H. PEKERJAAN LISTRIK DAN ARMATUR Rp. 26,086,490.00
I. PEKERJAAN SANITASI DAN INSTALASI AIR Rp. 60,545,284.31
J. PEKERJAAN LAIN-LAIN Rp. 35,152,480.65
III PEKERJAAN GEDUNG LANTAI 02 (DUA)
A. PEKERJAAN STRUKTUR BETON Rp. 355,028,900.26
B. PEKERJAAN DINDING Rp. 126,509,494.20
C. PEKERJAAN PINTU DAN JENDELA Rp. 87,957,013.11
D. PEKERJAAN PLAFOND Rp. 60,089,749.77
E. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING Rp. 102,373,038.28
F. PEKERJAAN PENGECATAN Rp. 58,051,680.66
G. PEKERJAAN RANGKA KAP DAN ATAP Rp. 115,033,710.68
H. PEKERJAAN LISTRIK DAN ARMATUR Rp. 30,982,440.00
I. PEKERJAAN SANITASI DAN INSTALASI AIR Rp. 39,919,997.00
J. PEKERJAAN LAIN-LAIN Rp. 16,841,250.00

Real Cost Rp. 1,851,206,579.35


PPN 10 % Rp. 185,120,657.94
Total Jumlah Rp. 2,036,327,237.29
Dibulatkan Rp. 2,036,327,000.00
Terbilang : Dua milyar tiga puluh enam juta tiga ratus dua puluh tujuh ribu rupiah,-

Makassar,……………………………………..2016

Disetujui/DiKetahui Oleh : Konsultan Perencana :


PEJABAT PEMBUAT KOMITMEN CV. MALLOMO ENGINEERING
(PPK)

Drs. ARMAN AGUNG, M.Pd. SJAMSIR, ST


Nip. 19691011 200112 1 002 Direktur
RENCANA ANGGARAN BIAYA (RAB)
PERENCANAAN KONSTRUKSI RENOVASI PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
BP-PAUD DAN DIKMAS PROVINSI SULAWESI SELATAN

PEKERJAAN : REHABILITASI TOTAL GEDUNG ASRAMA G3 (BANTIMURUNG)


LOKASI : KOTA MAKASSAR
TAHUN : 2016

NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA

I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran dan pemasangan Bouplank 59.60 m' 124,660.00 7,429,736.00
2 Pek. Pembongkaran Gedung Lama
- Pek. Pembongkaran Atap 220.68 m² 24,417.38 5,388,426.32
- Pek. Pembongkaran Plafond 183.90 m² 12,644.25 2,325,277.58
- Pek. Pembongkaran Dinding Batu Bata 50.61 m³ 632,471.25 32,009,369.96

Jumlah I 47,152,809.85

II PEKERJAAN GEDUNG LANTAI 01 (DASAR)


A. PEKERJAAN TANAH DAN PONDASI -
1 PONDASI POER
- Pek. Galian Tanah Pondasi Poer 23.91 m³ 85,387.50 2,041,636.47
- Pek. Urugan Tanah Kembali (Pondasi Poer) 18.01 m³ 22,942.50 413,306.27
- Pek. Urugan Pasir Bawah Pondasi Poer 0.92 m³ 165,600.00 152,289.90
- Pek. Lantai Kerja Bawah Pondasi Poer, Beton K.100 0.92 m³ 934,111.23 859,032.04
- Pek. Pondasi Poer (P1), Uk. 75 x 75 25.00 Bh
~ Beton K 225 3.98 m³ 1,182,874.94 4,713,017.34
~ Besi Beton Polos 481.28 Kg 14,860.88 7,152,167.62
~ Bekisting 2x Pakai 18.75 m² 165,197.50 3,097,453.13
- Pek. Pondasi Poer (P2), Uk. 50 x 50 1.00 Bh
~ Beton K 225 0.07 m³ 1,182,874.94 84,871.28
~ Besi Beton Polos 11.03 Kg 14,860.88 163,859.97
~ Bekisting 2x Pakai 0.50 m² 165,197.50 82,598.75
- Pek. Stek Poer (P1), Uk. 25 x 25
~ Beton K 225 1.95 m³ 1,182,874.94 2,310,302.62
~ Besi Beton Polos 652.66 Kg 14,860.88 9,699,098.68
~ Bekisting 2x Pakai 31.25 m² 284,567.50 8,892,734.38
- Pek. Stek Poer (P2), Uk. 20 x 20
~ Beton K 225 0.05 m³ 1,182,874.94 59,143.75
~ Besi Beton Polos 15.52 Kg 14,860.88 230,596.20
~ Bekisting 2x Pakai 1.00 m² 284,567.50 284,567.50

2 PONDASI BATU GUNUNG


- Pek. Galian Tanah Pondasi Garis 94.88 m³ 69,000.00 6,546,990.48
- Pek. Urugan Tanah Kembali (Pondasi Garis) 25.88 m³ 22,942.50 593,738.59
- Pek. Urugan Pasir Bawah Pondasi Garis 10.39 m³ 165,600.00 1,720,252.80
- Pek. Pas. Batu kosong 20.78 m³ 428,058.75 8,893,348.59
- Pek. Pondasi Batu Gunung, Camp. 1pc : 5ps 37.84 m³ 753,669.75 28,519,240.17

Jumlah II.A 86,510,246.51

B. PEKERJAAN STRUKTUR BETON


1 Pek. Sloef ( S1 & S1+ ) Uk. 20 x 30 cm
~ Beton K 225 6.72 m³ 1,182,874.94 7,948,919.60
~ Besi Beton Polos 1,216.10 Kg 14,860.88 18,072,250.64
~ Bekisting 2x Pakai 67.20 m² 174,613.13 11,734,002.00
2 Pek. Sloef ( S2 ) Uk. 15 x 25 cm
~ Beton K 175 1.29 m³ 1,120,337.12 1,441,033.62
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
~ Besi Beton Polos 227.13 Kg 14,860.88 3,375,418.90
~ Bekisting 2x Pakai 17.15 m² 174,613.13 2,994,615.09
3 Pek. Kolom (K1) Uk. 25 x25 cm 23.00 Bh
~ Beton K 225 5.75 m³ 1,182,874.94 6,801,530.91
~ Besi Beton Polos 964.53 Kg 14,860.88 14,333,730.04
~ Bekisting 2x Pakai 92.00 m² 284,567.50 26,180,210.00
4 Pek. Kolom (K2) Uk. 20 x 20 cm 1.00 Bh
~ Beton K 225 0.16 m³ 1,182,874.94 189,259.99
~ Besi Beton Polos 25.65 Kg 14,860.88 381,151.72
~ Bekisting 2x Pakai 3.20 m² 284,567.50 910,616.00
5 Pek. Kolom (K3) Uk. 25 x 25 cm + Lapisan Penebalan Batu Bata 2.00 Bh
~ Beton K 225 0.50 m³ 1,182,874.94 591,437.47
~ Besi Beton Polos 83.87 Kg 14,860.88 1,246,411.31
~ Bekisting 2x Pakai 8.00 m² 284,567.50 2,276,540.00
~ Pas. Batu Bata 1 Bt. Camp. 1pc : 3ps (Penebalan Kolom) 2.00 m² 233,790.69 467,581.38
6 Pek. Kolom (KP) Uk. 15 x 15 cm
~ Beton K 175 3.15 m³ 1,120,337.12 3,529,061.93
~ Besi Beton Polos 680.12 Kg 14,860.88 10,107,178.31
~ Bekisting 2x Pakai 42.00 m² 284,567.50 11,951,835.00
7 Pek. Balok Latei (BL1) Uk. 15 x 25 cm
a. Balok Latei, Uk. 15 x 25
~ Beton K 175 0.74 m³ 1,120,337.12 831,850.31
~ Besi Beton Polos 131.12 Kg 14,860.88 1,948,492.54
~ Bekisting 2x Pakai 9.90 m² 292,416.25 2,894,920.88
b. Plat Level Balok Latei, Lebar = 42,5 Cm
~ Beton K 175 0.47 m³ 1,120,337.12 523,757.60
~ Besi Beton Polos 48.99 Kg 14,860.88 728,093.71
~ Bekisting 2x Pakai 4.68 m² 342,067.50 1,599,165.56
8 Pek. Balok Latei (BL2) Uk. 15 x 20 cm
a. Balok Latei, Uk. 15 x 20
~ Beton K 175 0.45 m³ 1,120,337.12 504,151.70
~ Besi Beton Polos 76.80 Kg 14,860.88 1,141,315.20
~ Bekisting 2x Pakai 6.00 m² 292,416.25 1,754,497.50
b. Plat Level Balok Latei, Lebar = 42,5 Cm
~ Beton K 175 0.27 m³ 1,120,337.12 304,731.70
~ Besi Beton Polos 28.51 Kg 14,860.88 423,618.16
~ Bekisting 2x Pakai 2.72 m² 342,067.50 930,423.60
9 Pek. Balok Latei (BL3) Uk. 20 x 30 cm + Level
a. Balok Latei, Uk. 20 x 30
~ Beton K 175 0.34 m³ 1,120,337.12 376,433.27
~ Besi Beton Polos 54.92 Kg 14,860.88 816,147.37
~ Bekisting 2x Pakai 4.48 m² 292,416.25 1,310,024.80
b. Plat Level Balok Latei, Lebar = 80 Cm
~ Beton K 175 0.54 m³ 1,120,337.12 602,293.24
~ Besi Beton Polos 46.95 Kg 14,860.88 697,724.03
~ Bekisting 2x Pakai 4.48 m² 342,067.50 1,532,462.40
10 Pek. Tangga Beton
~ Beton K 225 1.86 m³ 1,182,874.94 2,202,152.36
~ Besi Beton Polos 261.42 Kg 14,860.88 3,884,872.84
~ Bekisting 2x Pakai 14.94 m² 265,305.00 3,964,373.02

Jumlah II.B 153,504,285.68

C. PEKERJAAN DINDING
1 Pek. Pas. Dinding 1/2 Bata (1pc : 5ps) 365.92 m² 106,854.55 39,100,377.22
2 Pek. Pas. Penebalan Dinding 1/2 Bata (1pc : 5ps) 38.96 m² 106,854.55 4,162,519.00
3 Pek. Plesteran Biasa (1pc : 5ps) 731.84 m² 59,506.29 43,549,261.79
4 Pek. Plesteran Beton (1pc : 3ps) 192.40 m² 62,841.06 12,090,475.41
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
5 Pek. Acian (saus semen) 841.74 m² 36,677.81 30,873,306.60

Jumlah II.C 129,775,940.01

D. PEKERJAAN PINTU DAN JENDELA


1 Pek. Kusen Dan Pintu ( PJ1 ) 1.00 Bh
~ Kusen Kayu Kls. I, Uk. 5/14 0.12 m³ 15,515,656.25 1,840,932.61
~ Daun Pintu Panel Kayu Kls. I 2.01 m² 959,675.00 1,927,987.08
~ Daun Jendela Kaca 5 mm, Bingkai Kayu Kls. I 2.22 m² 672,405.00 1,489,511.56
~ Engsel Pintu 3.00 Bh 61,654.38 184,963.13
~ Engsel Jendela Casement/Spring Knip 6.00 Bh 103,586.25 621,517.50
~ Kunci Tanam 2 x Slag 1.00 Set 419,462.50 419,462.50
~ Grendel Jendela 3.00 Bh 37,605.00 112,815.00
~ Handle Pintu 1.00 Set 242,017.50 242,017.50
~ Door Closer 1.00 Bh 213,267.50 213,267.50

2 Pek. Kusen Dan Pintu ( P1 ) 7.00 Bh


~ Kusen Kayu Kls. I, Uk. 5/14 0.29 m³ 15,515,656.25 4,485,576.22
~ Daun Pintu Panel Kayu Kls. I 14.06 m² 959,675.00 13,495,909.53
~ Engsel Pintu 21.00 Bh 61,654.38 1,294,741.88
~ Kunci Tanam 2 x Slag 7.00 Bh 419,462.50 2,936,237.50
~ Grendel Pintu 7.00 Bh 125,000.00 875,000.00
~ Handle Pintu 7.00 Set 242,017.50 1,694,122.50

3 Pek. Kusen Dan Pintu ( P2 ) 6.00 Bh


~ Kusen Kayu Kls. I, Uk. 5/14 0.28 m³ 15,515,656.25 4,300,939.91
~ Daun Pintu Panel Kayu Kls. I 8.82 m² 959,675.00 8,464,333.50
~ Kaca Mati Jendela 5 mm 1.38 m² 272,688.00 376,963.89
~ Engsel Pintu 18.00 Bh 61,654.38 1,109,778.75
~ Kunci Silinder (Km/Wc) 6.00 Bh 468,136.25 2,808,817.50
~ Grendel Pintu 6.00 Bh 125,000.00 750,000.00
~ Handle Pintu 6.00 Set 242,017.50 1,452,105.00

4 Pek. Kusen Dan Pintu Shaft ( PS ) 3.00 Bh


~ Kusen Aluminium, Uk. 1 3/4 x 4" 13.80 m' 184,549.13 2,546,777.93
~ Daun Pintu Aluminium, Uk. 50 x 160 3.00 Bh 1,089,803.25 3,269,409.75
~ Engsel Pintu 9.00 Bh 61,654.38 554,889.38
~ Kunci Silinder (Km/Wc) 3.00 Bh 468,136.25 1,404,408.75
~ Grendel Pintu 3.00 Bh 125,000.00 375,000.00
~ Handle Pintu 3.00 Set 242,017.50 726,052.50

5 Pek. Kusen Dan Jendela ( J1 ) 4.00 Bh


~ Kusen Aluminium, Uk. 1 3/4 x 4" 60.00 m' 184,549.13 11,072,947.50
~ Daun Jendela Aluminium 3/7" + Kaca 5 mm 8.00 Bh
- Bingkai Jendela Aluminium 31.20 m' 142,344.13 4,441,136.70
- Kaca Jendela 5 mm 4.13 m² 272,688.00 1,126,964.97
~ Kaca mati 5 mm 6.20 m² 272,688.00 1,691,101.90
~ Engsel Jendela Casement/Spring Knip 16.00 Bh 103,586.25 1,657,380.00
~ Grendel Jendela 8.00 Bh 37,605.00 300,840.00

6 Pek. Kusen Dan Jendela ( J2 ) 2.00 Bh


~ Kusen Aluminium, Uk. 1 3/4 x 4" 14.40 m' 184,549.13 2,657,507.40
~ Daun Jendela Aluminium 3/7" + Kaca 5 mm 4.00 Bh
- Bingkai Jendela Aluminium 16.00 m' 142,344.13 2,277,506.00
- Kaca Jendela 5 mm 2.32 m² 272,688.00 632,199.86
~ Engsel Jendela Casement/Spring Knip 8.00 Bh 103,586.25 828,690.00
~ Grendel Jendela 4.00 Bh 37,605.00 150,420.00
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
7 Pek. Kusen Dan Jendela (V1 ) 4.00 Bh
~ Kusen Aluminium, Uk. 1 3/4 x 4" 13.80 m' 184,549.13 2,546,777.93
~ Kaca mati 5 mm 3.53 m² 272,688.00 963,788.47

8 Pek. Kusen Dan Jendela (V2 ) 2.00 Bh


~ Kusen Aluminium, Uk. 1 3/4 x 4" 4.60 m' 184,549.13 848,925.98
~ Kaca mati 5 mm 0.57 m² 272,688.00 155,541.24

Jumlah II.D 91,325,266.77

E. PEKERJAAN PLAFOND
1 Pek. Plafond Gypsum 9mm + Rangka Hollow
- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 119.74 m² 164,823.75 19,736,589.19
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Gypsum Board 9mm 119.74 m² 73,207.85 8,766,171.51
- List Plafond Gypsum Type Sedang 140.50 m' 52,181.25 7,331,465.63
2 Pek. Plafond Calsyboard 4mm + Rangka Hollow
- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 22.53 m² 164,823.75 3,713,248.33
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Calsy Board 4mm 22.53 m² 75,928.75 1,710,568.44
- List Plafond Kayu, Uk. 5 cm 51.35 m' 19,197.81 985,807.67

Jumlah II.E 42,243,850.77

F. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 Pek. Urugan Tanah Bawah Lantai 32.64 m³ 179,400.00 5,856,391.01
2 Pek. Urugan Pasir Bawah Lantai 32.64 m³ 165,600.00 5,405,899.39
3 Pek. Lantai Kerja Beton, K. 100, Tbl = 7cm 11.43 m³ 934,111.23 10,672,699.07
4 Pek. Keramik Lantai, Uk. 60 x 60 (Type Homogenous Tile) 144.52 m² 503,366.50 72,744,261.43
5 Pek. Keramik Tangga, Uk. 60 x 60 (Type Homogenous Tile) 10.79 m² 503,366.50 5,431,223.86
(Dicutting)
6 Pek. Keramik Lantai, Uk. 30 x 30 (Gudang) 2.12 m² 233,674.77 496,255.11
7 Pek. Keramik Lantai, Uk. 30 x 30 (Km/WC) 16.04 m² 233,674.77 3,748,704.17
8 Pek. Keramik Dinding, Uk. 25 x 40 (Km/WC) 97.44 m² 302,176.88 29,444,114.70
9 Pek. Step Nosing Tangga 19.80 m' 25,000.00 495,000.00

Jumlah II.F 134,294,548.75

G. PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Dalam 608.15 m² 34,697.23 21,101,061.87
2 Pek. Pengecatan Dinding Luar 233.60 m² 37,687.23 8,803,547.32
3 Pek. Pengecatan Plafond 142.27 m² 34,697.23 4,936,450.53
4 Pek. Pengecatan Kayu Cat Duco (Kosen) 24.46 m² 228,792.50 5,596,836.53
5 Pek. Pengecatan Kayu Cat Duco (Daun Pintu) 49.78 m² 228,792.50 11,390,205.82

Jumlah II.G 51,828,102.08

H. PEKERJAAN LISTRIK DAN ARMATUR


1 Pek. Instalasi Titik Penerangan 27.00 Ttk 271,745.00 7,337,115.00
2 Pek. Instalasi Titik Stop Kontak 19.00 Ttk 325,795.00 6,190,105.00
3 Pek. Instalasi Titik Stop Kontak AC 6.00 Ttk 325,795.00 1,954,770.00
4 Pas. Instalasi TV Lengkap 6.00 Bh 250,000.00 1,500,000.00
5 Pas. Lampu LED 10 Wat 14.00 Bh 125,000.00 1,750,000.00
6 Pas. Lampu TL 12 Wat 7.00 Bh 94,000.00 658,000.00
7 Pas. Lampu Downlight 18 Wat 5.00 Bh 255,000.00 1,275,000.00
8 Pas. Lampu Gantung 18 Wat (Hias) 1.00 Bh 1,250,000.00 1,250,000.00
9 Pas. Saklar Tunggal 13.00 Bh 23,000.00 299,000.00
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
10 Pas. Saklar Ganda 4.00 Bh 28,000.00 112,000.00
11 Pas. Stop Kontak Biasa 19.00 Bh 28,000.00 532,000.00
12 Pas. Stop Kontak AC 6.00 Bh 75,000.00 450,000.00
13 Pas. Outlet Telepon + Instalasi 1.00 Bh 278,500.00 278,500.00
14 Pas. Panel Utama 1.00 Unit 2,500,000.00 2,500,000.00

Jumlah II.H 26,086,490.00

I. PEKERJAAN SANITASI DAN INSTALASI AIR


1 Pek. Pas. Kloset Duduk 6.00 Bh 2,876,868.75 17,261,212.50
2 Pek. Pas. Kran Air 6.00 Bh 76,618.75 459,712.50
3 Pek. Pas. Kran Air Ganda (Panas Dan Dingin) 6.00 Bh 341,118.75 2,046,712.50
4 Pek. Pas. Floordrain 6.00 Bh 89,412.50 536,475.00
5 Pek. Instalasi Air Bersih, Pipa PVC Dia. 1 1/2" AW (Pipa Utama) 37.64 m' 47,326.24 1,781,359.58
6 Pek. Instalasi Air Bersih, Pipa PVC Dia. 1" AW (Pipa Distribusi) 33.10 m' 24,249.67 802,663.97
7 Pek. Instalasi Air Bersih, Pipa PVC Dia. 3/4" AW (Kran + Closet) 18.00 m' 20,684.67 372,324.00
8 Pek. Instalasi Air Panas, Pipa PVC Dia. 1/2" AW (Kran Ganda) 18.00 m' 108,502.50 1,953,045.00
9 Pek. Instalasi Air Kotor, Pipa PVC Dia. 3" D (Disposal Padat) 56.00 m' 65,384.21 3,661,515.67
10 Pek. Instalasi Air Kotor, Pipa PVC Dia. 4" D (Disposal Padat) 12.00 m' 143,992.46 1,727,909.50
11 Pek. Instalasi Air Kotor, Pipa PVC Dia. 2" D (Floordrain) 7.50 m' 55,536.38 416,522.81
12 Pek. Instalasi Air Kotor, Pipa PVC Dia. 4" D (Floordrain/Air hujan) 16.50 m' 143,992.46 2,375,875.56
13 Pek. Bak Kontrol, Uk. 30 x 60 3.00 Bh 335,000.00 1,005,000.00
14 Pek. Septictank + Peresapan 3.00 Unit
A. Septic tank + Peresapan 01
- Pek. Galian Tanah 6.92 m3 85,387.50 590,774.77
- Pek. Pasir Urug Alas 0.36 m3 165,600.00 58,995.00
- Pek. Pas. Trasram 1 Bt., Camp. 1pc : 4ps 3.56 m2 224,717.19 800,554.98
- Pek. Pas. Trasram 1/2 Bt., Camp. 1pc : 4ps 15.13 m2 109,212.63 1,652,387.02
- Pek. Plesteran Trasram, Camp. 1pc : 3ps 18.69 m2 62,841.06 1,174,656.51
- Pek. Beton, Uk. 15/15
- Beton K175 0.02 m3 1,120,337.12 18,905.69
- Besi Beton 3.64 Kg 14,860.88 54,145.60
- Bekisting 2xpakai 0.34 m2 292,416.25 98,690.48
- Pek. Plat Beton, Tbl = 10 Cm
- Beton K175 0.36 m3 1,120,337.12 399,120.10
- Besi Beton 47.27 Kg 14,860.88 702,432.69
- Bekisting 2xpakai 3.56 m2 342,067.50 1,218,615.47
- Pek. Pipa Penghawaan (Pipa Gip 2") 1.30 m' 205,428.33 267,056.83
- Pek. Pipa Pembuangan, Dia. 4" (D) (Ke Peresapan) 4.00 m' 143,992.46 575,969.83
(Pada Posisi Peresapan Dilubangi Pada Sisinya Dan Dilapisi Ijuk)
- Pek. Peresapan
- Galian Tanah 2.81 m3 69,000.00 194,217.75
- Urugan Tanah 1.15 m3 179,400.00 205,682.10
- Urugan Pasir 0.94 m3 165,600.00 155,250.00
- Urugan Kerikil 0.73 m3 408,135.00 297,530.42

B. Septic tank + Peresapan 02


- Pek. Galian Tanah 6.92 m3 85,387.50 590,774.77
- Pek. Pasir Urug Alas 0.36 m3 165,600.00 58,995.00
- Pek. Pas. Trasram 1 Bt., Camp. 1pc : 4ps 3.56 m2 224,717.19 800,554.98
- Pek. Pas. Trasram 1/2 Bt., Camp. 1pc : 4ps 15.13 m2 109,212.63 1,652,387.02
- Pek. Plesteran Trasram, Camp. 1pc : 3ps 18.69 m2 62,841.06 1,174,656.51
- Pek. Beton, Uk. 15/15
- Beton K175 0.02 m3 1,120,337.12 18,905.69
- Besi Beton 3.64 Kg 14,860.88 54,145.60
- Bekisting 2xpakai 0.34 m2 292,416.25 98,690.48
- Pek. Plat Beton, Tbl = 10 Cm
- Beton K175 0.36 m3 1,120,337.12 399,120.10
- Besi Beton 47.27 Kg 14,860.88 702,432.69
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
- Bekisting 2xpakai 3.56 m2 342,067.50 1,218,615.47
- Pek. Pipa Penghawaan (Pipa Gip 2") 1.30 m' 205,428.33 267,056.83
- Pek. Pipa Pembuangan, Dia. 4" (D) (Ke Peresapan) 4.00 m' 143,992.46 575,969.83
(Pada Posisi Peresapan Dilubangi Pada Sisinya Dan Dilapisi Ijuk)
- Pek. Peresapan
- Galian Tanah 2.81 m3 69,000.00 194,217.75
- Urugan Tanah 1.15 m3 179,400.00 205,682.10
- Urugan Pasir 0.94 m3 165,600.00 155,250.00
- Urugan Kerikil 0.73 m3 408,135.00 297,530.42

C. Septic tank + Peresapan 03


- Pek. Galian Tanah 6.92 m3 85,387.50 590,774.77
- Pek. Pasir Urug Alas 0.36 m3 165,600.00 58,995.00
- Pek. Pas. Trasram 1 Bt., Camp. 1pc : 4ps 3.56 m2 224,717.19 800,554.98
- Pek. Pas. Trasram 1/2 Bt., Camp. 1pc : 4ps 15.13 m2 109,212.63 1,652,387.02
- Pek. Plesteran Trasram, Camp. 1pc : 3ps 18.69 m2 62,841.06 1,174,656.51
- Pek. Beton, Uk. 15/15
- Beton K175 0.02 m3 1,120,337.12 18,905.69
- Besi Beton 3.64 Kg 14,860.88 54,145.60
- Bekisting 2xpakai 0.34 m2 292,416.25 98,690.48
- Pek. Plat Beton, Tbl = 10 Cm
- Beton K175 0.36 m3 1,120,337.12 399,120.10
- Besi Beton 47.27 Kg 14,860.88 702,432.69
- Bekisting 2xpakai 3.56 m2 342,067.50 1,218,615.47
- Pek. Pipa Penghawaan (Pipa Gip 2") 1.30 m' 205,428.33 267,056.83
- Pek. Pipa Pembuangan, Dia. 4" (D) (Ke Peresapan) 4.00 m' 143,992.46 575,969.83
(Pada Posisi Peresapan Dilubangi Pada Sisinya Dan Dilapisi Ijuk)
- Pek. Peresapan
- Galian Tanah 2.81 m3 69,000.00 194,217.75
- Urugan Tanah 1.15 m3 179,400.00 205,682.10
- Urugan Pasir 0.94 m3 165,600.00 155,250.00
- Urugan Kerikil 0.73 m3 408,135.00 297,530.42
15 Mesin Pompa Air 1.00 Bh 750,000.00 750,000.00

Jumlah II.I 60,545,284.31

J. PEKERJAAN LAIN-LAIN
1 Pek. Rabat Beton Keliling Bangunan
- Urugan Tanah Bawah Rabat 4.39 m³ 179,400.00 788,036.03
- Urugan Pasir Bawah Rabat 8.79 m³ 165,600.00 1,454,835.74
- Beton Rabat K.100, Tbl = 10 Cm 4.39 m³ 1,010,931.32 4,440,637.14
2 Pek. Saluran Keliling Bangunan
- Pek. Galian Tanah 26.34 m³ 69,000.00 1,817,577.30
- Pek. Pasir Urug Alas Saluran 3.73 m³ 165,600.00 618,019.20
- Pek. Pas. Dinding Trasram 1/2 Bt. Camp. 1pc : 3ps 74.10 m² 112,955.01 8,369,966.43
- Pek. Pas. Trasram 1/2 Bt. Camp. 1pc : 3ps (Alas Saluran) 18.66 m² 112,955.01 2,107,740.53
- Pek. Plesteran Trasram, Camp. 1pc : 3ps 92.76 m² 62,841.06 5,829,136.73
3 Pek. Tangga Depan Teras
- Pek. Pas. Trasram 1/2 Bt. Camp. 1pc : 3ps (Anak Tangga) 3.45 m² 112,955.01 389,130.02
- Pek. Keramik Tangga, Uk. 60 x 60 (Type Homogenous Tile) 3.31 m² 503,366.50 1,667,401.53
(Dicutting)
4 Pek. Tangga Putar Besi, Dia. 110 Cm, Tinggi : 7,68 M 1.00 Bh 7,670,000.00 7,670,000.00
(Untuk Ke Rooftank)

Jumlah II.J 35,152,480.65

Jumlah Total Pekerjaan Lantai I (Dasar) 811,266,495.54


NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA

III PEKERJAAN GEDUNG LANTAI 02 (DUA)


A. PEKERJAAN STRUKTUR BETON
1 Pek. Balok Plat B1, Uk. 25 x 45
~ Beton K 225 4.84 m³ 1,182,874.94 5,722,157.52
~ Besi Beton Polos 803.89 Kg 14,860.88 11,946,562.30
~ Bekisting 2x Pakai 49.45 m² 292,416.25 14,459,983.56

2 Pek. Balok Plat B1, Uk. 25 x 45 + Lesplank


~ Beton K 225 0.75 m³ 1,182,874.94 889,521.96
~ Besi Beton Polos 110.56 Kg 14,860.88 1,643,087.89
~ Bekisting 2x Pakai 9.64 m² 292,416.25 2,817,430.57
3 Pek. Balok Plat B2, Uk. 20 x 35
~ Beton K 225 4.03 m³ 1,182,874.94 4,769,351.76
~ Besi Beton Polos 840.50 Kg 14,860.88 12,490,553.55
~ Bekisting 2x Pakai 51.84 m² 292,416.25 15,158,858.40
4 Pek. Balok Plat B3, Uk. 20 x 30
~ Beton K 225 2.33 m³ 1,182,874.94 2,753,732.86
~ Besi Beton Polos 395.06 Kg 14,860.88 5,870,961.05
~ Bekisting 2x Pakai 31.04 m² 292,416.25 9,076,600.40
5 Pek. Balok Plat B4, Uk. 20 x 25
~ Beton K 225 1.39 m³ 1,182,874.94 1,643,604.73
~ Besi Beton Polos 156.85 Kg 14,860.88 2,330,880.09
~ Bekisting 2x Pakai 19.45 m² 292,416.25 5,688,373.31
6 Pek. Plat Beton, Tbl = 12 cm
~ Beton K 225 15.23 m³ 1,182,874.94 18,011,584.67
~ Besi Beton Polos 2,401.84 Kg 14,860.88 35,693,497.91
~ Bekisting 2x Pakai 126.89 m² 342,067.50 43,405,389.76
7 Pek. Kolom (K1) Uk. 25 x25 cm 23.00 Bh
~ Beton K 225 5.69 m³ 1,182,874.94 6,727,601.22
~ Besi Beton Polos 954.04 Kg 14,860.88 14,177,928.63
~ Bekisting 2x Pakai 91.00 m² 284,567.50 25,895,642.50
8 Pek. Kolom (K2) Uk. 20 x 20 cm 1.00 Bh
~ Beton K 225 0.16 m³ 1,182,874.94 189,259.99
~ Besi Beton Polos 25.65 Kg 14,860.88 381,151.72
~ Bekisting 2x Pakai 3.20 m² 284,567.50 910,616.00
9 Pek. Kolom (K3) Uk. 25 x 25 cm + Lapisan Penebalan Batu Bata 2.00 Bh
~ Beton K 225 0.50 m³ 1,182,874.94 591,437.47
~ Besi Beton Polos 83.87 Kg 14,860.88 1,246,411.31
~ Bekisting 2x Pakai 8.00 m² 284,567.50 2,276,540.00
~ Pas. Batu Bata 1 Bt. Camp. 1pc : 3ps (Penebalan Kolom) 2.00 m² 233,790.69 467,581.38
10 Pek. Kolom (KP) Uk. 15 x 15 cm
~ Beton K 175 2.34 m³ 1,120,337.12 2,617,807.72
~ Besi Beton Polos 504.50 Kg 14,860.88 7,497,360.48
~ Bekisting 2x Pakai 31.16 m² 284,567.50 8,865,700.46
11 Pek. Balok Latei (BL1) Uk. 15 x 25 cm
a. Balok Latei, Uk. 15 x 25
~ Beton K 175 0.92 m³ 1,120,337.12 1,033,510.99
~ Besi Beton Polos 162.90 Kg 14,860.88 2,420,854.37
~ Bekisting 2x Pakai 12.30 m² 292,416.25 3,596,719.88
b. Plat Level Balok Latei, Lebar = 42,5 Cm
~ Beton K 175 0.47 m³ 1,120,337.12 523,757.60
~ Besi Beton Polos 48.99 Kg 14,860.88 728,093.71
~ Bekisting 2x Pakai 4.68 m² 342,067.50 1,599,165.56
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
12 Pek. Balok Latei (BL2) Uk. 15 x 20 cm
~ Beton K 175 0.51 m³ 1,120,337.12 571,371.93
~ Besi Beton Polos 87.04 Kg 14,860.88 1,293,490.56
~ Bekisting 2x Pakai 6.80 m² 292,416.25 1,988,430.50
13 Pek. Balok Latei (BL3) Uk. 20 x 30 cm + Level
a. Balok Latei, Uk. 20 x 30
~ Beton K 175 0.21 m³ 1,120,337.12 235,270.80
~ Besi Beton Polos 34.32 Kg 14,860.88 510,092.10
~ Bekisting 2x Pakai 2.80 m² 292,416.25 818,765.50
b. Plat Level Balok Latei, Lebar = 40 Cm
~ Beton K 175 0.17 m³ 1,120,337.12 188,216.64
~ Besi Beton Polos 14.67 Kg 14,860.88 218,038.76
~ Bekisting 2x Pakai 1.40 m² 342,067.50 478,894.50

14 Pek. Balok Latei (BL4) Uk. 20 x 35 cm


~ Beton K 175 0.25 m³ 1,120,337.12 274,482.59
~ Besi Beton Polos 43.11 Kg 14,860.88 640,696.90
~ Bekisting 2x Pakai 3.15 m² 292,416.25 921,111.19
15 Pek. Ringbalk RB1, Uk. 20 x 25
~ Beton K 175 5.98 m³ 1,120,337.12 6,699,615.97
~ Besi Beton Polos 675.02 Kg 14,860.88 10,031,423.51
~ Bekisting 2x Pakai 59.80 m² 292,416.25 17,486,491.75
16 Pek. Ringbalk RB2, Uk. 15 x 20
~ Beton K 175 0.34 m³ 1,120,337.12 379,794.28
~ Besi Beton Polos 45.79 Kg 14,860.88 680,443.80
~ Bekisting 2x Pakai 4.52 m² 292,416.25 1,321,721.45
17 Pek. Plat Dak Atap
a. Balok Plat Atap BA1, Uk. 20 x 35
~ Beton K 175 1.07 m³ 1,120,337.12 1,195,959.87
~ Besi Beton Polos 222.53 Kg 14,860.88 3,306,960.79
~ Bekisting 2x Pakai 13.73 m² 292,416.25 4,013,413.03
b. Balok Plat Atap BA2, Uk. 20 x 25
~ Beton K 175 0.50 m³ 1,120,337.12 560,168.56
~ Besi Beton Polos 56.44 Kg 14,860.88 838,747.79
~ Bekisting 2x Pakai 7.00 m² 292,416.25 2,046,913.75
c. Balok Plat Atap BA3, Uk. 15 x 20
~ Beton K 175 0.34 m³ 1,120,337.12 376,433.27
~ Besi Beton Polos 45.38 Kg 14,860.88 674,422.17
~ Bekisting 2x Pakai 6.16 m² 292,416.25 1,801,284.10
d. Plat Beton Dak, Tbl = 12cm
~ Beton K 175 3.01 m³ 1,120,337.12 3,373,783.20
~ Besi Beton Polos 497.88 Kg 14,860.88 7,399,003.78
~ Bekisting 2x Pakai 25.10 m² 342,067.50 8,584,183.91

Jumlah III.A 355,028,900.26

B. PEKERJAAN DINDING
1 Pek. Pas. Dinding 1/2 Bata (1pc : 4ps) 373.57 m² 106,854.55 39,917,654.24
2 Pek. Plesteran Biasa (1pc : 4ps) 747.14 m² 59,506.29 44,459,529.51
3 Pek. Plesteran Beton (1pc : 3ps) 189.58 m² 62,841.06 11,913,093.95
4 Pek. Acian (saus semen) 823.91 m² 36,677.81 30,219,216.50

Jumlah III.B 126,509,494.20

C. PEKERJAAN PINTU DAN JENDELA


1 Pek. Kusen Dan Pintu ( PJ1 ) 1.00 Bh
~ Kusen Kayu Kls. I, Uk. 5/14 0.12 m³ 15,515,656.25 1,840,932.61
~ Daun Pintu Panel Kayu Kls. I 2.01 m² 959,675.00 1,927,987.08
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
~ Daun Jendela Kaca 5 mm, Bingkai Kayu Kls. I 2.22 m² 672,405.00 1,489,511.56
~ Engsel Pintu 3.00 Bh 61,654.38 184,963.13
~ Engsel Jendela Casement/Spring Knip 6.00 Bh 103,586.25 621,517.50
~ Kunci Tanam 2 x Slag 1.00 Set 419,462.50 419,462.50
~ Grendel Jendela 3.00 Bh 37,605.00 112,815.00
~ Handle Pintu 1.00 Set 242,017.50 242,017.50
~ Door Closer 1.00 Bh 213,267.50 213,267.50

2 Pek. Kusen Dan Pintu ( P1 ) 7.00 Bh


~ Kusen Kayu Kls. I, Uk. 5/14 0.29 m³ 15,515,656.25 4,485,576.22
~ Daun Pintu Panel Kayu Kls. I 14.06 m² 959,675.00 13,495,909.53
~ Engsel Pintu 21.00 Bh 61,654.38 1,294,741.88
~ Kunci Tanam 2 x Slag 7.00 Bh 419,462.50 2,936,237.50
~ Grendel Pintu 7.00 Bh 125,000.00 875,000.00
~ Handle Pintu 7.00 Set 213,267.50 1,492,872.50

3 Pek. Kusen Dan Pintu ( P2 ) 7.00 Bh


~ Kusen Kayu Kls. I, Uk. 5/14 0.32 m³ 15,515,656.25 5,017,763.23
~ Daun Pintu Panel Kayu Kls. I 10.29 m² 959,675.00 9,875,055.75
~ Kaca Mati Jendela 5 mm 1.61 m² 272,688.00 439,791.21
~ Engsel Pintu 21.00 Bh 61,654.38 1,294,741.88
~ Kunci Silinder (Km/Wc) 6.00 Bh 468,136.25 2,808,817.50
~ Grendel Pintu 6.00 Bh 125,000.00 750,000.00

4 Pek. Kusen Dan Jendela ( J1 ) 4.00 Bh


~ Kusen Aluminium, Uk. 1 3/4 x 4" 60.00 m' 184,549.13 11,072,947.50
~ Daun Jendela Aluminium 3/7" + Kaca 5 mm 8.00 Bh
- Bingkai Jendela Aluminium 31.20 m' 142,344.13 4,441,136.70
- Kaca Jendela 5 mm 4.13 m² 272,688.00 1,126,964.97
~ Kaca mati 5 mm 6.20 m² 272,688.00 1,691,101.90
~ Engsel Jendela Casement/Spring Knip 16.00 Bh 103,586.25 1,657,380.00
~ Grendel Jendela 8.00 Bh 37,605.00 300,840.00

5 Pek. Kusen Dan Jendela ( J2 ) 2.00 Bh


~ Kusen Aluminium, Uk. 1 3/4 x 4" 14.40 m' 184,549.13 2,657,507.40
~ Daun Jendela Aluminium 3/7" + Kaca 5 mm 4.00 Bh
- Bingkai Jendela Aluminium 16.00 m' 142,344.13 2,277,506.00
- Kaca Jendela 5 mm 2.32 m² 272,688.00 632,199.86
~ Engsel Jendela Casement/Spring Knip 8.00 Bh 103,586.25 828,690.00
~ Grendel Jendela 4.00 Bh 37,605.00 150,420.00

6 Pek. Kusen Dan Jendela ( J3 ) 1.00 Bh


~ Kusen Aluminium, Uk. 1 3/4 x 4" 16.10 m' 184,549.13 2,971,240.91
~ Kaca mati 5 mm 4.81 m² 272,688.00 1,312,829.11

7 Pek. Kusen Dan Jendela (V1 ) 4.00 Bh


~ Kusen Aluminium, Uk. 1 3/4 x 4" 13.80 m' 184,549.13 2,546,777.93
~ Kaca mati 5 mm 3.53 m² 272,688.00 963,788.47

8 Pek. Kusen Dan Jendela (V2 ) 3.00 Bh


~ Kusen Aluminium, Uk. 1 3/4 x 4" 6.90 m' 184,549.13 1,273,388.96
~ Kaca mati 5 mm 0.86 m² 272,688.00 233,311.85

Jumlah III.C 87,957,013.11

D. PEKERJAAN PLAFOND
1 Pek. Plafond Gypsum 9mm + Rangka Hollow
- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 135.26 m² 164,823.75 22,294,752.68
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Gypsum Board 9mm 135.26 m² 73,207.85 9,902,401.26
- List Plafond Gypsum Type Sedang 152.05 m' 52,181.25 7,934,159.06
2 Pek. Plafond Calsyboard 4mm + Rangka Hollow
- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 25.24 m² 164,823.75 4,159,706.43
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Calsy Board 4mm 25.24 m² 75,928.75 1,916,236.64
- List Plafond Kayu, Uk. 5 cm 57.55 m' 19,197.81 1,104,834.11
3 Pek. Plafond Calsyboard 4mm + Rangka Hollow (Overstek Atap)
- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 43.05 m² 164,823.75 7,096,387.66
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Calsy Board 4mm 43.05 m² 75,928.75 3,269,066.77
- List Plafond Kayu, Uk. 5 cm 125.65 m' 19,197.81 2,412,205.14

Jumlah III.D 60,089,749.77

E. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 Pek. Keramik Lantai, Uk. 60 x 60 (Type Homogenous Tile) 126.93 m² 503,366.50 63,890,296.38
2 Pek. Keramik Lantai, Uk. 30 x 30 (Km/WC) 18.81 m² 233,674.77 4,395,679.52
3 Pek. Keramik Dinding, Uk. 25 x 40 (Km/WC) 112.81 m² 302,176.88 34,087,062.38

Jumlah III.E 102,373,038.28

F. PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Dalam 602.55 m² 34,697.23 20,906,639.44
2 Pek. Pengecatan Dinding Luar 221.37 m² 37,687.23 8,342,632.56
3 Pek. Pengecatan Plafond 203.56 m² 34,697.23 7,062,824.86
4 Pek. Pengecatan Kayu Cat Duco (Kosen) 26.11 m² 228,792.50 5,974,344.16
5 Pek. Pengecatan Kayu Cat Duco (Daun Pintu) 52.72 m² 228,792.50 12,062,855.77
6 Pek. Pengecatan Kayu (Lesplank Woodplank) 20.22 m² 40,378.78 816,458.87
7 Pek. Waterproofing Plat Dak Atap 25.10 m² 115,000.00 2,885,925.00

Jumlah III.F 58,051,680.66

G. PEKERJAAN RANGKA KAP DAN ATAP


1 Pek. Rangka Kap Baja Ringan 257.00 m2 239,356.86 61,514,330.05
2 Pek. Atap Zincalume, T = 0,35 mm 257.00 m2 147,976.25 38,029,659.49
3 Pek. Nok Atap Zincalume, T = 0,35 mm 61.52 m' 132,048.75 8,123,364.52
4 Pek. Lesplank Woodplank, Uk. 1 x 20 cm 67.40 m' 109,293.13 7,366,356.63

Jumlah III.G 115,033,710.68

H. PEKERJAAN LISTRIK DAN ARMATUR


1 Pek. Instalasi Titik Penerangan 37.00 Ttk 271,745.00 10,054,565.00
2 Pek. Instalasi Titik Stop Kontak 18.00 Ttk 325,795.00 5,864,310.00
3 Pek. Instalasi Titik Stop Kontak AC 7.00 Ttk 325,795.00 2,280,565.00
4 Pas. Instalasi TV Lengkap 7.00 Bh 250,000.00 1,750,000.00
5 Pas. Lampu LED 10 Wat 15.00 Bh 125,000.00 1,875,000.00
6 Pas. Lampu TL 12 Wat 16.00 Bh 94,000.00 1,504,000.00
7 Pas. Lampu Downlight 18 Wat 4.00 Bh 255,000.00 1,020,000.00
8 Pas. Lampu Gantung 18 Wat (Hias) 1.00 Bh 1,250,000.00 1,250,000.00
9 Pas. Lampu Gantung 25 Wat (Hias) 1.00 Bh 1,500,000.00 1,500,000.00
10 Pas. Saklar Tunggal 13.00 Bh 23,000.00 299,000.00
11 Pas. Saklar Ganda 2.00 Bh 28,000.00 56,000.00
12 Pas. Stop Kontak Biasa 18.00 Bh 28,000.00 504,000.00
13 Pas. Stop Kontak AC 7.00 Bh 75,000.00 525,000.00
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
14 Pas. Panel Utama 1.00 Unit 2,500,000.00 2,500,000.00

Jumlah III.H 30,982,440.00

I. PEKERJAAN SANITASI DAN INSTALASI AIR


1 Pek. Pas. Kloset Duduk 7.00 Bh 2,876,868.75 20,138,081.25
2 Pek. Pas. Kran Air 7.00 Bh 76,618.75 536,331.25
3 Pek. Pas. Kran Air Ganda (Panas Dan Dingin) 7.00 Bh 108,502.50 759,517.50
4 Pek. Pas. Floordrain 7.00 Bh 89,412.50 625,887.50
5 Pek. Instalasi Air Bersih, Pipa PVC Dia. 1 1/2" AW (Pipa Utama) 35.43 m' 47,326.24 1,676,768.59
6 Pek. Instalasi Air Bersih, Pipa PVC Dia. 1" AW (Pipa Distribusi) 38.90 m' 24,249.67 943,312.03
7 Pek. Instalasi Air Bersih, Pipa PVC Dia. 3/4" AW (Kran + Closet) 21.00 m' 20,684.67 434,378.00
8 Pek. Instalasi Air Panas, Pipa PVC Dia. 1/2" AW (Kran Ganda) 21.00 m' 341,118.75 7,163,493.75
9 Pek. Instalasi Air Kotor, Pipa PVC Dia. 3" D (Disposal Padat) 15.00 m' 65,384.21 980,763.13
10 Pek. Instalasi Air Kotor, Pipa PVC Dia. 2" D (Floordrain) 14.00 m' 55,536.38 777,509.25
11 Pek. Instalasi Air Kotor, Pipa PVC Dia. 4" D (Floordrain/Air hujan) 6.00 m' 143,992.46 863,954.75
12 Reservoir Fiber, Kap. 1 m3 (Lengkap) 4.00 Bh 1,255,000.00 5,020,000.00

Jumlah III.I 39,919,997.00

J. PEKERJAAN LAIN-LAIN
1 Pek. Reling Tangga Dan Void, T = 1,15 M 10.15 m' 850,000.00 8,627,500.00
(Bahan Dari Hollow BS, Finishing Cat Enamel)
2 Pek. Reling Balkon, T = 1,15 M 4.33 m' 850,000.00 3,676,250.00
(Bahan Dari Hollow BS, Finishing Cat Enamel)
3 Pek. Dudukan Reservoir, Uk. 1,5 x 5,5 M. T = 1 M 1.00 Bh 4,537,500.00 4,537,500.00
(Bahan Dari Besi Siku, Finishing Cat)

Jumlah III.J 16,841,250.00

Jumlah Total Pekerjaan Lantai II (Dua) 992,787,273.96

REAL COAST LT. I DAN II 1,851,206,579.35


REKAPITULASI ANGGARAN BIAYA
PERENCANAAN KONSTRUKSI RENOVASI PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
BP-PAUD DAN DIKMAS PROVINSI SULAWESI SELATAN

PEKERJAAN : REHABILITASI GEDUNG AULA ANGING MAMMIRI


LOKASI : KOTA MAKASSAR
TAHUN : 2016

NO JENIS PEKERJAAN TOTAL HARGA (Rp.)

I PEKERJAAN PERSIAPAN Rp. 32,366,258.69

II PEKERJAAN FASAD UTAMA GEDUNG Rp. 297,641,129.07

III PEKERJAAN AULA GEDUNG LT. II Rp. 878,085,336.09

Real Cost Rp. 1,208,092,723.85


PPN 10 % Rp. 120,809,272.39
Total Jumlah Rp. 1,328,901,996.24
Dibulatkan Rp. 1,328,901,000.00
Terbilang : Satu milyar tiga ratus dua puluh delapan juta sembilan ratus satu ribu rupiah,-

Makassar,……………………………………..2016

Disetujui/DiKetahui Oleh : Konsultan Perencana :


PEJABAT PEMBUAT KOMITMEN CV. MALLOMO ENGINEERING
(PPK)

Drs. ARMAN AGUNG, M.Pd. SJAMSIR, ST


Nip. 19691011 200112 1 002 Direktur

Mengetahui : Mengetahui :
KABID PENATAAN BANGUNAN DAN LINGKUNGAN KEPALA BALAI BP PAUDNI REGIONAL III
DINAS TATA RUANG DAN PERMUKIMAN
PROVINSI SULAWESI SELATAN

Dr. Ir. H. JUMRAS, M.Si Dr. H. MUHAMMAD HASBI


Nip. 19620707 199203 1 012 Nip. 19730623 199303 1 001
RENCANA ANGGARAN BIAYA (RAB)
PERENCANAAN KONSTRUKSI RENOVASI PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
BP-PAUD DAN DIKMAS PROVINSI SULAWESI SELATAN

PEKERJAAN : REHABILITASI GEDUNG AULA ANGING MAMMIRI


LOKASI : KOTA MAKASSAR
TAHUN : 2016

NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA

I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran dan pemasangan Bouplank 15.72 m' 124,660.00 1,959,655.20
2 Pek. Pembongkaran
- Pek. Pembongkaran Beton Tangga 2.46 m³ 1,264,942.50 3,116,818.32
- Pek. Pembongkaran Plafond Lama (Aula) 428.11 m² 12,644.25 5,413,124.81
- Pek. Pembongkaran Lantai Keramik Lama (Aula + Tangga) 442.65 m² 41,400.00 18,325,552.68
- Pek. Pembongkaran Dinding (Tangga) 2.51 m³ 632,471.25 1,588,135.31
- Pek. Pembongkaran Dinding Partisi Existing 154.53 m² 12,075.00 1,865,889.38
- Pek. Pembongkaran Dinding Partisi Existing (Rg. VIP) 8.04 m² 12,075.00 97,083.00
Jumlah I 32,366,258.69

II PEKERJAAN FASAD UTAMA GEDUNG


A. PEKERJAAN TANAH DAN PONDASI -
1 PONDASI POER
a. Pek. Galian Tanah Pondasi Poer 5.17 m³ 85,387.50 441,688.19
b. Pek. Urugan Tanah Kembali (Pondasi Poer) 3.26 m³ 22,942.50 74,685.75
c. Pek. Urugan Pasir Bawah Pondasi Poer 0.27 m³ 165,600.00 45,084.60
d. Pek. Lantai Kerja Bawah Pondasi Poer, Beton K.100 0.27 m³ 934,111.23 254,311.78
e. Pek. Pondasi Poer (P1), Uk. 50 x 75 2.00 Bh
~ Beton K 225 0.22 m³ 1,182,874.94 255,057.41
~ Besi Beton Polos 29.71 Kg 14,860.88 441,564.15
~ Bekisting 2x Pakai 1.25 m² 165,197.50 206,496.88
f. Pek. Pondasi Poer (P2), Uk. 100 x 97,5 4.00 Bh
~ Beton K 225 1.16 m³ 1,182,874.94 1,368,917.51
~ Besi Beton Polos 118.20 Kg 14,860.88 1,756,605.52
~ Bekisting 2x Pakai 3.97 m² 165,197.50 655,834.08
g. Pek. Stek Poer (P1), Uk. 25 x 25 2.00 Bh
~ Beton K 225 0.09 m³ 1,182,874.94 103,501.56
~ Besi Beton Polos 41.27 Kg 14,860.88 613,267.89
~ Bekisting 2x Pakai 1.40 m² 284,567.50 398,394.50
i. Pek. Stek Poer (P2), Uk. Dia. 60 Cm 4.00 Bh
~ Beton K 225 0.79 m³ 1,182,874.94 935,985.28
~ Besi Beton Polos 73.20 Kg 14,860.88 1,087,748.38
~ Bekisting 2x Pakai 5.28 m² 284,567.50 1,501,150.48

2 PONDASI BATU GUNUNG


a. Pek. Galian Tanah Pondasi Garis 10.50 m³ 69,000.00 724,457.77
b. Pek. Urugan Tanah Kembali (Pondasi Garis) 2.78 m³ 22,942.50 63,782.17
c. Pek. Urugan Pasir Bawah Pondasi Garis 1.10 m³ 165,600.00 182,226.24
d. Pek. Pas. Batu kosong 2.20 m³ 428,058.75 942,071.70
e. Pek. Pondasi Batu Gunung, Camp 1 pc : 5 ps 4.42 m³ 753,669.75 3,329,788.32

Jumlah II.A 15,382,620.15

B. PEKERJAAN STRUKTUR BETON


1 Pek. Sloef ( S1 ) Uk. 15 x 25 cm
~ Beton K 175 0.58 m³ 1,120,337.12 649,095.32
~ Besi Beton Polos 102.31 Kg 14,860.88 1,520,414.64
~ Bekisting 2x Pakai 15.45 m² 174,613.13 2,697,772.78
2 Pek. Kolom (K1) Uk. 25 x25 cm
~ Beton K 225 0.88 m³ 1,182,874.94 1,035,015.57
~ Besi Beton Polos 146.78 Kg 14,860.88 2,181,219.79
~ Bekisting 2x Pakai 14.00 m² 284,567.50 3,983,945.00
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA

3 Pek. Kolom (K2) Uk. Dia. 60 Cm


~ Beton K 225 7.91 m³ 1,182,874.94 9,359,852.83
~ Besi Beton Polos 431.87 Kg 14,860.88 6,418,032.43
~ Bekisting 2x Pakai 52.75 m² 284,567.50 15,011,504.76
4 Pek. Kolom (KP) Uk. 15 x 15 cm (Pegangan Tangga)
~ Beton K 175 0.08 m³ 1,120,337.12 90,747.31
~ Besi Beton Polos 17.49 Kg 14,860.88 259,898.87
~ Bekisting 2x Pakai 1.08 m² 284,567.50 307,332.90
5 Pek. Balok Latei (BL1) Uk. 20 x 30 cm
~ Beton K 175 0.41 m³ 1,120,337.12 453,736.53
~ Besi Beton Polos 48.24 Kg 14,860.88 716,821.74
~ Bekisting 2x Pakai 5.40 m² 292,416.25 1,579,047.75
6 Pek. Balok Latei (BL2) Uk. 15 x 30 cm
~ Beton K 175 0.68 m³ 1,120,337.12 759,588.57
~ Besi Beton Polos 107.86 Kg 14,860.88 1,602,871.69
~ Bekisting 2x Pakai 9.04 m² 292,416.25 2,643,442.90
7 Pek. Balok Plat BA1, Uk.25 x 40 Cm
~ Beton K 225 3.41 m³ 1,182,874.94 4,035,969.30
~ Besi Beton Polos 627.15 Kg 14,860.88 9,320,040.79
~ Bekisting 2x Pakai 35.83 m² 292,416.25 10,476,104.57
8 Pek. Balok Plat BA2, Uk.20 x 30 Cm
~ Beton K 225 0.41 m³ 1,182,874.94 479,064.35
~ Besi Beton Polos 63.74 Kg 14,860.88 947,296.07
~ Bekisting 2x Pakai 5.40 m² 292,416.25 1,579,047.75
9 Pek. Plat Dak, Tbl 12 Cm
~ Beton K 225 4.61 m³ 1,182,874.94 5,450,829.67
~ Besi Beton Polos 670.13 Kg 14,860.88 9,958,767.07
~ Bekisting 2x Pakai 38.40 m² 342,067.50 13,135,734.07
10 Pek. Lesplank Beton
~ Beton K 225 0.62 m³ 1,182,874.94 733,174.28
~ Besi Beton Polos 57.28 Kg 14,860.88 851,259.45
~ Bekisting 2x Pakai 17.23 m² 310,442.50 5,348,055.04
11 Pek. Tangga Beton (Tambahan) 2.00 Bh
~ Beton K 225 2.38 m³ 1,182,874.94 2,815,354.73
~ Besi Beton Polos 334.21 Kg 14,860.88 4,966,638.69
~ Bekisting 2x Pakai 15.79 m² 265,305.00 4,190,014.93
Jumlah II.B 125,557,692.12

C. PEKERJAAN DINDING
1 Pek. Pas. Dinding 1/2 Bata (1pc : 5ps) 75.85 m² 106,854.55 8,104,810.76
2 Pek. Pas. Dinding 1/2 Bata (1pc : 5ps) (Tangga) 10.49 m² 106,854.55 1,121,331.65
3 Pek. Plesteran Biasa (1pc : 5ps) 172.69 m² 59,506.29 10,275,903.19
4 Pek. Plesteran Beton (1pc : 3ps) 136.47 m² 62,841.06 8,575,680.66
5 Pek. Acian (saus semen) 364.78 m² 36,677.81 13,379,347.11
6 Pek. Profilan Melengkung 18.16 m' 175,000.00 3,178,000.00
7 Pek. Profilan Kaki Kolom 6.00 Bh 550,000.00 3,300,000.00
Jumlah II.C 47,935,073.38

D. PEKERJAAN PINTU DAN JENDELA


1 Pek. Kusen Dan Jendela ( J1 ) 2.00 Bh
~ Kusen Aluminium, Uk. 1 3/4 x 4" 16.70 m' 184,549.13 3,081,970.39
~ Kaca mati 5 mm 6.59 m² 272,688.00 1,798,268.28
Jumlah II.D 4,880,238.67

E. PEKERJAAN PENUTUP LANTAI (AREA FASAD)


1 Pek. Keramik Lantai, Uk. 80 x 80 (Type Homogenous Tile) Lt. I 17.36 m² 854,894.04 14,844,123.71
(Lantai Homogenous Tile Type Marmaro)
2 Pek. Keramik Lantai, Uk. 80 x 80 (Type Homogenous Tile) Lt. II 23.83 m² 854,894.04 20,374,347.79
(Lantai Homogenous Tile Type Marmaro)
3 Pek. Keramik Tangga, Uk. 80 x 80 (Type Homogenous Tile) 25.06 m² 854,894.04 21,421,251.03
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
(Lantai Homogenous Tile Type Marmaro) (Dicutting)
4 Pek. Step Nosing Tangga 54.25 m' 55,000.00 2,983,750.00
Jumlah II.E 59,623,472.53

F. PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Dalam 217.06 m² 34,697.23 7,531,379.66
2 Pek. Pengecatan Dinding Luar 147.72 m² 37,687.23 5,567,171.95
3 Pek. Pengecatan Dinding Lama 81.71 m² 24,112.05 1,970,195.61
4 Pek. Pengecatan Waterproofing Coating Plat Dak 48.28 m² 115,000.00 5,552,315.00

Jumlah II.F 20,621,062.22

G. PEKERJAAN LISTRIK DAN ARMATUR


1 Pek. Instalasi Titik Penerangan 6.00 Ttk 271,745.00 1,630,470.00
2 Pas. Lampu Gantung 18 Wat (Hias/Klasik) 2.00 Bh 3,000,000.00 6,000,000.00
3 Pek. Pas. Lampu SL 18 Wat 4.00 Bh 38,000.00 152,000.00
Jumlah II.G 7,782,470.00

H. PEKERJAAN LAIN-LAIN
1 Pek. Reling Tangga, T = 0,96 M (2 Bh) 12.51 m' 850,000.00 10,633,500.00
(Bahan Dari Hollow BS, Finishing Cat Enamel)
2 Pek. Papan Nama Gedung
- Pek. Huruf Nama Gedung, Tinggi = 22 Cm (Ex. Stainless Steel) 19.00 Bh 275,000.00 5,225,000.00
( " AKSARA ANGING MAMMIRI " )
Jumlah II.H 15,858,500.00

Jumlah Total Pekerjaan Fasad Utama Gedung 297,641,129.07

III PEKERJAAN AULA GEDUNG LT. II


A. PEKERJAAN PELAPIS DINDING/PARTISI
1 Pek. Partisi Dinding 1 Lapis + Rangka Hollow (Dinding Sisi)
- Rangka Partisi Besi Hollow, Modul 60 x 120 Cm 177.95 m² 136,648.75 24,316,645.06
(Hollow Galvanize, Uk. 40/40)
- Partisi Multipleks + Finishing HPL 177.95 m² 521,060.40 92,722,698.18
(Multipleks 9mm + HPL sesuai Gbr)
- Plint Kayu Ex. Pabrikasi 59.81 m' 97,491.25 5,830,951.66
2 Pek. Partisi Dinding 1 Lapis + Rangka Hollow (Area Panggung)
- Rangka Partisi Besi Hollow, Modul 60 x 120 Cm 89.55 m² 136,648.75 12,237,483.15
(Hollow Galvanize, Uk. 40/40)
- Partisi Multipleks + Peredam + Finishing HPL 44.31 m² 521,060.40 23,089,957.93
(Multipleks 9mm + Rockwool + HPL sesuai Gbr)
- Partisi Gypsum Perforated 9mm + Peredam 45.24 m² 269,658.90 12,199,611.33
(Gypsumboard Perforated 9mm + Peredam sesuai Gbr)
- Pek. Wallpaper 57.43 m² 261,481.25 15,016,397.52
- Pek. Pembuatan Lemari Panggung
- Pas. Dinding Dan Lantai Multipleks 9mm 10.04 m² 174,282.50 1,749,378.02
- Pas. Engsel Lemari 8.00 Set 35,000.00 280,000.00
Pas. Handel Pintu Lemari 8.00 Bh 25,000.00 200,000.00
- Pek. Pintu Backstage, Uk. 80 x 220 + Acs. 2.00 Bh 1,950,000.00 3,900,000.00
(Pintu Rangka Hollow Lapis Multipleks 12mm + HPL, include Kosen Hollow)
- Pek. Dindind Calsyboard lapis Kuda-kuda Existing
- Rangka Partisi Besi Hollow, Modul 60 x 120 Cm 7.87 m² 136,648.75 1,075,931.26
(Hollow Galvanize, Uk. 40/40)
- Partisi Calsyboard 7.87 m² 136,648.75 1,075,931.26
- Pek. Pengecatan 7.87 m² 34,697.23 273,195.54
- Pek. Penerangan
- Pek. Instalasi Titik Lampu 8.00 Ttk 271,745.00 2,173,960.00
- Pas. Lampu Downlight DL PLC 9 Wat 8.00 Bh 160,000.00 1,280,000.00
- Pas. Saklar Tunggal 1.00 Bh 23,000.00 23,000.00
3 Pek. Finishing Dinding Area Lobby
- Rangka Partisi Besi Hollow, Modul 60 x 120 Cm 8.38 m² 136,648.75 1,144,979.88
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
(Hollow Galvanize, Uk. 40/40)
- Partisi Multipleks + Peredam + Finishing HPL 8.38 m² 521,060.40 4,365,965.09
(Multipleks 9mm + Rockwool + HPL sesuai Gbr)
- Pek. Wallpaper 50.44 m² 261,481.25 13,189,114.25
- Plint Kayu Ex. Pabrikasi 14.72 m' 97,491.25 1,435,071.20
Jumlah III.A 217,580,271.34

B. PEKERJAAN PINTU DAN JENDELA


1 Pek. Pintu Jendela Kaca ( PJ1 ) 1.00 Bh
~ Daun Pintu Kaca Tempered 12 mm + Acs. (Stopsol Flat Laminated) 2.00 Bh 7,097,019.15 14,194,038.30
~ Kaca Mati Tempered 12 mm Stopsol Flat Laminated 4.07 m² 2,093,799.25 8,521,762.95
2 Pek. Pintu ( P2 )
- Pek. Pintu, Uk. 90 x 220 + Acs. 2.00 Bh 2,000,000.00 4,000,000.00
(Pintu Rangka Hollow Lapis Multipleks 12mm + Rockwool + HPL, include Kosen Hollow)
3 Pek. Pintu ( P3 )
- Pek. Pintu Double, Uk. 135 x 220 + Acs. 1.00 Bh 3,250,000.00 3,250,000.00
(Pintu Rangka Hollow Lapis Multipleks 12mm + Rockwool + HPL, include Kosen Hollow)

Jumlah III.B 29,965,801.25

C. PEKERJAAN PLAFOND
1 Pek. Plafond Gypsum 9mm + Rangka Hollow
- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 406.88 m² 164,823.75 67,063,223.68
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Gypsum Board 9mm 406.88 m² 73,207.85 29,786,692.88
2 Pek. Plafond Gypsum 9mm + Rangka Hollow (2 Sisi/Dinding Kuda2)
- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 25.58 m² 164,823.75 4,215,828.91
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Gypsum Board 9mm (2 Sisi) 51.16 m² 73,207.85 3,744,991.49
(Sebagian Untuk Dinding Dalam Ruang Operator)
Jumlah III.C 104,810,736.96

D. PEKERJAAN PENUTUP LANTAI (AULA DAN PANGGUNG)


1 Pek. Keramik Lantai Aula, Uk. 80 x 80 (Type Homogenous Tile) 322.04 m² 854,894.04 275,309,906.87
(Lantai Homogenous Tile Type Marmaro)
2 Pek. Keramik Lantai Panggung , Uk. 80 x 80 (Type Homogenous Tile) 42.45 m² 854,894.04 36,293,500.75
(Lantai Homogenous Tile Type Marmaro)
3 Pek. Keramik Lantai Balkon , Uk. 80 x 80 (Type Homogenous Tile) 11.88 m² 854,894.04 10,156,141.24
(Lantai Homogenous Tile Type Marmaro)
Jumlah III.D 321,759,548.86

E. PEKERJAAN PENGECATAN
1 Pek. Pengecatan Plafond Baru 458.03 m² 34,697.23 15,892,508.76
Jumlah III.E 15,892,508.76

F. PEKERJAAN LISTRIK DAN ARMATUR


1 Pek. Instalasi Titik Penerangan 47.00 Ttk 271,745.00 12,772,015.00
2 Pek. Instalasi Titik Stop Kontak 13.00 Ttk 325,795.00 4,235,335.00
3 Pek. Pas. Lampu Downlight 18 Wat 24.00 Bh 255,000.00 6,120,000.00
4 Pek. Pas. Lampu Hias 3.00 Bh 3,850,000.00 11,550,000.00
5 Pek. Pas. Lampu SL 18 Wat 2.00 Bh 38,000.00 76,000.00
6 Pek. Pas. Lampu RMI 2 x 36 Wat 18.00 Bh 675,000.00 12,150,000.00
7 Pas. Stop Kontak Biasa 13.00 Bh 28,000.00 364,000.00
8 Pas. Saklar Tunggal 3.00 Bh 23,000.00 69,000.00
9 Pas. Saklar Ganda 7.00 Bh 28,000.00 196,000.00
10 Pas. Panel Utama 1.00 Unit 2,500,000.00 2,500,000.00

Jumlah III.F 50,032,350.00

G. PEKERJAAN LAIN-LAIN
1 Pek. Ruang Control
- Tiang Kayu Kls. I, Uk. 10x10 0.12 m³ 14,112,225.00 1,693,467.00
- Dudukan Lantai Kayu Kls. I, Uk. 6 x 12 0.32 m³ 14,164,550.00 4,492,428.68
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
- Rangka Lantai Kayu Kls. I, Uk. 5 x 7 0.28 m³ 14,164,550.00 3,994,828.04
- Pek. Lantai Multipleks 18 mm 32.72 m² 116,610.00 3,815,292.62
- Pek. Lantai Parquet Kayu 32.72 m² 672,318.75 21,997,193.79
- Pek. Dinding Gypsum 2 sisi + Rangka Hollow
- Rangka Partisi Besi Hollow, Modul 60 x 120 Cm 25.12 m² 136,648.75 3,432,070.01
(Hollow Galvanize, Uk. 40/40)
- Dinding Gypsum Board 9mm (2 Sisi) 50.23 m² 73,207.85 3,677,376.72
(Sebagian Untuk Dinding masuk dalam Plafond Aula)

- Pek. Plafon Gypsum 9 mm + Rangka Hollow


- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 37.73 m² 164,823.75 6,218,800.09
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Gypsum Board 9mm 37.73 m² 73,207.85 2,762,132.18
(Sebagian Untuk Dinding masuk dalam Plafond Aula)
- Pek. Pengecatan Dinding Dan Plafond Baru 87.96 m² 34,697.23 3,052,037.31
- Pek. Pengecatan Dinding Lama 14.85 m² 24,112.05 358,063.94
- Pek. Instalasi Listrik
- Pek. Instalasi Titik Penerangan 4.00 Ttk 271,745.00 1,086,980.00
- Pek. Instalasi Titik Stop Kontak 4.00 Ttk 325,795.00 1,303,180.00
- Pek. Instalasi Titik Stop Kontak AC 1.00 Ttk 325,795.00 325,795.00
- Pas. Lampu Downlight 18 Wat 4.00 Bh 255,000.00 1,020,000.00
- Pas. Saklar Ganda 1.00 Bh 28,000.00 28,000.00
- Pas. Stop Kontak Biasa 4.00 Bh 28,000.00 112,000.00
- Pas. Stop Kontak AC 1.00 Bh 75,000.00 75,000.00
- Pas. Panel Utama 1.00 Set 5,000,000.00 5,000,000.00
2 Pek. Ruang VIP
- Pek. Lantai Parquet Kayu 19.38 m² 672,318.75 13,026,444.71
- Pek. Dinding Gypsum 2 sisi + Rangka Hollow
- Rangka Partisi Besi Hollow, Modul 60 x 120 Cm 10.55 m² 136,648.75 1,441,985.93
(Hollow Galvanize, Uk. 40/40)
- Dinding Gypsum Board Perforated 9mm (1 Sisi) + Peredam Rockw 10.55 m² 269,658.90 2,845,575.54
(Gypsum Board Perforated 9mm + Rockwool sesuai Gbr)
- Dinding Gypsum Board 9mm (1 Sisi) 10.55 m² 73,207.85 772,525.84
- Pek. Plafon Gypsum 9 mm + Rangka Hollow
- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 21.25 m² 164,823.75 3,501,911.32
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Gypsum Board 9mm 21.25 m² 73,207.85 1,555,403.26
- Pek. Pengecatan Dinding Dan Plafond Baru 31.80 m² 34,697.23 1,103,333.59
- Pek. Finishing Dinding VIP
- Rangka Partisi Besi Hollow, Modul 60 x 120 Cm 46.43 m² 136,648.75 6,344,738.11
(Hollow Galvanize, Uk. 40/40)
- Dinding Gypsum Board Perforated 9mm (1 Sisi) + Peredam Rockw 46.43 m² 269,658.90 12,520,532.39
(Gypsum Board Perforated 9mm + Rockwool sesuai Gbr)
- Pek. Wallpaper 52.46 m² 261,481.25 13,717,567.86
- Pek. Instalasi Listrik
- Pek. Instalasi Titik Penerangan 7.00 Ttk 271,745.00 1,902,215.00
- Pek. Instalasi Titik Stop Kontak 1.00 Ttk 325,795.00 325,795.00
- Pek. Instalasi Titik Stop Kontak AC 1.00 Ttk 325,795.00 325,795.00
- Pas. Lampu Downlight 18 Wat 6.00 Bh 255,000.00 1,530,000.00
- Pas. Lampu Gantung 18 Wat (Hias/Klasik) 1.00 Bh 3,000,000.00 3,000,000.00
- Pas. Saklar Ganda 1.00 Bh 28,000.00 28,000.00
- Pas. Stop Kontak Biasa 1.00 Bh 28,000.00 28,000.00
- Pas. Stop Kontak AC 1.00 Bh 75,000.00 75,000.00
3 Pek. Tangga Putar Besi, T = 3,7 M 1.00 Set 3,700,000.00 3,700,000.00
(Bahan Dari Pipa BS, Finishing Cat Enamel)
4 Pek. Pengecatan Waterproofing Coating Plat Dak (Existing) 50.91 m² 115,000.00 5,854,650.00
(Diatas Ruang Kontrol/Fasad Depan)
Jumlah III.J Jumlah III.G 138,044,118.92

Jumlah Total Pekerjaan Aula Lantai II (Dua) 878,085,336.09


NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
REAL COAST 1,175,726,465.16
REKAPITULASI ANGGARAN BIAYA
REHABILITASI GUESS HOUSE ASRAMA BP PAUDNI REGIONAL III
PROVINSI SULAWESI SELATAN

PEKERJAAN : REHABILITASI GUESS HOUSE/ASRAMA (TAMAN)


LOKASI : KOTA MAKASSAR
TAHUN : 2015

NO JENIS PEKERJAAN TOTAL HARGA (Rp.)

I PEKERJAAN PERSIAPAN Rp. 1,757,000.00

II PEKERJAAN TAMAN BERMAIN Rp. 75,544,117.25

III PEKERJAAN LAIN - LAIN Rp. 25,043,280.71

Real Cost Rp. 102,344,397.96


PPN 10 % Rp. 10,234,439.80
Total Jumlah Rp. 112,578,837.75
Dibulatkan Rp. 112,578,000.00
Terbilang : Seratus tiga juta tujuh puluh sembilan ribu rupiah,-

Makassar,……………………………………..2015

Disetujui/DiKetahui Oleh : Konsultan Perencana :


PEJABAT PEMBUAT KOMITMEN CV. MULTICIPTA ADHIRANCANA
(PPK)

IDHIL NUR MANSYUR BENNY MALIK, ST


Nip. 19790522 200312 1 001 Direktur

Mengetahui : Mengetahui :
KABID PENATAAN BANGUNAN DAN LINGKUNGAN KEPALA BALAI BP PAUDNI REGIONAL III
DINAS TATA RUANG DAN PERMUKIMAN
PROVINSI SULAWESI SELATAN

Dr. Ir. H. JUMRAS, M.Si Dr. H. MUHAMMAD HASBI


Nip. 19620707 199203 1 012 Nip. 19730623 199303 1 001
RENCANA ANGGARAN BIAYA (RAB)
REHABILITASI GUESS HOUSE ASRAMA BP PAUDNI REGIONAL III
PROVINSI SULAWESI SELATAN

PEKERJAAN : REHABILITASI GUESS HOUSE/ASRAMA (TAMAN)


LOKASI : KOTA MAKASSAR
TAHUN : 2015

NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA

I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan 1.00 Ls 500,000.00 500,000.00
2 Pek. Pengukuran dan pemasangan Bouplank 1.00 Ls 500,000.00 500,000.00
3 Pek. Pembongkaran 1.00 Ls 757,000.00 757,000.00

Jumlah I 1,757,000.00

II PEKERJAAN TAMAN BERMAIN


A. PEKERJAAN TAMAN LALU LINTAS -
a. Pek. Cansteen Beton
- Pek. Pas. Cansteen Beton, Uk. 60 x 30 x 15 cm 109.01 m' 202,242.87 22,047,304.64
- Pek. Pengecatan Cansteen 59.96 m² 37,687.23 2,259,639.33
b. Pek. Lantai Rabat Beton (Jalan)
- Pek. Urugan Pasir Bawah Beton Rabat, Tbl = 5 cm 2.03 m³ 165,600.00 335,771.39
- Beton Rabat K.100, Tbl = 10 Cm 4.06 m³ 1,010,931.32 4,099,538.80
- Acian Screeding 40.55 m² 36,677.81 1,487,362.32
c. Pek. Rumput
- Pek. Urugan Tanah Subur 4.37 m³ 179,400.00 783,791.42
- Pek. Penanaman Rumput Gajah Mini 43.69 m² 50,000.00 2,184,480.00
d. Pek. Acsesoris Taman Lalu lintas
- Pek. Assesories Traffic Light 2.00 Bh 1,500,000.00 3,000,000.00
- Pek. Assesories Rambu Lalu Lintas 7.00 Bh 1,000,000.00 7,000,000.00
- Pek. Zebra Cross 1.00 Ls 500,000.00 500,000.00

B. PEKERJAAN FASILITAS PENUNJANG TAMAN BERMAIN


a. Pek. Perbaikan Fasilitas Taman
- Pek. Pengecatan Dan Perbaikan Kembali Fasilitas Bermain 1.00 Ls 5,250,000.00 5,250,000.00
- Rumah Bermain
- Jungkit - Jungkitan
- Ayunan
- Perosotan
- Gua Buatan
- Panjat - Panjatan, Dll
b. Pek. Penanaman Kembali Rumput Taman
- Pek. Penggantian Rumput Gajah mini 420.99 m² 50,000.00 21,049,600.00
- Pek. Pas. Cansteen Beton, Uk. 60 x 30 x 15 cm (Batas Taman) 12.03 m' 202,242.87 2,432,981.77
- Pek. Pengecatan Cansteen 6.62 m² 37,687.23 249,357.52
c. Pek. Penambahan Fasilitas Taman
- Pek. Kolam Pasir
- Pek. Pas. Cansteen Beton, Uk. 60 x 30 x 15 cm (Batas Kolam) 9.20 m' 202,242.87 1,860,634.44
- Pek. Pengecatan Cansteen 5.06 m² 37,687.23 190,697.36
- Pek. Urugan Pasir 0.80 m³ 165,600.00 132,480.00
- Pek. Step Stone
- Beton Rabat K.100, Tbl = 10 Cm 0.49 m³ 1,010,931.32 499,319.20
- Acian Screeding 4.94 m² 36,677.81 181,159.05

Jumlah II 75,544,117.25
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA

III PEKERJAAN LAIN - LAIN


1 Pek. Pengecatan Kembali Pagar Taman Bermain 134.95 m² 24,112.05 3,253,921.15
2 Pek. Pemindahan Dan Pembuatan Kembali Kantin
a. Pek. Landasan Kantin
- Pek. Galian Tanah Pondasi 6.24 m³ 69,000.00 430,560.00
- Pek. Urugan Tanah Kembali (Pondasi Garis) 2.08 m³ 22,942.50 47,720.40
- Pek. Urugan Pasir Bawah Pondasi Garis 1.56 m³ 165,600.00 258,336.00
- Pek. Pas. Batu kosong 1.56 m³ 428,058.75 667,771.65
- Pek. Pondasi Batu Gunung, Camp 1 pc : 5 ps 3.38 m³ 753,669.75 2,547,403.76
- Pek. Sloef Beton, Uk. 15/20
- Beton K 175 0.78 m³ 1,120,337.12 873,862.95
- Besi Beton Polos 95.13 Kg 14,860.88 1,413,774.48
- Bekisting 2x Pakai 10.40 m² 174,613.13 1,815,976.50
- Pek. Rabat Lantai Beton
- Pek. Urugan Tanah Bawah Lantai 2.80 m³ 179,400.00 502,320.00
- Pek. Urugan Pasir Bawah Lantai 2.80 m³ 165,600.00 463,680.00
- Beton Rabat K.100, Tbl = 7 Cm 1.96 m³ 1,010,931.32 1,981,425.39
- Plesteran + Acian Screeding 28.00 m² 99,518.87 2,786,528.43

b. Pek. Pemasangan Kembali Bangunan Kantin Lama 1.00 Ls 8,000,000.00 8,000,000.00

Jumlah III 25,043,280.71

REAL COAST 102,344,397.96


REKAPITULASI ANGGARAN BIAYA
PERENCANAAN KONSTRUKSI RENOVASI PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
BP-PAUD DAN DIKMAS PROVINSI SULAWESI SELATAN

PEKERJAAN : REHABILITASI LAPANGAN TENNIS


LOKASI : KOTA MAKASSAR
TAHUN : 2016

NO JENIS PEKERJAAN TOTAL HARGA (Rp.)

I PEKERJAAN PERSIAPAN Rp. 17,327,740.00

II PEKERJAAN LAPANGAN TENNIS


A. PEKERJAAN STRUKTUR LAPANGAN TENNIS Rp. 479,634,175.46
B. PEKERJAAN FINISHING LAPANGAN TENNIS Rp. 563,865,180.98
C. PEKERJAAN SARANA PENDUKUNG LAPANGAN Rp. 301,247,342.48

Real Cost Rp. 1,362,074,438.92


PPN 10 % Rp. 136,207,443.89
Total Jumlah Rp. 1,498,281,882.81
Dibulatkan Rp. 1,498,281,000.00
Terbilang : Satu milyar empat ratus sembilan puluh delapan juta dua ratus delapan puluh satu ribu rupiah,-

Makassar,……………………………………..2016

Disetujui/DiKetahui Oleh : Konsultan Perencana :


PEJABAT PEMBUAT KOMITMEN CV. MALLOMO ENGINEERING
(PPK)

Drs. ARMAN AGUNG, M.Pd. SJAMSIR, ST


Nip. 19691011 200112 1 002 Direktur

Mengetahui : Mengetahui :
KABID PENATAAN BANGUNAN DAN LINGKUNGAN KEPALA BALAI BP PAUDNI REGIONAL III
DINAS TATA RUANG DAN PERMUKIMAN
PROVINSI SULAWESI SELATAN

Dr. Ir. H. JUMRAS, M.Si Dr. H. MUHAMMAD HASBI


Nip. 19620707 199203 1 012 Nip. 19730623 199303 1 001
RENCANA ANGGARAN BIAYA (RAB)
PERENCANAAN KONSTRUKSI RENOVASI PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
BP-PAUD DAN DIKMAS PROVINSI SULAWESI SELATAN

PEKERJAAN : REHABILITASI LAPANGAN TENNIS


LOKASI : KOTA MAKASSAR
TAHUN : 2016

NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA

I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran dan pemasangan Bouplank 139.00 m' 124,660.00 17,327,740.00

Jumlah I 17,327,740.00

II PEKERJAAN LAPANGAN TENNIS


A. PEKERJAAN STRUKTUR LAPANGAN TENNIS
1 Pek. Sloef, Uk. 20 x 30 cm
~ Pek. Galian/Bobokan Beton Existing (Plat Lap. Existing) 7.17 m³ 1,264,942.50 9,069,637.73
~ Pek. Urugan Pasir Alas Sloef 3.59 m³ 165,600.00 593,676.00
~ Pek. Lantai Kerja Alas Sloef, Tbl. 5 Cm, K.100 3.59 m³ 934,111.23 3,348,788.76
~ Beton K 225 21.51 m³ 1,182,874.94 25,443,639.97
~ Besi Beton Polos 4,326.38 Kg 14,860.88 64,293,762.66
~ Bekisting 2x Pakai 179.25 m² 174,613.13 31,299,402.66
2 Pek. Plat Beton Lapangan, Tbl = 10 Cm (Pembesian 1 Lapis)
~ Pek. Urugan Pasir Alas Beton Plat 111.53 m³ 165,600.00 18,469,699.20
~ Pek. Lantai Kerja Alas Plat, Tbl. 5 Cm, K.100 57.56 m³ 934,111.23 53,766,041.24
~ Beton K 225 111.53 m³ 1,182,874.94 131,928,407.86
~ Besi Beton Polos 9,516.34 Kg 14,860.88 141,421,119.38

Jumlah II.A 479,634,175.46

B. PEKERJAAN FINISHING LAPANGAN TENNIS


1 Pek. Plesteran Beton Screeding (1pc : 3ps) 1,187.02 m² 62,841.06 74,593,595.04
2 Pek. Acian (saus semen) 1,187.02 m² 36,677.81 43,537,296.99
3 Pek. Lapisan Finishing
a. Pek. Lapisan Finishing Ke - 1
- Lapisan Asphalt Dasar 1/Hotmix Screening, T = 2 Cm 1,187.02 m² 118,650.95 140,841,051.86
- Lapisan Asphalt Dasar 2/Hotmix Sand Sheet, T = 1 Cm 1,187.02 m² 69,675.48 82,706,182.93
- Pemadatan Lapisan Hotmix dengan Wales (4 - 6 Ton) 1,187.02 m² 35,000.00 41,545,700.00
b. Pek. Lapisan Finishing Ke - 2
- Pek. Lapisan Acrylic Filler Coat ACRONAL 1,187.02 m² 91,379.00 108,468,700.58
Specification :
- Acronal Latex Sintetis
- Pasir Silika
c. Pek. Lapisan Finishing Ke - 3
- Top Coat Playing Surface Sekw. Rebound Ace 1,187.02 m² 60,069.10 71,303,223.08
- Areal Permainan Warna Hijau
- Areal Luar Permainan Warna Merah
- Acrylic Line Marking 10.68 m² 81,407.35 869,430.50
Specification :
- Coat Warna Putih, Lebar Garis 5 Cm
- Pasir Silika

Jumlah II.B 563,865,180.98

C. PEKERJAAN SARANA PENDUKUNG LAPANGAN


1 Pek. Pagar Keliling Lapangan Tennis
- Pek. Pembongkaran Pagar Lama 220.63 m² 12,644.25 2,789,637.66
- Pek. Sloef Dudukan Pagar, Uk. 20 x 60 Cm
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
- Galian Tanah 11.90 m³ 1,264,942.50 15,051,234.57
- Pasir Urug Alas Sloef 1.19 m³ 165,600.00 197,043.30
- Lantai Kerja Alas Sloef, Beton K100 1.19 m³ 934,111.23 1,111,475.60
- Beton K.225 9.52 m³ 1,182,874.94 11,259,786.56
- Besi Beton Polos 1,089.13 Kg 14,860.88 16,185,458.23
- Bekisting 2x Pakai 95.19 m² 174,613.13 16,621,423.37
- Pek. Kolom Pagar, Uk. 30 x 30 Cm 25.00 Bh
- Galian Tanah 2.00 m³ 1,264,942.50 2,529,885.00
- Pasir Urug Alas Sloef 0.20 m³ 165,600.00 33,120.00
- Lantai Kerja Alas Sloef, Beton K100 0.20 m³ 934,111.23 186,822.25
- Beton K.225 1.80 m³ 1,182,874.94 2,129,174.89
- Besi Beton Polos 154.44 Kg 14,860.88 2,295,113.54
- Bekisting 2x Pakai 24.00 m² 284,567.50 6,829,620.00
- Pek. Plesteran Beton, Camp. 1pc : 3ps 78.46 m² 62,841.06 4,930,509.57
- Pek. Acian Saus Semen 78.46 m² 36,677.81 2,877,741.17
- Pek. Pas. Pipa Stainless Steel, Dia. 3" (Tiang Pagar) 172.80 m' 340,513.85 58,840,793.28
- Pek. Pas. Siku Stainless Steel 40. 40. 4 mm (Rangka Pagar Rang) 724.50 m' 80,048.05 57,994,812.23
- Pek. Pas. Rang Stainless Steel, Uk. 30 x 30 mm (Pagar Rang) 495.41 m² 69,230.00 34,297,407.38
- Pek. Pengecatan Baru (Sloef + Kolom Beton) 78.46 m² 37,687.23 2,956,939.67
2 Pek. Pengecatan Dinding Lama 247.10 m² 24,112.05 5,958,087.56
3 Pek. Penambahan Penerangan Lapangan
- Pek. Pas. Lampu Sorot Type HPI - T, 400 Wat 8.00 Bh 1,500,000.00 12,000,000.00
- Pek. Acsesories Penggantung Lampu/Bracket 4.00 Bh 283,500.00 1,134,000.00
- Pek. Kabel Instalasi NYY 3 x 2,5 56.00 m' 34,330.03 1,922,481.68
- MCB Penerangan 2.00 Bh 292,387.50 584,775.00
4 Pek. Frame Gambar, Uk. 75 x 100 Cm (30R) 12.00 Bh 350,000.00 4,200,000.00
(Hollow Stainless Steel + Multipleks 12 mm + Finishing Duco)
5 Pek. Perbaikan Saluran Keliling Lapangan Tennis 69.50 m' 150,000.00 10,425,000.00
6 Pek. Grill Besi Penutup Saluran 69.50 m' 350,000.00 24,325,000.00
7 Pek. Penambahan/Perbaikan Tiang Net 4.00 Bh 395,000.00 1,580,000.00
Jumlah II.C 301,247,342.48

Jumlah II (A + B + C) 1,344,746,698.92
REKAPITULASI ANGGARAN BIAYA
PERENCANAAN KONSTRUKSI RENOVASI PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
BP-PAUD DAN DIKMAS PROVINSI SULAWESI SELATAN

PEKERJAAN : PEMBUATAN RUANG MUSIK DAN FITNESS (EX. RUANG MAKAN LT. II)
LOKASI : KOTA MAKASSAR
TAHUN : 2016

NO JENIS PEKERJAAN TOTAL HARGA (Rp.)

I PEKERJAAN PERSIAPAN Rp. 10,826,640.83

II PEKERJAAN RUANG FITNES Rp. 505,973,343.43

III PEKERJAAN RUANG MUSIK Rp. 243,647,077.90

Real Cost Rp. 760,447,062.17


PPN 10 % Rp. 76,044,706.22
Total Jumlah Rp. 836,491,768.39
Dibulatkan Rp. 836,491,000.00
Terbilang : Delapan ratus tiga puluh enam juta empat ratus sembilan puluh satu ribu rupiah,-

Makassar,……………………………………..2016

Disetujui/DiKetahui Oleh : Konsultan Perencana :


PEJABAT PEMBUAT KOMITMEN CV. MALLOMO ENGINEERING
(PPK)

Drs. ARMAN AGUNG, M.Pd. SJAMSIR, ST


Nip. 19691011 200112 1 002 Direktur

Mengetahui : Mengetahui :
KABID PENATAAN BANGUNAN DAN LINGKUNGAN KEPALA BALAI BP PAUDNI REGIONAL III
DINAS TATA RUANG DAN PERMUKIMAN
PROVINSI SULAWESI SELATAN

Dr. Ir. H. JUMRAS, M.Si Dr. H. MUHAMMAD HASBI


Nip. 19620707 199203 1 012 Nip. 19730623 199303 1 001
RENCANA ANGGARAN BIAYA (RAB)
PERENCANAAN KONSTRUKSI RENOVASI PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
BP-PAUD DAN DIKMAS PROVINSI SULAWESI SELATAN

PEKERJAAN : PEMBUATAN RUANG MUSIK DAN FITNESS (EX. RUANG MAKAN LT. II)
LOKASI : KOTA MAKASSAR
TAHUN : 2016

NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA

I PEKERJAAN PERSIAPAN
1 Pek. Pembongkaran
- Pek. Pembongkaran Plafond Lama (Aula) 189.60 m² 12,644.25 2,397,381.41
- Pek. Pembongkaran Lantai Keramik Lama (Area Rg. Musik Dan Fitnes) 203.61 m² 41,400.00 8,429,259.42
Jumlah I 10,826,640.83

II PEKERJAAN RUANG FITNES


1 Pek. Kolom Praktis (KP) Uk. 15 x15 cm
- Beton K 175 0.18 m³ 1,120,337.12 201,660.68
- Besi Beton Polos 30.32 Kg 14,860.88 450,581.73
- Bekisting 2x Pakai 2.40 m² 284,567.50 682,962.00
2 Pekerjaan Dinding
- Pek. Pas. Dinding 1/2 Bata (1pc : 5ps) 58.01 m² 106,854.55 6,198,846.15
- Pek. Plesteran Biasa (1pc : 5ps) 116.02 m² 59,506.29 6,904,157.79
- Pek. Acian (saus semen) 116.02 m² 36,677.81 4,255,506.52
3 Pek. Kusen Pintu Dan Jendela
- Pek. Pintu P1 1.00 Bh
- Kusen Kayu Kls. I, Uk. 5/14 0.05 m³ 15,515,656.25 771,128.12
- Daun Pintu Panel Kayu Kls. I 4.00 m² 959,675.00 3,840,043.55
- Engsel Pintu 6.00 Bh 61,654.38 369,926.25
- Kunci Tanam 2 x Slag 1.00 Bh 419,462.50 419,462.50
- Grendel Tanam Pintu 1.00 Bh 125,000.00 125,000.00
- Handle Pintu 2.00 Set 242,017.50 484,035.00
- Door Closer/Expanyolet 2.00 Bh 213,267.50 426,535.00
- Pek. Pintu P2 1.00 Bh
- Kusen Kayu Kls. I, Uk. 5/14 0.04 m³ 15,515,656.25 662,518.52
- Daun Pintu Panel Kayu Kls. I 2.03 m² 959,675.00 1,943,725.75
- Engsel Pintu 3.00 Bh 61,654.38 184,963.13
- Kunci Tanam 2 x Slag 1.00 Bh 419,462.50 419,462.50
- Handle Pintu 1.00 Set 242,017.50 242,017.50
- Door Closer/Expanyolet 1.00 Bh 213,267.50 213,267.50
- Pek. Jendela J1 1.00 Bh
- Pek. Balok Latei Atas Jendela, Uk. 20 x 30 Cm
- Beton K 175 0.18 m³ 1,120,337.12 201,660.68
- Besi Beton Polos 28.85 Kg 14,860.88 428,795.69
- Bekisting 2x Pakai 2.40 m² 292,416.25 701,799.00
- Pek. Balok Dudukan Jendela, Uk. 15 x 30 Cm
- Beton K 175 0.14 m³ 1,120,337.12 151,245.51
- Besi Beton Polos 17.45 Kg 14,860.88 259,292.55
- Bekisting 2x Pakai 1.80 m² 292,416.25 526,349.25
- Pek. Pas. Dinding 1/2 Bt. Atas Balok Latei, Camp. 1pc : 5ps 2.38 m² 106,854.55 253,886.41
- Pek. Plesteran Biasa, Camp. 1pc : 5ps 4.75 m² 59,506.29 282,773.89
- Pek. Plesteran Beton, Camp. 1pc : 3ps 4.43 m² 62,841.06 278,071.69
- Pek. Acian 9.18 m² 36,677.81 336,592.29
- Pek. Kaca Mati Jendela, Kaca Tempered Tbl. 10 mm 5.99 m² 1,648,519.25 9,881,224.38
(Jendela Less Frame Kaca Tempered Stopsol Flat Laminated 10 mm)
- Pek. Jendela J2 2.00 Bh
- Pek. Balok Dudukan Jendela, Uk. 15 x 30 Cm
- Beton K 175 0.27 m³ 1,120,337.12 302,491.02
- Besi Beton Polos 34.90 Kg 14,860.88 518,585.09
- Bekisting 2x Pakai 3.60 m² 292,416.25 1,052,698.50
- Pek. Plesteran Beton, Camp. 1pc : 3ps 4.05 m² 62,841.06 254,506.29
- Pek. Acian 4.05 m² 36,677.81 148,545.14
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
- Pek. Kaca Mati Jendela, Kaca Tempered Tbl. 10 mm 11.99 m² 1,648,519.25 19,762,448.77
(Jendela Less Frame Kaca Tempered Stopsol Flat Laminated 10 mm)

- Pek. Jendela J3 1.00 Bh


- Pek. Balok Dudukan Jendela, Uk. 15 x 30 Cm
- Beton K 175 0.15 m³ 1,120,337.12 165,109.68
- Besi Beton Polos 19.05 Kg 14,860.88 283,061.03
- Bekisting 2x Pakai 1.97 m² 292,416.25 574,597.93
- Pek. Plesteran Beton, Camp. 1pc : 3ps 2.21 m² 62,841.06 139,035.85
- Pek. Acian 2.21 m² 36,677.81 81,149.66
- Pek. Kaca Mati Jendela, Kaca Tempered Tbl. 10 mm 6.55 m² 1,648,519.25 10,796,152.57
(Jendela Less Frame Kaca Tempered Stopsol Flat Laminated 10 mm)
- Pek. Jendela J4 1.00 Bh
- Pek. Balok Dudukan Jendela, Uk. 15 x 30 Cm
- Beton K 175 0.09 m³ 1,120,337.12 103,351.10
- Besi Beton Polos 11.92 Kg 14,860.88 177,183.24
- Bekisting 2x Pakai 1.23 m² 292,416.25 359,671.99
- Pek. Plesteran Beton, Camp. 1pc : 3ps 1.28 m² 62,841.06 80,122.35
- Pek. Acian 1.28 m² 36,677.81 46,764.21
- Pek. Kaca Mati Jendela, Kaca Tempered Tbl. 10 mm 3.77 m² 1,648,519.25 6,221,511.65
(Jendela Less Frame Kaca Tempered Stopsol Flat Laminated 10 mm)
- Pek. Jendela J5 1.00 Bh
- Pek. Balok Dudukan Jendela, Uk. 15 x 30 Cm
- Beton K 175 0.11 m³ 1,120,337.12 128,558.68
- Besi Beton Polos 14.83 Kg 14,860.88 220,398.66
- Bekisting 2x Pakai 1.53 m² 292,416.25 447,396.86
- Pek. Plesteran Beton, Camp. 1pc : 3ps 1.76 m² 62,841.06 110,757.37
- Pek. Acian 1.76 m² 36,677.81 64,644.64
- Pek. Kaca Mati Jendela, Kaca Tempered Tbl. 10 mm 5.22 m² 1,648,519.25 8,600,324.93
(Jendela Less Frame Kaca Tempered Stopsol Flat Laminated 10 mm)
- Pek. Jendela J6 1.00 Bh
- Pek. Balok Dudukan Jendela, Uk. 15 x 30 Cm
- Beton K 175 0.11 m³ 1,120,337.12 120,996.41
- Besi Beton Polos 13.96 Kg 14,860.88 207,434.04
- Bekisting 2x Pakai 1.44 m² 292,416.25 421,079.40
- Pek. Plesteran Beton, Camp. 1pc : 3ps 1.54 m² 62,841.06 96,618.13
- Pek. Acian 1.54 m² 36,677.81 56,392.14
- Pek. Kaca Mati Jendela, Kaca Tempered Tbl. 10 mm 4.55 m² 1,648,519.25 7,502,411.11
(Jendela Less Frame Kaca Tempered Stopsol Flat Laminated 10 mm)
4 Penutup Lantai
- Pek. Plesteran Lantai Screed, Camp. 1pc : 3ps + Acian 117.35 m² 99,518.87 11,678,788.49
(Perataan Lantai Untuk Dudukan Lantai Parquet)
- Pek. Lantai Parquet Kayu 117.35 m² 672,318.75 78,898,286.11
(Parquet Kayu Grade A Type Flooring UV Coating)
- Pek. Keramik Lantai, Uk. 60 x 60 (Type Homogenous Tile) 38.95 m² 503,366.50 19,606,729.21
(Lantai Balkon)
5 Pekerjaan Plafond
- Pek. Plafond Gypsum 9mm + Rangka Hollow
- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 130.61 m² 164,823.75 21,526,805.87
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Gypsum Board 9mm 130.61 m² 73,207.85 9,561,311.25
6 Pekerjaan Pengecatan
- Pek. Pengecatan Dinding Baru (Luar) 26.41 m² 37,687.23 995,451.52
- Pek. Pengecatan Plafond 130.61 m² 34,697.23 4,531,631.07
- Pek. Pengecatan Kayu Cat Duco (Kosen) 3.30 m² 228,792.50 755,015.25
- Pek. Pengecatan Kayu Cat Duco (Daun Pintu) 12.05 m² 228,792.50 2,757,773.28
7 Pekerjaan Pelapis Dinding/Partisi
- Pek. Partisi Dinding 1 Lapis + Rangka Hollow (Dinding Sisi)
- Rangka Partisi Besi Hollow, Modul 60 x 120 Cm 113.49 m² 136,648.75 15,507,856.69
(Hollow Galvanize, Uk. 40/40)
- Partisi Gypsum Perforated 9mm + Peredam + Finishing HPL 113.49 m² 533,440.15 60,538,522.30
(Gypsum Board Perforated 9mm + HPL sesuai Gbr)
- Plint Kayu Ex. Pabrikasi 46.95 m' 97,491.25 4,577,214.19
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
8 Pekerjaan Listrik Dan Armature
- Pek. Instalasi Titik Penerangan Dan Exaust Fan 24.00 Ttk 271,745.00 6,521,880.00
- Pek. Instalasi Titik Stop Kontak 11.00 Ttk 325,795.00 3,583,745.00
- Pek. Instalasi Titik Stop Kontak AC 4.00 Ttk 325,795.00 1,303,180.00
- Pas. Lampu Downlight 18 Wat 15.00 Bh 255,000.00 3,825,000.00
- Pas. Lampu Gantung 18 Wat (Hias) (Balkon) 2.00 Bh 750,000.00 1,500,000.00
- Pas. Lampu Blast TL-T5 9 Wat Shelline (Lampu Sembunyi) 65.00 Bh 125,000.00 8,125,000.00
- Pas. Exaust Fan 6.00 Bh 550,000.00 3,300,000.00
- Pek. Kabel instalasi NYM 2 x 2.5 mm² (Lampu Sembunyi) 39.00 m' 24,713.50 963,826.50
- Pas. Saklar Tunggal 2.00 Bh 23,000.00 46,000.00
- Pas. Saklar Ganda 2.00 Bh 28,000.00 56,000.00
- Pas. Stop Kontak Biasa 11.00 Bh 28,000.00 308,000.00
- Pas. Stop Kontak AC 4.00 Bh 75,000.00 300,000.00
- Pas. Panel Listrik 1.00 Unit 2,500,000.00 2,500,000.00
9 Pekerjaan Lain - Lain
- Pek. Reling Balkon, T = 0,50 M 2.70 m' 550,000.00 1,485,000.00
(Bahan Dari Hollow BS, Finishing Cat Enamel)
- Pek. Kanopi Balkon
- Pek. Tiang Kanopi Pipa Besi BS, Dia. 4"
- Pek. Pas. Tiang Kanopi Pipa BS, Dia. 4" 10.00 m' 409,384.67 4,093,846.67
- Pek. Pengecatan Zincromate Pipa 3.14 m² 28,635.00 89,913.90
- Pek. Dudukan Gording Kanopi Besi Hollow BS, Uk. 4 x 6 Cm
- Pek. Pas. Besi Hollow BS, Uk. 40 x 60 x 2,3 28.82 m' 123,462.08 3,558,177.24
- Pek. Pengecatan Zincromate Pipa 5.76 m² 28,635.00 165,052.14
- Pek. Gording Kanopi Besi Hollow BS, Uk. 4 x 4 Cm
- Pek. Pas. Besi Hollow BS, Uk. 40 x 40 x 2,3 90.90 m' 113,257.75 10,295,129.48
- Pek. Pengecatan Zincromate Pipa 14.54 m² 28,635.00 416,467.44
- Pek. Atap Zincalume, Tbl. 0,35 Tct 46.46 m² 147,976.25 6,874,976.58
- Pek. Talang Air Seng Plat, Rangka Hollow BS, Uk. 4 x 4 10.10 m' 250,000.00 2,525,000.00
- Pek. Lesplank Aluminium Composite Panel + Rangka Hollow
(Aluminium Composite Panel (ACP) Type PVDF + Rangka Hollow 3 x 3)
- Pek. Pas. Aluminium Composite Panel (ACP) Type PVDF 26.45 m² 753,048.75 19,914,374.19
- Pek. Rangka Besi Hollow BS, UK. 30 x 30 x 2,3 102.85 m' 118,823.75 12,221,022.69
- Pek. Pengecatan Rangka Besi Hollow 12.34 m² 28,635.00 353,413.17
- Pek. Pipa Air Hujan, Pipa Gip Ø 2" 33.20 m' 205,428.33 6,820,220.67
- Pek. Plafond Balkon + Rangka
- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 33.75 m² 164,823.75 5,562,801.56
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Gypsum Board 9mm 33.75 m² 73,207.85 2,470,764.94
- Pek. Pengecatan Plafond Baru 33.75 m² 34,697.23 1,171,031.34
- Pek. Dinding Alucopan Pelapis Tiang Kanopi
(Aluminium Composite Panel (ACP) Type PVDF + Rangka Hollow 3 x 3)
- Pek. Pas. Aluminium Composite Panel (ACP) Type PVDF 10.56 m² 1,039,111.25 10,973,014.80
- Pek. Rangka Besi Hollow BS, UK. 30 x 30 x 2,3 59.20 m' 118,823.75 7,034,366.00
- Pek. Pengecatan Rangka Besi Hollow 7.10 m² 28,635.00 203,423.04
- Pek. Penutup Fasade ACP System Cutting + Rangka (Area Balkon/Rg. Fitnes)
(Aluminium Composite Panel (ACP) Type PVDF + Rangka Hollow 5 x 5)
- Pek. Pas. Aluminium Composite Panel (ACP) Type PVDF (Cutting) 21.12 m² 1,154,111.25 24,374,829.60
- Pek. Rangka Besi Hollow BS, UK. 50 x 50 x 2,3 92.00 m' 120,932.08 11,125,751.67
- Pek. Pengecatan Rangka Besi Hollow 13.80 m² 28,635.00 395,163.00
- Pek. Finishing Duco Dinding ACP 21.12 m² 228,792.50 4,832,097.60
- Pek. Partisi Sisi Dalam Dinding ACP, Gypsum 9 mm 15.18 m² 73,207.85 1,111,295.16
- Pek. Finishing Cat Dinding 15.18 m² 34,697.23 526,703.88
- Pek. Vertical Garden (Sisi Depan Balkon) 11.88 m² 250,000.00 2,970,000.00
(Rangka Hollow 4/4 + Besi Ø 16 Dan Tanaman Rambat)

Jumlah Total Pekerjaan Ruang Fitnes 505,973,343.43

III PEKERJAAN RUANG MUSIK


1 Pekerjaan Dinding
- Pek. Pas. Dinding 1/2 Bata (1pc : 5ps) 20.22 m² 106,854.55 2,160,599.00
- Pek. Plesteran Biasa (1pc : 5ps) 40.44 m² 59,506.29 2,406,434.37
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
- Pek. Acian (saus semen) 40.44 m² 36,677.81 1,483,250.74
2 Pek. Kusen Pintu Dan Jendela
- Pek. Pintu P4 1.00 Bh
- Kusen Kayu Kls. I, Uk. 5/14 0.05 m³ 15,515,656.25 771,128.12
- Daun Pintu Panel Kayu Kls. I (Luar) 4.00 m² 959,675.00 3,840,043.55
- Daun Pintu Kedap Suara, Uk. 80 x 2,47 (Dalam) 2.00 Bh 1,650,000.00 3,300,000.00
(Rangka Hollow + Gypsum 9mm + Rockwool, Fin. Wallpaper)
- Engsel Pintu 6.00 Bh 61,654.38 369,926.25
- Kunci Tanam 2 x Slag 1.00 Bh 419,462.50 419,462.50
- Grendel Tanam Pintu 1.00 Bh 125,000.00 125,000.00
- Handle Pintu 2.00 Set 242,017.50 484,035.00
- Door Closer/Expanyolet 2.00 Bh 213,267.50 426,535.00
- Pek. Pintu P3 1.00 Bh
- Kosen + Daun Pintu Kedap Suara, Uk. 80 x 2,47 (Dalam) 1.00 Bh 1,850,000.00 1,850,000.00
(Kosen Hollow 4/4 + Pintu Rangka Hollow + Gypsum 9mm + Rockwool, Fin. Wallpaper)
3 Penutup Lantai
- Pek. Keramik Lantai, Uk. 60 x 60 (Type Homogenous Tile) 57.16 m² 503,366.50 28,773,033.18
(Ruang Musik/Studio)
- Pek. Keramik Lantai, Uk. 60 x 60 (Type Homogenous Tile) 6.51 m² 503,366.50 3,276,915.92
(Ruang Alat/Gudang)
- Pek. Finishing Lantai Karpet Kw. I
- Pek. Pas. Underlayer Alas Karpet 61.26 m² 127,535.00 7,812,947.14
- Pek. Pas. Karpet KW.I 61.26 m² 470,896.25 28,847,669.35
- Pek. Stage Dudukan Drum
- Rangka Besi Hollow BS, Uk. 4 x 4 x 2,3 45.05 m' 113,257.75 5,102,261.64
- Lantai Dan Dinding Stage Multipleks 18 mm 10.60 m² 116,610.00 1,235,482.95
- Alat Bantu Dan Acsesories 1.00 Lot 1,584,436.15 1,584,436.15
4 Pekerjaan Plafond
- Pek. Plafond Gypsum 9mm + Rockwool + Rangka Hollow
- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 63.31 m² 164,823.75 10,435,189.40
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Gypsum Board Perforated 9mm + Peredam 56.80 m² 303,589.65 17,244,256.43
(Gypsum board Perforated 9 mm + Rockwool + Kawat Rang)
- Plafond Gypsum Board 9mm (Rg. Alat) 6.51 m² 73,207.85 476,583.10
5 Pekerjaan Pengecatan
- Pek. Pengecatan Dinding Lama 41.93 m² 24,112.05 1,010,897.70
- Pek. Pengecatan Plafond 63.31 m² 34,697.23 2,196,722.95
- Pek. Pengecatan Kayu Cat Duco (Kosen) 1.78 m² 228,792.50 406,106.69
- Pek. Pengecatan Kayu Cat Duco (Daun Pintu) 8.00 m² 228,792.50 1,830,980.62
6 Pekerjaan Pelapis Dinding/Partisi
- Pek. Partisi Dinding 1 Lapis + Rangka Hollow
- Rangka Partisi Besi Hollow, Modul 60 x 120 Cm 107.18 m² 136,648.75 14,646,013.03
(Hollow Galvanize, Uk. 40/40)
- Partisi Gypsum Perforated 9mm + Peredam 107.18 m² 269,658.90 28,902,040.90
(Gypsumboard Perforated 9mm + Peredam sesuai Gbr)
- Pek. Wallpaper 107.18 m² 261,481.25 28,025,560.38
8 Pekerjaan Listrik Dan Armature
- Pek. Instalasi Titik Penerangan 8.00 Ttk 271,745.00 2,173,960.00
- Pek. Instalasi Titik Stop Kontak 6.00 Ttk 325,795.00 1,954,770.00
- Pek. Instalasi Titik Stop Kontak AC 1.00 Ttk 325,795.00 325,795.00
- Pas. Lampu Downlight 18 Wat 8.00 Bh 255,000.00 2,040,000.00
- Pas. Saklar Ganda 1.00 Bh 28,000.00 28,000.00
- Pas. Stop Kontak Biasa 6.00 Bh 28,000.00 168,000.00
- Pas. Stop Kontak AC 1.00 Bh 75,000.00 75,000.00
- Pas. Panel Listrik 1.00 Unit 2,500,000.00 2,500,000.00
9 Pekerjaan Lain - Lain
- Pek. Penutup Fasade ACP System Cutting + Rangka (Area Balkon/Rg. Fitnes)
(Aluminium Composite Panel (ACP) Type PVDF + Rangka Hollow 5 x 5)
- Pek. Pas. Aluminium Composite Panel (ACP) Type PVDF (Cutting) 13.61 m² 1,154,111.25 15,705,145.89
- Pek. Rangka Besi Hollow BS, UK. 50 x 50 x 2,3 29.40 m' 120,932.08 3,555,403.25
- Pek. Pengecatan Rangka Besi Hollow 4.41 m² 28,635.00 126,280.35
- Pek. Finishing Duco Dinding ACP 13.61 m² 228,792.50 3,113,408.34
- Pek. Keramik Lantai, Uk. 60 x 60 (Type Homogenous Tile) 20.53 m² 503,366.50 10,336,178.05
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
(Pek. Keramik Lantai Depan Rg. Musik Dan Rg. Fitnes)
- Pek. Penggantian Wastafel + Lengkap (Km/Wc) 2.00 Unit 1,050,812.50 2,101,625.00

Jumlah Total Pekerjaan Ruang Musik 243,647,077.90

REAL COAST 749,620,421.34


REKAPITULASI ANGGARAN BIAYA
PERENCANAAN KONSTRUKSI RENOVASI PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
BP-PAUD DAN DIKMAS PROVINSI SULAWESI SELATAN

PEKERJAAN : REHABILITASI GEDUNG AKSARA LONTARA


LOKASI : KOTA MAKASSAR
TAHUN : 2016

NO JENIS PEKERJAAN TOTAL HARGA (Rp.)

I PEKERJAAN PERSIAPAN Rp. 15,933,286.84


II PEKERJAAN GEDUNG LANTAI 01 (DASAR) (SISI KANAN DAN KIRI)
A. PEKERJAAN TANAH DAN PONDASI Rp. 32,251,864.09
B. PEKERJAAN STRUKTUR BETON DAN BAJA Rp. 69,534,417.32
C. PEKERJAAN PLAFOND Rp. 40,627,651.95
D. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING Rp. 25,658,922.69
E. PEKERJAAN PENGECATAN Rp. 3,990,874.82
F. PEKERJAAN LISTRIK DAN ARMATUR Rp. 4,720,000.00
G. PEKERJAAN LAIN-LAIN Rp. 71,795,876.06
III PEKERJAAN GEDUNG LANTAI 02 (DUA) (SISI KANAN DAN KIRI)
A. PEKERJAAN STRUKTUR BETON Rp. 337,266,575.31
B. PEKERJAAN DINDING Rp. 50,557,275.13
C. PEKERJAAN PINTU DAN JENDELA Rp. 35,309,513.53
D. PEKERJAAN PLAFOND Rp. 50,097,135.41
E. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING Rp. 67,108,821.78
F. PEKERJAAN PENGECATAN Rp. 19,460,979.89
G. PEKERJAAN RANGKA KAP DAN ATAP Rp. 136,718,738.92
H. PEKERJAAN LISTRIK DAN ARMATUR Rp. 11,954,640.00
I. PEKERJAAN LAIN-LAIN Rp. 42,639,930.14

Real Cost Rp. 1,015,626,503.88


PPN 10 % Rp. 101,562,650.39
Total Jumlah Rp. 1,117,189,154.27
Dibulatkan Rp. 1,117,189,000.00
Terbilang : Satu milyar seratus tujuh belas juta seratus delapan puluh sembilan ribu rupiah,-

Makassar,……………………………………..2016

Disetujui/DiKetahui Oleh : Konsultan Perencana :


PEJABAT PEMBUAT KOMITMEN CV. MALLOMO ENGINEERING
(PPK)

Drs. ARMAN AGUNG, M.Pd. SJAMSIR, ST


Nip. 19691011 200112 1 002 Direktur
RENCANA ANGGARAN BIAYA (RAB)
PERENCANAAN KONSTRUKSI RENOVASI PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
BP-PAUD DAN DIKMAS PROVINSI SULAWESI SELATAN

PEKERJAAN : REHABILITASI GEDUNG AKSARA LONTARA


LOKASI : KOTA MAKASSAR
TAHUN : 2016

NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA

I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran dan pemasangan Bouplank 45.00 m' 124,660.00 5,609,700.00
2 Pek. Pembongkaran Gedung Lama
- Pek. Pembongkaran Atap 363.24 m² 24,417.38 8,869,245.21
- Pek. Pembongkaran Plafond 115.02 m² 12,644.25 1,454,341.64

Jumlah I 15,933,286.84

II PEKERJAAN GEDUNG LANTAI 01 (DASAR) (SISI KANAN DAN KIRI)


A. PEKERJAAN TANAH DAN PONDASI -
1 PONDASI POER
- Pek. Galian Tanah Pondasi Poer 26.33 m³ 85,387.50 2,248,594.43
- Pek. Urugan Tanah Kembali (Pondasi Poer) 21.89 m³ 22,942.50 502,303.10
- Pek. Urugan Pasir Bawah Pondasi Poer 0.69 m³ 165,600.00 114,760.80
- Pek. Lantai Kerja Bawah Pondasi Poer, Beton K.100 0.69 m³ 934,111.23 647,339.08
- Pek. Pondasi Poer (P1), Uk. 90 x 100 12.00 Bh
~ Beton K 225 3.05 m³ 1,182,874.94 3,612,500.07
~ Besi Beton Polos 368.83 Kg 14,860.88 5,481,071.14
~ Bekisting 2x Pakai 12.00 m² 165,197.50 1,982,370.00
- Pek. Stek Poer/Kolom Pedestal (P1), Uk. 30 x 30 12.00 Bh
~ Beton K 225 2.05 m³ 1,182,874.94 2,427,259.38
~ Besi Beton Polos 501.31 Kg 14,860.88 7,449,899.30
~ Bekisting 2x Pakai 27.36 m² 284,567.50 7,785,766.80

Jumlah II.A 32,251,864.09

B. PEKERJAAN STRUKTUR BETON DAN BAJA


1 Pek. Sloef (S1) Uk. 20 x 30 cm
~ Beton K 225 2.76 m³ 1,182,874.94 3,264,734.84
~ Besi Beton Polos 499.47 Kg 14,860.88 7,422,531.51
~ Bekisting 2x Pakai 27.60 m² 174,613.13 4,819,322.25
~ Pek. Urugan Pasir Alas 0.69 m³ 165,600.00 114,264.00
~ Pek. Rabat Beton Alas Sloef, Tbl. 5 cm 0.69 m³ 934,111.23 644,536.75
2 Pek. Kolom (K1) Besi IWF. 250 12.00 Bh
~ Baja IWF. 250. 125. 6. 9 1,270.90 Kg 28,501.83 36,222,975.75
~ Base Plat. 2 x 30 x 30 x 12 210.00 Kg 42,179.13 8,857,616.25
~ Anchor Bolt/Angkur Baut, Dia. 25 mm 96.00 Bh 55,000.00 5,280,000.00
~ Pek. Perakitan 1,480.90 Kg 1,091.52 1,616,424.77
~ Pek. Pengecatan Anti Karat 1 Lapis 45.12 m² 28,635.00 1,292,011.20

Jumlah II.B 69,534,417.32

C. PEKERJAAN PLAFOND
1 Pek. Plafond Gypsum 9mm + Peredam + Rangka Hollow (Studio)
- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 57.51 m² 164,823.75 9,479,013.86
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Gypsum Board Perforated 9mm + Peredam 57.51 m² 303,589.65 17,459,440.77
(Gypsum board Perforated 9 mm + Rockwool + Kawat Rang)
2 Pek. Plafond Gypsum 9mm + Rangka Hollow (Ruang Belajar)
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 57.51 m² 164,823.75 9,479,013.86
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Gypsum Board 9mm 57.51 m² 73,207.85 4,210,183.45

Jumlah II.C 40,627,651.95

D. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 Pek. Urugan Tanah Bawah Lantai 22.60 m³ 179,400.00 4,054,009.44
2 Pek. Urugan Pasir Bawah Lantai 14.12 m³ 165,600.00 2,338,851.60
3 Pek. Lantai Kerja Beton, K. 100, Tbl = 7cm 3.95 m³ 934,111.23 3,694,017.59
4 Pek. Keramik Lantai, Uk. 60 x 60 (Type Homogenous Tile) 8.00 m² 503,366.50 4,026,932.00
(Penggantian Dalam Studio Dan Ruang Belajar)
5 Pek. Keramik Selasar, Uk. 40 x 40 48.49 m² 238,073.00 11,545,112.06
(Penggantian Selasar Keliling)

Jumlah II.D 25,658,922.69

E. PEKERJAAN PENGECATAN
1 Pek. Pengecatan Plafond 115.02 m² 34,697.23 3,990,874.82

Jumlah II.E 3,990,874.82

F. PEKERJAAN LISTRIK DAN ARMATUR


1 Pek. Pemasangan Kembali Lampu/Armatuer 1.00 Ls 1,000,000.00 1,000,000.00
2 Pek. Perbaikan Instalasi Listrik Ruang Studio Dan Rg. Belajar 1.00 Ls 3,720,000.00 3,720,000.00
(Pengaturan dan Penggantian Kabel Diatas Plafond)
Jumlah II.F 4,720,000.00

G. PEKERJAAN LAIN-LAIN
1 Pek. Perbaikan Saluran Keliling Bangunan 1.00 Ls 1,500,000.00 1,500,000.00
2 Pek. Finishing Kolom IWF Dengan ACP Type PVDF, Tbl. 0,5 mm + Rangka 67.65 m² 1,039,111.25 70,295,876.06
(Kolom Luar Dan Dalam)

Jumlah II.G 71,795,876.06

Jumlah Total Pekerjaan Lantai I (Dasar) 248,579,606.93

III PEKERJAAN GEDUNG LANTAI 02 (DUA) (SISI KANAN DAN KIRI)


A. PEKERJAAN STRUKTUR BETON
1 Pek. Balok Plat B1, Uk. 30 x 50 + Baja IWF. 250. 125. 6. 9
~ Beton K 225 11.70 m³ 1,182,874.94 13,839,636.80
~ Bekisting 2x Pakai 82.68 m² 292,416.25 24,176,975.55
~ Baja IWF. 250. 125. 6. 9 2,721.67 Kg 28,501.83 77,572,480.65
~ Plat Pengaku, Tbl. 10 mm 280.52 Kg 42,179.13 11,832,269.75
~ Baut + Mur, Dia. 16 mm 280.00 Bh 7,500.00 2,100,000.00
~ Pek. Perakitan 3,002.19 Kg 1,091.52 3,276,936.90
2 Pek. Plat Beton, Tbl = 12 cm
~ Beton K 225 14.48 m³ 1,182,874.94 17,129,212.01
~ Wiremesh M10 1,226.67 Kg 13,317.00 16,335,568.44
~ Structural Floor Decking, Bondek Superdyma G550 K18, Tbl 0.75 Tct 144.08 m² 414,172.50 59,671,902.94
3 Pek. Kolom (K1) Besi IWF. 250 12.00 Bh
~ Baja IWF. 250. 125. 6. 9 1,462.60 Kg 28,501.83 41,686,776.56
~ Pek. Perakitan 1,462.60 Kg 1,091.52 1,596,450.04
~ Pek. Pengecatan Anti Karat 1 Lapis 49.44 m² 28,635.00 1,415,714.40
4 Pek. Kolom (KP) Uk. 15 x 15 cm
~ Beton K 175 0.68 m³ 1,120,337.12 766,310.59
~ Besi Beton Polos 115.22 Kg 14,860.88 1,712,210.57
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
~ Bekisting 2x Pakai 9.12 m² 284,567.50 2,595,255.60
5 Pek. Ringbalk RB1 Baja IWF 200. 100. 5,5. 8
~ Baja IWF. 200. 100. 5,5. 8 1,408.00 Kg 28,501.83 40,130,576.64
~ Plat Pengaku, Tbl. 10 mm 140.49 Kg 42,179.13 5,925,710.12
~ Baut + Mur, Dia. 16 mm 144.00 Bh 7,500.00 1,080,000.00
~ Pek. Perakitan 1,548.49 Kg 1,091.52 1,690,199.37
~ Pek. Pengecatan Anti Karat 1 Lapis 54.53 m² 28,635.00 1,561,546.73
6 Pek. Ringbalk RB2, Uk. 15 x 15
~ Beton K 175 1.49 m³ 1,120,337.12 1,663,700.62
~ Besi Beton Polos 250.14 Kg 14,860.88 3,717,299.27
~ Bekisting 2x Pakai 19.80 m² 292,416.25 5,789,841.75

Jumlah III.A 337,266,575.31

B. PEKERJAAN DINDING
1 Pek. Pas. Dinding 1/2 Bata (1pc : 4ps) 168.96 m² 106,854.55 18,054,358.48
2 Pek. Plesteran Biasa (1pc : 4ps) 337.92 m² 59,506.29 20,108,603.54
3 Pek. Acian (saus semen) 337.92 m² 36,677.81 12,394,313.11

Jumlah III.B 50,557,275.13

C. PEKERJAAN PINTU DAN JENDELA


1 Pek. Kusen Dan Pintu ( P1 ) 2.00 Bh
~ Kusen Aluminium, Uk. 1 3/4 x 4" 11.40 m' 184,549.13 2,103,860.03
~ Daun Pintu Aluminium 3 x 1/2" + Kaca 5 mm 2.00 Bh
- Bingkai Jendela Aluminium 12.60 m' 142,344.13 1,793,535.98
- Kaca Jendela 5 mm 3.76 m² 272,688.00 1,025,306.88
~ Engsel Pintu 6.00 Bh 61,654.38 369,926.25
~ Kunci Selot 2.00 Set 286,522.50 573,045.00
~ Handle Pintu 2.00 Set 242,017.50 484,035.00
~ Door Closer 2.00 Bh 213,267.50 426,535.00

2 Pek. Kusen Dan Jendela ( J1 ) 8.00 Bh


~ Kusen Aluminium, Uk. 1 3/4 x 4" 61.60 m' 184,549.13 11,368,226.10
~ Daun Jendela Aluminium 3/7" + Kaca 5 mm 16.00 Bh
- Bingkai Jendela Aluminium 68.48 m' 142,344.13 9,747,725.68
- Kaca Jendela 5 mm 12.84 m² 272,688.00 3,500,877.62
~ Engsel Jendela Casement/Spring Knip 32.00 Bh 103,586.25 3,314,760.00
~ Grendel Jendela 16.00 Bh 37,605.00 601,680.00

Jumlah III.C 35,309,513.53

D. PEKERJAAN PLAFOND
1 Pek. Plafond Gypsum 9mm + Rangka Hollow
- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 133.05 m² 164,823.75 21,929,799.94
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Gypsum Board 9mm 133.05 m² 73,207.85 9,740,304.44
- List Plafond Gypsum Type Sedang 69.80 m' 52,181.25 3,642,251.25
2 Pek. Plafond Calsyboard 4mm + Rangka Hollow (Overstek Atap)
- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 52.21 m² 164,823.75 8,605,480.95
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Calsy Board 4mm 52.21 m² 75,928.75 3,964,255.22
- List Plafond Kayu, Uk. 5 cm 115.38 m' 19,197.81 2,215,043.61

Jumlah III.D 50,097,135.41

E. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
1 Pek. Keramik Lantai, Uk. 60 x 60 (Type Homogenous Tile) 133.32 m² 503,366.50 67,108,821.78

Jumlah III.E 67,108,821.78

F. PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Dalam 185.14 m² 34,697.23 6,423,705.45
2 Pek. Pengecatan Dinding Luar 152.79 m² 37,687.23 5,758,155.73
3 Pek. Pengecatan Plafond 185.26 m² 34,697.23 6,428,014.84
4 Pek. Pengecatan Kayu (Lesplank Woodplank) 21.08 m² 40,378.78 851,103.86

Jumlah III.F 19,460,979.89

G. PEKERJAAN RANGKA KAP DAN ATAP


1 Pek. Rangka Kap Baja Ringan (Sayap Kanan Dan Kiri) 320.62 m2 239,356.86 76,742,309.22
2 Pek. Atap Zincalume, T = 0,35 mm (Kanan Dan Kiri) 320.62 m2 147,976.25 47,443,967.70
3 Pek. Nok Atap Zincalume, T = 0,35 mm (kanan Dan Kiri) 36.76 m' 132,048.75 4,853,527.03
4 Pek. Lesplank Woodplank, Uk. 1 x 20 cm (kanan Dan Kiri) 70.26 m' 109,293.13 7,678,934.96

Jumlah III.G 136,718,738.92

H. PEKERJAAN LISTRIK DAN ARMATUR


1 Pek. Instalasi Titik Penerangan 16.00 Ttk 271,745.00 4,347,920.00
2 Pek. Instalasi Titik Stop Kontak 10.00 Ttk 325,795.00 3,257,950.00
3 Pek. Instalasi Titik Stop Kontak AC 6.00 Ttk 325,795.00 1,954,770.00
4 Pek. Pas. Lampu RMI 2 x 18 Wat 16.00 Bh 38,000.00 608,000.00
5 Pas. Saklar Ganda 2.00 Bh 28,000.00 56,000.00
6 Pas. Stop Kontak Biasa 10.00 Bh 28,000.00 280,000.00
7 Pas. Stop Kontak AC 6.00 Bh 75,000.00 450,000.00
8 Pas. Panel Instalasi + MCB 1.00 Unit 1,000,000.00 1,000,000.00

Jumlah III.H 11,954,640.00

I. PEKERJAAN LAIN-LAIN
1 Pek. Finishing Kolom IWF Dengan ACP Type PVDF, Tbl. 0,5 mm + Rangka 41.04 m² 1,039,111.25 42,639,930.14
(Kolom Luar Dan Dalam)

Jumlah III.I 42,639,930.14

Jumlah Total Pekerjaan Lantai II (Dua) 751,113,610.11

REAL COAST LT. I DAN II 1,015,626,503.88


REKAPITULASI ANGGARAN BIAYA
PERENCANAAN KONSTRUKSI RENOVASI PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
BP-PAUD DAN DIKMAS PROVINSI SULAWESI SELATAN

PEKERJAAN : REHABILITASI TOTAL GEDUNG ASRAMA KAYANGAN


LOKASI : KOTA MAKASSAR
TAHUN : 2016

NO JENIS PEKERJAAN TOTAL HARGA (Rp.)

I PEKERJAAN PERSIAPAN Rp. 38,055,422.80


II PEKERJAAN GEDUNG LANTAI 01 (DASAR)
A. PEKERJAAN TANAH DAN PONDASI Rp. 80,359,913.18
B. PEKERJAAN STRUKTUR BETON Rp. 142,388,583.31
C. PEKERJAAN DINDING Rp. 75,104,652.81
D. PEKERJAAN PINTU DAN JENDELA Rp. 30,498,663.98
E. PEKERJAAN PLAFOND Rp. 33,550,512.99
F. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING Rp. 113,304,452.93
G. PEKERJAAN PENGECATAN Rp. 34,036,106.35
H. PEKERJAAN LISTRIK DAN ARMATUR Rp. 14,113,480.00
I. PEKERJAAN SANITASI DAN INSTALASI AIR Rp. 31,111,729.31
J. PEKERJAAN LAIN-LAIN Rp. 12,375,092.08
III PEKERJAAN GEDUNG LANTAI 02 (DUA)
A. PEKERJAAN STRUKTUR BETON Rp. 316,906,914.65
B. PEKERJAAN DINDING Rp. 82,478,114.83
C. PEKERJAAN PINTU DAN JENDELA Rp. 30,498,663.98
D. PEKERJAAN PLAFOND Rp. 48,405,641.43
E. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING Rp. 76,791,746.67
F. PEKERJAAN PENGECATAN Rp. 40,338,425.99
G. PEKERJAAN RANGKA KAP DAN ATAP Rp. 107,011,111.25
H. PEKERJAAN LISTRIK DAN ARMATUR Rp. 12,256,500.00
I. PEKERJAAN SANITASI DAN INSTALASI AIR Rp. 22,734,445.35
J. PEKERJAAN LAIN-LAIN Rp. 32,053,500.00

Real Cost Rp. 1,374,373,673.88


PPN 10 % Rp. 137,437,367.39
Total Jumlah Rp. 1,511,811,041.27
Dibulatkan Rp. 1,511,811,000.00
Terbilang : Satu milyar lima ratus sebelas juta delapan ratus sebelas ribu rupiah,-

Makassar,……………………………………..2016

Disetujui/DiKetahui Oleh : Konsultan Perencana :


PEJABAT PEMBUAT KOMITMEN CV. MALLOMO ENGINEERING
(PPK)

Drs. ARMAN AGUNG, M.Pd. SJAMSIR, ST


Nip. 19691011 200112 1 002 Direktur
RENCANA ANGGARAN BIAYA (RAB)
PERENCANAAN KONSTRUKSI RENOVASI PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
BP-PAUD DAN DIKMAS PROVINSI SULAWESI SELATAN

PEKERJAAN : REHABILITASI TOTAL GEDUNG ASRAMA KAYANGAN


LOKASI : KOTA MAKASSAR
TAHUN : 2016

NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA

I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran dan pemasangan Bouplank 61.93 m' 124,660.00 7,720,193.80
2 Pek. Pembongkaran Gedung Lama
- Pek. Pembongkaran Atap 198.00 m² 24,417.38 4,834,640.25
- Pek. Pembongkaran Plafond 126.00 m² 12,644.25 1,593,175.50
- Pek. Pembongkaran Dinding Batu Bata 37.80 m³ 632,471.25 23,907,413.25

Jumlah I 38,055,422.80

II PEKERJAAN GEDUNG LANTAI 01 (DASAR)


A. PEKERJAAN TANAH DAN PONDASI -
1 PONDASI POER
- Pek. Galian Tanah Pondasi Poer 23.17 m³ 85,387.50 1,978,086.83
- Pek. Urugan Tanah Kembali (Pondasi Poer) 18.03 m³ 22,942.50 413,722.10
- Pek. Urugan Pasir Bawah Pondasi Poer 0.86 m³ 165,600.00 142,084.80
- Pek. Lantai Kerja Bawah Pondasi Poer, Beton K.100 0.86 m³ 934,111.23 801,467.44
- Pek. Pondasi Poer (P1), Uk. 90 x 100 12.00 Bh
~ Beton K 225 2.77 m³ 1,182,874.94 3,278,929.34
~ Besi Beton Polos 451.12 Kg 14,860.88 6,704,085.48
~ Bekisting 2x Pakai 11.40 m² 165,197.50 1,883,251.50
- Pek. Pondasi Poer (P2), Uk. 60 x 70 6.00 Bh
~ Beton K 225 0.65 m³ 1,182,874.94 762,954.34
~ Besi Beton Polos 117.05 Kg 14,860.88 1,739,462.45
~ Bekisting 2x Pakai 3.90 m² 165,197.50 644,270.25
- Pek. Stek Poer (P1), Uk. 30 x 40 12.00 Bh
~ Beton K 225 1.87 m³ 1,182,874.94 2,214,341.89
~ Besi Beton Polos 593.02 Kg 14,860.88 8,812,861.48
~ Bekisting 2x Pakai 21.84 m² 284,567.50 6,214,954.20
- Pek. Stek Poer (P2), Uk. 20 x 30 6.00 Bh
~ Beton K 225 0.47 m³ 1,182,874.94 553,585.47
~ Besi Beton Polos 134.88 Kg 14,860.88 2,004,363.49
~ Bekisting 2x Pakai 7.80 m² 284,567.50 2,219,626.50

2 PONDASI BATU GUNUNG


- Pek. Galian Tanah Pondasi Garis 63.12 m³ 69,000.00 4,355,063.62
- Pek. Urugan Tanah Kembali (Pondasi Garis) 16.34 m³ 22,942.50 374,771.83
- Pek. Urugan Pasir Bawah Pondasi Garis 8.39 m³ 165,600.00 1,389,913.92
- Pek. Pas. Batu kosong 16.79 m³ 428,058.75 7,185,565.40
- Pek. Pondasi Batu Gunung, Camp. 1pc : 5ps 35.41 m³ 753,669.75 26,686,550.86

Jumlah II.A 80,359,913.18

B. PEKERJAAN STRUKTUR BETON


1 Pek. Sloef (S1) Uk. 20 x 30 cm
~ Beton K 225 6.70 m³ 1,182,874.94 7,921,595.19
~ Besi Beton Polos 1,054.05 Kg 14,860.88 15,664,066.86
~ Bekisting 2x Pakai 66.97 m² 174,613.13 11,693,666.37
2 Pek. Kolom (K1) Uk. 30 x40 cm 12.00 Bh
~ Beton K 225 5.83 m³ 1,182,874.94 6,898,526.65
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
~ Besi Beton Polos 858.63 Kg 14,860.88 12,759,932.47
~ Bekisting 2x Pakai 68.04 m² 284,567.50 19,361,972.70
3 Pek. Kolom (K1a) Uk. 30 x40 cm 4.00 Bh
~ Beton K 225 1.94 m³ 1,182,874.94 2,299,508.88
~ Besi Beton Polos 251.77 Kg 14,860.88 3,741,484.45
~ Bekisting 2x Pakai 22.68 m² 284,567.50 6,453,990.90
4 Pek. Kolom (K2) Uk. 20 x 30 cm 6.00 Bh
~ Beton K 225 1.46 m³ 1,182,874.94 1,724,631.66
~ Besi Beton Polos 233.72 Kg 14,860.88 3,473,245.07
~ Bekisting 2x Pakai 24.30 m² 284,567.50 6,914,990.25
5 Pek. Kolom (K2a) Uk. 20 x 30 cm 9.00 Bh
~ Beton K 225 2.16 m³ 1,182,874.94 2,555,009.87
~ Besi Beton Polos 276.48 Kg 14,860.88 4,108,734.72
~ Bekisting 2x Pakai 36.00 m² 284,567.50 10,244,430.00
6 Pek. Kolom (KP) Uk. 15 x 15 cm
~ Beton K 175 1.55 m³ 1,120,337.12 1,735,542.24
~ Besi Beton Polos 334.47 Kg 14,860.88 4,970,565.90
~ Bekisting 2x Pakai 20.66 m² 284,567.50 5,877,741.71
7 Pek. Tangga Beton
~ Beton K 225 2.36 m³ 1,182,874.94 2,786,770.56
~ Besi Beton Polos 330.82 Kg 14,860.88 4,916,212.62
~ Bekisting 2x Pakai 23.69 m² 265,305.00 6,285,964.22

Jumlah II.B 142,388,583.31

C. PEKERJAAN DINDING
1 Pek. Pas. Dinding 1/2 Bata (1pc : 5ps) 221.83 m² 106,854.55 23,703,491.40
2 Pek. Plesteran Biasa (1pc : 5ps) 443.66 m² 59,506.29 26,400,501.12
3 Pek. Plesteran Beton (1pc : 3ps) 78.40 m² 62,841.06 4,926,550.58
4 Pek. Acian (saus semen) 547.31 m² 36,677.81 20,074,109.72

Jumlah II.C 75,104,652.81

D. PEKERJAAN PINTU DAN JENDELA


1 Pek. Kusen Dan Pintu ( P1 ) 4.00 Bh
~ Kusen Kayu Kls. I, Uk. 5/14 0.09 m³ 15,515,656.25 1,401,063.76
~ Daun Pintu Panel Kayu Kls. I 6.89 m² 959,675.00 6,610,241.40
~ Daun Jendela Kaca 5 mm, Bingkai Kayu Kls. I 4.22 m² 672,405.00 2,834,859.48
~ Kaca mati 5 mm 3.82 m² 272,688.00 1,042,104.46
~ Engsel Pintu 12.00 Bh 61,654.38 739,852.50
~ Engsel Jendela 16.00 Bh 43,786.25 700,580.00
~ Kunci Tanam 2 x Slag 4.00 Set 419,462.50 1,677,850.00
~ Grendel Jendela 8.00 Bh 37,605.00 300,840.00
~ Kait Angin 16.00 Bh 34,155.00 546,480.00
~ Handle Pintu 4.00 Set 242,017.50 968,070.00
~ Door Closer 4.00 Bh 213,267.50 853,070.00

2 Pek. Kusen Dan Pintu ( P2 ) (KM/WC) 4.00 Bh


~ Kusen Kayu Kls. I, Uk. 5/14 0.18 m³ 15,515,656.25 2,823,849.44
~ Daun Pintu Panel Kayu Kls. I 5.25 m² 959,675.00 5,040,980.84
~ Kaca Mati Jendela 5 mm 1.16 m² 272,688.00 316,099.93
~ Engsel Pintu 12.00 Bh 61,654.38 739,852.50
~ Kunci Silinder (Km/Wc) 4.00 Bh 468,136.25 1,872,545.00
~ Grendel Pintu 4.00 Bh 125,000.00 500,000.00

3 Pek. Kusen Dan Jendela (V1 ) 4.00 Bh


~ Kusen Aluminium, Uk. 1 3/4 x 4" 7.20 m' 184,549.13 1,328,753.70
~ Kaca mati 5 mm 0.74 m² 272,688.00 201,570.97
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA

Jumlah II.D 30,498,663.98

E. PEKERJAAN PLAFOND
1 Pek. Plafond Gypsum 9mm + Rangka Hollow
- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 110.32 m² 164,823.75 18,183,438.51
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Gypsum Board 9mm 110.32 m² 73,207.85 8,076,326.62
- List Plafond Gypsum Type Sedang 66.00 m' 52,181.25 3,443,962.50
2 Pek. Plafond Calsyboard 4mm + Rangka Hollow
- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 13.57 m² 164,823.75 2,236,658.29
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Calsy Board 4mm 13.57 m² 75,928.75 1,030,353.14
- List Plafond Kayu, Uk. 5 cm 30.20 m' 19,197.81 579,773.94

Jumlah II.E 33,550,512.99

F. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 Pek. Urugan Tanah Bawah Lantai 54.25 m³ 179,400.00 9,732,772.92
2 Pek. Urugan Pasir Bawah Lantai 33.91 m³ 165,600.00 5,615,061.30
3 Pek. Lantai Kerja Beton, K. 100, Tbl = 7cm 9.49 m³ 934,111.23 8,868,512.74
4 Pek. Keramik Lantai, Uk. 60 x 60 (Type Homogenous Tile) 121.52 m² 503,366.50 61,168,845.40
5 Pek. Keramik Tangga, Uk. 60 x 60 (Type Homogenous Tile) 13.78 m² 503,366.50 6,937,950.81
(Dicutting)
6 Pek. Keramik Lantai, Uk. 30 x 30 (Km/WC) 13.57 m² 233,674.77 3,170,966.67
7 Pek. Keramik Dinding, Uk. 25 x 40 (Km/WC) 57.12 m² 302,176.88 17,260,343.10
8 Pek. Step Nosing Tangga 22.00 m' 25,000.00 550,000.00

Jumlah II.F 113,304,452.93

G. PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Dalam 295.37 m² 34,697.23 10,248,368.42
2 Pek. Pengecatan Dinding Luar 251.94 m² 37,687.23 9,495,058.91
3 Pek. Pengecatan Plafond 123.89 m² 34,697.23 4,298,656.55
4 Pek. Pengecatan Kayu Cat Duco (Kosen) 19.40 m² 228,792.50 4,438,574.50
5 Pek. Pengecatan Kayu Cat Duco (Daun Pintu) 24.28 m² 228,792.50 5,555,447.97

Jumlah II.G 34,036,106.35

H. PEKERJAAN LISTRIK DAN ARMATUR


1 Pek. Instalasi Titik Penerangan 12.00 Ttk 271,745.00 3,260,940.00
2 Pek. Instalasi Titik Stop Kontak 8.00 Ttk 325,795.00 2,606,360.00
3 Pek. Instalasi Titik Stop Kontak AC 4.00 Ttk 325,795.00 1,303,180.00
4 Pas. Instalasi TV Lengkap 6.00 Bh 250,000.00 1,500,000.00
5 Pas. Lampu SL 18 Wat 4.00 Bh 38,000.00 152,000.00
6 Pas. Lampu Downlight 18 Wat 8.00 Bh 255,000.00 2,040,000.00
7 Pas. Saklar Tunggal 5.00 Bh 23,000.00 115,000.00
8 Pas. Saklar Ganda 4.00 Bh 28,000.00 112,000.00
9 Pas. Stop Kontak Biasa 8.00 Bh 28,000.00 224,000.00
10 Pas. Stop Kontak AC 4.00 Bh 75,000.00 300,000.00
11 Pas. Panel Instalasi + MCB 1.00 Unit 2,500,000.00 2,500,000.00

Jumlah II.H 14,113,480.00

I. PEKERJAAN SANITASI DAN INSTALASI AIR


1 Pek. Pas. Kloset Duduk 4.00 Bh 2,876,868.75 11,507,475.00
2 Pek. Pas. Kran Air 4.00 Bh 76,618.75 306,475.00
3 Pek. Pas. Kran Air Ganda (Panas Dan Dingin) 4.00 Bh 341,118.75 1,364,475.00
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
4 Pek. Pas. Floordrain 4.00 Bh 89,412.50 357,650.00
5 Pek. Instalasi Air Bersih, Pipa PVC Dia. 1 1/2" AW (Pipa Utama) 8.00 m' 47,326.24 378,609.90
6 Pek. Instalasi Air Bersih, Pipa PVC Dia. 1" AW (Pipa Distribusi) 6.00 m' 24,249.67 145,498.00
7 Pek. Instalasi Air Bersih, Pipa PVC Dia. 3/4" AW (Kran + Closet) 16.00 m' 20,684.67 330,954.67
8 Pek. Instalasi Air Panas, Pipa PVC Dia. 1/2" AW (Kran Ganda) 24.00 m' 108,502.50 2,604,060.00
9 Pek. Instalasi Air Kotor, Pipa PVC Dia. 4" D (Disposal Padat) 24.00 m' 143,992.46 3,455,819.00
10 Pek. Instalasi Air Kotor, Pipa PVC Dia. 2" D (Floordrain) 20.00 m' 55,536.38 1,110,727.50
11 Pek. Bak Kontrol, Uk. 30 x 60 1.00 Bh 335,000.00 335,000.00
12 Pek. Septictank + Peresapan 1.00 Unit
A. Septic tank + Peresapan 01
- Pek. Galian Tanah 6.92 m3 85,387.50 590,774.77
- Pek. Pasir Urug Alas 0.36 m3 165,600.00 58,995.00
- Pek. Pas. Trasram 1 Bt., Camp. 1pc : 4ps 3.56 m2 224,717.19 800,554.98
- Pek. Pas. Trasram 1/2 Bt., Camp. 1pc : 4ps 15.13 m2 109,212.63 1,652,387.02
- Pek. Plesteran Trasram, Camp. 1pc : 3ps 18.69 m2 62,841.06 1,174,656.51
- Pek. Beton, Uk. 15/15
- Beton K175 0.02 m3 1,120,337.12 18,905.69
- Besi Beton 3.64 Kg 14,860.88 54,145.60
- Bekisting 2xpakai 0.34 m2 292,416.25 98,690.48
- Pek. Plat Beton, Tbl = 10 Cm
- Beton K175 0.36 m3 1,120,337.12 399,120.10
- Besi Beton 47.27 Kg 14,860.88 702,432.69
- Bekisting 2xpakai 3.56 m2 342,067.50 1,218,615.47
- Pek. Pipa Penghawaan (Pipa Gip 2") 1.30 m' 205,428.33 267,056.83
- Pek. Pipa Pembuangan, Dia. 4" (D) (Ke Peresapan) 4.00 m' 143,992.46 575,969.83
(Pada Posisi Peresapan Dilubangi Pada Sisinya Dan Dilapisi Ijuk)
- Pek. Peresapan
- Galian Tanah 2.81 m3 69,000.00 194,217.75
- Urugan Tanah 1.15 m3 179,400.00 205,682.10
- Urugan Pasir 0.94 m3 165,600.00 155,250.00
- Urugan Kerikil 0.73 m3 408,135.00 297,530.42

13 Mesin Pompa Air 1.00 Bh 750,000.00 750,000.00

Jumlah II.I 31,111,729.31

J. PEKERJAAN LAIN-LAIN
1 Pek. Rabat Beton Keliling Bangunan
- Urugan Tanah Bawah Rabat 2.09 m³ 179,400.00 374,104.61
- Urugan Pasir Bawah Rabat 4.17 m³ 165,600.00 690,654.67
- Beton Rabat K.100, Tbl = 10 Cm 2.09 m³ 1,010,931.32 2,108,105.19
2 Pek. Saluran Keliling Bangunan
- Pek. Galian Tanah 14.84 m³ 69,000.00 1,024,213.58
- Pek. Pasir Urug Alas Saluran 2.10 m³ 165,600.00 348,256.80
- Pek. Pas. Dinding Trasram 1/2 Bt. Camp. 1pc : 3ps 25.33 m² 112,955.01 2,860,585.69
- Pek. Beton Rabat Alas Saluran, K.100, Tbl. 5 Cm 1.14 m³ 1,010,931.32 1,151,577.14
- Pek. Plesteran Trasram, Camp. 1pc : 3ps 60.75 m² 62,841.06 3,817,594.40

Jumlah II.J 12,375,092.08

Jumlah Total Pekerjaan Lantai I (Dasar) 566,843,186.93

III PEKERJAAN GEDUNG LANTAI 02 (DUA)


A. PEKERJAAN STRUKTUR BETON
1 Pek. Balok Plat B1, Uk. 30 x 40
~ Beton K 225 8.09 m³ 1,182,874.94 9,568,511.97
~ Besi Beton Polos 1,450.63 Kg 14,860.88 21,557,672.00
~ Bekisting 2x Pakai 57.97 m² 292,416.25 16,952,130.29
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
2 Pek. Balok Plat B2, Uk. 20 x 30
~ Beton K 225 3.73 m³ 1,182,874.94 4,410,230.93
~ Besi Beton Polos 690.80 Kg 14,860.88 10,265,847.04
~ Bekisting 2x Pakai 34.80 m² 292,416.25 10,175,617.63
3 Pek. Balok Plat B2, Uk. 20 x 30 + Lesplank
~ Beton K 225 2.88 m³ 1,182,874.94 3,409,755.30
~ Besi Beton Polos 310.87 Kg 14,860.88 4,619,728.28
~ Bekisting 2x Pakai 41.35 m² 292,416.25 12,091,528.90
4 Pek. Plat Beton, Tbl = 12 cm
~ Beton K 225 12.85 m³ 1,182,874.94 15,199,356.28
~ Besi Beton Polos 2,073.16 Kg 14,860.88 30,808,961.31
~ Bekisting 2x Pakai 107.08 m² 342,067.50 36,628,314.25
5 Pek. Kolom (K1) Uk. 30 x40 cm 12.00 Bh
~ Beton K 225 5.76 m³ 1,182,874.94 6,813,359.66
~ Besi Beton Polos 848.03 Kg 14,860.88 12,602,402.44
~ Bekisting 2x Pakai 67.20 m² 284,567.50 19,122,936.00
6 Pek. Kolom (K1a) Uk. 30 x40 cm 4.00 Bh
~ Beton K 225 1.49 m³ 1,182,874.94 1,760,117.91
~ Besi Beton Polos 192.71 Kg 14,860.88 2,863,852.30
~ Bekisting 2x Pakai 17.36 m² 284,567.50 4,940,091.80
7 Pek. Kolom (K2) Uk. 20 x 30 cm 6.00 Bh
~ Beton K 225 1.44 m³ 1,182,874.94 1,703,339.91
~ Besi Beton Polos 230.83 Kg 14,860.88 3,430,365.50
~ Bekisting 2x Pakai 24.00 m² 284,567.50 6,829,620.00
8 Pek. Kolom (K2a) Uk. 20 x 30 cm 5.00 Bh
~ Beton K 225 0.93 m³ 1,182,874.94 1,100,073.69
~ Besi Beton Polos 119.04 Kg 14,860.88 1,769,038.56
~ Bekisting 2x Pakai 15.50 m² 284,567.50 4,410,796.25
9 Pek. Kolom (KP) Uk. 15 x 15 cm
~ Beton K 175 1.53 m³ 1,120,337.12 1,714,115.79
~ Besi Beton Polos 330.34 Kg 14,860.88 4,909,200.89
~ Bekisting 2x Pakai 20.40 m² 284,567.50 5,805,177.00
10 Pek. Ringbalk RB1, Uk. 20 x 25
~ Beton K 175 3.30 m³ 1,120,337.12 3,701,593.84
~ Besi Beton Polos 681.46 Kg 14,860.88 10,127,134.68
~ Bekisting 2x Pakai 33.04 m² 292,416.25 9,661,432.90
11 Pek. Ringbalk RB1, Uk. 20 x 25 + Lesplank
~ Beton K 175 4.59 m³ 1,120,337.12 5,137,719.26
~ Besi Beton Polos 426.37 Kg 14,860.88 6,336,197.78
~ Bekisting 2x Pakai 74.64 m² 292,416.25 21,826,387.52
12 Pek. Ringbalk RB2, Uk. 15 x 20
~ Beton K 175 0.66 m³ 1,120,337.12 742,111.31
~ Besi Beton Polos 89.47 Kg 14,860.88 1,329,575.14
~ Bekisting 2x Pakai 8.83 m² 292,416.25 2,582,620.32

Jumlah III.A 316,906,914.65

B. PEKERJAAN DINDING
1 Pek. Pas. Dinding 1/2 Bata (1pc : 4ps) 238.04 m² 106,854.55 25,435,379.26
2 Pek. Plesteran Biasa (1pc : 4ps) 476.07 m² 59,506.29 28,329,445.11
3 Pek. Plesteran Beton (1pc : 3ps) 80.70 m² 62,841.06 5,071,462.07
4 Pek. Acian (saus semen) 644.58 m² 36,677.81 23,641,828.39

Jumlah III.B 82,478,114.83

C. PEKERJAAN PINTU DAN JENDELA


1 Pek. Kusen Dan Pintu ( P1 ) 4.00 Bh
~ Kusen Kayu Kls. I, Uk. 5/14 0.09 m³ 15,515,656.25 1,401,063.76
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
~ Daun Pintu Panel Kayu Kls. I 6.89 m² 959,675.00 6,610,241.40
~ Daun Jendela Kaca 5 mm, Bingkai Kayu Kls. I 4.22 m² 672,405.00 2,834,859.48
~ Kaca mati 5 mm 3.82 m² 272,688.00 1,042,104.46
~ Engsel Pintu 12.00 Bh 61,654.38 739,852.50
~ Engsel Jendela 16.00 Bh 43,786.25 700,580.00
~ Kunci Tanam 2 x Slag 4.00 Set 419,462.50 1,677,850.00
~ Grendel Jendela 8.00 Bh 37,605.00 300,840.00
~ Kait Angin 16.00 Bh 34,155.00 546,480.00
~ Handle Pintu 4.00 Set 242,017.50 968,070.00
~ Door Closer 4.00 Bh 213,267.50 853,070.00

2 Pek. Kusen Dan Pintu ( P2 ) (KM/WC) 4.00 Bh


~ Kusen Kayu Kls. I, Uk. 5/14 0.18 m³ 15,515,656.25 2,823,849.44
~ Daun Pintu Panel Kayu Kls. I 5.25 m² 959,675.00 5,040,980.84
~ Kaca Mati Jendela 5 mm 1.16 m² 272,688.00 316,099.93
~ Engsel Pintu 12.00 Bh 61,654.38 739,852.50
~ Kunci Silinder (Km/Wc) 4.00 Bh 468,136.25 1,872,545.00
~ Grendel Pintu 4.00 Bh 125,000.00 500,000.00

3 Pek. Kusen Dan Jendela (V1 ) 4.00 Bh


~ Kusen Aluminium, Uk. 1 3/4 x 4" 7.20 m' 184,549.13 1,328,753.70
~ Kaca mati 5 mm 0.74 m² 272,688.00 201,570.97

Jumlah III.C 30,498,663.98

D. PEKERJAAN PLAFOND
1 Pek. Plafond Gypsum 9mm + Rangka Hollow
- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 117.79 m² 164,823.75 19,414,160.97
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Gypsum Board 9mm 117.79 m² 73,207.85 8,622,962.31
- List Plafond Gypsum Type Sedang 66.00 m' 52,181.25 3,443,962.50
2 Pek. Plafond Calsyboard 4mm + Rangka Hollow
- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 13.57 m² 164,823.75 2,236,658.29
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Calsy Board 4mm 13.57 m² 75,928.75 1,030,353.14
- List Plafond Kayu, Uk. 5 cm 30.20 m' 19,197.81 579,773.94
3 Pek. Plafond Calsyboard 4mm + Rangka Hollow (Overstek Atap)
- Rangka Plafond Besi Hollow, Modul 60 x 60 Cm 46.07 m² 164,823.75 7,593,627.95
(Hollow Galvanize, Uk. 40/40 Dan 20/40)
- Plafond Calsy Board 4mm 46.07 m² 75,928.75 3,498,128.63
- List Plafond Kayu, Uk. 5 cm 103.45 m' 19,197.81 1,986,013.70

Jumlah III.D 48,405,641.43

E. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 Pek. Keramik Lantai, Uk. 60 x 60 (Type Homogenous Tile) 111.97 m² 503,366.50 56,360,436.91
2 Pek. Keramik Lantai, Uk. 30 x 30 (Km/WC) 13.57 m² 233,674.77 3,170,966.67
3 Pek. Keramik Dinding, Uk. 25 x 40 (Km/WC) 57.12 m² 302,176.88 17,260,343.10

Jumlah III.E 76,791,746.67

F. PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Dalam 288.27 m² 34,697.23 10,002,314.78
2 Pek. Pengecatan Dinding Luar 356.31 m² 37,687.23 13,428,222.08
3 Pek. Pengecatan Plafond 177.43 m² 34,697.23 6,156,280.06
4 Pek. Pengecatan Kayu Cat Duco (Kosen) 19.40 m² 228,792.50 4,438,574.50
5 Pek. Pengecatan Kayu Cat Duco (Daun Pintu) 24.28 m² 228,792.50 5,555,447.97
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
6 Pek. Pengecatan Kayu (Lesplank Woodplank) 18.76 m² 40,378.78 757,586.61

Jumlah III.F 40,338,425.99

G. PEKERJAAN RANGKA KAP DAN ATAP


1 Pek. Rangka Kap Baja Ringan 244.41 m2 239,356.86 58,500,731.44
2 Pek. Atap Zincalume, T = 0,35 mm 244.41 m2 147,976.25 36,166,579.31
3 Pek. Nok Atap Zincalume, T = 0,35 mm 41.72 m' 132,048.75 5,508,608.46
4 Pek. Lesplank Woodplank, Uk. 1 x 20 cm 62.54 m' 109,293.13 6,835,192.04

Jumlah III.G 107,011,111.25

H. PEKERJAAN LISTRIK DAN ARMATUR


1 Pek. Instalasi Titik Penerangan 8.00 Ttk 271,745.00 2,173,960.00
2 Pek. Instalasi Titik Stop Kontak 8.00 Ttk 325,795.00 2,606,360.00
3 Pek. Instalasi Titik Stop Kontak AC 4.00 Ttk 325,795.00 1,303,180.00
4 Pas. Instalasi TV Lengkap 7.00 Bh 250,000.00 1,750,000.00
5 Pas. Lampu SL 18 Wat 4.00 Bh 38,000.00 152,000.00
6 Pas. Lampu Downlight 18 Wat 4.00 Bh 255,000.00 1,020,000.00
7 Pas. Saklar Tunggal 5.00 Bh 23,000.00 115,000.00
8 Pas. Saklar Ganda 4.00 Bh 28,000.00 112,000.00
9 Pas. Stop Kontak Biasa 8.00 Bh 28,000.00 224,000.00
10 Pas. Stop Kontak AC 4.00 Bh 75,000.00 300,000.00
11 Pas. Panel Instalasi + MCB 1.00 Unit 2,500,000.00 2,500,000.00

Jumlah III.H 12,256,500.00

I. PEKERJAAN SANITASI DAN INSTALASI AIR


1 Pek. Pas. Kloset Duduk 4.00 Bh 2,876,868.75 11,507,475.00
2 Pek. Pas. Kran Air 4.00 Bh 76,618.75 306,475.00
3 Pek. Pas. Kran Air Ganda (Panas Dan Dingin) 4.00 Bh 108,502.50 434,010.00
4 Pek. Pas. Floordrain 4.00 Bh 89,412.50 357,650.00
5 Pek. Instalasi Air Bersih, Pipa PVC Dia. 1 1/2" AW (Pipa Utama) 5.00 m' 47,326.24 236,631.19
6 Pek. Instalasi Air Bersih, Pipa PVC Dia. 1" AW (Pipa Distribusi) 6.00 m' 24,249.67 145,498.00
7 Pek. Instalasi Air Bersih, Pipa PVC Dia. 3/4" AW (Kran + Closet) 16.00 m' 20,684.67 330,954.67
8 Pek. Instalasi Air Panas, Pipa PVC Dia. 1/2" AW (Kran Ganda) 24.00 m' 341,118.75 8,186,850.00
9 Pek. Instalasi Air Kotor, Pipa PVC Dia. 3" D (Disposal Padat) 12.00 m' 65,384.21 784,610.50
10 Pek. Instalasi Air Kotor, Pipa PVC Dia. 2" D (Floordrain) 8.00 m' 55,536.38 444,291.00

Jumlah III.I 22,734,445.35

J. PEKERJAAN LAIN-LAIN
1 Pek. Reling Tangga Dan Void, T = 1,15 M 21.81 m' 850,000.00 18,538,500.00
(Bahan Dari Hollow BS, Finishing Cat Enamel)
2 Pek. Reling Balkon, T = 1,15 M 15.90 m' 850,000.00 13,515,000.00
(Bahan Dari Hollow BS, Finishing Cat Enamel)

Jumlah III.J 32,053,500.00

Jumlah Total Pekerjaan Lantai II (Dua) 769,475,064.15

REAL COAST LT. I DAN II 1,374,373,673.88


DAFTAR ANALISA HARGA SATUAN PEKERJAAN
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN

A.2.2.1.2 Memasang 1 M' pagar sementara dari seng gelombang tinggi 2 meter
1.250 Btg Dolken kayu Ø8-10/400 cm @ Rp 25,000.00 Rp 31,250.00
2.500 Kg Semen Portland @ Rp 1,275.00 Rp 3,187.50
0.005 M3 Pasir beton @ Rp 148,000.00 Rp 740.00
0.009 M3 split/chipping 2-3 cm @ Rp 267,000.00 Rp 2,403.00
0.072 M3 Kayu klas II (balok) @ Rp 4,550,000.00 Rp 327,600.00
0.060 Kg Paku biasa 2" - 5" @ Rp 17,500.00 Rp 1,050.00
0.400 Ltr Cat meni @ Rp 16,375.00 Rp 6,550.00
0.400 Oh Tukang kayu @ Rp 100,000.00 Rp 40,000.00
0.200 Oh Pekerja @ Rp 75,000.00 Rp 15,000.00
0.020 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 2,500.00
0.020 Oh Mandor @ Rp 150,000.00 Rp 3,000.00
Rp 433,280.50
Profit Dan Overhead (15%) Rp 64,992.08
Jumlah Rp 498,272.58

A.2.2.1.4 Mengukur dan memasang 1 M' bouwplank


0.012 M3 Kayu klas II (balok) @ Rp 4,550,000.00 Rp 54,600.00
0.020 Kg Paku biasa 2" - 5" @ Rp 17,500.00 Rp 350.00
0.007 M3 Kayu klas II (papan) @ Rp 4,850,000.00 Rp 33,950.00
0.100 Oh Tukang kayu @ Rp 100,000.00 Rp 10,000.00
0.100 Oh Pekerja @ Rp 75,000.00 Rp 7,500.00
0.010 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 1,250.00
0.005 Oh Mandor @ Rp 150,000.00 Rp 750.00
Rp 108,400.00
Profit Dan Overhead (15%) Rp 16,260.00
Jumlah Rp 124,660.00

A.2.2.1.5 Membuat1 M2 kantor sementara, dengan lantai plesteran


1.250 Btg Dolken kayu Ø8-10/400 cm @ Rp 25,000.00 Rp 31,250.00
0.180 M3 Kayu klas II (balok) @ Rp 4,550,000.00 Rp 819,000.00
0.080 Kg Paku biasa 2" - 5" @ Rp 17,500.00 Rp 1,400.00
1.100 Kg Besi strip @ Rp 12,500.00 Rp 13,750.00
35.000 Kg Semen Portland @ Rp 1,275.00 Rp 44,625.00
0.150 M3 Pasir pasang @ Rp 135,000.00 Rp 20,250.00
0.100 M3 Pasir beton @ Rp 148,000.00 Rp 14,800.00
0.150 M3 split/chipping 2-3 cm @ Rp 267,000.00 Rp 40,050.00
30.000 Bh Batu merah @ Rp 550.00 Rp 16,500.00
0.250 Lbr Seng plat BJLS 0.30 @ Rp 65,000.00 Rp 16,250.00
0.200 set Kaca nako lengkap teralis @ Rp 350,000.00 Rp 70,000.00
0.080 M2 Kaca bening 5 mm @ Rp 125,000.00 Rp 10,000.00
0.150 Bh Kunci tanam biasa @ Rp 173,000.00 Rp 25,950.00
0.060 Lbr Multipleks 1.22 x 2.44 x 6 mm @ Rp 98,000.00 Rp 5,880.00
2.000 Oh Tukang kayu @ Rp 100,000.00 Rp 200,000.00
1.000 Oh Tukang batu @ Rp 100,000.00 Rp 100,000.00
2.000 Oh Pekerja @ Rp 75,000.00 Rp 150,000.00
0.300 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 37,500.00
0.050 Oh Mandor @ Rp 150,000.00 Rp 7,500.00
Rp 1,624,705.00
Profit Dan Overhead (15%) Rp 243,705.75
Jumlah Rp 1,868,410.75

A.2.2.1.10 Membuat1 M2 Steger Werk Dari Bambu


1.000 Btg Bambu, Uk. Besar @ Rp 25,000.00 Rp 25,000.00
0.250 Kg Tali Ijuk @ Rp 65,000.00 Rp 16,250.00
0.250 Oh Pekerja @ Rp 75,000.00 Rp 18,750.00
0.017 Oh Tukang kayu @ Rp 100,000.00 Rp 1,700.00
0.002 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 250.00
0.013 Oh Mandor @ Rp 150,000.00 Rp 1,950.00
Rp 63,900.00
Profit Dan Overhead (15%) Rp 9,585.00
Jumlah Rp 73,485.00
A. 2.2.1.13 Pembongkaran 1 m3 Beton bertulang
13.334 Oh Pekerja @ Rp 75,000.00 Rp 1,000,050.00
0.666 Oh Mandor @ Rp 150,000.00 Rp 99,900.00
Rp 1,099,950.00
Profit Dan Overhead (15%) Rp 164,992.50
Jumlah Rp 1,264,942.50

A. 2.2.1.14 Pembongkaran 1 m3 Dinding Tembok Bata


6.667 Oh Pekerja @ Rp 75,000.00 Rp 500,025.00
0.333 Oh Mandor @ Rp 150,000.00 Rp 49,950.00
Rp 549,975.00
Profit Dan Overhead (15%) Rp 82,496.25
Jumlah Rp 632,471.25

SPL Pembongkaran 1 m2 Finishing Lantai


0.400 Oh Pekerja @ Rp 75,000.00 Rp 30,000.00
0.040 Oh Mandor @ Rp 150,000.00 Rp 6,000.00
Rp 36,000.00
Profit Dan Overhead (15%) Rp 5,400.00
Jumlah Rp 41,400.00

SPL Pembongkaran 1 m2 Plafond + Rangka


0.127 Oh Pekerja @ Rp 75,000.00 Rp 9,495.00
0.010 Oh Mandor @ Rp 150,000.00 Rp 1,500.00
Rp 10,995.00
Profit Dan Overhead (15%) Rp 1,649.25
Jumlah Rp 12,644.25

SPL Pembongkaran 1 m2 Atap


0.253 Oh Pekerja @ Rp 75,000.00 Rp 18,982.50
0.015 Oh Mandor @ Rp 150,000.00 Rp 2,250.00
Rp 21,232.50
Profit Dan Overhead (15%) Rp 3,184.88
Jumlah Rp 24,417.38

SPL Pembongkaran 1 m2 Pagar Rang


0.127 Oh Pekerja @ Rp 75,000.00 Rp 9,495.00
0.010 Oh Mandor @ Rp 150,000.00 Rp 1,500.00
Rp 10,995.00
Profit Dan Overhead (15%) Rp 1,649.25
Jumlah Rp 12,644.25

SPL Pembongkaran 1 m2 Partisi 1 Lapis + Rangka


0.060 Oh Pekerja @ Rp 75,000.00 Rp 4,500.00
0.040 Oh Mandor @ Rp 150,000.00 Rp 6,000.00
Rp 10,500.00
Profit Dan Overhead (15%) Rp 1,575.00
Jumlah Rp 12,075.00

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

A.2.3.1.1 Menggali 1 M3 tanah biasa sedalam 1 m


0.750 Oh Pekerja @ Rp 75,000.00 Rp 56,250.00
0.025 Oh Mandor @ Rp 150,000.00 Rp 3,750.00
Rp 60,000.00
Profit Dan Overhead (15%) Rp 9,000.00
Jumlah Rp 69,000.00

A.2.3.1.2 Menggali 1 M3 tanah biasa sedalam 2 m


0.900 Oh Pekerja @ Rp 75,000.00 Rp 67,500.00
0.045 Oh Mandor @ Rp 150,000.00 Rp 6,750.00
Rp 74,250.00
Profit Dan Overhead (15%) Rp 11,137.50
Jumlah Rp 85,387.50

A.2.3.1.6 Menggali 1 M3 tanah lumpur sedalam 1 m


1.200 Oh Pekerja @ Rp 75,000.00 Rp 90,000.00
0.045 Oh Mandor @ Rp 150,000.00 Rp 6,750.00
Rp 96,750.00
Profit Dan Overhead (15%) Rp 14,512.50
Jumlah Rp 111,262.50

A.2.3.1.9 Mengurug kembali 1 M3 galian


(Pengurugan Kembali 1 M3 galian dihitung 1/3 kali dari koefisien pekerjaan galian)
0.250 Oh Pekerja @ Rp 75,000.00 Rp 18,750.00
0.008 Oh Mandor @ Rp 150,000.00 Rp 1,200.00
Rp 19,950.00
Profit Dan Overhead (15%) Rp 2,992.50
Jumlah Rp 22,942.50

A.2.3.1.10 Memadatkan 1 M3 tanah (per 20 cm)


0.500 Oh Pekerja @ Rp 75,000.00 Rp 37,500.00
0.050 Oh Mandor @ Rp 150,000.00 Rp 7,500.00
Rp 45,000.00
Profit Dan Overhead (15%) Rp 6,750.00
Jumlah Rp 51,750.00

A.2.3.1.11 Mengurug 1 M3 pasir urug


1.200 M3 Pasir urug @ Rp 100,000.00 Rp 120,000.00
0.300 Oh Pekerja @ Rp 75,000.00 Rp 22,500.00
0.010 Oh Mandor @ Rp 150,000.00 Rp 1,500.00
Rp 144,000.00
Profit Dan Overhead (15%) Rp 21,600.00
Jumlah Rp 165,600.00

A.2.3.1.11 - SPL Mengurug 1 M3 Tanah Timbunan


1.200 M3 Tanah timbunan @ Rp 110,000.00 Rp 132,000.00
0.300 Oh Pekerja @ Rp 75,000.00 Rp 22,500.00
0.010 Oh Mandor @ Rp 150,000.00 Rp 1,500.00
Rp 156,000.00
Profit Dan Overhead (15%) Rp 23,400.00
Jumlah Rp 179,400.00

A.2.3.1.14 Mengurug 1 M3 sirtu padat untuk peninggian lantai bangunan


1.200 M3 Sirtu @ Rp 177,000.00 Rp 212,400.00
0.250 Oh Pekerja @ Rp 75,000.00 Rp 18,750.00
0.025 Oh Mandor @ Rp 150,000.00 Rp 3,750.00
Rp 234,900.00
Profit Dan Overhead (15%) Rp 35,235.00
Jumlah Rp 270,135.00

A.2.3.1.14 - SPL Mengurug 1 M3 Kerikil


1.200 M3 Krikil @ Rp 277,000.00 Rp 332,400.00
0.250 Oh Pekerja @ Rp 75,000.00 Rp 18,750.00
0.025 Oh Mandor @ Rp 150,000.00 Rp 3,750.00
Rp 354,900.00
Profit Dan Overhead (15%) Rp 53,235.00
Jumlah Rp 408,135.00

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI

A.3.2.1.2 Memasang 1 M3 pondasi batu belah, campuran 1PC : 4PP


1.200 M3 Batu kali @ Rp 184,000.00 Rp 220,800.00
163.000 Kg Semen Portland @ Rp 1,275.00 Rp 207,825.00
0.520 M3 Pasir pasang @ Rp 135,000.00 Rp 70,200.00
1.500 Oh Pekerja @ Rp 75,000.00 Rp 112,500.00
0.750 Oh Tukang batu @ Rp 100,000.00 Rp 75,000.00
0.075 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 9,375.00
0.075 Oh Mandor @ Rp 150,000.00 Rp 11,250.00
Rp 706,950.00
Profit Dan Overhead (15%) Rp 106,042.50
Jumlah Rp 812,992.50

A.3.2.1.3 Memasang 1 M3 pondasi batu belah, campuran 1PC : 5PP


1.200 M3 Batu gunung @ Rp 167,000.00 Rp 200,400.00
136.000 Kg Semen Portland @ Rp 1,275.00 Rp 173,400.00
0.544 M3 Pasir pasang @ Rp 135,000.00 Rp 73,440.00
1.500 Oh Pekerja @ Rp 75,000.00 Rp 112,500.00
0.750 Oh Tukang batu @ Rp 100,000.00 Rp 75,000.00
0.075 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 9,375.00
0.075 Oh Mandor @ Rp 150,000.00 Rp 11,250.00
Rp 655,365.00
Profit Dan Overhead (15%) Rp 98,304.75
Jumlah Rp 753,669.75

A.3.2.1.9 Memasang 1 M3 batu kosong (aanstamping)


1.200 M3 Batu kali @ Rp 184,000.00 Rp 220,800.00
0.432 M3 Pasir urug @ Rp 100,000.00 Rp 43,200.00
0.780 Oh Pekerja @ Rp 75,000.00 Rp 58,500.00
0.390 Oh Tukang batu @ Rp 100,000.00 Rp 39,000.00
0.039 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 4,875.00
0.039 Oh Mandor @ Rp 150,000.00 Rp 5,850.00
Rp 372,225.00
Profit Dan Overhead (15%) Rp 55,833.75
Jumlah Rp 428,058.75

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

A.4.4.1.2 Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1 bt. camp. 1PC : 3PP
140.000 Bh Batu merah @ Rp 550.00 Rp 77,000.00
32.950 Kg Semen Portland @ Rp 1,275.00 Rp 42,011.25
0.091 M3 Pasir pasang @ Rp 135,000.00 Rp 12,285.00
0.600 Oh Pekerja @ Rp 75,000.00 Rp 45,000.00
0.200 Oh Tukang batu @ Rp 100,000.00 Rp 20,000.00
0.020 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 2,500.00
0.030 Oh Mandor @ Rp 150,000.00 Rp 4,500.00
Rp 203,296.25
Profit Dan Overhead (15%) Rp 30,494.44
Jumlah Rp 233,790.69

A.4.4.1.3 Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1 bt. camp. 1PC : 4PP
140.000 Bh Batu merah @ Rp 550.00 Rp 77,000.00
26.550 Kg Semen Portland @ Rp 1,275.00 Rp 33,851.25
0.093 M3 Pasir pasang @ Rp 135,000.00 Rp 12,555.00
0.600 Oh Pekerja @ Rp 75,000.00 Rp 45,000.00
0.200 Oh Tukang batu @ Rp 100,000.00 Rp 20,000.00
0.020 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 2,500.00
0.030 Oh Mandor @ Rp 150,000.00 Rp 4,500.00
Rp 195,406.25
Profit Dan Overhead (15%) Rp 29,310.94
Jumlah Rp 224,717.19

A.4.4.1.4 Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1 bt. camp. 1PC : 5PP
140.000 Bh Batu merah @ Rp 550.00 Rp 77,000.00
22.200 Kg Semen Portland @ Rp 1,275.00 Rp 28,305.00
0.102 M3 Pasir pasang @ Rp 135,000.00 Rp 13,770.00
0.600 Oh Pekerja @ Rp 75,000.00 Rp 45,000.00
0.200 Oh Tukang batu @ Rp 100,000.00 Rp 20,000.00
0.020 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 2,500.00
0.030 Oh Mandor @ Rp 150,000.00 Rp 4,500.00
Rp 191,075.00
Profit Dan Overhead (15%) Rp 28,661.25
Jumlah Rp 219,736.25

A.4.4.1.8 Memasang1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC : 3PP
70.000 Bh Batu merah @ Rp 550.00 Rp 38,500.00
14.370 Kg Semen Portland @ Rp 1,275.00 Rp 18,321.75
0.040 M3 Pasir pasang @ Rp 135,000.00 Rp 5,400.00
0.300 Oh Pekerja @ Rp 75,000.00 Rp 22,500.00
0.100 Oh Tukang batu @ Rp 100,000.00 Rp 10,000.00
0.010 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 1,250.00
0.015 Oh Mandor @ Rp 150,000.00 Rp 2,250.00
Rp 98,221.75
Profit Dan Overhead (15%) Rp 14,733.26
Jumlah Rp 112,955.01

A.4.4.1.9 Memasang1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC : 4PP
70.000 Bh Batu merah @ Rp 550.00 Rp 38,500.00
11.500 Kg Semen Portland @ Rp 1,275.00 Rp 14,662.50
0.043 M3 Pasir pasang @ Rp 135,000.00 Rp 5,805.00
0.300 Oh Pekerja @ Rp 75,000.00 Rp 22,500.00
0.100 Oh Tukang batu @ Rp 100,000.00 Rp 10,000.00
0.010 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 1,250.00
0.015 Oh Mandor @ Rp 150,000.00 Rp 2,250.00
Rp 94,967.50
Profit Dan Overhead (15%) Rp 14,245.13
Jumlah Rp 109,212.63

A.4.4.1.10 Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC : 5PP
70.000 Bh Batu merah @ Rp 550.00 Rp 38,500.00
9.680 Kg Semen Portland @ Rp 1,275.00 Rp 12,342.00
0.045 M3 Pasir pasang @ Rp 135,000.00 Rp 6,075.00
0.300 Oh Pekerja @ Rp 75,000.00 Rp 22,500.00
0.100 Oh Tukang batu @ Rp 100,000.00 Rp 10,000.00
0.010 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 1,250.00
0.015 Oh Mandor @ Rp 150,000.00 Rp 2,250.00
Rp 92,917.00
Profit Dan Overhead (15%) Rp 13,937.55
Jumlah Rp 106,854.55

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

A.4.4.2.3 Memasang 1 M2 plesteran 1PC : 3PP, tebal 15 mm


7.776 Kg Semen Portland @ Rp 1,275.00 Rp 9,914.40
0.023 M3 Pasir pasang @ Rp 135,000.00 Rp 3,105.00
0.300 Oh Pekerja @ Rp 75,000.00 Rp 22,500.00
0.150 Oh Tukang batu @ Rp 100,000.00 Rp 15,000.00
0.015 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 1,875.00
0.015 Oh Mandor @ Rp 150,000.00 Rp 2,250.00
Rp 54,644.40
Profit Dan Overhead (15%) Rp 8,196.66
Jumlah Rp 62,841.06

A.4.4.2.4 Memasang 1 M2 plesteran 1PC : 4PP, tebal 15 mm


6.240 Kg Semen Portland @ Rp 1,275.00 Rp 7,956.00
0.024 M3 Pasir pasang @ Rp 135,000.00 Rp 3,240.00
0.300 Oh Pekerja @ Rp 75,000.00 Rp 22,500.00
0.150 Oh Tukang batu @ Rp 100,000.00 Rp 15,000.00
0.015 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 1,875.00
0.015 Oh Mandor @ Rp 150,000.00 Rp 2,250.00
Rp 52,821.00
Profit Dan Overhead (15%) Rp 7,923.15
Jumlah Rp 60,744.15

A.4.4.2.5 Memasang 1 M2 plesteran 1PC : 5PP, tebal 15 mm


5.184 Kg Semen Portland @ Rp 1,275.00 Rp 6,609.60
0.026 M3 Pasir pasang @ Rp 135,000.00 Rp 3,510.00
0.300 Oh Pekerja @ Rp 75,000.00 Rp 22,500.00
0.150 Oh Tukang batu @ Rp 100,000.00 Rp 15,000.00
0.015 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 1,875.00
0.015 Oh Mandor @ Rp 150,000.00 Rp 2,250.00
Rp 51,744.60
Profit Dan Overhead (15%) Rp 7,761.69
Jumlah Rp 59,506.29

A.4.4.2.20 Memasang 1 M' plesteran skoning 1PC : 2PP, tebal 10 mm


0.500 Kg Semen Portland @ Rp 1,275.00 Rp 637.50
0.013 M3 Pasir pasang @ Rp 135,000.00 Rp 1,755.00
0.080 Oh Pekerja @ Rp 75,000.00 Rp 6,000.00
0.400 Oh Tukang batu @ Rp 100,000.00 Rp 40,000.00
0.040 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 5,000.00
0.004 Oh Mandor @ Rp 150,000.00 Rp 600.00
Rp 53,992.50
Profit Dan Overhead (15%) Rp 8,098.88
Jumlah Rp 62,091.38
A.4.4.2.27 Memasang 1 M2 acian
3.250 Kg Semen Portland @ Rp 1,275.00 Rp 4,143.75
0.200 Oh Pekerja @ Rp 75,000.00 Rp 15,000.00
0.100 Oh Tukang batu @ Rp 100,000.00 Rp 10,000.00
0.010 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 1,250.00
0.010 Oh Mandor @ Rp 150,000.00 Rp 1,500.00
Rp 31,893.75
Profit Dan Overhead (15%) Rp 4,784.06
Jumlah Rp 36,677.81

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


A.4.6.1.1 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I
1.100 M3 Kayu klas I (balok) untuk kosen pintu/jendela @ Rp 9,550,000.00 Rp 10,505,000.00
1.250 Kg Paku biasa 2" - 5" @ Rp 17,500.00 Rp 21,875.00
1.000 Kg Lem kayu @ Rp 25,000.00 Rp 25,000.00
7.000 Oh Pekerja @ Rp 75,000.00 Rp 525,000.00
21.000 Oh Tukang kayu @ Rp 100,000.00 Rp 2,100,000.00
2.100 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 262,500.00
0.350 Oh Mandor @ Rp 150,000.00 Rp 52,500.00
Rp 13,491,875.00
Profit Dan Overhead (15%) Rp 2,023,781.25
Jumlah Rp 15,515,656.25

A.4.6.1.5 Membuat dan memasang 1 m2 Daun pintu panel, kayu kelas I


0.040 M3 Kayu klas I (papan) listplank dan pintu/jendela @ Rp 10,050,000.00 Rp 402,000.00
0.500 Kg Lem kayu @ Rp 25,000.00 Rp 12,500.00
1.000 Oh Pekerja @ Rp 75,000.00 Rp 75,000.00
3.000 Oh Tukang kayu @ Rp 100,000.00 Rp 300,000.00
0.300 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 37,500.00
0.050 Oh Mandor @ Rp 150,000.00 Rp 7,500.00
Rp 834,500.00
Profit Dan Overhead (15%) Rp 125,175.00
Jumlah Rp 959,675.00

A.4.6.1.6 Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I
0.024 M3 Kayu klas I (papan) listplank dan pintu/jendela @ Rp 10,050,000.00 Rp 241,200.00
0.300 Kg Lem kayu @ Rp 25,000.00 Rp 7,500.00
0.800 Oh Pekerja @ Rp 75,000.00 Rp 60,000.00
2.400 Oh Tukang kayu @ Rp 100,000.00 Rp 240,000.00
0.240 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 30,000.00
0.040 Oh Mandor @ Rp 150,000.00 Rp 6,000.00
Rp 584,700.00
Profit Dan Overhead (15%) Rp 87,705.00
Jumlah Rp 672,405.00

A.4.6.1.8 1 M2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kls. II
0.025 M3 Kayu klas II (papan) @ Rp 4,850,000.00 Rp 121,250.00
0.030 Kg Paku Biasa 1/2" - 1" @ Rp 17,500.00 Rp 525.00
0.500 Kg Lem kayu @ Rp 25,000.00 Rp 12,500.00
1.000 Lbr Plywood Uk.80x240 cm Tebal 4 mm @ Rp 85,000.00 Rp 85,000.00
0.700 Oh Pekerja @ Rp 75,000.00 Rp 52,500.00
2.100 Oh Tukang kayu @ Rp 100,000.00 Rp 210,000.00
0.210 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 26,250.00
0.035 Oh Mandor @ Rp 150,000.00 Rp 5,250.00
Rp 513,275.00
Profit Dan Overhead (15%) Rp 76,991.25
Jumlah Rp 590,266.25

A.4.6.1.8 - SPL 1 M2 Membuat daun pintu Teakwood rangkap Lapis HPL, rangka tertutup kayu kls. II
0.025 M3 Kayu klas II (papan) @ Rp 4,850,000.00 Rp 121,250.00
0.030 Kg Paku Biasa 1/2" - 1" @ Rp 17,500.00 Rp 525.00
0.500 Kg Lem kayu @ Rp 25,000.00 Rp 12,500.00
1.000 Lbr Teakwood Uk. 120 x 240 x 3 mm @ Rp 95,230.00 Rp 95,230.00
0.700 Lbr HPL Uk. 120 x 240 @ Rp 425,000.00 Rp 297,500.00
0.700 Oh Pekerja @ Rp 75,000.00 Rp 52,500.00
2.100 Oh Tukang kayu @ Rp 100,000.00 Rp 210,000.00
0.210 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 26,250.00
0.035 Oh Mandor @ Rp 150,000.00 Rp 5,250.00
Rp 821,005.00
Profit Dan Overhead (15%) Rp 123,150.75
Jumlah Rp 944,155.75

SPL Membuat dan Memasang 1 m2 Daun Pintu Multipleks 18 mm


0.370 Lbr Multipleks 1.22 x 2.44 x 18 mm @ Rp 225,000.00 Rp 83,250.00
0.740 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 130,000.00 Rp 96,200.00
0.032 Kg Paku Biasa 1/2" - 1" @ Rp 17,500.00 Rp 560.00
0.500 Kg Lem Kayu @ Rp 25,000.00 Rp 12,500.00
0.770 Oh Pekerja @ Rp 75,000.00 Rp 57,750.00
2.310 Oh Tukang Kayu @ Rp 100,000.00 Rp 231,000.00
0.231 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 28,875.00
0.039 Oh Mandor @ Rp 150,000.00 Rp 5,775.00
Rp 515,910.00
Profit Dan Overhead (15%) Rp 77,386.50
Jumlah Rp 593,296.50

SPL Pemasangan 1 m3 Tiang Kayu Kls. I


1.100 M3 Kayu klas I (balok) untuk kuda-kuda @ Rp 8,550,000.00 Rp 9,405,000.00
3.000 Kg Paku biasa 2" - 5" @ Rp 17,500.00 Rp 52,500.00
6.700 Oh Pekerja @ Rp 75,000.00 Rp 502,500.00
20.100 Oh Tukang kayu @ Rp 100,000.00 Rp 2,010,000.00
2.010 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 251,250.00
0.335 Oh Mandor @ Rp 150,000.00 Rp 50,250.00
Rp 12,271,500.00
Profit Dan Overhead (15%) Rp 1,840,725.00
Jumlah Rp 14,112,225.00

SPL Pemasangan 1 m3 Rangka Lantai, Kayu Kls. I


1.100 M3 Kayu klas I (balok) untuk kuda-kuda @ Rp 8,550,000.00 Rp 9,405,000.00
5.600 Kg Paku biasa 2" - 5" @ Rp 17,500.00 Rp 98,000.00
6.700 Oh Pekerja @ Rp 75,000.00 Rp 502,500.00
20.100 Oh Tukang kayu @ Rp 100,000.00 Rp 2,010,000.00
2.010 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 251,250.00
0.335 Oh Mandor @ Rp 150,000.00 Rp 50,250.00
Rp 12,317,000.00
Profit Dan Overhead (15%) Rp 1,847,550.00
Jumlah Rp 14,164,550.00

SPL Pemasangan 1 m2 Lantai Multipleks 18 mm


0.400 m2 Multipleks 1.22 x 2.44 x 18 mm @ Rp 225,000.00 Rp 90,000.00
0.050 Kg Paku Biasa 1/2" - 1" @ Rp 17,500.00 Rp 875.00
0.025 Oh Pekerja @ Rp 75,000.00 Rp 1,875.00
0.075 Oh Tukang kayu @ Rp 100,000.00 Rp 7,500.00
0.008 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 1,000.00
0.001 Oh Mandor @ Rp 150,000.00 Rp 150.00
Rp 101,400.00
Profit Dan Overhead (15%) Rp 15,210.00
Jumlah Rp 116,610.00

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


A.4.1.1.1 Membuat 1 M3 beton mutu f'c=7,4 Mpa (K100), slump (12 ± 2) cm, w/c=0,87
247.000 Kg Semen Portland @ Rp 1,275.00 Rp 314,925.00
869.000 Kg Pasir beton (Kg) @ Rp 105.71 Rp 91,865.71
999.000 Kg split/chipping 2-3 cm(Kg) @ Rp 197.78 Rp 197,580.00
215.000 Ltr Air @ Rp 500.00 Rp 107,500.00
1.650 Oh Pekerja @ Rp 75,000.00 Rp 123,750.00
0.275 Oh Tukang batu @ Rp 100,000.00 Rp 27,500.00
0.028 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 3,500.00
0.083 Oh Mandor @ Rp 150,000.00 Rp 12,450.00
Rp 879,070.71
Profit Dan Overhead (15%) Rp 131,860.61
Jumlah Rp 1,010,931.32
A.4.1.1.4 Membuat 1 M3 lantai kerja beton mutu f'c=7,4 Mpa (K 100), slump (3-6) cm, w/c=0,87
1 0.1527224 230.000 Kg Semen Portland @ Rp 1,275.00 Rp 293,250.00
4.17658 0.6378571 893.000 Kg Pasir beton (Kg) @ Rp 105.71 Rp 94,402.86
4.9812 0.7607407 1,027.000 Kg split/chipping 2-3 cm(Kg) @ Rp 197.78 Rp 203,117.78
200.000 Ltr Air @ Rp 500.00 Rp 100,000.00
1.200 Oh Pekerja @ Rp 75,000.00 Rp 90,000.00
0.200 Oh Tukang batu @ Rp 100,000.00 Rp 20,000.00
0.020 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 2,500.00
0.060 Oh Mandor @ Rp 150,000.00 Rp 9,000.00
Rp 812,270.63
Profit Dan Overhead (15%) Rp 121,840.60
Jumlah Rp 934,111.23

A.4.1.1.5 Membuat 1 M3 beton mutu f'c=14,5 Mpa (K 175), slump (12 ± 2) cm, w/c=0,66
326.000 Kg Semen Portland @ Rp 1,275.00 Rp 415,650.00
760.000 Kg Pasir beton (Kg) @ Rp 105.71 Rp 80,342.86
1,029.000 Kg split/chipping 2-3 cm(Kg) @ Rp 197.78 Rp 203,513.33
215.000 Ltr Air @ Rp 500.00 Rp 107,500.00
1.650 Oh Pekerja @ Rp 75,000.00 Rp 123,750.00
0.275 Oh Tukang batu @ Rp 100,000.00 Rp 27,500.00
0.028 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 3,500.00
0.083 Oh Mandor @ Rp 150,000.00 Rp 12,450.00
Rp 974,206.19
Profit Dan Overhead (15%) Rp 146,130.93
Jumlah Rp 1,120,337.12

A.4.1.1.7 Membuat 1 M3 beton mutu f'c=19,3 Mpa (K 225), slump (12 ± 2) cm, w/c=0,58
371.000 Kg Semen Portland @ Rp 1,275.00 Rp 473,025.00
698.000 Kg Pasir beton (Kg) @ Rp 105.71 Rp 73,788.57
1,047.000 Kg split/chipping 2-3 cm(Kg) @ Rp 197.78 Rp 207,073.33
215.000 Ltr Air @ Rp 500.00 Rp 107,500.00
1.650 Oh Pekerja @ Rp 75,000.00 Rp 123,750.00
0.275 Oh Tukang batu @ Rp 100,000.00 Rp 27,500.00
0.028 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 3,500.00
0.083 Oh Mandor @ Rp 150,000.00 Rp 12,450.00
Rp 1,028,586.90
Profit Dan Overhead (15%) Rp 154,288.04
Jumlah Rp 1,182,874.94

A.4.1.1.8 Membuat 1 M3 beton mutu f'c=21,7 Mpa (K 250), slump (12 ± 2) cm, w/c=0,56
384.000 Kg Semen Portland @ Rp 1,275.00 Rp 489,600.00
692.000 Kg Pasir beton (Kg) @ Rp 105.71 Rp 73,154.29
1,039.000 Kg split/chipping 2-3 cm(Kg) @ Rp 197.78 Rp 205,491.11
215.000 Ltr Air @ Rp 500.00 Rp 107,500.00
1.650 Oh Pekerja @ Rp 75,000.00 Rp 123,750.00
0.275 Oh Tukang batu @ Rp 100,000.00 Rp 27,500.00
0.028 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 3,500.00
0.083 Oh Mandor @ Rp 150,000.00 Rp 12,450.00
Rp 1,042,945.40
Profit Dan Overhead (15%) Rp 156,441.81
Jumlah Rp 1,199,387.21

A.4.1.1.9 Membuat 1 M3 beton mutu f'c=24,0 Mpa (K 275), slump (12 ± 2) cm, w/c=0,53
406.000 Kg Semen Portland @ Rp 1,275.00 Rp 517,650.00
684.000 Kg Pasir beton (Kg) @ Rp 105.71 Rp 72,308.57
1,026.000 Kg split/chipping 2-3 cm(Kg) @ Rp 197.78 Rp 202,920.00
215.000 Ltr Air @ Rp 500.00 Rp 107,500.00
1.650 Oh Pekerja @ Rp 75,000.00 Rp 123,750.00
0.275 Oh Tukang batu @ Rp 100,000.00 Rp 27,500.00
0.028 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 3,500.00
0.083 Oh Mandor @ Rp 150,000.00 Rp 12,450.00
Rp 1,067,578.57
Profit Dan Overhead (15%) Rp 160,136.79
Jumlah Rp 1,227,715.36

A.4.1.1.10 Membuat 1 M3 beton mutu f'c=26,4 Mpa (K 300), slump (12 ± 2) cm, w/c=0,52
413.000 Kg Semen Portland @ Rp 1,275.00 Rp 526,575.00
681.000 Kg Pasir beton (Kg) @ Rp 105.71 Rp 71,991.43
1,021.000 Kg split/chipping 2-3 cm(Kg) @ Rp 197.78 Rp 201,931.11
215.000 Ltr Air @ Rp 500.00 Rp 107,500.00
1.650 Oh Pekerja @ Rp 75,000.00 Rp 123,750.00
0.275 Oh Tukang batu @ Rp 100,000.00 Rp 27,500.00
0.028 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 3,500.00
0.083 Oh Mandor @ Rp 150,000.00 Rp 12,450.00
Rp 1,075,197.54
Profit Dan Overhead (15%) Rp 161,279.63
Jumlah Rp 1,236,477.17
A.4.1.1.17 Pembesian 1 Kg dengan besi polos atau besi ulir
A. Pembesian 1 Kg dengan besi polos
10.500 Kg Besi beton polos @ Rp 10,700.00 Rp 112,350.00
0.150 Kg Kawat beton @ Rp 21,000.00 Rp 3,150.00
0.070 Oh Pekerja @ Rp 75,000.00 Rp 5,250.00
0.070 Oh Tukang besi @ Rp 100,000.00 Rp 7,000.00
0.007 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 875.00
0.004 Oh Mandor @ Rp 150,000.00 Rp 600.00
Untuk Pembesian 10 Kg Rp 129,225.00
Untuk Pembesian 1 Kg Rp 12,922.50
Profit Dan Overhead (15%) Rp 1,938.38
Jumlah Rp 14,860.88

B. Pembesian 1 Kg dengan besi ulir


10.500 Kg Besi beton ulir @ Rp 12,500.00 Rp 131,250.00
0.150 Kg Kawat beton @ Rp 21,000.00 Rp 3,150.00
0.070 Oh Pekerja @ Rp 75,000.00 Rp 5,250.00
0.070 Oh Tukang besi @ Rp 100,000.00 Rp 7,000.00
0.007 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 875.00
0.004 Oh Mandor @ Rp 150,000.00 Rp 600.00
Untuk Pembesian 10 Kg Rp 148,125.00
Untuk Pembesian 1 Kg Rp 14,812.50
Profit Dan Overhead (15%) Rp 2,221.88
Jumlah Rp 17,034.38

A.4.1.1.19 Pemasangan 10 Kg jaring kawat baja (wiremesh)


A. Pemasangan 1 Kg jaring kawat baja (wiremesh) M10
10.200 Kg Wiremesh M10, Uk. Kotak 15X15 cm, Lbr = 2,1 meter, Pj @ Rp 10,500.00 Rp 107,100.00
0.050 Kg Kawat beton @ Rp 21,000.00 Rp 1,050.00
0.025 Oh Pekerja @ Rp 75,000.00 Rp 1,875.00
0.025 Oh Tukang besi @ Rp 100,000.00 Rp 2,500.00
0.025 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 3,125.00
0.001 Oh Mandor @ Rp 150,000.00 Rp 150.00
Untuk Pembesian 10 Kg Rp 115,800.00
Untuk Pembesian 1 Kg Rp 11,580.00
Profit Dan Overhead (15%) Rp 1,737.00
Jumlah Rp 13,317.00

B. Pemasangan 1 Kg jaring kawat baja (wiremesh) M8


10.200 Kg Wiremesh M8, Uk. Kotak 15X15 cm, Lbr = 2,1 meter, Pjg @ Rp 10,000.00 Rp 102,000.00
0.050 Kg Kawat beton @ Rp 21,000.00 Rp 1,050.00
0.025 Oh Pekerja @ Rp 75,000.00 Rp 1,875.00
0.025 Oh Tukang besi @ Rp 100,000.00 Rp 2,500.00
0.025 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 3,125.00
0.001 Oh Mandor @ Rp 150,000.00 Rp 150.00
Untuk Pembesian 10 Kg Rp 110,700.00
Untuk Pembesian 1 Kg Rp 11,070.00
Profit Dan Overhead (15%) Rp 1,660.50
Jumlah Rp 12,730.50

A.4.1.1.20 - SPL Memasang 1 M2 bekisting untuk Pondasi 2 Kali Pemakaian


0.020 M3 Kayu klas III (papan) @ Rp 3,275,000.00 Rp 65,500.00
(Papan 2 kali Pakai)
0.300 Kg Paku biasa 2" - 5" @ Rp 17,500.00 Rp 5,250.00
0.100 Ltr Minyak bekisting @ Rp 7,500.00 Rp 750.00
0.520 Oh Pekerja @ Rp 75,000.00 Rp 39,000.00
0.260 Oh Tukang batu @ Rp 100,000.00 Rp 26,000.00
0.026 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 3,250.00
0.026 Oh Mandor @ Rp 150,000.00 Rp 3,900.00
Rp 143,650.00
Profit Dan Overhead (15%) Rp 21,547.50
Jumlah Rp 165,197.50
A.4.1.1.21 - SPL Memasang 1 M2 bekisting untuk sloof 2 Kali Pemakaian
0.023 M3 Kayu klas III (papan) @ Rp 3,275,000.00 Rp 73,687.50
(Papan 2 kali Pakai)
0.300 Kg Paku biasa 2" - 5" @ Rp 17,500.00 Rp 5,250.00
0.100 Ltr Minyak bekisting @ Rp 7,500.00 Rp 750.00
0.520 Oh Pekerja @ Rp 75,000.00 Rp 39,000.00
0.260 Oh Tukang batu @ Rp 100,000.00 Rp 26,000.00
0.026 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 3,250.00
0.026 Oh Mandor @ Rp 150,000.00 Rp 3,900.00
Rp 151,837.50
Profit Dan Overhead (15%) Rp 22,775.63
Jumlah Rp 174,613.13

A.4.1.1.22 - SPL Memasang 1 M2 bekisting untuk kolom Untuk 2x Pemakaian


0.020 M3 Kayu klas III (papan) @ Rp 3,275,000.00 Rp 65,500.00
(papan 2 x pakai)
0.400 Kg Paku biasa 2" - 5" @ Rp 17,500.00 Rp 7,000.00
0.200 Ltr Minyak bekisting @ Rp 7,500.00 Rp 1,500.00
0.008 M3 Kayu klas II (balok) @ Rp 4,550,000.00 Rp 34,125.00
(Balok 2x pakai)
0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 130,000.00 Rp 22,750.00
(Multipleks 2x pakai)
1.000 Btg Dolken kayu Ø8-10/400 cm @ Rp 25,000.00 Rp 25,000.00
(Dolken 2x pakai)
0.660 Oh Pekerja @ Rp 75,000.00 Rp 49,500.00
0.330 Oh Tukang kayu @ Rp 100,000.00 Rp 33,000.00
0.033 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 4,125.00
0.033 Oh Mandor @ Rp 150,000.00 Rp 4,950.00
Rp 247,450.00
Profit Dan Overhead (15%) Rp 37,117.50
Jumlah Rp 284,567.50

A.4.1.1.23 - SPL Memasang 1 M2 bekisting untuk balok Untuk 2x pemakaian


0.020 M3 Kayu klas III (papan) @ Rp 3,275,000.00 Rp 65,500.00
(papan 2 x pakai)
0.400 Kg Paku biasa 2" - 5" @ Rp 17,500.00 Rp 7,000.00
0.200 Ltr Minyak bekisting @ Rp 7,500.00 Rp 1,500.00
0.009 M3 Kayu klas II (balok) @ Rp 4,550,000.00 Rp 40,950.00
(Balok 2x pakai)
0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 130,000.00 Rp 22,750.00
(Multipleks 2x pakai)
1.000 Btg Dolken kayu Ø8-10/400 cm @ Rp 25,000.00 Rp 25,000.00
(Dolken 2x pakai)
0.660 Oh Pekerja @ Rp 75,000.00 Rp 49,500.00
0.330 Oh Tukang kayu @ Rp 100,000.00 Rp 33,000.00
0.033 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 4,125.00
0.033 Oh Mandor @ Rp 150,000.00 Rp 4,950.00
Rp 254,275.00
Profit Dan Overhead (15%) Rp 38,141.25
Jumlah Rp 292,416.25

A.4.1.1.24 - SPL Memasang 1 M2 bekisting untuk lantai Untuk 2x Pemakaian


0.020 M3 Kayu klas III (papan) @ Rp 3,275,000.00 Rp 65,500.00
(papan 2 x pakai)
0.400 Kg Paku biasa 2" - 5" @ Rp 17,500.00 Rp 7,000.00
0.200 Ltr Minyak bekisting @ Rp 7,500.00 Rp 1,500.00
0.008 M3 Kayu klas II (balok) @ Rp 4,550,000.00 Rp 34,125.00
(Balok 2x pakai)
0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 130,000.00 Rp 22,750.00
(Multipleks 2x pakai)
3.000 Btg Dolken kayu Ø8-10/400 cm @ Rp 25,000.00 Rp 75,000.00
(Dolken 2x pakai)
0.660 Oh Pekerja @ Rp 75,000.00 Rp 49,500.00
0.330 Oh Tukang kayu @ Rp 100,000.00 Rp 33,000.00
0.033 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 4,125.00
0.033 Oh Mandor @ Rp 150,000.00 Rp 4,950.00
Rp 297,450.00
Profit Dan Overhead (15%) Rp 44,617.50
Jumlah Rp 342,067.50

SPL Memasang 1 M2 Bondek untuk lantai


1.030 m2 Bondek Superdyma G550 K18, Tbl 0.75 Tct @ Rp 180,000.00 Rp 185,400.00
0.040 M3 Kayu klas III (Balok) @ Rp 2,800,000.00 Rp 112,000.00
0.100 Kg Paku biasa 2" - 5" @ Rp 17,500.00 Rp 1,750.00
1.500 Btg Dolken kayu Ø8-10/400 cm @ Rp 25,000.00 Rp 37,500.00
0.170 Oh Pekerja @ Rp 75,000.00 Rp 12,750.00
0.080 Oh Tukang kayu @ Rp 100,000.00 Rp 8,000.00
0.010 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 1,250.00
0.010 Oh Mandor @ Rp 150,000.00 Rp 1,500.00
Rp 360,150.00
Profit Dan Overhead (15%) Rp 54,022.50
Jumlah Rp 414,172.50

A.4.1.1.25 - SPL Memasang 1 M2 bekisting untuk dinding Untuk 2x Pemakaian


0.015 M3 Kayu klas III (papan) @ Rp 3,275,000.00 Rp 49,125.00
(papan 2 x pakai)
0.400 Kg Paku biasa 2" - 5" @ Rp 17,500.00 Rp 7,000.00
0.200 Ltr Minyak bekisting @ Rp 7,500.00 Rp 1,500.00
0.010 M3 Kayu klas II (balok) @ Rp 4,550,000.00 Rp 45,500.00
(Balok 2x pakai)
0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 130,000.00 Rp 22,750.00
(Multipleks 2x pakai)
1.500 Btg Dolken kayu Ø8-10/400 cm @ Rp 25,000.00 Rp 37,500.00
(Dolken 2x pakai)
2.000 Bh Spacer/formite/penjaga jarak bekisting @ Rp 7,500.00 Rp 15,000.00
(spacer 2x pemakaian)
0.660 Oh Pekerja @ Rp 75,000.00 Rp 49,500.00
0.330 Oh Tukang kayu @ Rp 100,000.00 Rp 33,000.00
0.033 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 4,125.00
0.033 Oh Mandor @ Rp 150,000.00 Rp 4,950.00
Rp 269,950.00
Profit Dan Overhead (15%) Rp 40,492.50
Jumlah Rp 310,442.50

A.4.1.1.26 - SPL Memasang 1 M2 bekisting Tangga Untuk 2x Pemakaian


0.015 M3 Kayu klas III (papan) @ Rp 3,275,000.00 Rp 49,125.00
(papan 2 x pakai)
0.400 Kg Paku biasa 2" - 5" @ Rp 17,500.00 Rp 7,000.00
0.150 Ltr Minyak bekisting @ Rp 7,500.00 Rp 1,125.00
0.008 M3 Kayu klas II (balok) @ Rp 4,550,000.00 Rp 34,125.00
(Balok 2x pakai)
0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 130,000.00 Rp 22,750.00
(Multipleks 2x pakai)
1.000 Btg Dolken kayu Ø8-10/400 cm @ Rp 25,000.00 Rp 25,000.00
(Dolken 2x pakai)
0.660 Oh Pekerja @ Rp 75,000.00 Rp 49,500.00
0.330 Oh Tukang kayu @ Rp 100,000.00 Rp 33,000.00
0.033 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 4,125.00
0.033 Oh Mandor @ Rp 150,000.00 Rp 4,950.00
Rp 230,700.00
Profit Dan Overhead (15%) Rp 34,605.00
Jumlah Rp 265,305.00

A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


SPL Menutup 1 m2 Atap Dengan Atap Zincalume
1.050 M2 Long Spandek Type G550 AZ-100 T=0,35 mm @ Rp 85,000.00 Rp 89,250.00
8.000 Bh Paku Sekrup + Mor + Pelapis @ Rp 2,500.00 Rp 20,000.00
0.140 Oh Pekerja @ Rp 75,000.00 Rp 10,500.00
0.070 Oh Tukang kayu @ Rp 100,000.00 Rp 7,000.00
0.007 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 875.00
0.007 Oh Mandor @ Rp 150,000.00 Rp 1,050.00
Rp 128,675.00
Profit Dan Overhead (15%) Rp 19,301.25
Jumlah Rp 147,976.25

SPL Menutup 1 m2 Atap Dengan Atap Zincalume


1.050 M2 Long Spandek Type G550 AZ-100 T=0,35 mm (Warna) @ Rp 95,000.00 Rp 99,750.00
8.000 Bh Paku Sekrup + Mor + Pelapis @ Rp 2,500.00 Rp 20,000.00
0.140 Oh Pekerja @ Rp 75,000.00 Rp 10,500.00
0.070 Oh Tukang kayu @ Rp 100,000.00 Rp 7,000.00
0.007 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 875.00
0.007 Oh Mandor @ Rp 150,000.00 Rp 1,050.00
Rp 139,175.00
Profit Dan Overhead (15%) Rp 20,876.25
Jumlah Rp 160,051.25

SPL Memasang 1 m' Nok Atap Zincalume


1.050 M' Nok Long Spandek Type G550 AZ-100 T=0.35 mm @ Rp 61,500.00 Rp 64,575.00
10.000 Bh Paku Sekrup + Mor + Pelapis @ Rp 2,500.00 Rp 25,000.00
0.150 Oh Tukang kayu @ Rp 100,000.00 Rp 15,000.00
0.070 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 8,750.00
0.008 Oh Pekerja @ Rp 75,000.00 Rp 600.00
0.006 Oh Mandor @ Rp 150,000.00 Rp 900.00
Rp 114,825.00
Profit Dan Overhead (15%) Rp 17,223.75
Jumlah Rp 132,048.75

SPL Memasang 1 m' Nok Atap Zincalume


1.050 M' Nok Long Spandek Type G550 AZ-100 T=0.35 mm (Warn @ Rp 72,500.00 Rp 76,125.00
10.000 Bh Paku Sekrup + Mor + Pelapis @ Rp 2,500.00 Rp 25,000.00
0.150 Oh Tukang kayu @ Rp 100,000.00 Rp 15,000.00
0.070 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 8,750.00
0.008 Oh Pekerja @ Rp 75,000.00 Rp 600.00
0.006 Oh Mandor @ Rp 150,000.00 Rp 900.00
Rp 126,375.00
Profit Dan Overhead (15%) Rp 18,956.25
Jumlah Rp 145,331.25

SPL Memasang 1m' Lisplank Ukuran (1x20) cm, woodplank


0.275 Lbr Woodplank T. 8 x 200 x 4000 mm @ Rp 105,000.00 Rp 28,875.00
0.088 Kg Paku sekrup 3,5" @ Rp 15,000.00 Rp 1,312.50
2.860 M Besi Hollow Galvanis 4 x 4 MB, Tbl 0.7 mm @ Rp 10,000.00 Rp 28,600.00
0.100 Oh Pekerja @ Rp 75,000.00 Rp 7,500.00
0.100 Oh Tukang kayu @ Rp 100,000.00 Rp 10,000.00
0.010 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 1,250.00
0.050 Oh Mandor @ Rp 150,000.00 Rp 7,500.00
1.000 Ls Alat Bantu @ Rp 10,000.00 Rp 10,000.00
Rp 95,037.50
Profit Dan Overhead (15%) Rp 14,255.63
Jumlah Rp 109,293.13

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT - LANGIT/PLAFOND

A.4.5.1.7 - SPL Memasang 1 M2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
0.364 Lbr Gypsumboard 9 mm @ Rp 63,500.00 Rp 23,114.00
2.500 Kg UB 888/400 Compoud @ Rp 9,000.00 Rp 22,500.00
0.072 Roll Isolasi Gypsun @ Rp 35,000.00 Rp 2,520.00
0.110 Kg Paku sekrup 3,5" @ Rp 15,000.00 Rp 1,650.00
0.100 Oh Pekerja @ Rp 75,000.00 Rp 7,500.00
0.050 Oh Tukang kayu @ Rp 100,000.00 Rp 5,000.00
0.005 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 625.00
0.005 Oh Mandor @ Rp 150,000.00 Rp 750.00
Rp 63,659.00
Profit Dan Overhead (15%) Rp 9,548.85
Jumlah Rp 73,207.85
A.4.5.1.7 - SPL2 Memasang 1 M2 langit-langit gypsum board Perforated ukuran (120x237x9) mm, tebal 9 mm + Peredam
0.369 Lbr Gypsumboard Perforated 9 mm, Uk. 1,2 x 2,37 @ Rp 330,000.00 Rp 121,770.00
2.500 Kg UB 888/400 Compoud @ Rp 9,000.00 Rp 22,500.00
0.072 Roll Isolasi Gypsun @ Rp 35,000.00 Rp 2,520.00
1.458 Lbr RockWool DN City 80 kg/m2, Uk. 1.2 x 0.6 m, T = 5 cm @ Rp 49,500.00 Rp 72,171.00
1.050 m2 Kawat Rang 3 x 3 @ Rp 28,100.00 Rp 29,505.00
0.110 Kg Paku sekrup 3,5" @ Rp 15,000.00 Rp 1,650.00
0.100 Oh Pekerja @ Rp 75,000.00 Rp 7,500.00
0.050 Oh Tukang kayu @ Rp 100,000.00 Rp 5,000.00
0.005 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 625.00
0.005 Oh Mandor @ Rp 150,000.00 Rp 750.00
Rp 263,991.00
Profit Dan Overhead (15%) Rp 39,598.65
Jumlah Rp 303,589.65

SPL Memasang 1 M2 langit-langit Calsy board ukuran (120x240x4) mm, tebal 4 mm


0.364 Lbr Calsyboard 4 mm @ Rp 70,000.00 Rp 25,480.00
2.500 Kg UB 888/400 Compoud @ Rp 9,000.00 Rp 22,500.00
0.072 Roll Isolasi Gypsun @ Rp 35,000.00 Rp 2,520.00
0.110 Kg Paku sekrup 3,5" @ Rp 15,000.00 Rp 1,650.00
0.100 Oh Pekerja @ Rp 75,000.00 Rp 7,500.00
0.050 Oh Tukang kayu @ Rp 100,000.00 Rp 5,000.00
0.005 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 625.00
0.005 Oh Mandor @ Rp 150,000.00 Rp 750.00
Rp 66,025.00
Profit Dan Overhead (15%) Rp 9,903.75
Jumlah Rp 75,928.75

SPL Memasang 1 M2 Partisi gypsum board ukuran (120x240x9) mm, tebal 9 mm + Peredam (1 Lapis)
0.364 Lbr Gypsumboard 9 mm @ Rp 63,500.00 Rp 23,114.00
2.500 Kg UB 888/400 Compoud @ Rp 9,000.00 Rp 22,500.00
0.072 Roll Isolasi Gypsun @ Rp 35,000.00 Rp 2,520.00
0.110 Kg Paku sekrup 3,5" @ Rp 15,000.00 Rp 1,650.00
1.458 Lbr RockWool DN City 80 kg/m2, Uk. 1.2 x 0.6 m, T = 5 cm @ Rp 49,500.00 Rp 72,171.00
0.100 Oh Pekerja @ Rp 75,000.00 Rp 7,500.00
0.050 Oh Tukang kayu @ Rp 100,000.00 Rp 5,000.00
0.005 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 625.00
0.005 Oh Mandor @ Rp 150,000.00 Rp 750.00
Rp 135,830.00
Profit Dan Overhead (15%) Rp 20,374.50
Jumlah Rp 156,204.50

SPL Memasang 1 M2 Partisi gypsum board Perforated ukuran (120x237x9) mm, tebal 9 mm + Peredam (1 Lapis)
0.369 Lbr Gypsumboard Perforated 9 mm, Uk. 1,2 x 2,37 @ Rp 330,000.00 Rp 121,770.00
2.500 Kg UB 888/400 Compoud @ Rp 9,000.00 Rp 22,500.00
0.072 Roll Isolasi Gypsun @ Rp 35,000.00 Rp 2,520.00
0.110 Kg Paku sekrup 3,5" @ Rp 15,000.00 Rp 1,650.00
1.458 Lbr RockWool DN City 80 kg/m2, Uk. 1.2 x 0.6 m, T = 5 cm @ Rp 49,500.00 Rp 72,171.00
0.100 Oh Pekerja @ Rp 75,000.00 Rp 7,500.00
0.050 Oh Tukang kayu @ Rp 100,000.00 Rp 5,000.00
0.005 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 625.00
0.005 Oh Mandor @ Rp 150,000.00 Rp 750.00
Rp 234,486.00
Profit Dan Overhead (15%) Rp 35,172.90
Jumlah Rp 269,658.90

SPL Memasang 1 M2 Partisi gypsum board ukuran (120x240x9) mm, tebal 9 mm + Peredam + Finishing HPL (1 Lapis)
0.364 Lbr Gypsumboard 9 mm @ Rp 63,500.00 Rp 23,114.00
0.375 Lbr HPL Uk. 120 x 240 @ Rp 425,000.00 Rp 159,375.00
2.500 Kg UB 888/400 Compoud @ Rp 9,000.00 Rp 22,500.00
0.072 Roll Isolasi Gypsun @ Rp 35,000.00 Rp 2,520.00
0.110 Kg Paku sekrup 3,5" @ Rp 15,000.00 Rp 1,650.00
2.000 Kg Lem Kayu Kuning @ Rp 35,000.00 Rp 70,000.00
1.458 Lbr RockWool DN City 80 kg/m2, Uk. 1.2 x 0.6 m, T = 5 cm @ Rp 49,500.00 Rp 72,171.00
0.100 Oh Pekerja @ Rp 75,000.00 Rp 7,500.00
0.050 Oh Tukang kayu @ Rp 100,000.00 Rp 5,000.00
0.005 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 625.00
0.005 Oh Mandor @ Rp 150,000.00 Rp 750.00
Rp 365,205.00
Profit Dan Overhead (15%) Rp 54,780.75
Jumlah Rp 419,985.75

SPL Memasang 1 M2 Partisi gypsum board Perforated ukuran (120x237x9) mm, tebal 9 mm + Peredam + Finishing HPL (1 Lapis)
0.369 Lbr Gypsumboard Perforated 9 mm, Uk. 1,2 x 2,37 @ Rp 330,000.00 Rp 121,770.00
0.375 Lbr HPL Uk. 120 x 240 @ Rp 425,000.00 Rp 159,375.00
2.500 Kg UB 888/400 Compoud @ Rp 9,000.00 Rp 22,500.00
0.072 Roll Isolasi Gypsun @ Rp 35,000.00 Rp 2,520.00
0.110 Kg Paku sekrup 3,5" @ Rp 15,000.00 Rp 1,650.00
2.000 Kg Lem Kayu Kuning @ Rp 35,000.00 Rp 70,000.00
1.458 Lbr RockWool DN City 80 kg/m2, Uk. 1.2 x 0.6 m, T = 5 cm @ Rp 49,500.00 Rp 72,171.00
0.100 Oh Pekerja @ Rp 75,000.00 Rp 7,500.00
0.050 Oh Tukang kayu @ Rp 100,000.00 Rp 5,000.00
0.005 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 625.00
0.005 Oh Mandor @ Rp 150,000.00 Rp 750.00
Rp 463,861.00
Profit Dan Overhead (15%) Rp 69,579.15
Jumlah Rp 533,440.15

SPL Mengerjakan 1 M2 Dinding Partisi 1 Sisi/Pelapis Dinding Tembok (Finishing HPL)


0.375 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 130,000.00 Rp 48,750.00
0.375 Lbr HPL Uk. 120 x 240 @ Rp 425,000.00 Rp 159,375.00
0.360 Kg Paku Biasa 1/2" - 1" @ Rp 17,500.00 Rp 6,300.00
0.500 Kg Lem kayu @ Rp 25,000.00 Rp 12,500.00
2.000 Kg Lem Kayu Kuning @ Rp 35,000.00 Rp 70,000.00
0.600 Oh Tukang kayu @ Rp 100,000.00 Rp 60,000.00
0.060 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 7,500.00
0.200 Oh Pekerja @ Rp 75,000.00 Rp 15,000.00
0.010 Oh Mandor @ Rp 150,000.00 Rp 1,500.00
Rp 380,925.00
Profit Dan Overhead (15%) Rp 57,138.75
Jumlah Rp 438,063.75

SPL Mengerjakan 1 M2 Dinding Partisi 1 Sisi/Pelapis Dinding Tembok (Finishing HPL) + Peredam
0.375 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 130,000.00 Rp 48,750.00
0.375 Lbr HPL Uk. 120 x 240 @ Rp 425,000.00 Rp 159,375.00
1.458 Lbr RockWool DN City 80 kg/m2, Uk. 1.2 x 0.6 m, T = 5 cm @ Rp 49,500.00 Rp 72,171.00
0.360 Kg Paku Biasa 1/2" - 1" @ Rp 17,500.00 Rp 6,300.00
0.500 Kg Lem kayu @ Rp 25,000.00 Rp 12,500.00
2.000 Kg Lem Kayu Kuning @ Rp 35,000.00 Rp 70,000.00
0.600 Oh Tukang kayu @ Rp 100,000.00 Rp 60,000.00
0.060 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 7,500.00
0.200 Oh Pekerja @ Rp 75,000.00 Rp 15,000.00
0.010 Oh Mandor @ Rp 150,000.00 Rp 1,500.00
Rp 453,096.00
Profit Dan Overhead (15%) Rp 67,964.40
Jumlah Rp 521,060.40

SPL Mengerjakan 1 M2 Dinding Multipleks 9mm


0.375 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 130,000.00 Rp 48,750.00
0.360 Kg Paku Biasa 1/2" - 1" @ Rp 17,500.00 Rp 6,300.00
0.500 Kg Lem kayu @ Rp 25,000.00 Rp 12,500.00
0.600 Oh Tukang kayu @ Rp 100,000.00 Rp 60,000.00
0.060 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 7,500.00
0.200 Oh Pekerja @ Rp 75,000.00 Rp 15,000.00
0.010 Oh Mandor @ Rp 150,000.00 Rp 1,500.00
Rp 151,550.00
Profit Dan Overhead (15%) Rp 22,732.50
Jumlah Rp 174,282.50

A.4.5.1.10 - SPL Memasang 1 M2 Rangka Besi Hollow, Modul 60 x 60 cm, Plafond


1.000 M' Besi Hollow Galvanis 2 x 4 MB, Tbl 0.7 mm @ Rp 7,500.00 Rp 7,500.00
3.000 M' Besi Hollow Galvanis 4 x 4 MB, Tbl 0.7 mm @ Rp 10,000.00 Rp 30,000.00
1.000 Ls Assesories (Perkuatan, Las, Dll) @ Rp 37,500.00 Rp 37,500.00
(100% X Rangka)
0.350 Oh Pekerja @ Rp 75,000.00 Rp 26,250.00
0.350 Oh Tukang besi @ Rp 100,000.00 Rp 35,000.00
0.035 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 4,375.00
0.018 Oh Mandor @ Rp 150,000.00 Rp 2,700.00
Rp 143,325.00
Profit Dan Overhead (15%) Rp 21,498.75
Jumlah Rp 164,823.75

A.4.5.1.20 - SPL Memasang 1 M2 Rangka Besi Hollow 1 x 40.40, Modul 60 x 120 cm, Dinding Partisi
3.500 M' Besi Hollow Galvanis 4 x 4 MB, Tbl 0.7 mm @ Rp 10,000.00 Rp 35,000.00
1.000 Ls Assesories (Perkuatan, Las, Dll) @ Rp 35,000.00 Rp 35,000.00
(100% X Rangka)
0.250 Oh Pekerja @ Rp 75,000.00 Rp 18,750.00
0.250 Oh Tukang besi @ Rp 100,000.00 Rp 25,000.00
0.025 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 3,125.00
0.013 Oh Mandor @ Rp 150,000.00 Rp 1,950.00
Rp 118,825.00
Profit Dan Overhead (15%) Rp 17,823.75
Jumlah Rp 136,648.75

A.4.5.1.9. Pemasangan 1 m' List Langit-langit Kayu Profil


1.050 m' List Profil 4 x 5 cm / 4 m @ Rp 6,375.00 Rp 6,693.75
0.010 Kg Paku Biasa 1/2" - 1" @ Rp 17,500.00 Rp 175.00
0.050 Oh Pekerja @ Rp 75,000.00 Rp 3,750.00
0.050 Oh Tukang kayu @ Rp 100,000.00 Rp 5,000.00
0.005 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 625.00
0.003 Oh Mandor @ Rp 150,000.00 Rp 450.00
Rp 16,693.75
Profit Dan Overhead (15%) Rp 2,504.06
Jumlah Rp 19,197.81

SPL Memasang 1 M' List Plafond Gypsum Profil


1.050 M' Les Gypsum @ Rp 29,500.00 Rp 30,975.00
0.150 Kg Lem profil gypsum @ Rp 18,000.00 Rp 2,700.00
0.060 Oh Pekerja @ Rp 75,000.00 Rp 4,500.00
0.060 Oh Tukang kayu @ Rp 100,000.00 Rp 6,000.00
0.006 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 750.00
0.003 Oh Mandor @ Rp 150,000.00 Rp 450.00
Rp 45,375.00
Profit Dan Overhead (15%) Rp 6,806.25
Jumlah Rp 52,181.25

SPL Memasang 1 M2 Konstruksi Baja Ringan + Reng untuk Atap Spandek


1.488 M Main Trus C 75 -80 @ Rp 18,800.00 Rp 27,974.40
2.232 M Main Trus C 75 -60 @ Rp 16,000.00 Rp 35,712.00
3.600 M Roof Botom/ Reng R 33 -0.45 @ Rp 10,200.00 Rp 36,720.00
28.000 Bh Screw dia.6 x 20 mm (truss sreew) @ Rp 420.00 Rp 11,760.00
25.000 Bh Screw dia.4 x 20 mm (roof baten screew) @ Rp 420.00 Rp 10,500.00
1.600 Bh Dynabolt dia 12 x 120 mm @ Rp 4,200.00 Rp 6,720.00
0.200 Oh Pekerja @ Rp 75,000.00 Rp 15,000.00
0.450 Oh Tukang Besi @ Rp 100,000.00 Rp 45,000.00
0.010 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 1,250.00
0.050 Oh Mandor @ Rp 150,000.00 Rp 7,500.00
1.000 Ls Alat Bantu @ Rp 10,000.00 Rp 10,000.00
Rp 208,136.40
Profit Dan Overhead (15%) Rp 31,220.46
Jumlah Rp 239,356.86

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.1 Memasang 1 Bh kloset duduk/monoblok


1.000 Bh Closet duduk Lengkap @ Rp 2,000,000.00 Rp 2,000,000.00
6 % Perlengkapan Rp 120,000.00
3.300 Oh Pekerja @ Rp 75,000.00 Rp 247,500.00
1.100 Oh Tukang batu @ Rp 100,000.00 Rp 110,000.00
0.001 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 125.00
0.160 Oh Mandor @ Rp 150,000.00 Rp 24,000.00
Rp 2,501,625.00
Profit Dan Overhead (15%) Rp 375,243.75
Jumlah Rp 2,876,868.75

A.5.1.1.2 Memasang 1 Bh kloset jongkok porselen


1.000 Bh Closet jongkok @ Rp 230,000.00 Rp 230,000.00
6.000 Kg Semen Portland @ Rp 1,275.00 Rp 7,650.00
0.010 M3 Pasir pasang @ Rp 135,000.00 Rp 1,350.00
1.000 Oh Pekerja @ Rp 75,000.00 Rp 75,000.00
1.500 Oh Tukang batu @ Rp 100,000.00 Rp 150,000.00
0.150 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 18,750.00
0.160 Oh Mandor @ Rp 150,000.00 Rp 24,000.00
Rp 506,750.00
Profit Dan Overhead (15%) Rp 76,012.50
Jumlah Rp 582,762.50

A.5.1.1.4 Memasang 1 Bh Urinoir


1.000 Bh Urinoir Type U57, Lengkap @ Rp #N/A Rp #N/A
30 % Perlengkapan Rp #N/A
6.000 Kg Semen Portland @ Rp 1,275.00 Rp 7,650.00
0.010 M3 Pasir pasang @ Rp 135,000.00 Rp 1,350.00
1.000 Oh Pekerja @ Rp 75,000.00 Rp 75,000.00
1.000 Oh Tukang batu @ Rp 100,000.00 Rp 100,000.00
0.100 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 12,500.00
0.050 Oh Mandor @ Rp 150,000.00 Rp 7,500.00
Rp #N/A
Profit Dan Overhead (15%) Rp #N/A
Jumlah Rp #N/A

A.5.1.1.5 Memasang 1 Bh wastafel Keramik


1.200 Bh Wastafel keramik @ Rp 475,000.00 Rp 570,000.00
12 % Perlengkapan Rp 57,000.00
6.000 Kg Semen Portland @ Rp 1,275.00 Rp 7,650.00
0.010 M3 Pasir pasang @ Rp 135,000.00 Rp 1,350.00
1.200 Oh Pekerja @ Rp 75,000.00 Rp 90,000.00
1.450 Oh Tukang batu @ Rp 100,000.00 Rp 145,000.00
0.150 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 18,750.00
0.160 Oh Mandor @ Rp 150,000.00 Rp 24,000.00
Rp 913,750.00
Profit Dan Overhead (15%) Rp 137,062.50
Jumlah Rp 1,050,812.50

A.5.1.1.12 Memasang 1 Bh Washbasin stainless stel


1.000 Bh Washbasin stainless stel @ Rp 451,000.00 Rp 451,000.00
1.000 Unit Waterdrain + Accesoriss @ Rp 65,000.00 Rp 65,000.00
0.030 Oh Pekerja @ Rp 75,000.00 Rp 2,250.00
0.300 Oh Tukang batu @ Rp 100,000.00 Rp 30,000.00
0.030 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 3,750.00
0.015 Oh Mandor @ Rp 150,000.00 Rp 2,250.00
Rp 554,250.00
Profit Dan Overhead (15%) Rp 83,137.50
Jumlah Rp 637,387.50
A.5.1.1.6 Memasang 1 Bh badkip porselen
1.000 Bh Bath tub + Acs @ Rp 8,500,000.00 Rp 8,500,000.00
20 % Perlengkapan Rp 1,700,000.00
0.075 Oh Pekerja @ Rp 75,000.00 Rp 5,625.00
0.750 Oh Tukang pipa @ Rp 100,000.00 Rp 75,000.00
0.075 Oh Kepala Tukang pipa @ Rp 125,000.00 Rp 9,375.00
0.003 Oh Mandor @ Rp 150,000.00 Rp 450.00
Rp 10,290,450.00
Profit Dan Overhead (15%) Rp 1,543,567.50
Jumlah Rp 11,834,017.50

A.5.1.1.23 - SPL Memasang 1 M' pipa PVC tipe GIP diameter 2"
1.200 M' Pipa GIP Medium Class Dia. 50 mm (2") @ Rp 91,666.67 Rp 110,000.00
35 % Perlengkapan Rp 32,083.33
0.135 Oh Pekerja @ Rp 75,000.00 Rp 10,125.00
0.225 Oh Tukang pipa @ Rp 100,000.00 Rp 22,500.00
0.023 Oh Kepala Tukang pipa @ Rp 125,000.00 Rp 2,875.00
0.007 Oh Mandor @ Rp 150,000.00 Rp 1,050.00
Rp 178,633.33
Profit Dan Overhead (15%) Rp 26,795.00
Jumlah Rp 205,428.33

A.5.1.1.25 Memasang 1 M' pipa PVC tipe AW diameter 1/2"


1.200 M' Pipa PVC AW Dia. 15 mm (1/2'') @ Rp 3,750.00 Rp 4,500.00
35 % Perlengkapan Rp 1,312.50
0.036 Oh Pekerja @ Rp 75,000.00 Rp 2,700.00
0.060 Oh Tukang pipa @ Rp 100,000.00 Rp 6,000.00
0.006 Oh Kepala Tukang pipa @ Rp 125,000.00 Rp 750.00
0.002 Oh Mandor @ Rp 150,000.00 Rp 270.00
Rp 15,532.50
Profit Dan Overhead (15%) Rp 2,329.88
Jumlah Rp 17,862.38

A.5.1.1.25 - SPL Memasang 1 M' pipa PEX Untuk Air Panas, diameter 1/2"
1.200 M' Pipa PVC Air Panas 1/2'' @ Rp 54,600.00 Rp 65,520.00
35 % Perlengkapan Rp 19,110.00
0.036 Oh Pekerja @ Rp 75,000.00 Rp 2,700.00
0.060 Oh Tukang pipa @ Rp 100,000.00 Rp 6,000.00
0.006 Oh Kepala Tukang pipa @ Rp 125,000.00 Rp 750.00
0.002 Oh Mandor @ Rp 150,000.00 Rp 270.00
Rp 94,350.00
Profit Dan Overhead (15%) Rp 14,152.50
Jumlah Rp 108,502.50

A.5.1.1.26 Memasang 1 M' pipa PVC tipe AW diameter 3/4"


1.200 M' Pipa PVC AW Dia. 20 mm (3/4'') @ Rp 5,333.33 Rp 6,400.00
35 % Perlengkapan Rp 1,866.67
0.036 Oh Pekerja @ Rp 75,000.00 Rp 2,700.00
0.060 Oh Tukang pipa @ Rp 100,000.00 Rp 6,000.00
0.006 Oh Kepala Tukang pipa @ Rp 125,000.00 Rp 750.00
0.002 Oh Mandor @ Rp 150,000.00 Rp 270.00
Rp 17,986.67
Profit Dan Overhead (15%) Rp 2,698.00
Jumlah Rp 20,684.67

A.5.1.1.27 Memasang 1 M' pipa PVC tipe AW diameter 1"


1.200 M' Pipa PVC AW Dia. 25 mm (1'') @ Rp 7,333.33 Rp 8,800.00
35 % Perlengkapan Rp 2,566.67
0.036 Oh Pekerja @ Rp 75,000.00 Rp 2,700.00
0.060 Oh Tukang pipa @ Rp 100,000.00 Rp 6,000.00
0.006 Oh Kepala Tukang pipa @ Rp 125,000.00 Rp 750.00
0.002 Oh Mandor @ Rp 150,000.00 Rp 270.00
Rp 21,086.67
Profit Dan Overhead (15%) Rp 3,163.00
Jumlah Rp 24,249.67

A.5.1.1.28 Memasang 1 M' pipa PVC tipe AW diameter 1 1/2"


1.200 M' Pipa PVC AW Dia. 40 mm (1 1/2'') @ Rp 17,115.00 Rp 20,538.00
35 % Perlengkapan Rp 5,990.25
0.054 Oh Pekerja @ Rp 75,000.00 Rp 4,050.00
0.090 Oh Tukang pipa @ Rp 100,000.00 Rp 9,000.00
0.009 Oh Kepala Tukang pipa @ Rp 125,000.00 Rp 1,125.00
0.003 Oh Mandor @ Rp 150,000.00 Rp 450.00
Rp 41,153.25
Profit Dan Overhead (15%) Rp 6,172.99
Jumlah Rp 47,326.24

A.5.1.1.29 Memasang 1 M' pipa PVC tipe AW diameter 2"


1.200 M' Pipa PVC AW Dia. 50 mm (2'') @ Rp 21,750.00 Rp 26,100.00
35 % Perlengkapan Rp 7,612.50
0.054 Oh Pekerja @ Rp 75,000.00 Rp 4,050.00
0.090 Oh Tukang pipa @ Rp 100,000.00 Rp 9,000.00
0.009 Oh Kepala Tukang pipa @ Rp 125,000.00 Rp 1,125.00
0.003 Oh Mandor @ Rp 150,000.00 Rp 405.00
Rp 48,292.50
Profit Dan Overhead (15%) Rp 7,243.88
Jumlah Rp 55,536.38

A.5.1.1.30 Memasang 1 M' pipa PVC tipe AW diameter 2 1/2"


1.200 M' Pipa PVC AW Dia. 65 mm (2 1/2'') @ Rp 17,378.00 Rp 20,853.60
35 % Perlengkapan Rp 6,082.30
0.081 Oh Pekerja @ Rp 70,000.00 Rp 5,670.00
0.135 Oh Tukang pipa @ Rp 90,000.00 Rp 12,150.00
0.0135 Oh Kepala Tukang pipa @ Rp 95,000.00 Rp 1,282.50
0.004 Oh Mandor @ Rp 115,000.00 Rp 460.00
Rp 46,498.40
Profit Dan Overhead (15%) Rp 6,974.76
Jumlah Rp 53,473.16

A.5.1.1.31 Memasang 1 M' pipa PVC tipe AW diameter 3"


1.200 M' Pipa PVC AW Dia. 80 mm (3'') @ Rp 22,566.67 Rp 27,080.00
35 % Perlengkapan Rp 7,898.33
0.081 Oh Pekerja @ Rp 75,000.00 Rp 6,075.00
0.135 Oh Tukang pipa @ Rp 100,000.00 Rp 13,500.00
0.0135 Oh Kepala Tukang pipa @ Rp 125,000.00 Rp 1,687.50
0.004 Oh Mandor @ Rp 150,000.00 Rp 615.00
Rp 56,855.83
Profit Dan Overhead (15%) Rp 8,528.38
Jumlah Rp 65,384.21

A.5.1.1.32 Memasang 1 M' pipa PVC tipe AW diameter 4"


1.200 M' Pipa PVC AW Dia. 100 mm (4'') @ Rp 66,666.67 Rp 80,000.00
35 % Perlengkapan Rp 23,333.33
0.081 Oh Pekerja @ Rp 75,000.00 Rp 6,075.00
0.135 Oh Tukang pipa @ Rp 100,000.00 Rp 13,500.00
0.0135 Oh Kepala Tukang pipa @ Rp 125,000.00 Rp 1,687.50
0.004 Oh Mandor @ Rp 150,000.00 Rp 615.00
Rp 125,210.83
Profit Dan Overhead (15%) Rp 18,781.63
Jumlah Rp 143,992.46

A.5.1.1.12 Memasang 1 Bh bak cuci piring stainles steel


1.000 Bh Washbasin stainless stel @ Rp 451,000.00 Rp 451,000.00
1.000 Bh Waterdrain + accesoriss @ Rp 65,000.00 Rp 65,000.00
0.030 Oh Pekerja @ Rp 75,000.00 Rp 2,250.00
0.300 Oh Tukang batu @ Rp 100,000.00 Rp 30,000.00
0.030 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 3,750.00
0.002 Oh Mandor @ Rp 150,000.00 Rp 225.00
Rp 552,225.00
Profit Dan Overhead (15%) Rp 82,833.75
Jumlah Rp 635,058.75

A.5.1.1.19 Memasang 1 Bh kran diameter 3/4" atau 1/2"


1.000 Bh Kran air biasa 1/2" - 3/4" @ Rp 20,000.00 Rp 20,000.00
0.025 Bh Seal tape @ Rp 5,000.00 Rp 125.00
0.010 Oh Pekerja @ Rp 75,000.00 Rp 750.00
0.400 Oh Tukang pipa @ Rp 100,000.00 Rp 40,000.00
0.040 Oh Kepala Tukang pipa @ Rp 125,000.00 Rp 5,000.00
0.005 Oh Mandor @ Rp 150,000.00 Rp 750.00
Rp 66,625.00
Profit Dan Overhead (15%) Rp 9,993.75
Jumlah Rp 76,618.75

SPL Memasang 1 Bh kran air ganda diameter 3/4" atau 1/2"


1.000 Bh Kran air ganda 1/2" - 3/4" @ Rp 250,000.00 Rp 250,000.00
0.025 Bh Seal tape @ Rp 5,000.00 Rp 125.00
0.010 Oh Pekerja @ Rp 75,000.00 Rp 750.00
0.400 Oh Tukang pipa @ Rp 100,000.00 Rp 40,000.00
0.040 Oh Kepala Tukang pipa @ Rp 125,000.00 Rp 5,000.00
0.005 Oh Mandor @ Rp 150,000.00 Rp 750.00
Rp 296,625.00
Profit Dan Overhead (15%) Rp 44,493.75
Jumlah Rp 341,118.75

SPL Memasang 1 Bh kran Shower


1.000 Bh Kran Shower @ Rp 75,000.00 Rp 75,000.00
0.025 Bh Seal tape @ Rp 5,000.00 Rp 125.00
0.010 Oh Pekerja @ Rp 75,000.00 Rp 750.00
0.400 Oh Tukang pipa @ Rp 100,000.00 Rp 40,000.00
0.040 Oh Kepala Tukang pipa @ Rp 125,000.00 Rp 5,000.00
0.005 Oh Mandor @ Rp 150,000.00 Rp 750.00
Rp 121,625.00
Profit Dan Overhead (15%) Rp 18,243.75
Jumlah Rp 139,868.75

SPL Memasang 1 Bh Shower


1.000 Bh Shower + Acc @ Rp 275,000.00 Rp 275,000.00
0.025 Bh Seal tape @ Rp 5,000.00 Rp 125.00
0.010 Oh Pekerja @ Rp 75,000.00 Rp 750.00
0.400 Oh Tukang pipa @ Rp 100,000.00 Rp 40,000.00
0.040 Oh Kepala Tukang pipa @ Rp 125,000.00 Rp 5,000.00
0.005 Oh Mandor @ Rp 150,000.00 Rp 750.00
Rp 321,625.00
Profit Dan Overhead (15%) Rp 48,243.75
Jumlah Rp 369,868.75

SPL Memasang 1 Bh Stop kran


1.000 Bh Stop Kran @ Rp 75,000.00 Rp 75,000.00
0.025 Bh Seal tape @ Rp 5,000.00 Rp 125.00
0.010 Oh Pekerja @ Rp 75,000.00 Rp 750.00
0.400 Oh Tukang pipa @ Rp 100,000.00 Rp 40,000.00
0.040 Oh Kepala Tukang pipa @ Rp 125,000.00 Rp 5,000.00
0.005 Oh Mandor @ Rp 150,000.00 Rp 750.00
Rp 121,625.00
Profit Dan Overhead (15%) Rp 18,243.75
Jumlah Rp 139,868.75

A.5.1.1.14 Memasang 1 Bh floor drain


1.000 Bh Floor drain Stainlees @ Rp 65,000.00 Rp 65,000.00
0.010 Oh Pekerja @ Rp 75,000.00 Rp 750.00
0.100 Oh Tukang batu @ Rp 100,000.00 Rp 10,000.00
0.010 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 1,250.00
0.005 Oh Mandor @ Rp 150,000.00 Rp 750.00
Rp 77,750.00
Profit Dan Overhead (15%) Rp 11,662.50
Jumlah Rp 89,412.50

A.5.1.1.14 - SPL Memasang 1 Bh Roof drain


1.000 Bh Roof drain @ Rp 250,000.00 Rp 250,000.00
0.010 Oh Pekerja @ Rp 75,000.00 Rp 750.00
0.100 Oh Tukang batu @ Rp 100,000.00 Rp 10,000.00
0.010 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 1,250.00
0.005 Oh Mandor @ Rp 150,000.00 Rp 750.00
Rp 262,750.00
Profit Dan Overhead (15%) Rp 39,412.50
Jumlah Rp 302,162.50

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM


K.6.1 Memasang 1 Kg besi profil
D. 1.150 Kg Plat Baja T = 10 mm @ Rp 22,750.00 Rp 26,162.50
0.060 Oh Pekerja @ Rp 70,000.00 Rp 4,200.00
0.060 Oh Tukang las @ Rp 90,000.00 Rp 5,400.00
0.006 Oh Kepala Tukang Besi @ Rp 95,000.00 Rp 570.00
0.003 Oh Mandor @ Rp 115,000.00 Rp 345.00
Rp 36,677.50
Profit Dan Overhead (15%) Rp 5,501.63
Jumlah Rp 42,179.13

K.6.2 Memasang 1 Kg rangka kuda-kuda baja IWF/ H Beam


A. 1.150 Kg Besi Profil H Beam 400 x 400 x 13 x 21 @ Rp 15,000.00 Rp 17,250.00
0.060 Oh Pekerja @ Rp 70,000.00 Rp 4,200.00
0.060 Oh Tukang las @ Rp 90,000.00 Rp 5,400.00
0.006 Oh Kepala Tukang Besi @ Rp 95,000.00 Rp 570.00
0.003 Oh Mandor @ Rp 115,000.00 Rp 345.00
Rp 27,765.00
Profit Dan Overhead (15%) Rp 4,164.75
Jumlah Rp 31,929.75

B. 1.150 Kg Besi Profil IWF @ Rp 12,408.00 Rp 14,269.20


0.060 Oh Pekerja @ Rp 70,000.00 Rp 4,200.00
0.060 Oh Tukang las @ Rp 90,000.00 Rp 5,400.00
0.006 Oh Kepala Tukang Besi @ Rp 95,000.00 Rp 570.00
0.003 Oh Mandor @ Rp 115,000.00 Rp 345.00
Rp 24,784.20
Profit Dan Overhead (15%) Rp 3,717.63
Jumlah Rp 28,501.83

K.6.3 Mengerjakan 100 Kg pekerjaan perakitan


1.000 Ltr Solar @ Rp 13,913.00 Rp 13,913.00
0.100 Ltr Minyak pelumas @ Rp 43,313.60 Rp 4,331.36
0.100 Oh Pekerja @ Rp 70,000.00 Rp 7,000.00
0.100 Oh Tukang besi @ Rp 90,000.00 Rp 9,000.00
0.001 Oh Kepala Tukang Besi @ Rp 95,000.00 Rp 95.00
0.005 Oh Mandor @ Rp 115,000.00 Rp 575.00
0.800 Jam Sewa alat @ Rp 75,000.00 Rp 60,000.00
Rp 94,914.36
Untuk 1 Kg Pek. Perakitan Rp 949.14
Profit Dan Overhead (15%) Rp 142.37
Jumlah Rp 1,091.52
SPL Mengerjakan 1 M' Pipa Black Steel (BS), Dia. 4"
1.100 M' Pipa BS Medium Class Dia. 100 mm (4") @ Rp 185,833.33 Rp 204,416.67
0.726 Oh Pekerja @ Rp 75,000.00 Rp 54,450.00
0.726 Oh Tukang las @ Rp 100,000.00 Rp 72,600.00
0.073 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 9,075.00
0.036 Oh Mandor @ Rp 150,000.00 Rp 5,445.00
1.000 Ls Alat Bantu @ Rp 10,000.00 Rp 10,000.00
Rp 355,986.67
Profit Dan Overhead (15%) Rp 53,398.00
Jumlah Rp 409,384.67

SPL Mengerjakan 1 M' Pipa Stainless Steel, Dia. 3"


1.100 M' Pipa Stainless Steel, Dia. 3" @ Rp 170,000.00 Rp 187,000.00
0.508 Oh Pekerja @ Rp 75,000.00 Rp 38,115.00
0.508 Oh Tukang las @ Rp 100,000.00 Rp 50,820.00
0.051 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 6,352.50
0.025 Oh Mandor @ Rp 150,000.00 Rp 3,811.50
1.000 Ls Alat Bantu @ Rp 10,000.00 Rp 10,000.00
Rp 296,099.00
Profit Dan Overhead (15%) Rp 44,414.85
Jumlah Rp 340,513.85

SPL Mengerjakan 1 M' Besi Siku Stainless Steel, Uk. 40. 40. 4
1.100 M' Besi Siku Stainless Steel L. 40. 40. 4 @ Rp 30,000.00 Rp 33,000.00
0.183 Oh Pekerja @ Rp 75,000.00 Rp 13,695.00
0.183 Oh Tukang las @ Rp 100,000.00 Rp 18,260.00
0.018 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 2,282.50
0.009 Oh Mandor @ Rp 150,000.00 Rp 1,369.50
0.100 Ls Alat Bantu @ Rp 10,000.00 Rp 1,000.00
Rp 69,607.00
Profit Dan Overhead (15%) Rp 10,441.05
Jumlah Rp 80,048.05

SPL Mengerjakan 1 M1 Pek. Rangka Besi Hollow 30x30x2,3 mm


1.100 M' Besi Hollow 40 x 40 x 2.3 mm @ Rp 33,000.00 Rp 36,300.00
3.000 Bh Srews/sekrup @ Rp 1,100.00 Rp 3,300.00
0.200 kg Electroda 6 mm @ Rp 65,000.00 Rp 13,000.00
0.225 Oh Pekerja @ Rp 75,000.00 Rp 16,875.00
0.200 Oh Tukang besi @ Rp 100,000.00 Rp 20,000.00
0.100 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 12,500.00
0.009 Oh Mandor @ Rp 150,000.00 Rp 1,350.00
Rp 103,325.00
Profit Dan Overhead (15%) Rp 15,498.75
Jumlah Rp 118,823.75

SPL Mengerjakan 1 M1 Pek. Rangka Besi Hollow 40x40x2,3 mm


1.100 M' Besi Hollow 30 x 30 x 2.3 mm @ Rp 28,600.00 Rp 31,460.00
3.000 Bh Srews/sekrup @ Rp 1,100.00 Rp 3,300.00
0.200 kg Electroda 6 mm @ Rp 65,000.00 Rp 13,000.00
0.225 Oh Pekerja @ Rp 75,000.00 Rp 16,875.00
0.200 Oh Tukang besi @ Rp 100,000.00 Rp 20,000.00
0.100 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 12,500.00
0.009 Oh Mandor @ Rp 150,000.00 Rp 1,350.00
Rp 98,485.00
Profit Dan Overhead (15%) Rp 14,772.75
Jumlah Rp 113,257.75

SPL Mengerjakan 1 M1 Pek. Rangka Besi Hollow 50x50x2,3 mm


1.100 M' Besi Hollow 50 x 50 x 2.3 mm @ Rp 34,666.67 Rp 38,133.33
3.000 Bh Srews/sekrup @ Rp 1,100.00 Rp 3,300.00
0.200 kg Electroda 6 mm @ Rp 65,000.00 Rp 13,000.00
0.225 Oh Pekerja @ Rp 75,000.00 Rp 16,875.00
0.200 Oh Tukang besi @ Rp 100,000.00 Rp 20,000.00
0.100 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 12,500.00
0.009 Oh Mandor @ Rp 150,000.00 Rp 1,350.00
Rp 105,158.33
Profit Dan Overhead (15%) Rp 15,773.75
Jumlah Rp 120,932.08

SPL Mengerjakan 1 M1 Pek. Rangka Besi Hollow 40x60x2,3 mm


1.100 M' Besi Hollow 40 x 60 x 2.3 mm @ Rp 36,666.67 Rp 40,333.33
3.000 Bh Srews/sekrup @ Rp 1,100.00 Rp 3,300.00
0.200 kg Electroda 6 mm @ Rp 65,000.00 Rp 13,000.00
0.225 Oh Pekerja @ Rp 75,000.00 Rp 16,875.00
0.200 Oh Tukang besi @ Rp 100,000.00 Rp 20,000.00
0.100 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 12,500.00
0.009 Oh Mandor @ Rp 150,000.00 Rp 1,350.00
Rp 107,358.33
Profit Dan Overhead (15%) Rp 16,103.75
Jumlah Rp 123,462.08

A.4.2.1.11 - SPL Mengerjakan 1 M2 Kawat Ram Stainless Steel


1.100 M2 Kawat Rang Stainless Steel 3 x 3 @ Rp 37,000.00 Rp 40,700.00
0.100 Oh Pekerja @ Rp 75,000.00 Rp 7,500.00
0.100 Oh Tukang las @ Rp 100,000.00 Rp 10,000.00
0.010 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 1,250.00
0.005 Oh Mandor @ Rp 150,000.00 Rp 750.00
Rp 60,200.00
Profit Dan Overhead (15%) Rp 9,030.00
Jumlah Rp 69,230.00

A.4.2.1.11 Mengerjakan 1 M' Kusen Aluminium


1.100 M' Kusen Aluminium Warna 4" x 1 3/4" (Coating) @ Rp 130,000.00 Rp 143,000.00
2.000 Bh Sektrup Fixer @ Rp 1,850.00 Rp 3,700.00
0.060 Tube Sealent @ Rp 90,000.00 Rp 5,400.00
0.043 Oh Pekerja @ Rp 75,000.00 Rp 3,225.00
0.043 Oh Tukang besi @ Rp 100,000.00 Rp 4,300.00
0.0043 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 537.50
0.0021 Oh Mandor @ Rp 150,000.00 Rp 315.00
Rp 160,477.50
Profit Dan Overhead (15%) Rp 24,071.63
Jumlah Rp 184,549.13

SPL.1 Mengerjakan 1 M' Bingkai Jendela Aluminium


A 1.100 M' Bingkai Pintu Aluminium Warna 4" x 1 1/2" (Coating) @ Rp 110,000.00 Rp 121,000.00
B 1.100 M' Bingkai Pintu / Rangka Partisi Aluminium Warna 3" x 1 1 @ Rp 100,000.00 Rp 110,000.00
C 1.100 M1 Bingkai Jendela Aluminium Warna (2"x1") (Coating) @ Rp 90,000.00 Rp 99,000.00
0.060 Tube Sealent @ Rp 90,000.00 Rp 5,400.00
0.043 Oh Pekerja @ Rp 75,000.00 Rp 3,225.00
0.043 Oh Tukang besi @ Rp 100,000.00 Rp 4,300.00
0.0043 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 537.50
0.0021 Oh Mandor @ Rp 150,000.00 Rp 315.00
1.000 Ls Alat Bantu + Accessories dll Rp 11,000.00
A Rp 145,777.50
Profit Dan Overhead (15%) Rp 21,866.63
Jumlah Rp 167,644.13
B Rp 134,777.50
Profit Dan Overhead (15%) Rp 20,216.63
Jumlah Rp 154,994.13
C Rp 123,777.50
Profit Dan Overhead (15%) Rp 18,566.63
Jumlah Rp 142,344.13

SPL 1 Unit Pasang Pintu Kaca Tempered, Tebal 12 Mm, Uk. 100 x 220 cm
2.310 M2 Pintu Kaca Tempered 12 mm Flat Laminated @ Rp 1,622,000.00 Rp 3,746,820.00
1.000 Oh Pekerja @ Rp 75,000.00 Rp 75,000.00
2.500 Oh Tukang Besi @ Rp 100,000.00 Rp 250,000.00
0.250 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 31,250.00
0.050 Oh Mandor @ Rp 150,000.00 Rp 7,500.00
1.000 Set Frame List, Baut / Sekrup DLL Rp 1,873,410.00
1.000 Ls Alat bantu + Fabrikasi dll Rp 187,341.00
Rp 6,171,321.00
Profit Dan Overhead (15%) Rp 925,698.15
Jumlah Rp 7,097,019.15

SPL 1 Bh Pasang Pintu Aluminium


1.000 Bh Pintu Aluminium, Uk. 70 x 210 @ Rp 1,350,000.00 Rp 1,350,000.00
1.050 Oh Pekerja @ Rp 75,000.00 Rp 78,750.00
1.050 Oh Tukang besi @ Rp 100,000.00 Rp 105,000.00
0.105 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 13,125.00
0.0052 Oh Mandor @ Rp 150,000.00 Rp 780.00
Rp 1,547,655.00
Profit Dan Overhead (15%) Rp 232,148.25
Jumlah Rp 1,779,803.25

SPL 1 Bh Pasang Pintu Aluminium


1.000 Bh Pintu Aluminium, Uk. 50 x 160 @ Rp 750,000.00 Rp 750,000.00
1.050 Oh Pekerja @ Rp 75,000.00 Rp 78,750.00
1.050 Oh Tukang besi @ Rp 100,000.00 Rp 105,000.00
0.105 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 13,125.00
0.0052 Oh Mandor @ Rp 150,000.00 Rp 780.00
Rp 947,655.00
Profit Dan Overhead (15%) Rp 142,148.25
Jumlah Rp 1,089,803.25

SPL Mengerjakan 1 M2 Pek. Cladding Aluminium Composite Panel System Cutting


1.000 M2 Alumunium Composite Panel (PVDF), T= 4 mm @ Rp 400,000.00 Rp 400,000.00
20.000 Bh Srews/sekrup @ Rp 1,100.00 Rp 22,000.00
0.080 Tube Sealent @ Rp 90,000.00 Rp 7,200.00
1.000 Bh Stiffener @ Rp 50,000.00 Rp 50,000.00
1.000 Bh Bracket steel Galfanized @ Rp 75,000.00 Rp 75,000.00
1.250 Oh Pekerja @ Rp 75,000.00 Rp 93,750.00
1.250 Oh Tukang besi @ Rp 100,000.00 Rp 125,000.00
0.125 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 15,625.00
0.500 Oh Mandor @ Rp 150,000.00 Rp 75,000.00
1.000 Ls Biaya Cutting ACP @ Rp 100,000.00 Rp 100,000.00
1.000 Ls Alat bantu @ Rp 40,000.00 Rp 40,000.00
Rp 1,003,575.00
Profit Dan Overhead (15%) Rp 150,536.25
Jumlah Rp 1,154,111.25

SPL Mengerjakan 1 M2 Pek. Cladding Aluminium Composite Panel (Pasang Biasa)


1.000 M2 Alumunium Composite Panel (PVDF), T= 4 mm @ Rp 400,000.00 Rp 400,000.00
20.000 Bh Srews/sekrup @ Rp 1,100.00 Rp 22,000.00
0.080 Tube Sealent @ Rp 90,000.00 Rp 7,200.00
1.000 Bh Stiffener @ Rp 50,000.00 Rp 50,000.00
1.000 Bh Bracket steel Galfanized @ Rp 75,000.00 Rp 75,000.00
1.250 Oh Pekerja @ Rp 75,000.00 Rp 93,750.00
1.250 Oh Tukang besi @ Rp 100,000.00 Rp 125,000.00
0.125 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 15,625.00
0.500 Oh Mandor @ Rp 150,000.00 Rp 75,000.00
1.000 Ls Alat bantu @ Rp 40,000.00 Rp 40,000.00
Rp 903,575.00
Profit Dan Overhead (15%) Rp 135,536.25
Jumlah Rp 1,039,111.25

SPL Mengerjakan 1 M2 Pek. Lesplank Aluminium Composite Panel


1.000 M2 Alumunium Composite Panel (PVDF), T= 4 mm @ Rp 400,000.00 Rp 400,000.00
20.000 Bh Srews/sekrup @ Rp 1,100.00 Rp 22,000.00
0.080 Tube Sealent @ Rp 90,000.00 Rp 7,200.00
0.750 Oh Pekerja @ Rp 75,000.00 Rp 56,250.00
0.750 Oh Tukang besi @ Rp 100,000.00 Rp 75,000.00
0.075 Oh Kepala Tukang Besi @ Rp 125,000.00 Rp 9,375.00
0.300 Oh Mandor @ Rp 150,000.00 Rp 45,000.00
1.000 Ls Alat bantu @ Rp 40,000.00 Rp 40,000.00
Rp 654,825.00
Profit Dan Overhead (15%) Rp 98,223.75
Jumlah Rp 753,048.75

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.2 Memasang 1 Bh kunci tanam biasa


1.000 Bh Kunci tanam biasa (2 x Slag) @ Rp 307,000.00 Rp 307,000.00
0.010 Oh Pekerja @ Rp 75,000.00 Rp 750.00
0.500 Oh Tukang kayu @ Rp 100,000.00 Rp 50,000.00
0.050 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 6,250.00
0.005 Oh Mandor @ Rp 150,000.00 Rp 750.00
Rp 364,750.00
Profit Dan Overhead (15%) Rp 54,712.50
Jumlah Rp 419,462.50

A.4.6.2.4 Memasang 1 Bh kunci silinder


1.000 Bh Kunci tanam silinder @ Rp 350,000.00 Rp 350,000.00
0.005 Oh Pekerja @ Rp 75,000.00 Rp 375.00
0.500 Oh Tukang kayu @ Rp 100,000.00 Rp 50,000.00
0.050 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 6,250.00
0.003 Oh Mandor @ Rp 150,000.00 Rp 450.00
Rp 407,075.00
Profit Dan Overhead (15%) Rp 61,061.25
Jumlah Rp 468,136.25

A.4.6.2.5 Memasang 1 Bh engsel pintu


1.000 Bh Engsel pintu Kw.1 @ Rp 35,500.00 Rp 35,500.00
0.015 Oh Pekerja @ Rp 75,000.00 Rp 1,125.00
0.150 Oh Tukang kayu @ Rp 100,000.00 Rp 15,000.00
0.015 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 1,875.00
0.0008 Oh Mandor @ Rp 150,000.00 Rp 112.50
Rp 53,612.50
Profit Dan Overhead (15%) Rp 8,041.88
Jumlah Rp 61,654.38

SPL Memasang 1 Psg Flooring Engsel pintu


1.000 Psg Flooring engsel @ Rp 900,000.00 Rp 900,000.00
0.015 Oh Pekerja @ Rp 75,000.00 Rp 1,125.00
0.300 Oh Tukang kayu @ Rp 100,000.00 Rp 30,000.00
0.030 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 3,750.00
0.0008 Oh Mandor @ Rp 150,000.00 Rp 112.50
Rp 934,987.50
Profit Dan Overhead (15%) Rp 140,248.13
Jumlah Rp 1,075,235.63

A.4.6.2.6 Memasang 1 Bh engsel jendela


1.000 Bh Engsel jendela Kw.1 @ Rp 26,000.00 Rp 26,000.00
0.010 Oh Pekerja @ Rp 75,000.00 Rp 750.00
0.100 Oh Tukang kayu @ Rp 100,000.00 Rp 10,000.00
0.010 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 1,250.00
0.0005 Oh Mandor @ Rp 150,000.00 Rp 75.00
Rp 38,075.00
Profit Dan Overhead (15%) Rp 5,711.25
Jumlah Rp 43,786.25

A.4.6.2.7 Memasang 1 Bh Engsel angin/Casement


1.000 Bh Engsel Angin/Casement 12" @ Rp 60,000.00 Rp 60,000.00
0.100 Oh Pekerja @ Rp 75,000.00 Rp 7,500.00
0.200 Oh Tukang kayu @ Rp 100,000.00 Rp 20,000.00
0.020 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 2,500.00
0.0005 Oh Mandor @ Rp 150,000.00 Rp 75.00
Rp 90,075.00
Profit Dan Overhead (15%) Rp 13,511.25
Jumlah Rp 103,586.25

A.4.6.2.9 Memasang 1 Bh kait angin


1.000 Bh Hak Angin Kecil @ Rp 10,500.00 Rp 10,500.00
0.015 Oh Pekerja @ Rp 75,000.00 Rp 1,125.00
0.150 Oh Tukang kayu @ Rp 100,000.00 Rp 15,000.00
0.015 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 1,875.00
0.008 Oh Mandor @ Rp 150,000.00 Rp 1,200.00
Rp 29,700.00
Profit Dan Overhead (15%) Rp 4,455.00
Jumlah Rp 34,155.00

A.4.6.2.8 Memasang 1 Bh grendel jendela/Spring Knip


1.000 Bh Grendel jendela Kw.1 Kecil @ Rp 13,500.00 Rp 13,500.00
0.015 Oh Pekerja @ Rp 75,000.00 Rp 1,125.00
0.150 Oh Tukang kayu @ Rp 100,000.00 Rp 15,000.00
0.015 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 1,875.00
0.008 Oh Mandor @ Rp 150,000.00 Rp 1,200.00
Rp 32,700.00
Profit Dan Overhead (15%) Rp 4,905.00
Jumlah Rp 37,605.00

A.4.6.2.10 Memasang 1 Bh door closer


1.000 Bh Door closer/espanyolet @ Rp 125,000.00 Rp 125,000.00
0.050 Oh Pekerja @ Rp 75,000.00 Rp 3,750.00
0.500 Oh Tukang kayu @ Rp 100,000.00 Rp 50,000.00
0.050 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 6,250.00
0.003 Oh Mandor @ Rp 150,000.00 Rp 450.00
Rp 185,450.00
Profit Dan Overhead (15%) Rp 27,817.50
Jumlah Rp 213,267.50

A.4.6.2.11 Memasang 1 Bh kunci selot


A 1.000 Bh Kunci selot @ Rp 500,000.00 Rp 500,000.00
B 1.000 Bh Kunci selot biasa @ Rp 225,000.00 Rp 225,000.00
0.020 Oh Pekerja @ Rp 75,000.00 Rp 1,500.00
0.200 Oh Tukang kayu @ Rp 100,000.00 Rp 20,000.00
0.020 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 2,500.00
0.001 Oh Mandor @ Rp 150,000.00 Rp 150.00
Juml. A Rp 524,150.00
Profit Dan Overhead (15%) Rp 78,622.50
Jumlah Rp 602,772.50
Juml. B Rp 249,150.00
Profit Dan Overhead (15%) Rp 37,372.50
Jumlah Rp 286,522.50

A.4.6.2.12 Memasang 1 Bh pegangan pintu/door holder


1.000 Bh Door Holder @ Rp 150,000.00 Rp 150,000.00
0.050 Oh Pekerja @ Rp 75,000.00 Rp 3,750.00
0.500 Oh Tukang kayu @ Rp 100,000.00 Rp 50,000.00
0.050 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 6,250.00
0.003 Oh Mandor @ Rp 150,000.00 Rp 450.00
Rp 210,450.00
Profit Dan Overhead (15%) Rp 31,567.50
Jumlah Rp 242,017.50
A.4.6.2.17 Memasang 1 M2 kaca, tebal 5 mm
1.100 M2 Kaca Ryben 5mm @ Rp 175,000.00 Rp 192,500.00
0.050 Tube Sealent @ Rp 90,000.00 Rp 4,500.00
0.015 Oh Pekerja @ Rp 75,000.00 Rp 1,125.00
0.150 Oh Tukang kayu @ Rp 100,000.00 Rp 15,000.00
0.015 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 1,875.00
0.0008 Oh Mandor @ Rp 150,000.00 Rp 120.00
Rp 215,120.00
Profit Dan Overhead (15%) Rp 32,268.00
Jumlah Rp 247,388.00

SPL Memasang 1 M2 kaca, tebal 5 mm


1.100 M2 Kaca bening 5 mm @ Rp 125,000.00 Rp 137,500.00
0.050 Tube Sealent @ Rp 90,000.00 Rp 4,500.00
0.015 Oh Pekerja @ Rp 75,000.00 Rp 1,125.00
0.150 Oh Tukang kayu @ Rp 100,000.00 Rp 15,000.00
0.015 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 1,875.00
0.0008 Oh Mandor @ Rp 150,000.00 Rp 120.00
Rp 160,120.00
Profit Dan Overhead (15%) Rp 24,018.00
Jumlah Rp 184,138.00

SPL Memasang 1 M2 kaca, tebal 5 mm


1.100 M2 Kaca Ryben 5mm @ Rp 175,000.00 Rp 192,500.00
0.050 Tube Sealent @ Rp 90,000.00 Rp 4,500.00
8.800 m' Karet List Kaca @ Rp 2,500.00 Rp 22,000.00
0.015 Oh Pekerja @ Rp 75,000.00 Rp 1,125.00
0.150 Oh Tukang kayu @ Rp 100,000.00 Rp 15,000.00
0.015 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 1,875.00
0.0008 Oh Mandor @ Rp 150,000.00 Rp 120.00
Rp 237,120.00
Profit Dan Overhead (15%) Rp 35,568.00
Jumlah Rp 272,688.00

A.4.6.2.18 Memasang 1 M2 kaca, tebal 8 mm


1.100 M2 Kaca Stopsol Laminated 8 mm @ Rp 667,700.00 Rp 734,470.00
0.050 Tube Sealent @ Rp 90,000.00 Rp 4,500.00
0.017 Oh Pekerja @ Rp 75,000.00 Rp 1,275.00
0.170 Oh Tukang kayu @ Rp 100,000.00 Rp 17,000.00
0.017 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 2,125.00
0.0009 Oh Mandor @ Rp 150,000.00 Rp 135.00
Rp 759,505.00
Profit Dan Overhead (15%) Rp 113,925.75
Jumlah Rp 873,430.75

A.4.6.2.19 Memasang 1 M2 kaca, tebal 12 mm


1.100 M2 Pintu Kaca Tempered 12 mm Flat Laminated @ Rp 1,622,000.00 Rp 1,784,200.00
0.070 Tube Sealent @ Rp 90,000.00 Rp 6,300.00
0.025 Oh Pekerja @ Rp 75,000.00 Rp 1,875.00
0.250 Oh Tukang kayu @ Rp 100,000.00 Rp 25,000.00
0.025 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 3,125.00
0.0013 Oh Mandor @ Rp 150,000.00 Rp 195.00
Rp 1,820,695.00
Profit Dan Overhead (15%) Rp 273,104.25
Jumlah Rp 2,093,799.25

A.4.6.2.19 - SPL Memasang 1 M2 kaca, tebal 10 mm


1.100 M2 Kaca Tempered 10 mm Flat Laminated @ Rp 1,270,000.00 Rp 1,397,000.00
0.070 Tube Sealent @ Rp 90,000.00 Rp 6,300.00
0.025 Oh Pekerja @ Rp 75,000.00 Rp 1,875.00
0.250 Oh Tukang kayu @ Rp 100,000.00 Rp 25,000.00
0.025 Oh Kepala Tukang Kayu @ Rp 125,000.00 Rp 3,125.00
0.0013 Oh Mandor @ Rp 150,000.00 Rp 195.00
Rp 1,433,495.00
Profit Dan Overhead (15%) Rp 215,024.25
Jumlah Rp 1,648,519.25

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING

SPL Memasang 1 M2 lantai Keramik Homogenous Tile, ukuran (60x60) cm


3.100 Bh Tegel keramik Homogenous Tile, Uk. 60 x 60 Cm @ Rp 96,700.00 Rp 299,770.00
9.600 Kg Semen Portland @ Rp 1,275.00 Rp 12,240.00
0.045 M3 Pasir pasang @ Rp 135,000.00 Rp 6,075.00
1.500 Kg Semen warna @ Rp 15,000.00 Rp 22,500.00
0.700 Oh Pekerja @ Rp 75,000.00 Rp 52,500.00
0.350 Oh Tukang batu @ Rp 100,000.00 Rp 35,000.00
0.035 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 4,375.00
0.035 Oh Mandor @ Rp 150,000.00 Rp 5,250.00
Rp 437,710.00
Profit Dan Overhead (15%) Rp 65,656.50
Rp 503,366.50

SPL Memasang 1 M2 lantai Keramik Anti Noda T = 1 cm, ukuran (20x60) cm


9.160 Bh Tegel keramik Homogenous Tile, Uk. 20 x 60 Cm @ Rp 46,800.00 Rp 428,688.00
9.800 Kg Semen Portland @ Rp 1,275.00 Rp 12,495.00
0.045 M3 Pasir pasang @ Rp 135,000.00 Rp 6,075.00
1.300 Kg Semen warna @ Rp 15,000.00 Rp 19,500.00
0.700 Oh Pekerja @ Rp 75,000.00 Rp 52,500.00
0.350 Oh Tukang batu @ Rp 100,000.00 Rp 35,000.00
0.035 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 4,375.00
0.035 Oh Mandor @ Rp 150,000.00 Rp 5,250.00
Rp 563,883.00
Profit Dan Overhead (15%) Rp 84,582.45
Jumlah Rp 648,465.45

SPL Memasang 1 M2 lantai Keramik Homogenous Tile, ukuran (80x80) cm


1.656 Bh Tegel keramik Homogenous Tile, Uk. 80 x 80 Cm (Type @ Rp 370,000.00 Rp 612,720.00
8.895 Kg Semen Portland @ Rp 1,275.00 Rp 11,341.13
0.045 M3 Pasir pasang @ Rp 135,000.00 Rp 6,075.00
1.075 Kg Semen warna @ Rp 15,000.00 Rp 16,125.00
0.700 Oh Pekerja @ Rp 75,000.00 Rp 52,500.00
0.350 Oh Tukang batu @ Rp 100,000.00 Rp 35,000.00
0.035 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 4,375.00
0.035 Oh Mandor @ Rp 150,000.00 Rp 5,250.00
Rp 743,386.13
Profit Dan Overhead (15%) Rp 111,507.92
Rp 854,894.04

SPL Memasang 1 M2 lantai keramik ukuran (40x40) cm


6.630 Bh Tegel keramik 40 x 40 cm (Warna) @ Rp 10,833.33 Rp 71,825.00
9.800 Kg Semen Portland @ Rp 1,275.00 Rp 12,495.00
0.045 M3 Pasir pasang @ Rp 135,000.00 Rp 6,075.00
1.300 Kg Semen warna @ Rp 15,000.00 Rp 19,500.00
0.700 Oh Pekerja @ Rp 75,000.00 Rp 52,500.00
0.350 Oh Tukang batu @ Rp 100,000.00 Rp 35,000.00
0.035 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 4,375.00
0.035 Oh Mandor @ Rp 150,000.00 Rp 5,250.00
Rp 207,020.00
Profit Dan Overhead (15%) Rp 31,053.00
Jumlah Rp 238,073.00

A.4.4.3.35 Memasang 1 M2 lantai keramik ukuran (30x30) cm


11.870 Bh Tegel keramik 30 x 30 cm (warna) @ Rp 5,454.55 Rp 64,745.45
10.000 Kg Semen Portland @ Rp 1,275.00 Rp 12,750.00
0.045 M3 Pasir pasang @ Rp 135,000.00 Rp 6,075.00
1.500 Kg Semen warna @ Rp 15,000.00 Rp 22,500.00
0.700 Oh Pekerja @ Rp 75,000.00 Rp 52,500.00
0.350 Oh Tukang batu @ Rp 100,000.00 Rp 35,000.00
0.035 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 4,375.00
0.035 Oh Mandor @ Rp 150,000.00 Rp 5,250.00
Rp 203,195.45
Profit Dan Overhead (15%) Rp 30,479.32
Jumlah Rp 233,674.77

A.4.4.3.36 Memasang 1 M2 lantai keramik ukuran (20x20) cm


26.500 Bh Tegel keramik 20 x 20 cm (kasar) @ Rp 1,920.00 Rp 50,880.00
10.400 Kg Semen Portland @ Rp 1,275.00 Rp 13,260.00
0.045 M3 Pasir pasang @ Rp 135,000.00 Rp 6,075.00
1.620 Kg Semen warna @ Rp 15,000.00 Rp 24,300.00
0.700 Oh Pekerja @ Rp 75,000.00 Rp 52,500.00
0.350 Oh Tukang batu @ Rp 100,000.00 Rp 35,000.00
0.035 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 4,375.00
0.035 Oh Mandor @ Rp 150,000.00 Rp 5,250.00
Rp 191,640.00
Profit Dan Overhead (15%) Rp 28,746.00
Jumlah Rp 220,386.00

SPL Memasang 1 M2 dinding keramik ukuran (20x25) cm


21.000 Bh Tegel keramik 20 x 25 cm ( warna ) @ Rp 3,250.00 Rp 68,250.00
9.300 Kg Semen Portland @ Rp 1,275.00 Rp 11,857.50
0.018 M3 Pasir pasang @ Rp 135,000.00 Rp 2,430.00
1.940 Kg Semen warna @ Rp 15,000.00 Rp 29,100.00
0.900 Oh Pekerja @ Rp 75,000.00 Rp 67,500.00
0.450 Oh Tukang batu @ Rp 100,000.00 Rp 45,000.00
0.045 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 5,625.00
0.045 Oh Mandor @ Rp 150,000.00 Rp 6,750.00
Rp 236,512.50
Profit Dan Overhead (15%) Rp 35,476.88
Jumlah Rp 271,989.38

SPL Memasang 1 M2 dinding keramik ukuran (30x50) cm


7.000 Bh Tegel keramik 30 x 50 Cm @ Rp 7,428.57 Rp 52,000.00
9.300 Kg Semen Portland @ Rp 1,275.00 Rp 11,857.50
0.018 M3 Pasir pasang @ Rp 135,000.00 Rp 2,430.00
1.940 Kg Semen warna @ Rp 15,000.00 Rp 29,100.00
0.900 Oh Pekerja @ Rp 75,000.00 Rp 67,500.00
0.450 Oh Tukang batu @ Rp 100,000.00 Rp 45,000.00
0.045 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 5,625.00
0.045 Oh Mandor @ Rp 150,000.00 Rp 6,750.00
Rp 220,262.50
Profit Dan Overhead (15%) Rp 33,039.38
Jumlah Rp 253,301.88

SPL Memasang 1 M2 dinding keramik ukuran (25x40) cm


10.500 Bh Tegel keramik 25 x 40 Cm @ Rp 9,000.00 Rp 94,500.00
9.300 Kg Semen Portland @ Rp 1,275.00 Rp 11,857.50
0.018 M3 Pasir pasang @ Rp 135,000.00 Rp 2,430.00
1.940 Kg Semen warna @ Rp 15,000.00 Rp 29,100.00
0.900 Oh Pekerja @ Rp 75,000.00 Rp 67,500.00
0.450 Oh Tukang batu @ Rp 100,000.00 Rp 45,000.00
0.045 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 5,625.00
0.045 Oh Mandor @ Rp 150,000.00 Rp 6,750.00
Rp 262,762.50
Profit Dan Overhead (15%) Rp 39,414.38
Jumlah Rp 302,176.88

SPL Memasang 1 M plint Keramik ukuran (10 x 40) cm


1.700 Bh Plint Keramik 10 x 40 cm @ Rp 4,875.00 Rp 8,287.50
1.140 Kg Semen Portland @ Rp 1,275.00 Rp 1,453.50
0.003 M3 Pasir pasang @ Rp 135,000.00 Rp 405.00
0.100 Kg Semen warna @ Rp 15,000.00 Rp 1,500.00
0.090 Oh Pekerja @ Rp 75,000.00 Rp 6,750.00
0.090 Oh Tukang batu @ Rp 100,000.00 Rp 9,000.00
0.035 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 4,375.00
0.005 Oh Mandor @ Rp 150,000.00 Rp 750.00
Rp 32,521.00
Profit Dan Overhead (15%) Rp 4,878.15
Jumlah Rp 37,399.15

A.4.4.3.44 Memasang 1 M2 lantai karpet


1.050 M2 karpet KW 1 @ Rp 350,000.00 Rp 367,500.00
0.350 Kg lem karpet @ Rp 25,000.00 Rp 8,750.00
0.170 Oh Pekerja @ Rp 75,000.00 Rp 12,750.00
0.170 Oh Tukang batu @ Rp 100,000.00 Rp 17,000.00
0.017 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 2,125.00
0.009 Oh Mandor @ Rp 150,000.00 Rp 1,350.00
Rp 409,475.00
Profit Dan Overhead (15%) Rp 61,421.25
Jumlah Rp 470,896.25

A.4.4.3.45 Memasang 1 M2 lantai underlayer


1.050 M2 Underlayer/rubber corrugate @ Rp 75,000.00 Rp 78,750.00
0.350 Kg lem karpet @ Rp 25,000.00 Rp 8,750.00
0.120 Oh Pekerja @ Rp 75,000.00 Rp 9,000.00
0.120 Oh Tukang batu @ Rp 100,000.00 Rp 12,000.00
0.012 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 1,500.00
0.006 Oh Mandor @ Rp 150,000.00 Rp 900.00
Rp 110,900.00
Profit Dan Overhead (15%) Rp 16,635.00
Jumlah Rp 127,535.00

A.4.4.3.46 Memasang 1 M2 lantai Parquet Kayu


1.050 M2 Parquet Kayu Grade A Type Flooring UV Coating @ Rp 450,000.00 Rp 472,500.00
0.600 Kg lem Kayu @ Rp 25,000.00 Rp 15,000.00
0.700 Oh Pekerja @ Rp 75,000.00 Rp 52,500.00
0.350 Oh Tukang batu @ Rp 100,000.00 Rp 35,000.00
0.035 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 4,375.00
0.035 Oh Mandor @ Rp 150,000.00 Rp 5,250.00
Rp 584,625.00
Profit Dan Overhead (15%) Rp 87,693.75
Jumlah Rp 672,318.75

A.4.4.3.63 - SPL Memasang 1 M' Plint Kayu Tebal 2 Cm, Lebar 10 Cm


1.100 m' Plint Kayu, Lbr 10 Cm Ex. Pabrikasi @ Rp 55,000.00 Rp 60,500.00
0.050 Kg Paku biasa 2" - 5" @ Rp 17,500.00 Rp 875.00
0.120 Oh Pekerja @ Rp 75,000.00 Rp 9,000.00
0.120 Oh Tukang batu @ Rp 100,000.00 Rp 12,000.00
0.012 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 1,500.00
0.006 Oh Mandor @ Rp 150,000.00 Rp 900.00
Rp 84,775.00
Profit Dan Overhead (15%) Rp 12,716.25
Jumlah Rp 97,491.25

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


A.4.7.1.4 Mengecat 1 M2 bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
0.200 Kg Cat meni @ Rp 16,375.00 Rp 3,275.00
0.150 Kg Dempul @ Rp 31,000.00 Rp 4,650.00
0.170 Kg Cat dasar @ Rp 19,000.00 Rp 3,230.00
0.260 Kg Cat kayu @ Rp 56,373.00 Rp 14,656.98
0.010 Bh Kuas @ Rp 35,000.00 Rp 350.00
0.030 Kg Minyak Cat @ Rp 10,000.00 Rp 300.00
0.200 Lbr Kertas amplas @ Rp 6,500.00 Rp 1,300.00
0.070 Oh Pekerja @ Rp 75,000.00 Rp 5,250.00
0.009 Oh Tukang cat @ Rp 100,000.00 Rp 900.00
0.006 Oh Kepala Tukang Cat @ Rp 125,000.00 Rp 750.00
0.003 Oh Mandor @ Rp 150,000.00 Rp 450.00
Rp 35,111.98
Profit Dan Overhead (15%) Rp 5,266.80
Jumlah Rp 40,378.78

SPL Melabur 1 M2 bidang Batu Alam dengan Coating


0.360 Ltr Coating @ Rp 55,000.00 Rp 19,800.00
0.040 Oh Pekerja @ Rp 75,000.00 Rp 3,000.00
0.063 Oh Tukang cat @ Rp 100,000.00 Rp 6,300.00
0.063 Oh Kepala Tukang Cat @ Rp 125,000.00 Rp 7,875.00
0.003 Oh Mandor @ Rp 150,000.00 Rp 450.00
Rp 37,425.00
Profit Dan Overhead (15%) Rp 5,613.75
Jumlah Rp 43,038.75

A.4.7.1.10 Mengecat 1 M2 tembok baru (1 lapis plamir, 1 lapis cat dasar, dan 2 lapis cat penutup)
0.100 Kg Plamur tembok @ Rp 27,500.00 Rp 2,750.00
0.100 Kg Cat dasar @ Rp 19,000.00 Rp 1,900.00
0.260 Kg Cat tembok Kw. 1 @ Rp 63,400.00 Rp 16,484.00
0.020 Oh Pekerja @ Rp 75,000.00 Rp 1,500.00
0.063 Oh Tukang cat @ Rp 100,000.00 Rp 6,300.00
0.0063 Oh Kepala Tukang Cat @ Rp 125,000.00 Rp 787.50
0.003 Oh Mandor @ Rp 150,000.00 Rp 450.00
Rp 30,171.50
Profit Dan Overhead (15%) Rp 4,525.73
Jumlah Rp 34,697.23

A.4.7.1.10 - SPL Mengecat 1 M2 tembok baru (1 lapis plamir, 1 lapis cat dasar, dan 2 lapis cat penutup), (Eksterior)
0.100 Kg Plamur tembok @ Rp 27,500.00 Rp 2,750.00
0.100 Kg Cat dasar @ Rp 19,000.00 Rp 1,900.00
0.260 Kg Cat tembok Kw. 1 (Exterior) @ Rp 73,400.00 Rp 19,084.00
0.020 Oh Pekerja @ Rp 75,000.00 Rp 1,500.00
0.063 Oh Tukang cat @ Rp 100,000.00 Rp 6,300.00
0.0063 Oh Kepala Tukang Cat @ Rp 125,000.00 Rp 787.50
0.003 Oh Mandor @ Rp 150,000.00 Rp 450.00
Rp 32,771.50
Profit Dan Overhead (15%) Rp 4,915.73
Jumlah Rp 37,687.23

A.4.7.1.19 Mengecat 1 M2 permukaan baja lapis seng (galbani) secara manual sistem 1 lapis
cat mutakhir dengan tebal 200 µm
0.300 Kg Cat Zincromate @ Rp 40,000.00 Rp 12,000.00
0.010 Bh Kuas @ Rp 35,000.00 Rp 350.00
0.010 Kg Minyak Cat @ Rp 10,000.00 Rp 100.00
0.060 Oh Pekerja @ Rp 75,000.00 Rp 4,500.00
0.060 Oh Tukang cat @ Rp 100,000.00 Rp 6,000.00
0.012 Oh Kepala Tukang Cat @ Rp 125,000.00 Rp 1,500.00
0.003 Oh Mandor @ Rp 150,000.00 Rp 450.00
Rp 24,900.00
Profit Dan Overhead (15%) Rp 3,735.00
Jumlah Rp 28,635.00

A.4.7.1.21 Mengecat 1 M2 permukaan baja lapis seng (galbani) secara semprot manual sistem 3 lapis
(airless spray) dengan sistem 1 lapis cat mutakhir dengan tebal 200 µm
0.300 Kg Cat Zincromate @ Rp 40,000.00 Rp 12,000.00
0.400 Oh Pekerja @ Rp 75,000.00 Rp 30,000.00
0.700 Oh Tukang cat @ Rp 100,000.00 Rp 70,000.00
0.200 Oh Kepala Tukang Cat @ Rp 125,000.00 Rp 25,000.00
0.200 Oh Mandor @ Rp 150,000.00 Rp 30,000.00
Rp 167,000.00
Profit Dan Overhead (15%) Rp 25,050.00
Jumlah Rp 192,050.00

A.4.7.1.11 Mengecat 1 M2 tembok lama (1 lapis cat dasar, dan 2 lapis cat penutup),
0.120 Kg Cat dasar @ Rp 19,000.00 Rp 2,280.00
0.180 Kg Cat tembok Kw. 1 @ Rp 63,400.00 Rp 11,412.00
0.028 Oh Pekerja @ Rp 75,000.00 Rp 2,100.00
0.042 Oh Tukang cat @ Rp 100,000.00 Rp 4,200.00
0.0042 Oh Kepala Tukang Cat @ Rp 125,000.00 Rp 525.00
0.0030 Oh Mandor @ Rp 150,000.00 Rp 450.00
Rp 20,967.00
Profit Dan Overhead (15%) Rp 3,145.05
Jumlah Rp 24,112.05

SPL Pengecatan 1 m2 Waterproofing System Coating


1.000 Kg Waterproofing Coating @ Rp 82,500.00 Rp 82,500.00
0.125 Oh Tukang cat @ Rp 100,000.00 Rp 12,500.00
0.025 Oh Kepala Tukang Cat @ Rp 125,000.00 Rp 3,125.00
0.013 Oh Mandor @ Rp 150,000.00 Rp 1,875.00
Rp 100,000.00
Profit Dan Overhead (15%) Rp 15,000.00
Jumlah Rp 115,000.00

SPL Pengecatan 1 m2 Duco


0.400 Kg Cat Duco @ Rp 94,000.00 Rp 37,600.00
0.750 Kg Dempul Duco @ Rp 49,000.00 Rp 36,750.00
0.800 Ltr Tinner A @ Rp 32,500.00 Rp 26,000.00
2.000 Lbr Kertas amplas @ Rp 6,500.00 Rp 13,000.00
1.000 Ls Alat bantu @ Rp 10,000.00 Rp 10,000.00
0.400 Oh Pekerja @ Rp 75,000.00 Rp 30,000.00
0.400 Oh Tukang cat @ Rp 100,000.00 Rp 40,000.00
0.040 Oh Kepala Tukang Cat @ Rp 125,000.00 Rp 5,000.00
0.004 Oh Mandor @ Rp 150,000.00 Rp 600.00
Rp 198,950.00
Profit Dan Overhead (15%) Rp 29,842.50
Jumlah Rp 228,792.50

SPL Mengecat 1 M2 Lantai Lapangan Acrylic filler coat


0.667 Kg Cat Lapangan Ex-TENIS COURT SEALER TNK-1020 WA @ Rp 65,000.00 Rp 43,355.00
0.067 Kg Pasir silika @ Rp 15,000.00 Rp 1,005.00
0.080 Oh Pekerja @ Rp 75,000.00 Rp 6,000.00
0.126 Oh Tukang cat @ Rp 100,000.00 Rp 12,600.00
0.126 Oh Kepala Tukang Cat @ Rp 125,000.00 Rp 15,750.00
0.005 Oh Mandor @ Rp 150,000.00 Rp 750.00
Rp 79,460.00
Profit Dan Overhead (15%) Rp 11,919.00
Jumlah Rp 91,379.00

SPL Mengecat 1 M2 Lantai Lapangan Top coat


0.667 Kg Cat Lapangan Ex-TENIS COURT SEALER TNK-1000 WA @ Rp 52,000.00 Rp 34,684.00
0.040 Oh Pekerja @ Rp 75,000.00 Rp 3,000.00
0.063 Oh Tukang cat @ Rp 100,000.00 Rp 6,300.00
0.063 Oh Kepala Tukang Cat @ Rp 125,000.00 Rp 7,875.00
0.003 Oh Mandor @ Rp 150,000.00 Rp 375.00
Rp 52,234.00
Profit Dan Overhead (15%) Rp 7,835.10
Jumlah Rp 60,069.10

SPL Mengecat 1 M2 Acrylic Line marking


0.667 Kg Cat Lapangan Ex-TENIS COURT SEALER TNK-1000 WA @ Rp 52,000.00 Rp 34,684.00
0.067 Kg Pasir silika @ Rp 15,000.00 Rp 1,005.00
0.080 Oh Pekerja @ Rp 75,000.00 Rp 6,000.00
0.126 Oh Tukang cat @ Rp 100,000.00 Rp 12,600.00
0.126 Oh Kepala Tukang Cat @ Rp 125,000.00 Rp 15,750.00
0.005 Oh Mandor @ Rp 150,000.00 Rp 750.00
Rp 70,789.00
Profit Dan Overhead (15%) Rp 10,618.35
Jumlah Rp 81,407.35

A.4.7.1.15 Pemasangan 1 M2 Wallpaper


1.200 m² Wallpaper KW. 1 @ Rp 165,000.00 Rp 198,000.00
0.200 Kg Lem kayu @ Rp 25,000.00 Rp 5,000.00
0.020 Oh Pekerja @ Rp 75,000.00 Rp 1,500.00
0.200 Oh Tukang cat @ Rp 100,000.00 Rp 20,000.00
0.0200 Oh Kepala Tukang Cat @ Rp 125,000.00 Rp 2,500.00
0.0025 Oh Mandor @ Rp 150,000.00 Rp 375.00
Rp 227,375.00
Profit Dan Overhead (15%) Rp 34,106.25
Jumlah Rp 261,481.25

AN - L PEKERJAAN LISTRIK

SPL - 01 Mengerjakan 1 Titik Instalasi Penerangan


10.000 M' Kabel NYM (2x2,5) mm @ Rp 8,000.00 Rp 80,000.00
4.000 Bh Klem Kabel No. 10 @ Rp 5,000.00 Rp 20,000.00
1.000 Bh Pipa Instalasi Listrik Ø 5/8" - 4m @ Rp 15,500.00 Rp 15,500.00
1.000 Bh Inbow Dos @ Rp 3,500.00 Rp 3,500.00
4.000 Bh Las Dop @ Rp 3,450.00 Rp 13,800.00
1.000 Bh Isolasi @ Rp 25,000.00 Rp 25,000.00
1.000 Bh T - Dos 5/8" @ Rp 2,500.00 Rp 2,500.00
0.100 Ls Alat bantu @ Rp 10,000.00 Rp 1,000.00
0.500 Oh Tukang listrik @ Rp 100,000.00 Rp 50,000.00
0.200 Oh Kepala Tukang listrik @ Rp 125,000.00 Rp 25,000.00
Rp 236,300.00
Profit Dan Overhead (15%) Rp 35,445.00
Jumlah Rp 271,745.00

SPL - 02 Mengerjakan 1 Titik Instalasi Stop Kontak


12.000 M' Kabel NYM (3x2,5) mm @ Rp 11,000.00 Rp 132,000.00
3.000 Bh Klem Kabel No. 10 @ Rp 5,000.00 Rp 15,000.00
1.000 Bh Pipa Instalasi Listrik Ø 5/8" - 4m @ Rp 15,500.00 Rp 15,500.00
1.000 Bh Inbow Dos @ Rp 3,500.00 Rp 3,500.00
4.000 Bh Las Dop @ Rp 3,450.00 Rp 13,800.00
1.000 Bh Isolasi @ Rp 25,000.00 Rp 25,000.00
1.000 Bh T - Dos 5/8" @ Rp 2,500.00 Rp 2,500.00
0.100 Ls Alat bantu @ Rp 10,000.00 Rp 1,000.00
0.500 Oh Tukang listrik @ Rp 100,000.00 Rp 50,000.00
0.200 Oh Kepala Tukang listrik @ Rp 125,000.00 Rp 25,000.00
Rp 283,300.00
Profit Dan Overhead (15%) Rp 42,495.00
Jumlah Rp 325,795.00

SPL Mengerjakan 1 M' Instalasi Kabel NYY 2 x 2,5 mm²


1.050 M' Kabel NYY 2x2½ mm @ Rp 15,240.00 Rp 16,002.00
0.100 Lot Acsesoris, Dll (Conector, Sadel, Dll) Rp 1,600.20
0.100 Ls Alat Bantu @ Rp 10,000.00 Rp 1,000.00
0.050 Oh Tukang listrik @ Rp 100,000.00 Rp 5,000.00
0.050 Oh Kepala Tukang listrik @ Rp 125,000.00 Rp 6,250.00
Rp 29,852.20
Profit Dan Overhead (15%) Rp 4,477.83
Jumlah Rp 34,330.03

SPL Mengerjakan 1 M' Instalasi Kabel NYM 2 x 2,5 mm²


1.050 M' Kabel NYM (2x2,5) mm @ Rp 8,000.00 Rp 8,400.00
0.100 Lot Acsesoris, Dll (Conector, Sadel, Dll) Rp 840.00
0.100 Ls Alat Bantu @ Rp 10,000.00 Rp 1,000.00
0.050 Oh Tukang listrik @ Rp 100,000.00 Rp 5,000.00
0.050 Oh Kepala Tukang listrik @ Rp 125,000.00 Rp 6,250.00
Rp 21,490.00
Profit Dan Overhead (15%) Rp 3,223.50
Jumlah Rp 24,713.50
SPL Mengerjakan Pasang MCB 10A
1.000 Bh MCB 10 - 40A/25 kA @ Rp 242,000.00 Rp 242,000.00
0.100 Ls Alat Bantu @ Rp 10,000.00 Rp 1,000.00
0.050 Oh Tukang listrik @ Rp 100,000.00 Rp 5,000.00
0.050 Oh Kepala Tukang listrik @ Rp 125,000.00 Rp 6,250.00
Rp 254,250.00
Profit Dan Overhead (15%) Rp 38,137.50
Jumlah Rp 292,387.50

SPL Memasang 1 M2 Paving Blok (K 225) T=8 cm


1.0100 m2 Paving Blok Mutu (K 225) T=8 cm @ Rp 62,000.00 Rp 62,620.00
0.1000 m3 Pasir Urug @ Rp 100,000.00 Rp 10,000.00
0.2500 Oh Pekerja @ Rp 75,000.00 Rp 18,750.00
0.5000 Oh Tukang Batu @ Rp 100,000.00 Rp 50,000.00
0.0500 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 6,250.00
0.0250 Oh Mandor @ Rp 150,000.00 Rp 3,750.00
Rp 151,370.00
Profit Dan Overhead (15%) Rp 22,705.50
Jumlah Rp 174,075.50

SPL Mengerjakan 1 M' Cansteen Beton Uk. 60 x 30 x 15


0.068 M3 Galian Tanah @ Rp 69,000.00 Rp 4,657.50
0.108 M2 Plesteran Siar/Skoning 1 : 2 @ Rp 62,091.38 Rp 6,705.87
(Harga Diambil Dari Analisa Diatas)
1.830 Bh Cansteen Beton, Uk. 60 x 30 x 15 @ Rp 75,000.00 Rp 137,250.00
0.010 M3 Pasir Urug @ Rp 100,000.00 Rp 1,000.00
0.150 Oh Pekerja @ Rp 75,000.00 Rp 11,250.00
0.120 Oh Tukang Batu @ Rp 100,000.00 Rp 12,000.00
0.012 Oh Kepala Tukang Batu @ Rp 125,000.00 Rp 1,500.00
0.010 Oh Mandor @ Rp 150,000.00 Rp 1,500.00
Rp 175,863.37
Profit Dan Overhead (15%) Rp 26,379.51
Jumlah Rp 202,242.87

SPL Memasang 1 M2 Lapisan Asphalt Dasar/Hotmix Screening, Tbl = 2 Cm


0.0466 Ton Asphalt Hotmix @ Rp 1,827,000.00 Rp 85,174.74
0.2000 Oh Pekerja @ Rp 75,000.00 Rp 15,000.00
0.0200 Oh Mandor @ Rp 150,000.00 Rp 3,000.00
Rp 103,174.74
Profit Dan Overhead (15%) Rp 15,476.21
Jumlah Rp 118,650.95

SPL Memasang 1 M2 Lapisan Asphalt Dasar/Hotmix Sandsheet, Tbl = 1 Cm


0.0233 Ton Asphalt Hotmix @ Rp 1,827,000.00 Rp 42,587.37
0.2000 Oh Pekerja @ Rp 75,000.00 Rp 15,000.00
0.0200 Oh Mandor @ Rp 150,000.00 Rp 3,000.00
Rp 60,587.37
Profit Dan Overhead (15%) Rp 9,088.11
Jumlah Rp 69,675.48
DAFTAR HARGA BAHAN DAN UPAH
Tahun Anggaran 2016
I. HARGA BAHAN

BAHAN BATU, PASIR, CIPPING DAN BATU MERAH SAT HARGA


Batu gunung M3 Rp. 167,000.00
Batu Kali M3 Rp. 184,000.00
Batu belah 7-10 cm M3 Rp. 237,000.00
Batu pecah 5-7 cm M3 Rp. 256,000.00
Batu pecah 3-5 cm M3 Rp. 262,000.00
Batu pecah 1-2 cm M3 Rp. 272,000.00
Batu pecah 0.5-1 cm M3 Rp. 317,000.00
Batu Alam Andesit Biasa M² Rp. 186,000.00
Batu Alam Andesit Susun Sirih M² Rp. 285,000.00
Batu Alam Andesit Halus M² Rp. 185,000.00
Batu Alam Andesit Gelombang M² Rp. 196,000.00
Batu Candi Permukaan Rata M² Rp. 175,000.00
Batu Palimanan Kuning M² Rp. 180,000.00
Batu Hijau Sukabumi M² Rp. 170,000.00
Batu Bali Green M² Rp. 166,000.00
Batu Bali Napoli M² Rp. 185,000.00
Batu Alam Paras Jogja Besar M² Rp. 180,000.00
Batu Cirebon Beraturan M² Rp. 170,000.00
Batu Cirebon Tidak Beraturan M² Rp. 125,000.00
Pasir pasang M3 Rp. 135,000.00
Pasir beton M3 Rp. 148,000.00
Pasir beton (Kg) Kg Rp. 105.71
Pasir urug M3 Rp. 100,000.00
split/chipping 2-3 cm M3 Rp. 267,000.00
split/chipping 2-3 cm(Kg) Kg Rp. 197.78
Tanah Timbunan M3 Rp. 110,000.00
Tanah timbunan (Pilihan) M3 Rp. 120,000.00
Krikil M3 Rp. 277,000.00
Krikil (Kg) Kg Rp. 205.19
Sirtu M3 Rp. 177,000.00
Batu merah Bh Rp. 550.00
Bata Ringan/Hebel (60x20x7.5 s/d 20) M3 Rp. 1,200,000.00
Cansteen Beton, Uk. 60 x 30 x 15 Bh Rp. 75,000.00
Cansteen Beton, Uk. 20 x 25 x 50 Bh Rp. 37,000.00
Air Ltr Rp. 500.00
Kapur Pasangan Zak Rp. 60,000.00
Paving Blok Mutu (K 175) T= 6 cm M² Rp. 55,000.00
Paving Blok Mutu (K 175) T=8 cm M² Rp. 60,000.00
Paving Blok Mutu (K 175) Berlian M² Rp. 51,000.00
Paving Blok Mutu (K 225) T=6 cm M² Rp. 59,000.00
Paving Blok Mutu (K 225) T=8 cm M² Rp. 62,000.00
Paving Blok Mutu (K 300) T=6 cm M² Rp. 60,000.00
Paving Blok Mutu (K 300) T=8 cm M² Rp. 65,000.00
Paving Blok Mutu (K 400) M² Rp. 75,000.00
Topiuskup (K 225) Biji Rp. 4,200.00
Buis Beton Dia. 20 cm Biji Rp. 215,000.00
Buis Beton Dia. 30 cm Biji Rp. 256,000.00
Buis Beton Dia. 40 cm Biji Rp. 326,000.00
Buis Beton Dia. 50 cm Biji Rp. 386,000.00
Buis Beton Dia. 60 cm Biji Rp. 442,000.00
Pasir Silika Kg Rp. 15,000.00

BAHAN SEMEN
Semen PC 40 kg (zak) Zak Rp. 51,000.00
Semen Portland Kg Rp. 1,275.00
Semen Nat Kg Rp. 10,000.00
Semen Putih Zak Rp. 53,000.00
Semen warna Kg Rp. 15,000.00
Semen Prime Mortar / PM 110 (40 kg) Perekat Zak Rp. 75,000.00
Semen Prime Mortar / PM 210 (50 kg) Plesteran Zak Rp. 65,000.00
Semen Prime Mortar / PM 310 (40 kg) Acian Zak Rp. 65,000.00
BAHAN BESI
Besi beton polos Kg Rp. 10,700.00
Besi beton ulir Kg Rp. 12,500.00
Besi Siku L. 50. 50. 5 Kg Rp. 10,000.00
Besi Siku L. 60. 60. 6 Kg Rp. 10,968.78
Besi Siku L. 70. 70. 7 Kg Rp. 10,250.00
Besi Siku L. 30. 30. 3 Btg Rp. 74,400.00
Besi Siku L. 40. 40. 4 Btg Rp. 146,000.00
Besi Siku L. 40. 40. 30 Btg Rp. 65,500.00
Besi Siku L. 50. 50. 4 Btg Rp. 101,000.00
Besi Siku L. 50. 50. 5 Btg Rp. 230,000.00
Besi Siku L. 60. 60. 6 Btg Rp. 301,000.00
Besi Siku L. 70. 70. 7 Btg Rp. 351,000.00
Besi Siku Stainless Steel L. 40. 40. 4 M' Rp. 30,000.00
Besi Siku Stainless Steel L. 50. 50. 5 M' Rp. 42,500.00
Besi Profil Kanal C. 125 x 50 x 20 x 3,2 Kg Rp. 8,836.32
Besi Profil H Beam 400 x 400 x 13 x 21 Kg Rp. 15,000.00
Besi Profil H Beam 300 x 300 x 10 x 15 Kg Rp. 15,000.00
Besi Profil H Beam 200 x 200 x 8 x 12 Kg Rp. 15,000.00
Besi Profil IWF Kg Rp. 12,408.00
Plat Baja T = 10 mm Kg Rp. 22,750.00
Plat Baja T = 8 mm Kg Rp. 15,775.40
Plat Baja T = 5 mm Kg Rp. 16,452.00
Plat Baja T = 2 mm Kg Rp. 16,488.00
Kawat beton Kg Rp. 21,000.00
Kawat Rang 3 x 3 M2 Rp. 28,100.00
Kawat Rang Nyamuk M Rp. 30,000.00
Kawat Rang Stainless Steel 3 x 3 M2 Rp. 37,000.00
Kawat Ayakan Kecil M Rp. 26,000.00
Kawat Duri Roll Rp. 153,000.00
Paku Biasa 1/2" - 1" Kg Rp. 17,500.00
Paku biasa 2" - 5" Kg Rp. 17,500.00
Paku Biasa Kg Rp. 17,500.00
Paku asbes Kg Rp. 45,000.00
Paku Seng (Payung) RRT Dos Rp. 21,000.00
Paku Payung Berulir 75 mm Dos Rp. 35,500.00
Paku Sirap Kg Rp. 20,000.00
Paku beton Putih Dos Rp. 27,500.00
Paku beton Hitam Dos Rp. 43,500.00
Paku pancing Kg Rp. 27,500.00
Paku Sekrup Galvaniz Dia. 3 mm Bj Rp. 600.00
Besi Hollow 20 x 40 x 1.8 mm M Rp. 23,400.00
Besi Hollow 30 x 30 x 1.8 mm M Rp. 22,500.00
Besi Hollow 30 x 30 x 2.3 mm M Rp. 28,600.00
Besi Hollow 40 x 40 x 1.8 mm M Rp. 31,200.00
Besi Hollow 40 x 40 x 2.3 mm M Rp. 33,000.00
Besi Hollow 50 x 50 x 1.8 mm M Rp. 32,812.50
Besi Hollow 50 x 50 x 2.3 mm M Rp. 34,666.67
Besi Hollow 40 x 60 x 2.3 mm M Rp. 36,666.67
Besi Hollow Galvanis 2 x 4 MB, Tbl 0.7 mm M Rp. 7,500.00
Besi Hollow Galvanis 4 x 4 MB, Tbl 0.7 mm M Rp. 10,000.00
Besi Plat 2 mm = 120x240 mm Lbr Rp. 410,000.00
Besi Plat 3 mm = 120x240 mm Lbr Rp. 520,000.00
Besi H 15 cm Panjang 12 m Btg Rp. 4,750,000.00
Besi strip Kg Rp. 12,500.00
Besi Strep 30.3 mm Btg Rp. 34,000.00
Besi Strep 35.4 mm Btg Rp. 55,000.00
Besi Strep 46.4 mm Btg Rp. 105,000.00
Besi Strep 40.6 mm Btg Rp. 75,000.00
Besi Strep 50.6 mm Btg Rp. 130,000.00
Besi Type C (rangka Baja Ringan) Lebar 10 Tebal, 1,8 - 2,00 (6 M) Btg Rp. 138,000.00
Besi Type C (rangka Baja Ringan) Lebar 12,5 Tebal, 1,8 - 2,00 (6 M) Btg Rp. 165,000.00
Besi Type C (rangka Baja Ringan) Lebar 15 Tebal, 1,8 - 2,00 (6 M) Btg Rp. 220,000.00
Main Trus C 75 -80 M Rp. 18,800.00
Main Trus C 75 -60 M Rp. 16,000.00
Roof Bottom/ Reng R 33 -0.45 M Rp. 10,200.00
Screw dia.6 x 20 mm (truss sreew) Bh Rp. 420.00
Screw dia.4 x 20 mm (roof batten screew) Bh Rp. 420.00
Dynabolt dia 12 x 120 mm Bh Rp. 4,200.00
Baut - Baut Bh Rp. 5,100.00
Baut Dia. 16 mm Bh Rp. 15,000.00
Paku sekrup 3,5" Kg Rp. 15,000.00
Paku sekrup 4"-6" Kg Rp. 15,000.00
Paku Sekrup + Mor + Pelapis Bh Rp. 2,500.00
Jarum Pengeras Bh Rp. 275,000.00
Pintu Aluminium, Uk. 70 x 210 Bh Rp. 1,350,000.00
Pintu Aluminium, Uk. 50 x 160 Bh Rp. 750,000.00
List Alluminium strip M Rp. 10,000.00
Alumunium Composite Panel (PVDF), T= 4 mm M2 Rp. 400,000.00
Srews/sekrup Bh Rp. 1,100.00
Besi 6 mm M Rp. 20,000.00

BAHAN PLAPON DAN PARTISI


Multipleks 1.22 x 2.44 x 2 mm Lbr Rp. 52,500.00
Multipleks 1.22 x 2.44 x 3 mm Lbr Rp. 70,000.00
Multipleks 1.22 x 2.44 x 4 mm Lbr Rp. 85,000.00
Multipleks 1.22 x 2.44 x 6 mm Lbr Rp. 98,000.00
Multipleks 1.22 x 2.44 x 9 mm Lbr Rp. 130,000.00
Multipleks 1.22 x 2.44 x 18 mm Lbr Rp. 225,000.00
Tripleks Melamin 1.22x2.44x3mm Lbr Rp. 85,500.00
Gypsumboard 9 mm Lbr Rp. 63,500.00
Gypsumboard Perforated 9 mm, Uk. 1,2 x 2,37 Lbr Rp. 330,000.00
Les Gypsum Lbr Rp. 29,500.00
Lem profil gypsum Kg Rp. 18,000.00
Calsyboard 4 mm Lbr Rp. 70,000.00
Teakwood Uk. 80 x 240 x 4 mm Lbr Rp. 65,000.00
Teakwood Uk. 80 x 244 x 3 mm Lbr Rp. 92,000.00
Teakwood Uk. 122 x 240 x 3 mm Lbr Rp. 96,500.00
Teakwood Uk. 120 x 240 x 3 mm Lbr Rp. 95,230.00
Plywood Uk.80x240 cm Tebal 4 mm Lbr Rp. 85,000.00
Glass Wool DN City 32 kg/m2, Uk. 1.2 x 15 m, T = 5 cm Roll Rp. 515,000.00
RockWool DN City 80 kg/m2, Uk. 1.2 x 0.6 m, T = 5 cm Lbr Rp. 49,500.00
Lambrasering Aluminium L = 20 Cm M2 Rp. 580,000.00
Lambrasering Aluminium L = 12 Cm M2 Rp. 455,000.00
Jalusi Aluminium M2 Rp. 275,000.00
Ramsel nails Bh Rp. 5,000.00
UB 888/400 Compoud Kg Rp. 9,000.00
Isolasi Gypsun Roll Rp. 35,000.00
Eternit 100x100 Set Rp. 18,500.00
Accoustic 40x60 Lbr Rp. 55,500.00
Hard Board 122 x 244 cm Lbr Rp. 77,000.00
Asbes Plat Harfeks 200 x 100 x 0.3 cm Lbr Rp. 48,500.00
List Profil 2 x 3 cm / 4 m M' Rp. 2,875.00
List Profil 3 x 3 cm / 4 m M' Rp. 3,875.00
List Profil 4 x 4 cm / 4 m M' Rp. 4,875.00
List Profil 4 x 5 cm / 4 m M' Rp. 6,375.00
Plint Kayu, Lbr 10 Cm Ex. Pabrikasi M' Rp. 55,000.00

BAHAN KERAMIK
Tegel keramik 60 x 60 cm (Warna) Bh Rp. 58,333.33
Tegel keramik 50 x 50 cm (Warna) Bh Rp. 33,750.00
Tegel keramik 40 x 40 cm (putih) Bh Rp. 9,166.67
Tegel keramik 40 x 40 cm (Warna) Bh Rp. 10,833.33
Tegel keramik 30 x 30 cm (putih) Bh Rp. 4,545.45
Tegel keramik 30 x 30 cm (Warna) Bh Rp. 5,454.55
Tegel keramik 20 x 20 cm (kasar) Bh Rp. 1,920.00
Tegel keramik 20 x 20 cm (putih) Bh Rp. 2,400.00
Tegel keramik 20 x 20 cm (Warna) Bh Rp. 2,600.00
Tegel keramik 20 x 25 cm ( Putih ) Bh Rp. 3,000.00
Tegel keramik 20 x 25 cm ( warna ) Bh Rp. 3,250.00
Tegel keramik 10 x 20 cm (Putih ) Dos Rp. 45,000.00
Tegel keramik 10 x 20 cm ( warna ) Dos Rp. 47,000.00
Tegel keramik 10 x 10 cm ( putih ) Bh Rp. 500.00
Tegel keramik 30 x 50 Cm Bh Rp. 7,428.57
Tegel keramik 25 x 40 Cm Bh Rp. 9,000.00
Tegel keramik Homogenous Tile, Uk. 60 x 60 Cm Bh Rp. 96,700.00
Tegel keramik Homogenous Tile, Uk. 20 x 60 Cm Bh Rp. 46,800.00
Tegel keramik Homogenous Tile, Uk. 80 x 80 Cm (Type Marmaro) Bh Rp. 370,000.00
Tegel keramik 40 x 40 cm Dos Rp. 55,000.00
Tegel keramik 30 x 30 cm impresso Dos Rp. 50,000.00
Tegel keramik 20 x 20 cm kia Dos Rp. 60,000.00
Tegel keramik 20 x 25 cm kia Dos Rp. 65,000.00
Granit Lantai Type Starwhite, t = 2 cm M2 Rp. 420,000.00
Granit Dinding Type Starwhite, t = 2 cm M2 Rp. 420,000.00
Marmer Lantai Ex Ujungpandang, t = 2 cm M2 Rp. 638,000.00
Marmer Dinding Ex Ujungpandang, t = 2 cm M2 Rp. 638,000.00
Plint Granit Type Starwhite, t = 2 cm M Rp. 35,000.00
Plint Keramik 10 x 60 cm (Anti Noda) M Rp. 29,010.00
Plint Keramik 10 x 40 cm M Rp. 4,875.00
Plint Keramik 10 x 30 cm M Rp. 3,272.73
Batu Alam Undersheet M2 Rp. 186,000.00
Koral Sikat Kg Rp. 6,400.00
Parquet Kayu Grade A Type Flooring UV Coating M2 Rp. 450,000.00
Beton Roster Bh Rp. 19,500.00

BAHAN ATAP
Atap Multi Roof Lbr Rp. 87,000.00
Nok Atap Multi Roof Bh Rp. 50,850.00
Genteng Beton Biji Rp. 33,500.00
Genteng keramik Natural Bh Rp. 16,000.00
Genteng Asbes Gelombang 7 Kaki Lbr Rp. 60,000.00
Genteng Harfles (115x85x0.5 cm) Lbr Rp. 63,000.00
Asbes Genteng Lbr Rp. 72,500.00
Karet Pelapis Genteng M2 Rp. 11,600.00
Bubungan Genteng Beton Bh Rp. 35,500.00
Bubungan Genteng Asbes Bh Rp. 55,500.00
Nok genteng keramik Natural Bh Rp. 20,500.00
BuBungan Aluminium SWG 28" -180 cm Lbr Rp. 45,000.00
Bubungan Aluminium SWG 28" -105 cm Lbr Rp. 40,000.00
Nok Steel Gelombang Super - 180 cm Bh Rp. 52,500.00
Nok Steel Gelombang Mini - 105 cm Bh Rp. 41,500.00
Nok Steel Gelombang Ekonomi - 95 cm Bh Rp. 19,000.00
Nok Steel Rata Super - 180 cm Bh Rp. 30,000.00
Nok Steel Rata Mini - 105 cm Bh Rp. 25,500.00
Nok Steel Rata Ekonomi - 95 cm Bh Rp. 21,000.00
Nok 1/2 Lingkaran Bh Rp. 40,500.00
Karet Pelapis Genteng Uk. 55 M¹ Rp. 9,500.00
Karet Pelapis Genteng Uk. 90 M¹ Rp. 19,000.00
Sirap Ikat Rp. 305,000.00
Atap Bitumen Gel. Acrylic Base (200x95x0.23 cm) Lbr Rp. 173,800.00
Bitumen Listplank Acrylic base (104x34x0.23 cm) Lbr Rp. 101,200.00
Bitumen Nok Acrylic Base (50x104x0.23 cm) Lbr Rp. 101,200.00
Sekrup Atap Bitumen 6,5 cm Bh Rp. 1,200.00
Sekrup Nok Bitumen 6,5 cm Bh Rp. 1,200.00
Bitumen Talang Air Acrylic Base (104x50x0.23 cm) Lbr Rp. 101,200.00
Sekrup Durafit (Ø 0.355 cm - 6.5 cm) Bh Rp. 1,350.00
Atap Genteng Bitumen Uk. 106 x 40 x 0.3 Lbr Rp. 70,000.00
Fiber Glass Gelombang (Transparan) Lbr Rp. 343,000.00
Nok Atap Bitumen Uk. 50 x 90 x 0.3 Lbr Rp. 95,500.00
Long Spandek Type G550 AZ-100 T=0,35 mm M2 Rp. 85,000.00
Long Spandek Type G550 AZ-100 T=0,35 mm (Warna) M2 Rp. 95,000.00
Nok Long Spandek Type G550 AZ-100 T=0.35 mm M' Rp. 61,500.00
Nok Long Spandek Type G550 AZ-100 T=0.35 mm (Warna) M' Rp. 72,500.00
Atap Zincalume Type Flexlok 0.6 mm tct Zincalume M2 Rp. 296,000.00
Nok Atap Zincalume, T = 0.6 mm M' Rp. 137,500.00
Flexlok Clip Pcs Rp. 15,000.00
Aluminium foil/sisalation single type M2 Rp. 5,171.67
Ancor / Seng Pelapis Genteng Rol Rp. 2,500,000.00
Seng Plastik (Fiber) Kaki Rp. 13,500.00
Fiber Semen (Harflex) Super 240x108x0.6 cm Lbr Rp. 79,000.00
Fiber Semen (Harflex) Super 180x108x0.6 cm Lbr Rp. 65,000.00
Fiber Semen (Harflex) Ekonomi 240x92x0.5 cm Lbr Rp. 69,500.00
Fiber Semen (Harflex) Ekonomi 180x92x0.4 cm Lbr Rp. 63,000.00
Fiber Semen (Harflex) Mini 240x105x0.4 cm Lbr Rp. 62,500.00
Fiber Semen (Harflex) Mini 180x92x0.5 cm Lbr Rp. 71,000.00
Fiber Semen (Harflex) Super 240x105x0.4 cm Lbr Rp. 66,500.00
Fiber Semen (Harflex) Super 180x105x0.4 cm Lbr Rp. 69,000.00

BAHAN SENG/ALUMINIUM
Seng plat BJLS 0.30 Lbr Rp. 65,000.00
Seng plat BJLS 0.35 Lbr Rp. 75,000.00
Seng plat BJLS 0.28 Lbr Rp. 52,800.00
Seng gelombang BWG 34 " BJLS 0.18 mm Kaki Rp. 8,000.00
Seng gelombang BWG 33 " BJLS 0.22 mm Kaki Rp. 10,550.00
Seng gelombang BWG 32 " BJLS 0.30 mm Kaki Rp. 12,500.00
Seng gelombang BWG 28 " BJLS 0.35 mm Kaki Rp. 13,900.00
Seng Super Deck (180x70 cm - 10 Kaki) Kaki Rp. 13,000.00
Seng Aluminium Gelombang SWG 32" 0.27 mm Kaki Rp. 9,500.00
Seng Aluminium Gelombang SWG 30" 0.31 mm Kaki Rp. 12,000.00
Seng Aluminium Gelombang SWG 28" 0.38 mm Kaki Rp. 13,000.00
Kusen Aluminium Warna 4" x 1 3/4" (Coating) M' Rp. 130,000.00
Bingkai Pintu Aluminium Warna 4" x 1 1/2" (Coating) M' Rp. 110,000.00
Bingkai Pintu / Rangka Partisi Aluminium Warna 3" x 1 1/2" (Coating) M' Rp. 100,000.00
Bingkai Jendela Aluminium Warna (2"x1") (Coating) M' Rp. 90,000.00
Cubical Toilet 12 mm Laminated (Harga Terpasang) M' Rp. 3,750,000.00

BAHAN KAYU
Kayu klas I (balok) untuk kuda-kuda M3 Rp. 8,550,000.00
Kayu klas I (Papan) M3 Rp. 8,650,000.00
Kayu klas II (balok) M3 Rp. 4,550,000.00
Kayu klas II (papan) M3 Rp. 4,850,000.00
Kayu klas III (balok) M3 Rp. 2,800,000.00
Kayu klas III (papan) M3 Rp. 3,275,000.00
Kayu klas I (papan) listplank dan pintu/jendela M3 Rp. 10,050,000.00
Dolken kayu Ø8-10/400 cm Btg Rp. 25,000.00
Kayu klas I (balok) untuk kosen pintu/jendela M3 Rp. 9,550,000.00
HPL Uk. 120 x 240 Lbr Rp. 425,000.00
Woodplank T. 8 x 200 x 4000 mm Lbr Rp. 105,000.00

BAHAN KUNCI, ENGSEL, GRENDEL DAN HAK ANGIN


Kunci tanam biasa (2 x Slag) Bh Rp. 307,000.00
Kunci tanam biasa (1 x Slag) Bh Rp. 173,000.00
Kunci tanam silinder Bh Rp. 350,000.00
Kunci selot Bh Rp. 500,000.00
Kunci selot biasa Bh Rp. 225,000.00
Kunci tanam biasa Bh Rp. 173,000.00
Flooring engsel Psg Rp. 900,000.00
Engsel pintu Kw.1 Bh Rp. 35,500.00
Engsel jendela Kw.1 Bh Rp. 26,000.00
Engsel Angin/Casement 12" Bh Rp. 60,000.00
Grendel jendela Kw.1 Besar Bh Rp. 17,500.00
Grendel jendela Kw.1 Kecil Bh Rp. 13,500.00
Hak Angin Besar Bh Rp. 15,500.00
Hak Angin Kecil Bh Rp. 10,500.00
Grendel tanam Bh Rp. 150,000.00
Door closer/espanyolet Bh Rp. 125,000.00
Door Holder Bh Rp. 150,000.00
Door stop Bh Rp. 75,000.00

BAHAN KACA
Kaca bening 3 mm M2 Rp. 100,000.00
Kaca bening 5 mm M2 Rp. 125,000.00
Kaca buram 3 mm M2 Rp. 100,000.00
Kaca buram 5 mm M2 Rp. 110,000.00
Kaca Ryben 3 mm M2 Rp. 150,000.00
Kaca Ryben 5mm M2 Rp. 175,000.00
Kaca Stopsol Laminated 8 mm M2 Rp. 667,700.00
Kaca nako lengkap teralis set Rp. 350,000.00
Kaca Tempered 10 mm Flat Laminated M2 Rp. 1,270,000.00
Pintu Kaca Tempered 12 mm Flat Laminated M2 Rp. 1,622,000.00
Karet List Kaca M' Rp. 2,500.00

BAHAN CAT
Cat tembok Kw. 1 Kg Rp. 63,400.00
Cat tembok Kw. 1 (Exterior) Kg Rp. 73,400.00
Cat tembok Kw. 2 Kg Rp. 18,000.00
Cat tembok Dasar Kg Rp. 12,000.00
Cat tembok Kilap Kg Rp. 18,000.00
Cat Dasar Atap Kg Rp. 30,000.00
Cat Kilap Atap Ltr Rp. 90,000.00
Lem Seng Ltr Rp. 13,000.00
Amplas / Kertas Gosok M Rp. 12,000.00
Cat Seng Kg Rp. 78,000.00
Cat kayu Kg Rp. 56,373.00
Cat Besi Kg Rp. 68,000.00
Minyak bekisting Ltr Rp. 7,500.00
Cat meni Kg Rp. 16,375.00
Plamur tembok Kg Rp. 27,500.00
Lem kayu Kg Rp. 25,000.00
Lem Kayu Kuning Kg Rp. 35,000.00
Residu Ltr Rp. 6,400.00
Kertas amplas Lbr Rp. 6,500.00
Dempul Kg Rp. 31,000.00
Minyak cat Kg Rp. 10,000.00
Cat dasar Kg Rp. 19,000.00
Cat dasar Kayu Kg Rp. 20,000.00
Cat Kilap Kayu Ltr Rp. 61,000.00
Palatone Ltr Rp. 50,500.00
ICI Kg Rp. 75,500.00
Politur Kg Rp. 51,000.00
Minyak cat Ltr Rp. 10,000.00
Cat Lapangan Ex-TENIS COURT SEALER TNK-1000 WA Kg Rp. 52,000.00
Cat Lapangan Ex-TENIS COURT SEALER TNK-1020 WA Kg Rp. 65,000.00
Waterproofing Coating Ltr Rp. 82,500.00
Cat Zincromate Kg Rp. 40,000.00
Cat Epoxy Kg Rp. 65,600.00
Coating Ltr Rp. 55,000.00
Cat Duco Kg Rp. 94,000.00
Dempul Duco Kg Rp. 49,000.00
Tinner A Ltr Rp. 32,500.00

BAHAN SANITASI
Closet duduk Lengkap Bh Rp. 2,000,000.00
Bath tub + Acs Bh Rp. 8,500,000.00
Closet jongkok Bh Rp. 230,000.00
Urinoir Type U57, Lengkap Bh Rp. 1,500,000.00
Wastafel Keramik Bh Rp. 475,000.00
Wastafel Cuci Piring Logam Bh Rp. 451,000.00
Roof drain Bh Rp. 250,000.00
Floor drain Stainlees Bh Rp. 65,000.00
Seal tape Bh Rp. 5,000.00
Kran air Biasa 1/2" - 3/4" Bh Rp. 20,000.00
Kran air ganda 1/2" - 3/4" Bh Rp. 250,000.00
Kran Shower Bh Rp. 75,000.00
Shower + Acc Set Rp. 275,000.00
Stop kran Bh Rp. 75,000.00
Washbasin stainless stel Bh Rp. 451,000.00
Waterdrain + Accesoriss Bh Rp. 65,000.00
Reservoir stainless steel Kap. 1 M3 Bh Rp. 3,400,000.00
Tempat Sabun Dinding Bh Rp. 100,000.00
Saringan got Bh Rp. 50,000.00
Pompa Mesin Bh Rp. 1,800,000.00
Bak Mandi Fiber Bh Rp. 755,000.00
Reservoir Fiber Kap. 1 M3 Bh Rp. 1,255,000.00

BAHAN PIPA
Pipa PVC AW Dia. 15 mm (1/2'') M' Rp. 3,750.00
Pipa PVC AW Dia. 20 mm (3/4'') M' Rp. 5,333.33
Pipa PVC AW Dia. 25 mm (1'') M' Rp. 7,333.33
Pipa PVC AW Dia. 32 mm (1 1/4'') M' Rp. 15,833.33
Pipa PVC AW Dia. 40 mm (1 1/2'') M' Rp. 17,115.00
Pipa PVC AW Dia. 50 mm (2'') M' Rp. 21,750.00
Pipa PVC AW Dia. 65 mm (2 1/2'') M' Rp. 31,133.33
Pipa PVC AW Dia. 80 mm (3'') M' Rp. 22,566.67
Pipa PVC AW Dia. 100 mm (4'') M' Rp. 66,666.67
Pipa PVC AW Dia. 150 mm (6'') M' Rp. 142,616.67
Pipa PVC AW Dia. 200 mm (8'') M' Rp. 234,166.67
Pipa PVC AW Dia. 250 mm (10'') M' Rp. 372,041.67
Pipa PVC Type D, Dia. 250 mm (10'') M' Rp. 615,250.00
Pipa PVC Type D, Dia. 150 mm (6'') M' Rp. 252,750.00
Pipa PVC Type D, Dia. 125 mm (5') M' Rp. 191,125.00
Pipa PVC Type D, Dia. 100 mm (4'') M' Rp. 118,250.00
Pipa PVC Type D, Dia. 80 mm (3'') M' Rp. 78,750.00
Pipa PVC Type D, Dia. 65 mm (2 1/2'') M' Rp. 55,000.00
Pipa PVC Type D, Dia. 50 mm (2'') M' Rp. 38,125.00
Pipa PVC Type D, Dia. 40 mm (1 1/2'') M' Rp. 24,125.00
Pipa PVC Type D, Dia. 25 mm (1'') M' Rp. 8,375.00
Pipa PVC Type D, Dia. 20 mm (3/4'') M' Rp. 6,875.00
Pipa PVC Type D, Dia. 15 mm (1/2'') M' Rp. 5,625.00
Pipa PVC Air Panas 1/2'' M' Rp. 54,600.00
Pipa GIP Medium Class Dia. 100 mm (4") M' Rp. 319,800.00
Pipa GIP Medium Class Dia. 80 mm (3") M' Rp. 191,666.67
Pipa GIP Medium Class Dia. 65 mm (2 1/2") M' Rp. 150,000.00
Pipa GIP Medium Class Dia. 50 mm (2") M' Rp. 91,666.67
Pipa GIP Medium Class Dia. 40 mm (1 1/2") M' Rp. 140,500.00
Pipa GIP Medium Class Dia. 32 mm (1 1/4") M' Rp. 76,444.00
Pipa GIP Medium Class Dia. 25 mm (1") M' Rp. 42,083.33
Pipa GIP Medium Class Dia. 20 mm (3/4") M' Rp. 20,000.00
Pipa GIP Medium Class Dia. 15 mm (1/2") M' Rp. 21,416.67
Pipa BS Medium Class Dia. 150 mm (6") M' Rp. 296,666.67
Pipa BS Medium Class Dia. 100 mm (4") M' Rp. 185,833.33
Pipa BS Medium Class Dia. 80 mm (3") M' Rp. 128,000.00
Pipa BS Medium Class Dia. 65 mm (2 1/2") M' Rp. 99,166.67
Pipa BS Medium Class Dia. 50 mm (2") M' Rp. 77,500.00
Pipa BS Medium Class Dia. 40 mm (1 1/2") M' Rp. 57,500.00
Pipa BS Medium Class Dia. 32 mm (1 1/4") M' Rp. 49,666.67
Pipa BS Medium Class Dia. 25 mm (1") M' Rp. 37,500.00
Pipa Stainless Steel, Dia. 2" M' Rp. 102,500.00
Pipa Stainless Steel, Dia. 3" M' Rp. 170,000.00
Pipa Stainless Steel, Dia. 4" M' Rp. 245,000.00
Lem pipa Klg Rp. 37,500.00
BAHAN LISTRIK
Lampu Pijar 40 Watt Bh Rp. 56,000.00
Lampu Pijar 15 Watt Bh Rp. 5,000.00
Lampu Pijar 25 Watt Bh Rp. 32,000.00
Lampu Pijar 60 Watt Bh Rp. 106,000.00
Lampu Pijar 100 Watt Bh Rp. 188,000.00
Lampu Downlight DL PLC 9 Watt Bh Rp. 160,000.00
Lampu Downlight DL PLC 18 Watt Bh Rp. 255,000.00
Lampu RMI 2 x 40 Watt, Tutup Metal Louvre Lengkap Set Rp. 675,000.00
Lampu TL 1 x 40 Watt Bh Rp. 117,000.00
Lampu TL 2 x 40 Watt Bh Rp. 150,000.00
Lampu TL 1 x 20 Watt Bh Rp. 94,000.00
Lampu TL 2 x 20 Watt Bh Rp. 123,000.00
Lampu SL-E 9 Watt Bh Rp. 27,500.00
Lampu SL-E 15 Watt Bh Rp. 35,000.00
Lampu SL-E 18 Watt Set Rp. 38,000.00
Lampu SL-E 23 Watt Bh Rp. 45,000.00
Lampu Hias Set Rp. 3,850,000.00
Lampu Taman Mercury Bh Rp. 354,000.00
Ceiling Fan For Lavatory/Wc Set Rp. 325,000.00
Stop Kontak Kw. 1 16A Putih Bh Rp. 28,000.00
Stop Kontak Kw. 1 16A Hitam Bh Rp. 26,000.00
Stop Kontak AC Kw. 1 c/w Fuse Bh Rp. 75,000.00
Saklar Tunggal Kw. 1 Putih Bh Rp. 23,000.00
Saklar Tunggal Kw. 1 Hitam Bh Rp. 18,000.00
Saklar Ganda Kw. 1 Putih Bh Rp. 28,000.00
Saklar Ganda Kw. 1 Hitam Bh Rp. 21,000.00
Klem Kabel No. 10 Bh Rp. 5,000.00
Pipa Instalasi Listrik Ø 5/8" - 4m Btg Rp. 15,500.00
Pipa Instalasi Listrik Ø ¾" - 4m Btg Rp. 25,500.00
Pipa Instalasi Listrik Ø 1" - 4m Btg Rp. 32,500.00
Pipa Instalasi Listrik Ø 1 ½" - 4m Btg Rp. 96,500.00
Inbow Dos Bh Rp. 3,500.00
Las Dop Bh Rp. 3,450.00
Isolasi Bh Rp. 25,000.00
T - Dos 5/8" Bh Rp. 2,500.00
Fitting Bh Rp. 15,500.00
Kabel NYM (2x2,5) mm M' Rp. 8,000.00
Kabel NYM (3x2,5) mm M' Rp. 11,000.00
Kabel NYY (4x6) mm M' Rp. 42,291.00
Kabel NYY (4x10) mm M' Rp. 67,465.00
Kabel NYY 2x1½ mm M' Rp. 12,240.00
Kabel NYY 2x2½ mm M' Rp. 15,240.00
MCB 10 - 40A/25 kA Set Rp. 242,000.00
Alat bantu Ls Rp. 10,000.00

BAHAN LAIN - LAIN


Electroda 6 mm Kg Rp. 65,000.00
Spacer/formite/penjaga jarak bekisting Bh Rp. 7,500.00
Wiremesh M10, Uk. Kotak 15X15 cm, Lbr = 2,1 meter, Pjg = 5,4 m' M2 Rp. 10,500.00
Wiremesh M8, Uk. Kotak 15X15 cm, Lbr = 2,1 meter, Pjg = 5,4 m' M2 Rp. 10,000.00
Bondek Superdyma G550 K18, Tbl 0.75 Tct M2 Rp. 180,000.00
Bambu, Uk. Besar Panjang 4 M Btg Rp. 15,000.00
Bambu, Uk. Besar Btg Rp. 25,000.00
Tali Ijuk Kg Rp. 65,000.00
Sealent Tube Rp. 90,000.00
Sektrup Fixer Bh Rp. 1,850.00
Stiffener Bh Rp. 50,000.00
Bracket steel Galfanized Bh Rp. 75,000.00
Pompa Air Booster (Lengkap Preasure Tank Dan Pengabelan) Unit Rp. 1,900,000.00
Wallpaper KW. 1 M2 Rp. 165,000.00
Karpet KW 1 M2 Rp. 350,000.00
Underlayer/rubber corrugate M2 Rp. 75,000.00
Lem Karpet Kg Rp. 25,000.00
AC Split 1 PK Unit Rp. 5,600,000.00
AC Split 1 1/2 PK Unit Rp. 7,200,000.00
Kabel Tray, 300 mm M' Rp. 250,000.00
Kabel Duct, 20 mm M' Rp. 125,000.00
Kabel Duct, 10 mm M' Rp. 100,000.00
Solar Ltr Rp. 6,900.00
Minyak pelumas Ltr Rp. 28,000.00
Mesin Las Jam Rp. 75,000.00
Sewa Alat Jam Rp. 75,000.00
Gravel M3 Rp. 946,220.00
HCL Ltr Rp. 7,500.00
Pupuk Kandang Kg Rp. 1,000.00
Pupuk Anorganik Kg Rp. 2,600.00
Sekop Bh Rp. 50,000.00
Pacul Bh Rp. 50,000.00
Kuas Bh Rp. 35,000.00
Rumput Gajah Mini + Penanaman M² Rp. 50,000.00
Aspal Kg Rp. 15,000.00
Asphalt Hotmix Ton Rp. 1,827,000.00
II. HARGA UPAH KERJA
Tukang kayu Oh Rp. 100,000.00
Tukang las Oh Rp. 100,000.00
Tukang Pipa Oh Rp. 100,000.00
Tukang gali Oh Rp. 100,000.00
Tukang batu Oh Rp. 100,000.00
Tukang besi Oh Rp. 100,000.00
Tukang cat Oh Rp. 100,000.00
Tukang listrik Oh Rp. 100,000.00
Tukang Taman Oh Rp. 100,000.00
Kepala Tukang Kayu Oh Rp. 125,000.00
Kepala Tukang Batu Oh Rp. 125,000.00
Kepala Tukang Cat Oh Rp. 125,000.00
Kepala Tukang Listrik Oh Rp. 125,000.00
Kepala Tukang Pipa Oh Rp. 125,000.00
Kepala Tukang Besi Oh Rp. 125,000.00
Mandor Oh Rp. 150,000.00
Pekerja Terampil Oh Rp. 75,000.00
Pekerja Oh Rp. 75,000.00
Pekerja Tidak Terampil Oh Rp. 65,000.00
Pembantu Masinis Oh Rp. 80,000.00
Penjaga Gudang Oh Rp. 100,000.00
Penjaga Malam Oh Rp. 100,000.00
REKAPITULASI ANGGARAN BIAYA
PERENCANAAN KONSTRUKSI RENOVASI PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
BP-PAUD DAN DIKMAS PROVINSI SULAWESI SELATAN

PEKERJAAN : REHABILITASI LAPANGAN TENNIS


LOKASI : KOTA MAKASSAR
TAHUN : 2016

NO JENIS PEKERJAAN TOTAL HARGA (Rp.)

I PEKERJAAN PERSIAPAN Rp. 17,327,740.00

II PEKERJAAN LAPANGAN TENNIS


A. PEKERJAAN STRUKTUR LAPANGAN TENNIS Rp. 479,634,175.46
B. PEKERJAAN FINISHING LAPANGAN TENNIS Rp. 563,865,180.98
C. PEKERJAAN SARANA PENDUKUNG LAPANGAN Rp. 57,927,344.24

Real Cost Rp. 1,118,754,440.67


PPN 10 % Rp. 111,875,444.07
Total Jumlah Rp. 1,230,629,884.74
Dibulatkan Rp. 1,230,629,000.00
Terbilang : Satu milyar seratus delapan puluh tiga juta tiga ratus tujuh puluh lima ribu rupiah,-

Makassar,……………………………………..2016

Disetujui/DiKetahui Oleh : Konsultan Perencana :


PEJABAT PEMBUAT KOMITMEN CV. MALLOMO ENGINEERING
(PPK)

Drs. ARMAN AGUNG, M.Pd. SJAMSIR, ST


Nip. 19691011 200112 1 002 Direktur

Mengetahui : Mengetahui :
KABID PENATAAN BANGUNAN DAN LINGKUNGAN KEPALA BALAI BP PAUDNI REGIONAL III
DINAS TATA RUANG DAN PERMUKIMAN
PROVINSI SULAWESI SELATAN

Dr. Ir. H. JUMRAS, M.Si Dr. H. MUHAMMAD HASBI


Nip. 19620707 199203 1 012 Nip. 19730623 199303 1 001
RENCANA ANGGARAN BIAYA (RAB)
PERENCANAAN KONSTRUKSI RENOVASI PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
BP-PAUD DAN DIKMAS PROVINSI SULAWESI SELATAN

PEKERJAAN : REHABILITASI LAPANGAN TENNIS


LOKASI : KOTA MAKASSAR
TAHUN : 2016

NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA

I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran dan pemasangan Bouplank 139.00 m' 124,660.00 17,327,740.00

Jumlah I 17,327,740.00

II PEKERJAAN LAPANGAN TENNIS


A. PEKERJAAN STRUKTUR LAPANGAN TENNIS
1 Pek. Sloef, Uk. 20 x 30 cm
~ Pek. Galian/Bobokan Beton Existing (Plat Lap. Existing) 7.17 m³ 1,264,942.50 9,069,637.73
~ Pek. Urugan Pasir Alas Sloef 3.59 m³ 165,600.00 593,676.00
~ Pek. Lantai Kerja Alas Sloef, Tbl. 5 Cm, K.100 3.59 m³ 934,111.23 3,348,788.76
~ Beton K 225 21.51 m³ 1,182,874.94 25,443,639.97
~ Besi Beton Polos 4,326.38 Kg 14,860.88 64,293,762.66
~ Bekisting 2x Pakai 179.25 m² 174,613.13 31,299,402.66
2 Pek. Plat Beton Lapangan, Tbl = 10 Cm (Pembesian 1 Lapis)
~ Pek. Urugan Pasir Alas Beton Plat 111.53 m³ 165,600.00 18,469,699.20
~ Pek. Lantai Kerja Alas Plat, Tbl. 5 Cm, K.100 57.56 m³ 934,111.23 53,766,041.24
~ Beton K 225 111.53 m³ 1,182,874.94 131,928,407.86
~ Besi Beton Polos 9,516.34 Kg 14,860.88 141,421,119.38

Jumlah II.A 479,634,175.46

B. PEKERJAAN FINISHING LAPANGAN TENNIS


1 Pek. Plesteran Beton Screeding (1pc : 3ps) 1,187.02 m² 62,841.06 74,593,595.04
2 Pek. Acian (saus semen) 1,187.02 m² 36,677.81 43,537,296.99
3 Pek. Lapisan Finishing
a. Pek. Lapisan Finishing Ke - 1
- Lapisan Asphalt Dasar 1/Hotmix Screening, T = 2 Cm 1,187.02 m² 118,650.95 140,841,051.86
- Lapisan Asphalt Dasar 2/Hotmix Sand Sheet, T = 1 Cm 1,187.02 m² 69,675.48 82,706,182.93
- Pemadatan Lapisan Hotmix dengan Wales (4 - 6 Ton) 1,187.02 m² 35,000.00 41,545,700.00
b. Pek. Lapisan Finishing Ke - 2
- Pek. Lapisan Acrylic Filler Coat ACRONAL 1,187.02 m² 91,379.00 108,468,700.58
Specification :
- Acronal Latex Sintetis
- Pasir Silika
c. Pek. Lapisan Finishing Ke - 3
- Top Coat Playing Surface Sekw. Rebound Ace 1,187.02 m² 60,069.10 71,303,223.08
- Areal Permainan Warna Hijau
- Areal Luar Permainan Warna Merah
- Acrylic Line Marking 10.68 m² 81,407.35 869,430.50
Specification :
- Coat Warna Putih, Lebar Garis 5 Cm
- Pasir Silika

Jumlah II.B 563,865,180.98

C. PEKERJAAN SARANA PENDUKUNG LAPANGAN


1 Pek. Pengecatan Dinding Lama 247.10 m² 24,112.05 5,958,087.56
2 Pek. Penambahan Penerangan Lapangan
- Pek. Pas. Lampu Sorot Type HPI - T, 400 Wat 8.00 Bh 1,500,000.00 12,000,000.00
NO URAIAN PEKERJAAN VOL. SAT. HRG. SAT. (Rp.) JML. HARGA
- Pek. Acsesories Penggantung Lampu/Bracket 4.00 Bh 283,000.00 1,132,000.00
- Pek. Kabel Instalasi NYY 3 x 2,5 56.00 m' 34,330.03 1,922,481.68
- MCB Penerangan 2.00 Bh 292,387.50 584,775.00
3 Pek. Perbaikan Saluran Keliling Lapangan Tennis 69.50 m' 150,000.00 10,425,000.00
4 Pek. Grill Besi Penutup Saluran 69.50 m' 350,000.00 24,325,000.00
5 Pek. Penambahan/Perbaikan Tiang Net 4.00 Bh 395,000.00 1,580,000.00
Jumlah II.C 57,927,344.24

Jumlah II (A + B + C) 1,101,426,700.67
DAFTAR HARGA BAHAN DAN UPAH
Tahun Anggaran 2014
I. HARGA BAHAN

BAHAN BATU, PASIR, CIPPING DAN BATU MERAH SAT HARGA


Batu gunung M3 Rp. 167,000.00
Batu Kali M3 Rp. 184,000.00
Batu belah 7/10 M3 Rp. 180,600.00
Batu pecah 5/7 M3 Rp. 221,550.00
Pasir pasang M3 Rp. 135,000.00
Pasir beton M3 Rp. 148,000.00
Pasir beton (Kg) Kg Rp. 105.71
Pasir urug M3 Rp. 100,000.00
split/chipping 2-3 cm M3 Rp. 267,000.00
split/chipping 2-3 cm(Kg) Kg Rp. 197.78
Tanah Timbunan M3 Rp. 110,000.00
Tanah timbunan (Pilihan) M3 Rp. 110,000.00
Krikil M3 Rp. 277,000.00
Krikil (Kg) Kg Rp. 205.19
Sirtu M3 Rp. 177,000.00
Batu merah Bh Rp. 550.00
Cansteen Beton, Uk. 60 x 30 x 15 Bh Rp. 60,000.00
Air Ltr Rp. 100.00
Beton Roster 20,865

BAHAN SEMEN
Semen PC 50kg (zak) Zak Rp. 53,000.00
Semen Portland Kg Rp. 1,275.00
Semen PC 40 kg (zak) Zak Rp. 51,000.00
Semen Nat Kg Rp. 10,000.00
Semen Putih Zak Rp. 53,000.00
Semen warna Kg Rp. 15,750.00

BAHAN BESI
Besi beton polos Kg Rp. 15,015.00
Besi beton ulir Kg Rp. 15,488.00
Besi Siku L. 50. 50. 5 Kg Rp. 10,000.00
Besi Siku L. 60. 60. 6 Kg Rp. 10,968.78
Besi Siku L. 70. 70. 7 Kg Rp. 10,250.00
Besi Profil Kanal C. 125 x 50 x 20 x 3,2 Kg Rp. 8,836.32
Besi Profil H Beam 400 x 400 x 13 x 21 Kg Rp. 15,000.00
Besi Profil H Beam 300 x 300 x 10 x 15 Kg Rp. 15,000.00
Besi Profil H Beam 200 x 200 x 8 x 12 Kg Rp. 15,000.00
Besi Profil IWF Kg Rp. 12,408.00
Plat Baja T = 10 mm Kg Rp. 22,750.00
Plat Baja T = 8 mm Kg Rp. 15,775.40
Plat Baja T = 5 mm Kg Rp. 16,452.00
Plat Baja T = 2 mm Kg Rp. 16,488.00
Kawat beton Kg Rp. 25,252.00
Kawat Rang 3 x 3 M2 Rp. 30,067.00
Paku Biasa 1/2" - 1" Kg Rp. 24,610.00
Paku biasa 2" - 5" Kg Rp. 19,927.00
Paku asbes Kg Rp. 31,030.00
Paku beton Dos Rp. 16,275.00
Paku pancing Kg Rp. 27,500.00
Paku Sekrup Galvaniz Dia. 3 mm Bj Rp. 630.00
Besi Hollow 20 x 40 x 1.8 mm M Rp. 23,400.00
Besi Hollow 30 x 30 x 1.8 mm M Rp. 22,500.00
Besi Hollow 30 x 30 x 2.3 mm M Rp. 28,600.00
Besi Hollow 40 x 40 x 1.8 mm M Rp. 31,200.00
Besi Hollow 40 x 40 x 2.3 mm M Rp. 21,091.67
Besi Hollow 50 x 50 x 1.8 mm M Rp. 32,812.50
Besi Hollow 50 x 50 x 2.3 mm M Rp. 34,666.67
Besi Hollow Galvanis 2 x 4 MB, Tbl 0.8 mm M Rp. 4,524.00
Besi Hollow Galvanis 4 x 4 MB, Tbl 0.8 mm M Rp. 6,738.00
Besi strip Kg Rp. 12,500.00
Baut - Baut Bh Rp. 5,457.00
Baut Dia. 16 mm Bh Rp. 15,000.00
Paku sekrup 3,5" Kg Rp. 15,000.00
Paku sekrup 4"-6" Kg Rp. 15,000.00
Paku Sekrup + Mor + Pelapis Bh Rp. 2,500.00
Jarum Pengeras Bh Rp. 275,000.00
Pintu Aluminium, Uk. 60 x 200 Bh Rp. 1,250,000.00
List Alluminium strip M Rp. 10,000.00
Aluminium Composite Panel M2 Rp. 275,000.00
Srews/sekrup Bh Rp. 1,177.00

BAHAN PLAPON DAN PARTISI


Mulripleks 1.22 x 2.44 x 4 mm Lbr Rp. 67,515.00
Multipleks 1.22 x 2.44 x 6 mm Lbr Rp. 89,880.00
Multipleks 1.22 x 2.44 x 9 mm Lbr Rp. 128,400.00
Gypsumboard 9 mm Lbr Rp. 64,680.00
Calsyboard 4 mm Lbr Rp. 70,000.00
Teakwood Uk. 120x 240 x 3 mm Lbr Rp. 95,230.00
Plywood Uk.80x240 cm Tebal 4 mm Lbr Rp. 85,000.00
Glass Wool DN City 48 kg/m2, Uk. 1.2 x 2.3 m, T = 5 cm Roll Rp. 230,000.00
Lambrasering Aluminium L = 20 Cm M2 Rp. 580,000.00
Lambrasering Aluminium L = 12 Cm M2 Rp. 455,000.00
Jalusi Aluminium M2 Rp. 275,000.00
Ramsel nails Bh Rp. 1,070.00
UB 888/400 Compoud Kg Rp. 9,000.00
Isolasi Gypsun Roll Rp. 35,000.00

BAHAN KERAMIK
Tegel keramik 40 x 40 cm (putih) Bh Rp. 11,564.00
Tegel keramik 40 x 40 cm (Warna) Bh Rp. 9,666.67
Tegel keramik 30 x 30 cm (putih) Bh Rp. 5,679.55
Tegel keramik 30 x 30 cm (Warna) Bh Rp. 4,909.09
Tegel keramik 20 x 20 cm (kasar) Bh Rp. 1,920.00
Tegel keramik 20 x 20 cm (putih) Bh Rp. 2,477.44
Tegel keramik 20 x 25 cm ( warna ) Bh Rp. 3,243.80
Tegel keramik 10 x 10 cm ( putih ) Bh Rp. 500.00
Tegel keramik 30 x 50 Cm Bh Rp. 7,428.57
Tegel keramik Anti noda, T = 1 Cm, 60 x 60 Cm Bh Rp. 62,500.00
Tegel keramik Anti noda, T = 1 Cm, 20 x 60 Cm Bh Rp. 27,010.80
Tegel keramik 40 x 40 cm Dos Rp. 69,384.00
Tegel keramik 30 x 30 cm impresso Dos Rp. 62,475.00
Tegel keramik 20 x 20 cm kia Dos Rp. 61,936.00
Tegel keramik 20 x 25 cm kia Dos Rp. 64,876.00
Granit Lantai Type Starwhite, t = 2 cm M2 Rp. 420,000.00
Granit Dinding Type Starwhite, t = 2 cm M2 Rp. 420,000.00
Marmer Lantai Ex Ujungpandang, t = 2 cm M2 Rp. 638,000.00
Marmer Dinding Ex Ujungpandang, t = 2 cm M2 Rp. 638,000.00
Plint Granit Type Starwhite, t = 2 cm M Rp. 35,000.00
Plint Keramik 10 x 40 cm M Rp. 18,000.00
Batu Alam Undersheet M2 Rp. 190,000.00
Koral Sikat Kg Rp. 4,800.00

BAHAN ATAP
Genteng keramik Natural Bh Rp. 16,170.00
Karet Pelapis Genteng M2 Rp. 12,180.00
Nok genteng keramik Natural Bh Rp. 39,427.50
Atap Genteng Bitumen Uk. 106 x 40 x 0.3 Lbr Rp. 70,000.00
Nok Atap Bitumen Uk. 50 x 90 x 0.3 Lbr Rp. 95,500.00
Long Spandek Type G550 AZ-100 T=0,4 mm, Lbr = 80 Cm M2 Rp. 93,500.00
Nok Long Spandek Type G550 AZ-100 T=0.4 mm M' Rp. 61,500.00
Atap Zincalume Type Flexlok 0.6 mm tct Zincalume M2 Rp. 296,000.00
Nok Atap Zincalume, T = 0.6 mm M' Rp. 137,500.00
Flexlok Clip Pcs Rp. 15,000.00
Rangka Atap Baja Ringan M2 Rp. 180,000.00
Aluminium foil/sisalation single type M2 Rp. 5,533.68
Ancor / Seng Pelapis Genteng Rol Rp. 2,500,000.00

BAHAN SENG/ALUMINIUM
Seng plat BJLS 0.30 Lbr Rp. 62,060.00
Seng plat BJLS 0.28 Lbr Rp. 56,496.00
Seng gelombang BWG 34 " BJLS 0.18 mm Kaki Rp. 8,400.00
Seng gelombang BWG 33 " BJLS 0.22 mm Kaki Rp. 11,078.00
Seng gelombang BWG 32 " BJLS 0.30 mm Kaki Rp. 13,375.00
Seng gelombang BWG 28 " BJLS 0.35 mm Kaki Rp. 14,873.00
Kusen Aluminium Warna 4" x 1 3/4" M' Rp. 130,000.00
Bingkai Pintu Aluminium Warna 4" x 1 1/2" M' Rp. 110,000.00
Bingkai Pintu / Rangka Partisi Aluminium Warna 3" x 1 1/2" M' Rp. 100,000.00
Bingkai Jendela Aluminium Warna (2"x1") M' Rp. 90,000.00
Cubical Toilet 12 mm Laminated (Harga Terpasang) M' Rp. 3,300,000.00

BAHAN KAYU
Kayu klas I (balok) untuk kuda-kuda M3 Rp. 13,755,000.00
Kayu klas II (balok) M3 Rp. 3,265,500.00
Kayu klas II (papan) M3 Rp. 3,969,000.00
Kayu klas III (balok) M3 Rp. 2,189,250.00
Kayu klas III (papan) M3 Rp. 2,291,100.00
Kayu klas I (papan) listplank dan pintu/jendela M3 Rp. 15,750,000.00
Dolken kayu Ø8-10/400 cm Btg Rp. 44,619.00
Kayu klas I (balok) untuk kosen pintu/jendela M3 Rp. 9,240,000.00
HPL Uk. 120 x 240 Lbr Rp. 145,000.00
Woodplank T. 8 x 300 x 4000 mm Lbr Rp. 80,000.00

BAHAN KUNCI, ENGSEL, GRENDEL DAN HAK ANGIN


Kunci tanam biasa (2 x Slag) Bh Rp. 214,000.00
Kunci tanam silinder Bh Rp. 350,000.00
Kunci selot Bh Rp. 500,000.00
Kunci selot biasa Bh Rp. 225,000.00
Kunci tanam biasa Bh Rp. 160,500.00
Flooring engsel Psg Rp. 900,000.00
Engsel pintu Kw.1 Bh Rp. 35,310.00
Engsel jendela Kw.1 Bh Rp. 31,779.00
Grendel jendela Kw.1 Bh Rp. 9,345.00
Kait angin Bh Rp. 20,000.00
Grendel tanam Bh Rp. 107,000.00
Door closer/espanyolet Bh Rp. 107,000.00
Door Holder Bh Rp. 150,000.00
Door stop Bh Rp. 75,000.00

BAHAN KACA
Kaca bening 3 mm M2 Rp. 114,555.00
Kaca bening 5 mm M2 Rp. 129,045.00
Kaca buram 5 mm M2 Rp. 110,000.00
Kaca Ryben 5mm M2 Rp. 139,755.00
Kaca Stopsol Laminated 8 mm M2 Rp. 667,700.00
Kaca nako lengkap teralis set Rp. 350,000.00
Pintu Kaca Tempered 12 mm M2 Rp. 1,506,750.00
Karet List Kaca M' Rp. 2,500.00

BAHAN CAT
Cat tembok Kw. 1 Kg Rp. 60,060.00
Cat tembok Kw. 1 (Exterior) Kg Rp. 60,060.00
Cat tembok Kw. 2 Kg Rp. 22,638.00
Cat Seng Kg Rp. 78,000.00
Cat kayu Kg Rp. 59,192.00
Cat Besi Kg Rp. 71,400.00
Minyak bekisting Ltr Rp. 7,500.00
Cat meni Kg Rp. 23,063.00
Plamur tembok Kg Rp. 11,697.00
Lem kayu Kg Rp. 17,120.00
Residu Ltr Rp. 6,400.00
Kertas amplas Lbr Rp. 3,675.00
Dempul Kg Rp. 24,610.00
Minyak cat Kg Rp. 30,608.00
Cat dasar Kg Rp. 19,000.00
Cat dasar Kayu Kg Rp. 56,000.00
Cat Waterproofing Ltr Rp. 75,000.00
Cat Zincromate Kg Rp. 40,000.00
Cat Epoxy Kg Rp. 65,600.00
Coating Ltr Rp. 55,000.00

BAHAN SANITASI
Closet duduk Lengkap Bh Rp. 1,617,000.00
Bath tub + Acs Bh Rp. 8,500,000.00
Closet jongkok Bh Rp. 224,700.00
Urinoir Type U57, Lengkap Bh Rp. 508,200.00
Wastafel Keramik Bh Rp. 472,500.00
Roof drain Bh Rp. 125,000.00
Floor drain Stainlees Bh Rp. 28,890.00
Seal tape Bh Rp. 5,350.00
Kran air Biasa 1/2" - 3/4" Bh Rp. 20,330.00
Kran air ganda 1/2" - 3/4" Bh Rp. 150,000.00
Kran Shower Bh Rp. 75,000.00
Shower + Acc Set Rp. 275,000.00
Stop kran Bh Rp. 72,332.00
Washbasin stainless stel Bh Rp. 529,650.00
Waterdrain + Accesoriss Bh Rp. 65,000.00
Reservoir stainless steel Kap. 1 M3 Bh Rp. 3,562,500.00
Tempat Sabun Dinding Bh Rp. 100,000.00
Saringan got Bh Rp. 50,000.00
Pintu PVC Bh Rp. 550,000.00

BAHAN PIPA
Pipa PVC AW Dia. 15 mm (1/2'') M' Rp. 8,346.00
Pipa PVC AW Dia. 20 mm (3/4'') M' Rp. 10,165.00
Pipa PVC AW Dia. 25 mm (1'') M' Rp. 12,600.00
Pipa PVC AW Dia. 32 mm (1 1/4'') M' Rp. 13,333.33
Pipa PVC AW Dia. 40 mm (1 1/2'') M' Rp. 12,810.00
Pipa PVC AW Dia. 50 mm (2'') M' Rp. 14,385.00
Pipa PVC AW Dia. 65 mm (2 1/2'') M' Rp. 17,378.00
Pipa PVC AW Dia. 80 mm (3'') M' Rp. 21,919.00
Pipa PVC AW Dia. 100 mm (4'') M' Rp. 38,115.00
Pipa PVC AW Dia. 200 mm (8'') M' Rp. 265,650.00
Pipa PVC Type D, Dia. 150 mm (6'') M' Rp. 252,750.00
Pipa PVC Type D, Dia. 100 mm (4'') M' Rp. 118,250.00
Pipa PVC Type D, Dia. 80 mm (3'') M' Rp. 78,750.00
Pipa PVC Type D, Dia. 65 mm (2 1/2'') M' Rp. 55,000.00
Pipa PVC Type D, Dia. 50 mm (2'') M' Rp. 38,125.00
Pipa PVC Air Panas 1/2'' M' Rp. 54,600.00
Pipa GIP Medium Class Dia. 100 mm (4") M' Rp. 342,186.00
Pipa GIP Medium Class Dia. 80 mm (3") M' Rp. 277,200.00
Pipa GIP Medium Class Dia. 65 mm (2 1/2") M' Rp. 187,250.00
Pipa GIP Medium Class Dia. 50 mm (2") M' Rp. 178,500.00
Pipa GIP Medium Class Dia. 40 mm (1 1/2") M' Rp. 150,335.00
Pipa GIP Medium Class Dia. 32 mm (1 1/4") M' Rp. 76,444.00
Pipa GIP Medium Class Dia. 25 mm (1") M' Rp. 89,613.00
Pipa GIP Medium Class Dia. 20 mm (3/4") M' Rp. 47,793.00
Pipa GIP Medium Class Dia. 15 mm (1/2") M' Rp. 35,809.00
Pipa BS Medium Class Dia. 150 mm (6") M' Rp. 295,375.00
Pipa BS Medium Class Dia. 100 mm (4") M' Rp. 182,875.00
Pipa BS Medium Class Dia. 80 mm (3") M' Rp. 131,125.00
Pipa BS Medium Class Dia. 65 mm (2 1/2") M' Rp. 113,925.00
Pipa BS Medium Class Dia. 50 mm (2") M' Rp. 83,875.00
Pipa BS Medium Class Dia. 40 mm (1 1/2") M' Rp. 63,166.67
Pipa BS Medium Class Dia. 32 mm (1 1/4") M' Rp. 54,950.00
Pipa BS Medium Class Dia. 25 mm (1") M' Rp. 42,666.67
Pipa Black Steel Pipe STK 41-JLS. G-3444, Ø 7" M' Rp. 418,916.67
Pipa Black Steel Pipe STK 41-JLS. G-3444, Ø 7" (Kg) Kg Rp. 17,310.61
Pipa Black Steel Pipe STK 41-JLS. G-3444, Ø 6" M' Rp. 357,500.00
Pipa Black Steel Pipe STK 41-JLS. G-3444, Ø 6" (Kg) Kg Rp. 20,084.27
Pipa Black Steel Pipe STK 41-JLS. G-3444, Ø 5" M' Rp. 309,283.33
Pipa Black Steel Pipe STK 41-JLS. G-3444, Ø 5" (Kg) Kg Rp. 20,618.89
Pipa Black Steel Pipe STK 41-JLS. G-3444, Ø 4" M' Rp. 201,666.67
Pipa Black Steel Pipe STK 41-JLS. G-3444, Ø 4" (Kg) Kg Rp. 21,094.84
Pipa Black Steel Pipe STK 41-JLS. G-3444, Ø 3" M' Rp. 128,333.33
Pipa Black Steel Pipe STK 41-JLS. G-3444, Ø 3" (Kg) Kg Rp. 18,928.22
Pipa Black Steel Pipe STK 41-JLS. G-3444, Ø 2,5" M' Rp. 105,416.67
Pipa Black Steel Pipe STK 41-JLS. G-3444, Ø 2,5" (Kg) Kg Rp. 18,269.79
Lem pipa Klg Rp. 35,000.00
BAHAN LISTRIK
Lampu Pijar 40 Watt Bh Rp. 6,000.00
Lampu Pijar 15 Watt Bh Rp. 5,000.00
Lampu Downlight DL PLC 9 Watt Bh Rp. 155,000.00
Lampu RMI 2 x 40 Watt, Tutup Metal Louvre Lengkap Set Rp. 605,000.00
Lampu TL 1 x 40 Watt Set Rp. 63,000.00
Lampu SL-E 15 Watt Bh Rp. 33,600.00
Lampu SL-E 18 Watt Set Rp. 36,000.00
Lampu SL-E 23 Watt Bh Rp. 42,000.00
Lampu Hias Set Rp. 3,850,000.00
Ceiling Fan For Lavatory/Wc Set Rp. 325,000.00
Stop Kontak Kw. 1 16A Bh Rp. 29,190.00
Stop Kontak AC Kw. 1 c/w Fuse Bh Rp. 75,000.00
Saklar Tunggal Kw. 1 Bh Rp. 29,085.00
Saklar Ganda Kw. 1 Bh Rp. 37,275.00
Klem Kabel No. 10 Bh Rp. 5,350.00
Pipa Instalasi Listrik Bh Rp. 34,240.00
Inbow Dos Bh Rp. 3,745.00
Las Dop Bh Rp. 3,623.00
Isolasi Bh Rp. 8,820.00
T - Dos 5/8" Bh Rp. 12,600.00
Fitting Bh Rp. 18,113.00
Kabel NYM (2x2,5) mm M' Rp. 8,873.00
Kabel NYM (3x2,5) mm M' Rp. 11,340.00
Kabel NYY (4x6) mm M' Rp. 42,291.00
Kabel NYY (4x10) mm M' Rp. 67,465.00
MCB 6A Ex. Supran Bh Rp. 61,200.00
MCB 32A Ex. Supran Bh Rp. 85,000.00
Fuse Box Bh Rp. 150,000.00
Kotak Panil + MCB + Pentanahan Set Rp. 450,000.00
Kotak kontak biasa 200 VA Bh Rp. 40,000.00
Kotak kontak khusus 1000 VA Bh Rp. 49,000.00
Tranking kabel M' Rp. 210,000.00
Distribustion panel + acc Set Rp. 4,000,000.00
Kabel NYFGby 4 x 16 mm2 M' Rp. 50,000.00
Alat bantu Ls Rp. 10,000.00
BAHAN LAIN - LAIN
Electroda 6 mm Kg Rp. 65,000.00
Spacer/formite/penjaga jarak bekisting Bh Rp. 7,500.00
Bambu, Uk. Besar Btg Rp. 25,000.00
Tali Ijuk Kg Rp. 65,000.00
Solar Ltr Rp. 13,913.00
Minyak pelumas Ltr Rp. 43,313.60
Mesin Las Jam Rp. 75,000.00
Sewa Alat Jam Rp. 75,000.00
Gravel M3 Rp. 946,220.00
HCL Ltr Rp. 7,500.00
Pupuk Kandang Kg Rp. 1,000.00
Pupuk Anorganik Kg Rp. 2,600.00
Sekop Bh Rp. 50,000.00
Pacul Bh Rp. 50,000.00
Rumput Gajah Mini M² Rp. 17,500.00
II. HARGA UPAH KERJA
Tukang kayu Oh Rp. 90,000.00
Tukang las Oh Rp. 90,000.00
Tukang Pipa Oh Rp. 90,000.00
Tukang gali Oh Rp. 90,000.00
Tukang batu Oh Rp. 90,000.00
Tukang besi Oh Rp. 90,000.00
Tukang cat Oh Rp. 90,000.00
Tukang listrik Oh Rp. 105,000.00
Tukang Taman Oh Rp. 95,000.00
Kepala Tukang Kayu Oh Rp. 95,000.00
Kepala Tukang Batu Oh Rp. 95,000.00
Kepala Tukang Cat Oh Rp. 95,000.00
Kepala Tukang Listrik Oh Rp. 95,000.00
Kepala Tukang Pipa Oh Rp. 95,000.00
Kepala Tukang Besi Oh Rp. 95,000.00
Mandor Oh Rp. 115,000.00
Pekerja Oh Rp. 70,000.00
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN
BP-PAUD DAN DIKMAS PROVINSI SULAWESI SELATAN

PERENCANAAN KONSTRUKSI RENOVASI


PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
BP-PAUD DAN DIKMAS PROVINSI SULAWESI SELATAN

TAHUN ANGGARAN 2016

Konsultan Perencana
PERENCANAAN KONSTRUKSI RENOVASI
PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
BP-PAUD DAN DIKMAS PROVINSI SULAWESI SELATAN

UNIT PEKERJAAN :
REHABILITASI RUANG MAKAN LT. II
(PEMBUATAN RUANG MUSIK DAN RUANG FITNES)

TAHUN ANGGARAN 2016

Konsultan Perencana
PERENCANAAN KONSTRUKSI RENOVASI
PRASARANA GEDUNG ASRAMA DAN RUANG BELAJAR
BP-PAUD DAN DIKMAS PROVINSI SULAWESI SELATAN

ANALISA HARGA SATUAN PEKERJAAN


HARGA BAHAN DAN UPAH

TAHUN ANGGARAN 2016

Konsultan Perencana
Copy Sheet ini Ke File Anda

#REF! #REF!

Sesuaikan sel yang berwarna merah dengan Sel yang akan ditulis terbilang pada Sheet anda

0
1
2
3
4
5
6
7
8
9

Copy Sheet ini Ke File Anda

#REF! #REF!

Sesuaikan sel yang berwarna merah dengan Sel yang akan ditulis terbilang pada Sheet anda

0
1
2
3
4
5
6
7
8
9

Copy Sheet ini Ke File Anda

#REF! #REF!
Sesuaikan sel yang berwarna merah dengan Sel yang akan ditulis terbilang pada Sheet anda

0
1
2
3
4
5
6
7
8
9

Copy Sheet ini Ke File Anda

#REF! #REF!
Sesuaikan sel yang berwarna merah dengan Sel yang akan ditulis terbilang pada Sheet anda

0
1
2
3
4
5
6
7
8
9

Copy Sheet ini Ke File Anda

#REF! #REF!
Sesuaikan sel yang berwarna merah dengan Sel yang akan ditulis terbilang pada Sheet anda

0
1
2
3
4
5
6
7
8
9

Copy Sheet ini Ke File Anda

#REF! #REF!
Sesuaikan sel yang berwarna merah dengan Sel yang akan ditulis terbilang pada Sheet anda
0
1
2
3
4
5
6
7
8
9
#REF! #REF! #REF!
Satu #REF!
Dua #REF! #REF! Milyaran
Tiga #REF! #REF! Jutaan
Empat #REF! #REF! Ribuan
Lima #REF! #REF! Ratusan
Enam #REF!
Tujuh #REF!
Delapan #REF!
Sembilan #REF!
#REF!
#REF!

#REF! #REF! #REF!


Satu #REF!
Dua #REF! #REF! Milyaran
Tiga #REF! #REF! Jutaan
Empat #REF! #REF! Ribuan
Lima #REF! #REF! Ratusan
Enam #REF!
Tujuh #REF!
Delapan #REF!
Sembilan #REF!
#REF!
#REF!

#REF! #REF! #REF!


Satu #REF!
Dua #REF! #REF! Milyaran
Tiga #REF! #REF! Jutaan
Empat #REF! #REF! Ribuan
Lima #REF! #REF! Ratusan
Enam #REF!
Tujuh #REF!
Delapan #REF!
Sembilan #REF!
#REF!

#REF! #REF! #REF!


Satu #REF!
Dua #REF! #REF! Milyaran
Tiga #REF! #REF! Jutaan
Empat #REF! #REF! Ribuan
Lima #REF! #REF! Ratusan
Enam #REF!
Tujuh #REF!
Delapan #REF!
Sembilan #REF!
#REF!

#REF! #REF! #REF!


Satu #REF!
Dua #REF! #REF! Milyaran
Tiga #REF! #REF! Jutaan
Empat #REF! #REF! Ribuan
Lima #REF! #REF! Ratusan
Enam #REF!
Tujuh #REF!
Delapan #REF!
Sembilan #REF!
#REF!
#REF! #REF! #REF!
Satu #REF!
Dua #REF! #REF! Milyaran
Tiga #REF! #REF! Jutaan
Empat #REF! #REF! Ribuan
Lima #REF! #REF! Ratusan
Enam #REF!
Tujuh #REF!
Delapan #REF!
Sembilan #REF!
#REF!
No Nama Pekerjaan Volume Satuan Anggaran Biaya Harga Sat./M2

1 Pek. Asrama/Guess House 01


- Lantai I 175.51 m2
- Lantai II 167.35 m2
Total 342.86 m2 Rp 1,598,500,000 Rp 4,662,253

2 Pek. Asrama/Guess House 02


- Lantai I 175.51 m2
- Lantai II 167.35 m2
Total 342.86 m2 Rp 1,598,500,000 Rp 4,662,253
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
A.6 PEKERJAAN PERSIAPAN

A.6.2 Memasang 1 M' pagar sementara dari seng gelombang tinggi 2 meter
1.250 Btg Dolken kayu Ø8-10/400 cm @ Rp 44,619.00 Rp 55,773.75
2.500 Kg Semen Portland @ Rp 1,275.00 Rp 3,187.50
0.005 M3 Pasir beton @ Rp 148,000.00 Rp 740.00
0.009 M3 split/chipping 2-3 cm @ Rp 267,000.00 Rp 2,403.00
0.072 M3 Kayu klas II (balok) @ Rp 3,265,500.00 Rp 235,116.00
0.060 Kg Paku biasa 2" - 5" @ Rp 19,927.00 Rp 1,195.62
0.400 Ltr Residu @ Rp 6,400.00 Rp 2,560.00
0.200 Oh Tukang kayu @ Rp 90,000.00 Rp 18,000.00
0.400 Oh Pekerja @ Rp 70,000.00 Rp 28,000.00
0.020 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 1,900.00
0.020 Oh Mandor @ Rp 115,000.00 Rp 2,300.00
Rp 351,175.87
Profit Dan Overhead (10%) Rp 35,117.59
Jumlah Rp 386,293.46

A.6.4 Mengukur dan memasang 1 M' bouwplank


0.012 M3 Kayu klas II (balok) @ Rp 3,265,500.00 Rp 39,186.00
0.020 Kg Paku biasa 2" - 5" @ Rp 19,927.00 Rp 398.54
0.007 M3 Kayu klas II (papan) @ Rp 3,969,000.00 Rp 27,783.00
0.100 Oh Tukang kayu @ Rp 90,000.00 Rp 9,000.00
0.100 Oh Pekerja @ Rp 70,000.00 Rp 7,000.00
0.010 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 950.00
0.005 Oh Mandor @ Rp 115,000.00 Rp 575.00
Rp 84,892.54
Profit Dan Overhead (10%) Rp 8,489.25
Jumlah Rp 93,381.79
A.6.5 Membuat1 M2 kantor sementara, dengan lantai plesteran
1.250 Btg Dolken kayu Ø8-10/400 cm @ Rp 44,619.00 Rp 55,773.75
0.180 M3 Kayu klas II (balok) @ Rp 3,265,500.00 Rp 587,790.00
0.850 Kg Paku biasa 2" - 5" @ Rp 19,927.00 Rp 16,937.95
1.100 Kg Besi strip @ Rp 12,500.00 Rp 13,750.00
35.000 Kg Semen Portland @ Rp 1,275.00 Rp 44,625.00
0.150 M3 Pasir pasang @ Rp 135,000.00 Rp 20,250.00
0.100 M3 Pasir beton @ Rp 148,000.00 Rp 14,800.00
0.150 M3 split/chipping 2-3 cm @ Rp 267,000.00 Rp 40,050.00
30.000 Bh Batu merah @ Rp 550.00 Rp 16,500.00
0.250 Lbr Seng plat BJLS 0.30 @ Rp 62,060.00 Rp 15,515.00
2.000 set Kaca nako lengkap teralis @ Rp 350,000.00 Rp 700,000.00
0.080 M2 Kaca bening 5 mm @ Rp 129,045.00 Rp 10,323.60
0.150 Bh Kunci tanam biasa @ Rp 160,500.00 Rp 24,075.00
0.060 Lbr Multipleks 1.22 x 2.44 x 6 mm @ Rp 89,880.00 Rp 5,392.80
2.000 Oh Tukang kayu @ Rp 90,000.00 Rp 180,000.00
1.000 Oh Tukang batu @ Rp 90,000.00 Rp 90,000.00
2.000 Oh Pekerja @ Rp 70,000.00 Rp 140,000.00
0.300 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 28,500.00
0.050 Oh Mandor @ Rp 115,000.00 Rp 5,750.00
Rp 2,010,033.10

SPL 1 Titik Loading Test Tiang Pancang (Test Pembebanan)


PERSIAPAN:
1.000 Ls - Persiapan besi-besi meja, balok utama, @ Rp 5,000,000.00 Rp 5,000,000.00
cek hidrolik jack dan peralatan uji coba
serta perbaikan
1.000 Ls - Tera baru meteran (Gauge) di Bandung @ Rp 6,000,000.00 Rp 6,000,000.00
Rp 11,000,000.00
MOBILISASI DAN DEMOBILISASI:
1.000 Ls - Trailer Forklift dan alat bantu kerja Rp 29,000,000.00
Untuk pengambilan pemberat (Blok Beton)
Pool I: Rute Kab. Pangkep - ke Makassar = Rp. 20.000.0000
Pool II: Rute Jl. Tol - Pettarani = Rp. 9.000.0000
1.000 Ls - Tenaga Kerja + Angkut alat-alat ukur/jk dll Rp 4,000,000.00
Rp 33,000,000.00
PEMINDAHAN & PEMASANGAN/PEMBONGKARAN (Pertitik Uji):
1.000 Ls - Tukang las pasang/potong meja loading dan pemasngan blok beton Rp 6,000,000.00
4.000 Hari - Sewa crane 4 hari @ Rp 4,000,000.00 Rp 16,000,000.00
( termasuk tenaga dan bahan bakar )
1.000 Ls - Bahan habis (kawat las, asetilin oksigen, tali slang dll) Rp. 2,000,000.00
1.000 Ls - Pelaksanaan Uji Loading (pembebanan) 4 hari Rp. 5,000,000.00
1.000 Ls - Sewa alat jack dan Crew Teknisi Rp. 7,000,000.00
1.000 Ls - Biaya kantor, analisis, data processing & dokumentasi Rp. 2,000,000.00
Rp 38,000,000.00
REKAPITULASI:
PERSIAPAN: 11,000,000.00
MOBILISASI DAN DEMOBILISASI: 33,000,000.00
PEMINDAHAN & PEMASANGAN/PEMBONGKARAN (Pertitik Uji): 76,000,000.00
(dikali 2 titik) Rp 120,000,000.00

Jadi Harga Pertitik ………………………………… Rp. 60,000,000.00

A.6.8 Membuat1 M2 Steger Werk Dari Bambu


1.000 Btg Bambu, Uk. Besar @ Rp 25,000.00 Rp 25,000.00
0.250 Kg Tali Ijuk @ Rp 65,000.00 Rp 16,250.00
0.250 Oh Pekerja @ Rp 70,000.00 Rp 17,500.00
0.017 Oh Tukang kayu @ Rp 90,000.00 Rp 1,530.00
0.002 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 190.00
0.013 Oh Mandor @ Rp 115,000.00 Rp 1,495.00
Rp 61,965.00
Profit Dan Overhead (10%) Rp 6,196.50
Jumlah Rp 68,161.50

B.6 PEKERJAAN TANAH

B.6.1 Menggali 1 M3 tanah biasa sedalam 1 m


0.750 Oh Pekerja @ Rp 70,000.00 Rp 52,500.00
0.025 Oh Mandor @ Rp 115,000.00 Rp 2,875.00
Rp 55,375.00
Profit Dan Overhead (10%) Rp 5,537.50
Jumlah Rp 60,912.50

B.6.2 Menggali 1 M3 tanah biasa sedalam 2 m


0.900 Oh Pekerja @ Rp 70,000.00 Rp 63,000.00
0.045 Oh Mandor @ Rp 115,000.00 Rp 5,175.00
Rp 68,175.00
Profit Dan Overhead (10%) Rp 6,817.50
Jumlah Rp 74,992.50

B.6.6 Menggali 1 M3 tanah lumpur sedalam 1 m


1.200 Oh Pekerja @ Rp #N/A Rp #N/A
0.045 Oh Mandor @ Rp #N/A Rp #N/A
Rp #N/A
Profit Dan Overhead (10%) Rp #N/A
Jumlah Rp #N/A

B.6.9 Mengurug kembali 1 M3 galian


0.250 Oh Pekerja @ Rp 70,000.00 Rp 17,500.00
0.008 Oh Mandor @ Rp 115,000.00 Rp 920.00
Rp 18,420.00
Profit Dan Overhead (10%) Rp 1,842.00
Jumlah Rp 20,262.00

B.6.10 Memadatkan 1 M3 tanah (per 20 cm)


0.500 Oh Pekerja @ Rp #N/A Rp #N/A
0.050 Oh Mandor @ Rp #N/A Rp #N/A
Rp #N/A
Profit Dan Overhead (10%) Rp #N/A
Jumlah Rp #N/A

B.6.11 Mengurug 1 M3 pasir urug


1.200 M3 Pasir urug @ Rp 100,000.00 Rp 120,000.00
0.300 Oh Pekerja @ Rp 70,000.00 Rp 21,000.00
0.010 Oh Mandor @ Rp 115,000.00 Rp 1,150.00
Rp 142,150.00
Profit Dan Overhead (10%) Rp 14,215.00
Jumlah Rp 156,365.00

Mengurug 1 M3 Tanah Timbunan


1.200 M3 Tanah timbunan @ Rp 110,000.00 Rp 132,000.00
0.300 Oh Pekerja @ Rp 70,000.00 Rp 21,000.00
0.010 Oh Mandor @ Rp 115,000.00 Rp 1,150.00
Rp 154,150.00
Profit Dan Overhead (10%) Rp 15,415.00
Jumlah Rp 169,565.00

B.6.15 Mengurug 1 M3 sirtu padat untuk peninggian lantai bangunan


1.200 M3 Sirtu @ Rp 177,000.00 Rp 212,400.00
0.250 Oh Pekerja @ Rp 70,000.00 Rp 17,500.00
0.025 Oh Mandor @ Rp 115,000.00 Rp 2,875.00
Rp 232,775.00
Profit Dan Overhead (10%) Rp 23,277.50
Jumlah Rp 256,052.50

C.6 PEKERJAAN PONDASI

C.6.2 Memasang 1 M3 pondasi batu belah, campuran 1PC : 4PP


1.200 M3 Batu kali @ Rp 184,000.00 Rp 220,800.00
163.000 Kg Semen Portland @ Rp 1,275.00 Rp 207,825.00
0.520 M3 Pasir pasang @ Rp 135,000.00 Rp 70,200.00
1.500 Oh Tukang batu @ Rp 90,000.00 Rp 135,000.00
0.750 Oh Pekerja @ Rp 70,000.00 Rp 52,500.00
0.075 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 7,125.00
0.075 Oh Mandor @ Rp 115,000.00 Rp 8,625.00
Rp 702,075.00
Profit Dan Overhead (10%) Rp 70,207.50
Jumlah Rp 772,282.50

C.6.9 Memasang 1 M3 batu kosong (aanstamping)


1.200 M3 Batu kali @ Rp 184,000.00 Rp 220,800.00
0.432 M3 Pasir urug @ Rp 100,000.00 Rp 43,200.00
0.780 Oh Pekerja @ Rp 70,000.00 Rp 54,600.00
0.390 Oh Tukang batu @ Rp 90,000.00 Rp 35,100.00
0.039 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 3,705.00
0.039 Oh Mandor @ Rp 115,000.00 Rp 4,485.00
Rp 361,890.00
Profit Dan Overhead (10%) Rp 36,189.00
Jumlah Rp 398,079.00

D.6 PEKERJAAN DINDING


D.6.2 Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1 bt. camp. 1PC : 3PP
140.000 Bh Batu merah @ Rp 550.00 Rp 77,000.00
32.950 Kg Semen Portland @ Rp 1,275.00 Rp 42,011.25
0.091 M3 Pasir pasang @ Rp 135,000.00 Rp 12,285.00
0.600 Oh Pekerja @ Rp 70,000.00 Rp 42,000.00
0.200 Oh Tukang batu @ Rp 90,000.00 Rp 18,000.00
0.020 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 1,900.00
0.030 Oh Mandor @ Rp 115,000.00 Rp 3,450.00
Rp 196,646.25
Profit Dan Overhead (10%) Rp 19,664.63
Jumlah Rp 216,310.88

D.6.4 Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1 bt. camp. 1PC : 5PP
140.000 Bh Batu merah @ Rp 550.00 Rp 77,000.00
22.200 Kg Semen Portland @ Rp 1,275.00 Rp 28,305.00
0.102 M3 Pasir pasang @ Rp 135,000.00 Rp 13,770.00
0.600 Oh Pekerja @ Rp 70,000.00 Rp 42,000.00
0.200 Oh Tukang batu @ Rp 90,000.00 Rp 18,000.00
0.020 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 1,900.00
0.030 Oh Mandor @ Rp 115,000.00 Rp 3,450.00
Rp 184,425.00
Profit Dan Overhead (10%) Rp 18,442.50
Jumlah Rp 202,867.50

D.6.8 Memasang1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC : 3PP
70.000 Bh Batu merah @ Rp 550.00 Rp 38,500.00
14.370 Kg Semen Portland @ Rp 1,275.00 Rp 18,321.75
0.040 M3 Pasir pasang @ Rp 135,000.00 Rp 5,400.00
0.300 Oh Pekerja @ Rp 70,000.00 Rp 21,000.00
0.100 Oh Tukang batu @ Rp 90,000.00 Rp 9,000.00
0.010 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 950.00
0.015 Oh Mandor @ Rp 115,000.00 Rp 1,725.00
Rp 94,896.75
Profit Dan Overhead (10%) Rp 9,489.68
Jumlah Rp 104,386.43

D.6.9 Memasang1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC : 4PP
70.000 Bh Batu merah @ Rp 550.00 Rp 38,500.00
11.500 Kg Semen Portland @ Rp 1,275.00 Rp 14,662.50
0.043 M3 Pasir pasang @ Rp 135,000.00 Rp 5,805.00
0.300 Oh Pekerja @ Rp 70,000.00 Rp 21,000.00
0.100 Oh Tukang batu @ Rp 90,000.00 Rp 9,000.00
0.010 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 950.00
0.015 Oh Mandor @ Rp 115,000.00 Rp 1,725.00
Rp 91,642.50
Profit Dan Overhead (10%) Rp 9,164.25
Jumlah Rp 100,806.75

D.6.10 Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC : 5PP
70.000 Bh Batu merah @ Rp 550.00 Rp 38,500.00
9.680 Kg Semen Portland @ Rp 1,275.00 Rp 12,342.00
0.045 M3 Pasir pasang @ Rp 135,000.00 Rp 6,075.00
0.300 Oh Pekerja @ Rp 70,000.00 Rp 21,000.00
0.100 Oh Tukang batu @ Rp 90,000.00 Rp 9,000.00
0.010 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 950.00
0.015 Oh Mandor @ Rp 115,000.00 Rp 1,725.00
Rp 89,592.00
Profit Dan Overhead (10%) Rp 8,959.20
Jumlah Rp 98,551.20

D.6.11 Memasang 1 m2 dinding roster / terawang (10x11x40) cm


12.500 bh Beton Roster @ Rp 20,865.00 Rp 260,812.50
0.320 kg Semen Portland @ Rp 1,275.00 Rp 408.00
0.035 m3 Pasir pasang @ Rp 135,000.00 Rp 4,725.00
0.300 oh Pekerja @ Rp 70,000.00 Rp 21,000.00
0.100 oh Tukang Batu @ Rp 90,000.00 Rp 9,000.00
0.010 oh Kepala Tukang Batu @ Rp 95,000.00 Rp 950.00
0.015 oh Mandor @ Rp 115,000.00 Rp 1,725.00
Rp 298,620.50
Profit Dan Overhead (10%) Rp 29,862.05
Jumlah Rp 328,482.55

E.6 PEKERJAAN PLESTERAN

E.6.3 Memasang 1 M2 plesteran 1PC : 3PP, tebal 15 mm


7.776 Kg Semen Portland @ Rp 1,275.00 Rp 9,914.40
0.023 M3 Pasir pasang @ Rp 135,000.00 Rp 3,105.00
0.300 Oh Pekerja @ Rp 70,000.00 Rp 21,000.00
0.150 Oh Tukang batu @ Rp 90,000.00 Rp 13,500.00
0.015 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 1,425.00
0.015 Oh Mandor @ Rp 115,000.00 Rp 1,725.00
Rp 50,669.40
Profit Dan Overhead (10%) Rp 5,066.94
Jumlah Rp 55,736.34

E.6.4 Memasang 1 M2 plesteran 1PC : 4PP, tebal 15 mm


6.240 Kg Semen Portland @ Rp 1,275.00 Rp 7,956.00
0.024 M3 Pasir pasang @ Rp 135,000.00 Rp 3,240.00
0.300 Oh Pekerja @ Rp 70,000.00 Rp 21,000.00
0.150 Oh Tukang batu @ Rp 90,000.00 Rp 13,500.00
0.015 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 1,425.00
0.015 Oh Mandor @ Rp 115,000.00 Rp 1,725.00
Rp 48,846.00
Profit Dan Overhead (10%) Rp 4,884.60
Jumlah Rp 53,730.60

E.6.5 Memasang 1 M2 plesteran 1PC : 5PP, tebal 15 mm


5.184 Kg Semen Portland @ Rp 1,275.00 Rp 6,609.60
0.026 M3 Pasir pasang @ Rp 135,000.00 Rp 3,510.00
0.300 Oh Pekerja @ Rp 70,000.00 Rp 21,000.00
0.150 Oh Tukang batu @ Rp 90,000.00 Rp 13,500.00
0.015 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 1,425.00
0.015 Oh Mandor @ Rp 115,000.00 Rp 1,725.00
Rp 47,769.60
Profit Dan Overhead (10%) Rp 4,776.96
Jumlah Rp 52,546.56

E.6.20 Memasang 1 M2 plesteran skoning 1PC : 2PP, tebal 10 mm


0.500 Kg Semen Portland @ Rp 1,275.00 Rp 637.50
0.013 M3 Pasir pasang @ Rp 135,000.00 Rp 1,755.00
0.080 Oh Pekerja @ Rp 70,000.00 Rp 5,600.00
0.400 Oh Tukang batu @ Rp 90,000.00 Rp 36,000.00
0.040 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 3,800.00
0.004 Oh Mandor @ Rp 115,000.00 Rp 460.00
Rp 48,252.50
Profit Dan Overhead (10%) Rp 4,825.25
Jumlah Rp 53,077.75

E.6.27 Memasang 1 M2 acian


3.250 Kg Semen Portland @ Rp 1,275.00 Rp 4,143.75
0.150 Oh Pekerja @ Rp 70,000.00 Rp 10,500.00
0.100 Oh Tukang batu @ Rp 90,000.00 Rp 9,000.00
0.010 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 950.00
0.008 Oh Mandor @ Rp 115,000.00 Rp 920.00
Rp 25,513.75
Profit Dan Overhead (10%) Rp 2,551.38
Jumlah Rp 28,065.13

F.6.1 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I
1.100 M3 Kayu klas I (balok) untuk kosen pintu/jendela @ Rp 9,240,000.00 Rp 10,164,000.00
1.250 Kg Paku biasa 2" - 5" @ Rp 19,927.00 Rp 24,908.75
1.000 Kg Lem kayu @ Rp 17,120.00 Rp 17,120.00
7.000 Oh Pekerja @ Rp 70,000.00 Rp 490,000.00
21.000 Oh Tukang kayu @ Rp 90,000.00 Rp 1,890,000.00
2.100 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 199,500.00
0.350 Oh Mandor @ Rp 115,000.00 Rp 40,250.00
Rp 12,825,778.75
Profit Dan Overhead (10%) Rp 1,282,577.88
Jumlah Rp 14,108,356.63

F.6.5 Membuat dan memasang 1 m2 Daun pintu panel, kayu kelas I


0.040 M3 Kayu klas I (papan) listplank dan pintu/jendela @ Rp 15,750,000.00 Rp 630,000.00
0.500 Kg Lem kayu @ Rp 17,120.00 Rp 8,560.00
1.000 Oh Pekerja @ Rp 70,000.00 Rp 70,000.00
3.000 Oh Tukang kayu @ Rp 90,000.00 Rp 270,000.00
0.300 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 28,500.00
0.050 Oh Mandor @ Rp 115,000.00 Rp 5,750.00
Rp 1,012,810.00
Profit Dan Overhead (10%) Rp 101,281.00
Jumlah Rp 1,114,091.00

F.6.6 Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I
0.024 M3 Kayu klas I (papan) listplank dan pintu/jendela @ Rp 15,750,000.00 Rp 378,000.00
0.300 Kg Lem kayu @ Rp 17,120.00 Rp 5,136.00
0.800 Oh Pekerja @ Rp 70,000.00 Rp 56,000.00
2.400 Oh Tukang kayu @ Rp 90,000.00 Rp 216,000.00
0.240 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 22,800.00
0.040 Oh Mandor @ Rp 115,000.00 Rp 4,600.00
Rp 682,536.00
Profit Dan Overhead (10%) Rp 68,253.60
Jumlah Rp 750,789.60

F.6.8 1 M2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kls. II
0.025 M3 Kayu klas II (papan) @ Rp 3,969,000.00 Rp 99,225.00
0.030 Kg Paku Biasa 1/2" - 1" @ Rp 24,610.00 Rp 738.30
0.500 Kg Lem kayu @ Rp 17,120.00 Rp 8,560.00
1.000 Lbr Plywood Uk.80x240 cm Tebal 4 mm @ Rp 85,000.00 Rp 85,000.00
0.600 Oh Pekerja @ Rp 70,000.00 Rp 42,000.00
2.000 Oh Tukang kayu @ Rp 90,000.00 Rp 180,000.00
0.200 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 19,000.00
0.030 Oh Mandor @ Rp 115,000.00 Rp 3,450.00
Rp 437,973.30
Profit Dan Overhead (10%) Rp 43,797.33
Jumlah Rp 481,770.63

F.6.8 - SPL 1 M2 Membuat daun pintu Teakwood rangkap Lapis HPL, rangka tertutup kayu kls. II
0.025 M3 Kayu klas II (papan) @ Rp 3,969,000.00 Rp 99,225.00
0.030 Kg Paku Biasa 1/2" - 1" @ Rp 24,610.00 Rp 738.30
0.500 Kg Lem kayu @ Rp 17,120.00 Rp 8,560.00
1.000 Lbr Teakwood Uk. 120x 240 x 3 mm @ Rp 95,230.00 Rp 95,230.00
0.700 Lbr HPL Uk. 120 x 240 @ Rp 145,000.00 Rp 101,500.00
0.600 Oh Pekerja @ Rp 70,000.00 Rp 42,000.00
2.500 Oh Tukang kayu @ Rp 90,000.00 Rp 225,000.00
0.250 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 23,750.00
0.030 Oh Mandor @ Rp 115,000.00 Rp 3,450.00
Rp 599,453.30
Profit Dan Overhead (10%) Rp 59,945.33
Jumlah Rp 659,398.63

SPL Membuat 1 Bh daun pintu Acoustic Multipleks rangkap Lapis HPL, rangka tertutup Besi Hollow, Uk. 80 x 240
8.800 M' Besi Hollow 30 x 30 x 2.3 mm @ Rp 28,600.00 Rp 251,680.00
36.000 Bh Srews/sekrup @ Rp 1,177.00 Rp 42,372.00
0.960 Kg Lem kayu @ Rp 17,120.00 Rp 16,435.20
1.418 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 128,400.00 Rp 182,071.20
1.467 Lbr HPL Uk. 120 x 240 @ Rp 145,000.00 Rp 212,715.00
0.730 Roll Glass Wool DN City 48 kg/m2, Uk. 1.2 x 2.3 m, T @ Rp 230,000.00 Rp 167,900.00
1.152 Oh Pekerja @ Rp 70,000.00 Rp 80,640.00
4.800 Oh Tukang kayu @ Rp 90,000.00 Rp 432,000.00
0.480 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 45,600.00
0.058 Oh Mandor @ Rp 115,000.00 Rp 6,624.00
Rp 1,438,037.40
Profit Dan Overhead (10%) Rp 143,803.74
Jumlah Rp 1,581,841.14

SPL Memasang 1 M2 langit-langit gypsum board Acoustic ukuran (60x80), tebal 9 mm + rangka Besi Hollow
4.400 M Besi Hollow 40 x 40 x 2.3 mm @ Rp 21,091.67 Rp 92,803.33
8.000 Bh Sektrup Fixer @ Rp #N/A Rp #N/A
1.050 M2 Kawat Rang 3 x 3 @ Rp 30,067.00 Rp 31,570.35
0.381 Roll Glass Wool DN City 48 kg/m2, Uk. 1.2 x 2.3 m, T @ Rp 230,000.00 Rp 87,630.00
0.353 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 128,400.00 Rp 45,325.20
0.364 Lbr HPL Uk. 120 x 240 @ Rp 145,000.00 Rp 52,780.00
0.263 Kg Lem kayu @ Rp 17,120.00 Rp 4,494.00
11.500 Bh Srews/sekrup @ Rp 1,177.00 Rp 13,535.50
0.010 Lbr Kertas Amplas @ Rp 3,675.00 Rp 36.75
0.070 Oh Pekerja @ Rp 70,000.00 Rp 4,900.00
0.700 Oh Tukang besi @ Rp 90,000.00 Rp 63,000.00
0.007 Oh Kepala Tukang Besi @ Rp 95,000.00 Rp 665.00
0.012 Oh Mandor @ Rp 115,000.00 Rp 1,380.00
Rp #N/A
Profit Dan Overhead (10%) Rp #N/A
Jumlah Rp #N/A

F.6.19 1 M2 Memasang rangka langit-langit (50x100) cm, kayu kls. II atau III
0.0154 M3 Kayu klas II (balok) @ Rp 3,265,500.00 Rp 50,288.70
0.200 Kg Paku biasa 2" - 5" @ Rp 19,927.00 Rp 3,985.40
0.150 Oh Pekerja @ Rp 70,000.00 Rp 10,500.00
0.250 Oh Tukang kayu @ Rp 90,000.00 Rp 22,500.00
0.025 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 2,375.00
0.075 Oh Mandor @ Rp 115,000.00 Rp 8,625.00
Rp 98,274.10
Profit Dan Overhead (10%) Rp 9,827.41
Jumlah Rp 108,101.51
F.6.22 1 M' Memasang lisplank ukuran (3x30) cm, kayu kls. I atau II
0.0108 M3 Kayu klas I (papan) listplank dan pintu/jendela @ Rp 15,750,000.00 Rp 170,100.00
0.050 Kg Paku biasa 2" - 5" @ Rp 19,927.00 Rp 996.35
0.100 Oh Pekerja @ Rp 70,000.00 Rp 7,000.00
0.200 Oh Tukang kayu @ Rp 90,000.00 Rp 18,000.00
0.020 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 1,900.00
0.005 Oh Mandor @ Rp 115,000.00 Rp 575.00
Rp 198,571.35
Profit Dan Overhead (10%) Rp 19,857.14
Jumlah Rp 218,428.49

G.6 PEKERJAAN BETON

G.6.1 Membuat 1 M3 beton mutu f'c=7,4 Mpa (K100), slump (12 ± 2) cm, w/c=0,87
247.000 Kg Semen Portland @ Rp 1,275.00 Rp 314,925.00
869.000 Kg Pasir beton (Kg) @ Rp 105.71 Rp 91,865.71
999.000 Kg split/chipping 2-3 cm(Kg) @ Rp 197.78 Rp 197,580.00
215.000 Ltr Air @ Rp 100.00 Rp 21,500.00
1.650 Oh Pekerja @ Rp 70,000.00 Rp 115,500.00
0.275 Oh Tukang batu @ Rp 90,000.00 Rp 24,750.00
0.028 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 2,660.00
0.083 Oh Mandor @ Rp 115,000.00 Rp 9,545.00
Rp 778,325.71
Profit Dan Overhead (10%) Rp 77,832.57
Jumlah Rp 856,158.29

G.6.4 Membuat 1 M3 lantai kerja beton mutu f'c=7,4 Mpa (K 100), slump (3-6) cm, w/c=0,87
1 0.1527 230.000 Kg Semen Portland @ Rp 1,275.00 Rp 293,250.00
4.177 0.6379 893.000 Kg Pasir beton (Kg) @ Rp 105.71 Rp 94,402.86
4.981 0.7607 1,027.000 Kg split/chipping 2-3 cm(Kg) @ Rp 197.78 Rp 203,117.78
200.000 Ltr Air @ Rp 100.00 Rp 20,000.00
1.200 Oh Pekerja @ Rp 70,000.00 Rp 84,000.00
0.200 Oh Tukang batu @ Rp 90,000.00 Rp 18,000.00
0.020 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 1,900.00
0.060 Oh Mandor @ Rp 115,000.00 Rp 6,900.00
Rp 721,570.63
Profit Dan Overhead (10%) Rp 72,157.06
Jumlah Rp 793,727.70

G.6.5 Membuat 1 M3 beton mutu f'c=14,5 Mpa (K 175), slump (12 ± 2) cm, w/c=0,66
326.000 Kg Semen Portland @ Rp 1,275.00 Rp 415,650.00
760.000 Kg Pasir beton (Kg) @ Rp 105.71 Rp 80,342.86
1,029.000 Kg split/chipping 2-3 cm(Kg) @ Rp 197.78 Rp 203,513.33
215.000 Ltr Air @ Rp 100.00 Rp 21,500.00
1.650 Oh Pekerja @ Rp 70,000.00 Rp 115,500.00
0.275 Oh Tukang batu @ Rp 90,000.00 Rp 24,750.00
0.028 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 2,660.00
0.083 Oh Mandor @ Rp 115,000.00 Rp 9,545.00
Rp 873,461.19
Profit Dan Overhead (10%) Rp 87,346.12
Jumlah Rp 960,807.31

G.6.7 Membuat 1 M3 beton mutu f'c=19,3 Mpa (K 225), slump (12 ± 2) cm, w/c=0,58
371.000 Kg Semen Portland @ Rp 1,275.00 Rp 473,025.00
698.000 Kg Pasir beton (Kg) @ Rp 105.71 Rp 73,788.57
1,047.000 Kg split/chipping 2-3 cm(Kg) @ Rp 197.78 Rp 207,073.33
215.000 Ltr Air @ Rp 100.00 Rp 21,500.00
1.650 Oh Pekerja @ Rp 70,000.00 Rp 115,500.00
0.275 Oh Tukang batu @ Rp 90,000.00 Rp 24,750.00
0.028 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 2,660.00
0.083 Oh Mandor @ Rp 115,000.00 Rp 9,545.00
Rp 927,841.90
Profit Dan Overhead (10%) Rp 92,784.19
Jumlah Rp 1,020,626.10

G.6.17 Pembesian 1 Kg dengan besi polos atau besi ulir


A. Pembesian 1 Kg dengan besi polos
10.500 Kg Besi beton polos @ Rp 15,015.00 Rp 157,657.50
0.150 Kg Kawat beton @ Rp 25,252.00 Rp 3,787.80
0.070 Oh Pekerja @ Rp 70,000.00 Rp 4,900.00
0.070 Oh Tukang besi @ Rp 90,000.00 Rp 6,300.00
0.007 Oh Kepala Tukang Besi @ Rp 95,000.00 Rp 665.00
0.004 Oh Mandor @ Rp 115,000.00 Rp 460.00
Untuk Pembesian 10 Kg Rp 173,770.30
Untuk Pembesian 1 Kg Rp 17,377.03
Profit Dan Overhead (10%) Rp 1,737.70
Jumlah Rp 19,114.73

Memasang 1 M2 bekisting untuk Pondasi 2 Kali Pemakaian


0.0200 M3 Kayu klas III (papan) @ Rp 2,291,100.00 Rp 45,822.00
(Papan 2 kali Pakai)
0.300 Kg Paku biasa 2" - 5" @ Rp 19,927.00 Rp 5,978.10
0.100 Ltr Minyak bekisting @ Rp 7,500.00 Rp 750.00
0.520 Oh Pekerja @ Rp 70,000.00 Rp 36,400.00
0.260 Oh Tukang batu @ Rp 90,000.00 Rp 23,400.00
0.026 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 2,470.00
0.026 Oh Mandor @ Rp 115,000.00 Rp 2,990.00
Rp 117,810.10
Profit Dan Overhead (10%) Rp 11,781.01
Jumlah Rp 129,591.11

Memasang 1 M2 bekisting untuk sloof 2 Kali Pemakaian


0.023 M3 Kayu klas III (papan) @ Rp 2,291,100.00 Rp 51,549.75
(Papan 2 kali Pakai)
0.300 Kg Paku biasa 2" - 5" @ Rp 19,927.00 Rp 5,978.10
0.100 Ltr Minyak bekisting @ Rp 7,500.00 Rp 750.00
0.520 Oh Pekerja @ Rp 70,000.00 Rp 36,400.00
0.260 Oh Tukang batu @ Rp 90,000.00 Rp 23,400.00
0.026 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 2,470.00
0.026 Oh Mandor @ Rp 115,000.00 Rp 2,990.00
Rp 123,537.85
Profit Dan Overhead (10%) Rp 12,353.79
Jumlah Rp 135,891.64

Memasang 1 M2 bekisting untuk kolom Untuk 2x Pemakaian


0.020 M3 Kayu klas III (papan) @ Rp 2,291,100.00 Rp 45,822.00
(papan 2 x pakai)
0.400 Kg Paku biasa 2" - 5" @ Rp 19,927.00 Rp 7,970.80
0.200 Ltr Minyak bekisting @ Rp 7,500.00 Rp 1,500.00
0.008 M3 Kayu klas II (balok) @ Rp 3,265,500.00 Rp 24,491.25
(Balok 2x pakai)
0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 128,400.00 Rp 22,470.00
(Multipleks 2x pakai)
1.000 Btg Dolken kayu Ø8-10/400 cm @ Rp 44,619.00 Rp 44,619.00
(dolken 2x pakai)
0.660 Oh Pekerja @ Rp 70,000.00 Rp 46,200.00
0.330 Oh Tukang kayu @ Rp 90,000.00 Rp 29,700.00
0.033 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 3,135.00
0.033 Oh Mandor @ Rp 115,000.00 Rp 3,795.00
Rp 229,703.05
Profit Dan Overhead (10%) Rp 22,970.31
Jumlah Rp 252,673.36

Memasang 1 M2 bekisting untuk balok Untuk 2x pemakaian


0.020 M3 Kayu klas III (papan) @ Rp 2,291,100.00 Rp 45,822.00
(papan 2 x pakai)
0.400 Kg Paku biasa 2" - 5" @ Rp 19,927.00 Rp 7,970.80
0.200 Ltr Minyak bekisting @ Rp 7,500.00 Rp 1,500.00
0.009 M3 Kayu klas II (balok) @ Rp 3,265,500.00 Rp 29,389.50
(Balok 2x pakai)
0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 128,400.00 Rp 22,470.00
(Multipleks 2x pakai)
1.000 Btg Dolken kayu Ø8-10/400 cm @ Rp 44,619.00 Rp 44,619.00
(dolken 2x pakai)
0.660 Oh Pekerja @ Rp 70,000.00 Rp 46,200.00
0.330 Oh Tukang kayu @ Rp 90,000.00 Rp 29,700.00
0.033 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 3,135.00
0.033 Oh Mandor @ Rp 115,000.00 Rp 3,795.00
Rp 234,601.30
Profit Dan Overhead (10%) Rp 23,460.13
Jumlah Rp 258,061.43
Memasang 1 M2 bekisting untuk lantai Untuk 2x Pemakaian
0.020 M3 Kayu klas III (papan) @ Rp 2,291,100.00 Rp 45,822.00
(papan 2 x pakai)
0.400 Kg Paku biasa 2" - 5" @ Rp 19,927.00 Rp 7,970.80
0.200 Ltr Minyak bekisting @ Rp 7,500.00 Rp 1,500.00
0.008 M3 Kayu klas II (balok) @ Rp 3,265,500.00 Rp 24,491.25
(Balok 2x pakai)
0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 128,400.00 Rp 22,470.00
(Multipleks 2x pakai)
3.000 Btg Dolken kayu Ø8-10/400 cm @ Rp 44,619.00 Rp 133,857.00
(dolken 2x pakai)
0.660 Oh Pekerja @ Rp 70,000.00 Rp 46,200.00
0.330 Oh Tukang kayu @ Rp 90,000.00 Rp 29,700.00
0.033 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 3,135.00
0.033 Oh Mandor @ Rp 115,000.00 Rp 3,795.00
Rp 318,941.05
Profit Dan Overhead (10%) Rp 31,894.11
Jumlah Rp 350,835.16

G.6.25 Memasang 1 M2 bekisting untuk dinding


0.030 M3 Kayu klas III (papan) @ Rp 2,291,100.00 Rp 68,733.00
0.400 Kg Paku biasa 2" - 5" @ Rp 19,927.00 Rp 7,970.80
0.200 Ltr Minyak bekisting @ Rp 7,500.00 Rp 1,500.00
0.020 M3 Kayu klas II (balok) @ Rp 3,265,500.00 Rp 65,310.00
0.350 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 128,400.00 Rp 44,940.00
3.000 Btg Dolken kayu Ø8-10/400 cm @ Rp 44,619.00 Rp 133,857.00
4.000 Bh Spacer/formite/penjaga jarak bekisting @ Rp 7,500.00 Rp 30,000.00
0.660 Oh Pekerja @ Rp 70,000.00 Rp 46,200.00
0.330 Oh Tukang kayu @ Rp 90,000.00 Rp 29,700.00
0.033 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 3,135.00
0.033 Oh Mandor @ Rp 115,000.00 Rp 3,795.00
Rp 435,140.80
Profit Dan Overhead (10%) Rp 43,514.08
Jumlah Rp 478,654.88

Memasang 1 M2 bekisting untuk dinding Untuk 2x Pemakaian


0.015 M3 Kayu klas III (papan) @ Rp 2,291,100.00 Rp 34,366.50
(papan 2 x pakai)
0.400 Kg Paku biasa 2" - 5" @ Rp 19,927.00 Rp 7,970.80
0.200 Ltr Minyak bekisting @ Rp 7,500.00 Rp 1,500.00
0.010 M3 Kayu klas II (balok) @ Rp 3,265,500.00 Rp 32,655.00
(Balok 2x pakai)
0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 128,400.00 Rp 22,470.00
(Multipleks 2x pakai)
1.500 Btg Dolken kayu Ø8-10/400 cm @ Rp 44,619.00 Rp 66,928.50
(dolken 2x pakai)
2.000 Bh Spacer/formite/penjaga jarak bekisting @ Rp 7,500.00 Rp 15,000.00
(spacer 2x pemakaian)
0.660 Oh Pekerja @ Rp 70,000.00 Rp 46,200.00
0.330 Oh Tukang kayu @ Rp 90,000.00 Rp 29,700.00
0.033 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 3,135.00
0.033 Oh Mandor @ Rp 115,000.00 Rp 3,795.00
Rp 263,720.80
Profit Dan Overhead (10%) Rp 26,372.08
Jumlah Rp 290,092.88

H.6 PEKERJAAN PENUTUP ATAP

H.6.2 - SPL Memasang 1 M2 Atap Genteng Keramik


16.000 Bh Genteng keramik Natural @ Rp 16,170.00 Rp 258,720.00
0.150 Oh Pekerja @ Rp 70,000.00 Rp 10,500.00
0.075 Oh Tukang kayu @ Rp 90,000.00 Rp 6,750.00
0.008 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 760.00
0.008 Oh Mandor @ Rp 115,000.00 Rp 920.00
Rp 277,650.00
H.6.5 - SPL Memasang 1 M' Bubung Genteng Keramik
5.000 Bh Nok genteng keramik Natural @ Rp 39,427.50 Rp 197,137.50
8.000 Kg Semen Portland @ Rp 1,275.00 Rp 10,200.00
0.032 M3 Pasir pasang @ Rp 135,000.00 Rp 4,320.00
0.400 Oh Pekerja @ Rp 70,000.00 Rp 28,000.00
0.200 Oh Tukang kayu @ Rp 90,000.00 Rp 18,000.00
0.020 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 1,900.00
0.002 Oh Mandor @ Rp 115,000.00 Rp 230.00
Rp 259,787.50

H.6.32 - SPL Memasang 1 M2 Atap Bitumen Genteng


3.230 Lbr Atap Genteng Bitumen Uk. 106 x 40 x 0.3 @ Rp 70,000.00 Rp 226,100.00
17.000 Bj Paku Sekrup Galvaniz Dia. 3 mm @ Rp 630.00 Rp 10,710.00
0.200 Oh Pekerja @ Rp 70,000.00 Rp 14,000.00
0.100 Oh Tukang kayu @ Rp 90,000.00 Rp 9,000.00
0.010 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 950.00
0.001 Oh Mandor @ Rp 115,000.00 Rp 115.00
Rp 260,875.00

H.6.36 - SPL Memasang 1 M' Nok Atap Bitumen


1.200 Lbr Nok Atap Bitumen Uk. 50 x 90 x 0.3 @ Rp #N/A Rp #N/A
10.000 Bj Paku Sekrup Galvaniz Dia. 3 mm @ Rp 630.00 Rp 6,300.00
0.250 Oh Pekerja @ Rp 70,000.00 Rp 17,500.00
0.150 Oh Tukang kayu @ Rp 90,000.00 Rp 13,500.00
0.015 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 1,425.00
0.013 Oh Mandor @ Rp 115,000.00 Rp 1,495.00
Rp #N/A

SPL Menutup 1 m2 Atap Dengan Atap Zincalume


1.050 M2 Long Spandek Type G550 AZ-100 T=0,4 mm, Lbr @ Rp 93,500.00 Rp 98,175.00
8.000 Bh Paku Sekrup + Mor + Pelapis @ Rp 2,500.00 Rp 20,000.00
0.140 Oh Pekerja @ Rp 70,000.00 Rp 9,800.00
0.070 Oh Tukang kayu @ Rp 90,000.00 Rp 6,300.00
0.007 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 665.00
0.007 Oh Mandor @ Rp 115,000.00 Rp 805.00
Rp 135,745.00
Profit Dan Overhead (10%) Rp 13,574.50
Jumlah Rp 149,319.50

SPL Memasang 1 m' Nok Atap Zincalume


1.050 M' Nok Long Spandek Type G550 AZ-100 T=0.4 mm @ Rp 61,500.00 Rp 64,575.00
10.000 Bh Paku Sekrup + Mor + Pelapis @ Rp 2,500.00 Rp 25,000.00
0.150 Oh Tukang kayu @ Rp 90,000.00 Rp 13,500.00
0.070 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 6,650.00
0.008 Oh Pekerja @ Rp 70,000.00 Rp 560.00
0.006 Oh Mandor @ Rp 115,000.00 Rp 690.00
Rp 110,975.00
Profit Dan Overhead (10%) Rp 11,097.50
Jumlah Rp 122,072.50

SPL Memasang Lisplank Ukuran (2x20) cm, woodplank


0.275 Lbr Woodplank T. 8 x 300 x 4000 mm @ Rp 80,000.00 Rp 22,000.00
0.088 Kg Paku sekrup 3,5" @ Rp 15,000.00 Rp 1,312.50
2.860 M Besi Hollow Galvanis 4 x 4 MB, Tbl 0.8 mm @ Rp 6,738.00 Rp 19,270.68
0.100 Oh Pekerja @ Rp 70,000.00 Rp 7,000.00
0.100 Oh Tukang kayu @ Rp 90,000.00 Rp 9,000.00
0.010 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 950.00
0.050 Oh Mandor @ Rp 115,000.00 Rp 5,750.00
1.000 Ls Alat Bantu @ Rp 10,000.00 Rp 10,000.00
Rp 75,283.18
Profit Dan Overhead (10%) Rp 7,528.32
Jumlah Rp 82,811.50

I.6 PEKERJAAN LANGIT - LANGIT/PLAFOND

SPL Memasang 1 M2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm + rangka Hollow
4.400 M Besi Hollow Galvanis 2 x 4 MB, Tbl 0.8 mm @ Rp 4,524.00 Rp 19,905.60
1.500 Bh Ramsel nails @ Rp 1,070.00 Rp 1,605.00
0.364 Lbr Gypsumboard 9 mm @ Rp 64,680.00 Rp 23,543.52
0.03 Za 0.600 Kg UB 888/400 Compoud @ Rp 9,000.00 Rp 5,400.00
0.016 Roll Isolasi Gypsun @ Rp 35,000.00 Rp 560.00
11.500 Bh Srews/sekrup @ Rp 1,177.00 Rp 13,535.50
1.000 Lbr Kertas Amplas @ Rp 3,675.00 Rp 3,675.00
0.070 Oh Pekerja @ Rp 70,000.00 Rp 4,900.00
0.700 Oh Tukang besi @ Rp 90,000.00 Rp 63,000.00
0.007 Oh Kepala Tukang Besi @ Rp 95,000.00 Rp 665.00
0.012 Oh Mandor @ Rp 115,000.00 Rp 1,380.00
Rp 138,169.62
Profit Dan Overhead (10%) Rp 13,816.96
Jumlah Rp 151,986.58

SPL Memasang 1 M2 langit-langit Calsyboard board ukuran (120x240) mm, tebal 6 mm + rangka Hollow
4.400 M Besi Hollow Galvanis 2 x 4 MB, Tbl 0.7 mm @ Rp #N/A Rp #N/A
1.500 Bh Ramsel nails @ Rp 1,070.00 Rp 1,605.00
0.364 Lbr Calsyboard 4 mm @ Rp 70,000.00 Rp 25,480.00
0.600 Kg UB 888/400 Compoud @ Rp 9,000.00 Rp 5,400.00
0.016 Roll Isolasi Gypsun @ Rp 35,000.00 Rp 560.00
11.500 Bh Srews/sekrup @ Rp 1,177.00 Rp 13,535.50
1.000 Lbr Kertas Amplas @ Rp 3,675.00 Rp 3,675.00
0.070 Oh Pekerja @ Rp 70,000.00 Rp 4,900.00
0.700 Oh Tukang besi @ Rp 90,000.00 Rp 63,000.00
0.007 Oh Kepala Tukang Besi @ Rp 95,000.00 Rp 665.00
0.012 Oh Mandor @ Rp 115,000.00 Rp 1,380.00
Rp #N/A
Profit Dan Overhead (10%) Rp #N/A
Jumlah Rp #N/A

J.6 PEKERJAAN PIPA DAN SANITER

J.6.1 Memasang 1 Bh kloset duduk/monoblok


1.000 Bh Closet duduk Lengkap @ Rp 1,617,000.00 Rp 1,617,000.00
6 % Perlengkapan Rp 97,020.00
3.300 Oh Pekerja @ Rp 70,000.00 Rp 231,000.00
1.100 Oh Tukang batu @ Rp 90,000.00 Rp 99,000.00
0.001 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 95.00
0.160 Oh Mandor @ Rp 115,000.00 Rp 18,400.00
Rp 2,062,515.00
Profit Dan Overhead (10%) Rp 206,251.50
Jumlah Rp 2,268,766.50

J.6.2 Memasang 1 Bh kloset jongkok porselen


1.000 Bh Closet jongkok @ Rp 224,700.00 Rp 224,700.00
6.000 Kg Semen Portland @ Rp 1,275.00 Rp 7,650.00
0.010 M3 Pasir pasang @ Rp 135,000.00 Rp 1,350.00
1.000 Oh Pekerja @ Rp 70,000.00 Rp 70,000.00
1.500 Oh Tukang batu @ Rp 90,000.00 Rp 135,000.00
1.500 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 142,500.00
0.160 Oh Mandor @ Rp 115,000.00 Rp 18,400.00
Rp 599,600.00
Profit Dan Overhead (10%) Rp 59,960.00
Jumlah Rp 659,560.00

J.6.4 Memasang 1 Bh Urinoir


1.000 Bh Urinoir Type U57, Lengkap @ Rp #N/A Rp #N/A
30 % Perlengkapan Rp #N/A
6.000 Kg Semen Portland @ Rp 1,275.00 Rp 7,650.00
0.010 M3 Pasir pasang @ Rp 135,000.00 Rp 1,350.00
1.000 Oh Pekerja @ Rp 70,000.00 Rp 70,000.00
1.000 Oh Tukang batu @ Rp 90,000.00 Rp 90,000.00
0.300 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 28,500.00
0.110 Oh Mandor @ Rp 115,000.00 Rp 12,650.00
Rp #N/A
Profit Dan Overhead (10%) Rp #N/A
Jumlah Rp #N/A

J.6.5 Memasang 1 Bh wastafel Keramik


1.000 Bh Wastafel keramik @ Rp 472,500.00 Rp 472,500.00
12 % Perlengkapan Rp 56,700.00
6.000 Kg Semen Portland @ Rp 1,275.00 Rp 7,650.00
0.010 M3 Pasir pasang @ Rp 135,000.00 Rp 1,350.00
1.200 Oh Pekerja @ Rp 70,000.00 Rp 84,000.00
1.450 Oh Tukang batu @ Rp 90,000.00 Rp 130,500.00
0.150 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 14,250.00
0.100 Oh Mandor @ Rp 115,000.00 Rp 11,500.00
Rp 778,450.00
Profit Dan Overhead (10%) Rp 77,845.00
Jumlah Rp 856,295.00

J.6.5 Memasang 1 Bh Washbasin stainless stel


1.000 Bh Washbasin stainless stel @ Rp 529,650.00 Rp 529,650.00
12 % Perlengkapan Rp 63,558.00
6.000 Kg Semen Portland @ Rp 1,275.00 Rp 7,650.00
0.010 M3 Pasir pasang @ Rp 135,000.00 Rp 1,350.00
1.200 Oh Pekerja @ Rp 70,000.00 Rp 84,000.00
1.450 Oh Tukang batu @ Rp 90,000.00 Rp 130,500.00
0.150 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 14,250.00
0.100 Oh Mandor @ Rp 115,000.00 Rp 11,500.00
Rp 842,458.00
Profit Dan Overhead (10%) Rp 84,245.80
Jumlah Rp 926,703.80
J.6.9 Memasang 1 Bh badkip porselen
1.000 Bh Bath tub + Acs @ Rp 8,500,000.00 Rp 8,500,000.00
2 % Perlengkapan Rp 170,000.00
0.008 Oh Pekerja @ Rp 70,000.00 Rp 525.00
0.075 Oh Tukang pipa @ Rp 90,000.00 Rp 6,750.00
0.008 Oh Kepala Tukang pipa @ Rp 95,000.00 Rp 712.50
0.004 Oh Mandor @ Rp 115,000.00 Rp 437.00
Rp 8,678,424.50
Profit Dan Overhead (10%) Rp 867,842.45
Jumlah Rp 9,546,266.95

J.6.25 Memasang 1 M' pipa PVC tipe AW diameter 1/2"


1.200 M' Pipa PVC AW Dia. 15 mm (1/2'') @ Rp 8,346.00 Rp 10,015.20
35 % Perlengkapan Rp 2,921.10
0.036 Oh Pekerja @ Rp 70,000.00 Rp 2,520.00
0.060 Oh Tukang pipa @ Rp 90,000.00 Rp 5,400.00
0.006 Oh Kepala Tukang pipa @ Rp 95,000.00 Rp 570.00
0.002 Oh Mandor @ Rp 115,000.00 Rp 207.00
Rp 21,633.30
Profit Dan Overhead (10%) Rp 2,163.33
Jumlah Rp 23,796.63

J.6.26 Memasang 1 M' pipa PVC tipe AW diameter 3/4"


1.200 M' Pipa PVC AW Dia. 20 mm (3/4'') @ Rp 10,165.00 Rp 12,198.00
35 % Perlengkapan Rp 3,557.75
0.036 Oh Pekerja @ Rp 70,000.00 Rp 2,520.00
0.060 Oh Tukang pipa @ Rp 90,000.00 Rp 5,400.00
0.006 Oh Kepala Tukang pipa @ Rp 95,000.00 Rp 570.00
0.002 Oh Mandor @ Rp 115,000.00 Rp 207.00
Rp 24,452.75
Profit Dan Overhead (10%) Rp 2,445.28
Jumlah Rp 26,898.03

J.6.27 Memasang 1 M' pipa PVC tipe AW diameter 1"


1.200 M' Pipa PVC AW Dia. 25 mm (1'') @ Rp 12,600.00 Rp 15,120.00
35 % Perlengkapan Rp 4,410.00
0.036 Oh Pekerja @ Rp 70,000.00 Rp 2,520.00
0.060 Oh Tukang pipa @ Rp 90,000.00 Rp 5,400.00
0.006 Oh Kepala Tukang pipa @ Rp 95,000.00 Rp 570.00
0.002 Oh Mandor @ Rp 115,000.00 Rp 207.00
Rp 28,227.00
Profit Dan Overhead (10%) Rp 2,822.70
Jumlah Rp 31,049.70

J.6.28 Memasang 1 M' pipa PVC tipe AW diameter 1 1/2"


1.200 M' Pipa PVC AW Dia. 40 mm (1 1/2'') @ Rp 12,810.00 Rp 15,372.00
35 % Perlengkapan Rp 4,483.50
0.036 Oh Pekerja @ Rp 70,000.00 Rp 2,520.00
0.060 Oh Tukang pipa @ Rp 90,000.00 Rp 5,400.00
0.006 Oh Kepala Tukang pipa @ Rp 95,000.00 Rp 570.00
0.002 Oh Mandor @ Rp 115,000.00 Rp 207.00
Rp 28,552.50
Profit Dan Overhead (10%) Rp 2,855.25
Jumlah Rp 31,407.75
J.6.29 Memasang 1 M' pipa PVC tipe AW diameter 2"
1.200 M' Pipa PVC AW Dia. 50 mm (2'') @ Rp 14,385.00 Rp 17,262.00
35 % Perlengkapan Rp 5,034.75
0.054 Oh Pekerja @ Rp 70,000.00 Rp 3,780.00
0.090 Oh Tukang pipa @ Rp 90,000.00 Rp 8,100.00
0.009 Oh Kepala Tukang pipa @ Rp 95,000.00 Rp 855.00
0.003 Oh Mandor @ Rp 115,000.00 Rp 310.50
Rp 35,342.25
Profit Dan Overhead (10%) Rp 3,534.23
Jumlah Rp 38,876.48

J.6.30 Memasang 1 M' pipa PVC tipe AW diameter 2 1/2"


1.200 M' Pipa PVC AW Dia. 65 mm (2 1/2'') @ Rp 17,378.00 Rp 20,853.60
35 % Perlengkapan Rp 6,082.30
0.054 Oh Pekerja @ Rp 70,000.00 Rp 3,780.00
0.090 Oh Tukang pipa @ Rp 90,000.00 Rp 8,100.00
0.009 Oh Kepala Tukang pipa @ Rp 95,000.00 Rp 855.00
0.003 Oh Mandor @ Rp 115,000.00 Rp 310.50
Rp 39,981.40
Profit Dan Overhead (10%) Rp 3,998.14
Jumlah Rp 43,979.54

J.6.31 Memasang 1 M' pipa PVC tipe AW diameter 3"


1.200 M' Pipa PVC AW Dia. 80 mm (3'') @ Rp 21,919.00 Rp 26,302.80
35 % Perlengkapan Rp 7,671.65
0.081 Oh Pekerja @ Rp 70,000.00 Rp 5,670.00
0.135 Oh Tukang pipa @ Rp 90,000.00 Rp 12,150.00
0.014 Oh Kepala Tukang pipa @ Rp 95,000.00 Rp 1,282.50
0.004 Oh Mandor @ Rp 115,000.00 Rp 471.50
Rp 53,548.45
Profit Dan Overhead (10%) Rp 5,354.85
Jumlah Rp 58,903.30

J.6.32 Memasang 1 M' pipa PVC tipe AW diameter 4"


1.200 M' Pipa PVC AW Dia. 100 mm (4'') @ Rp 38,115.00 Rp 45,738.00
35 % Perlengkapan Rp 13,340.25
0.081 Oh Pekerja @ Rp 70,000.00 Rp 5,670.00
0.135 Oh Tukang pipa @ Rp 90,000.00 Rp 12,150.00
0.014 Oh Kepala Tukang pipa @ Rp 95,000.00 Rp 1,282.50
0.004 Oh Mandor @ Rp 115,000.00 Rp 471.50
Rp 78,652.25
Profit Dan Overhead (10%) Rp 7,865.23
Jumlah Rp 86,517.48

J.6.33 Memasang 1 Bh bak cuci piring stainles steel


1.000 Bh Washbasin stainless stel @ Rp 529,650.00 Rp 529,650.00
1.000 Bh Waterdrain + accesoriss @ Rp 65,000.00 Rp 65,000.00
0.030 Oh Pekerja @ Rp 70,000.00 Rp 2,100.00
0.300 Oh Tukang batu @ Rp 90,000.00 Rp 27,000.00
0.030 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 2,850.00
0.002 Oh Mandor @ Rp 115,000.00 Rp 172.50
Rp 626,772.50
Profit Dan Overhead (10%) Rp 62,677.25
Jumlah Rp 689,449.75

J.6.35 Memasang 1 Bh kran diameter 3/4" atau 1/2"


1.000 Bh Kran air biasa 1/2" - 3/4" @ Rp 20,330.00 Rp 20,330.00
0.025 Bh Seal tape @ Rp 5,350.00 Rp 133.75
0.010 Oh Pekerja @ Rp 70,000.00 Rp 700.00
0.100 Oh Tukang pipa @ Rp 90,000.00 Rp 9,000.00
0.010 Oh Kepala Tukang pipa @ Rp 95,000.00 Rp 950.00
0.005 Oh Mandor @ Rp 115,000.00 Rp 575.00
Rp 31,688.75
Profit Dan Overhead (10%) Rp 3,168.88
Jumlah Rp 34,857.63

K.6.11-SNI Mengerjakan 1 M' Kusen Aluminium


1.100 M' Kusen Aluminium Warna 4" x 1 3/4" @ Rp 130,000.00 Rp 143,000.00
2.000 Bh Sektrup Fixer @ Rp 1,850.00 Rp 3,700.00
0.060 Tube Sealent @ Rp 90,000.00 Rp 5,400.00
0.043 Oh Pekerja @ Rp 70,000.00 Rp 3,010.00
0.043 Oh Tukang besi @ Rp 90,000.00 Rp 3,870.00
0.0043 Oh Kepala Tukang Besi @ Rp 95,000.00 Rp 408.50
0.0021 Oh Mandor @ Rp 115,000.00 Rp 241.50
Rp 159,630.00
Profit Dan Overhead (10%) Rp 15,963.00
Jumlah Rp 175,593.00

SPL.1 Mengerjakan 1 M' Bingkai Jendela Aluminium


A 1.100 M' Bingkai Pintu Aluminium Warna 4" x 1 1/2" @ Rp 110,000.00 Rp 121,000.00
B 1.100 M' Bingkai Pintu / Rangka Partisi Aluminium Warna 3" @ Rp 100,000.00 Rp 110,000.00
C 1.100 M1 Bingkai Jendela Aluminium Warna (2"x1") @ Rp 90,000.00 Rp 99,000.00
0.060 Tube Sealent @ Rp 90,000.00 Rp 5,400.00
0.043 Oh Pekerja @ Rp 70,000.00 Rp 3,010.00
0.043 Oh Tukang besi @ Rp 90,000.00 Rp 3,870.00
0.0043 Oh Kepala Tukang Besi @ Rp 95,000.00 Rp 408.50
0.0021 Oh Mandor @ Rp 115,000.00 Rp 241.50
1.000 Ls Alat Bantu + Accessories dll Rp 11,000.00
A Rp 144,930.00
Profit Dan Overhead (10%) Rp 14,493.00
Jumlah Rp 159,423.00
B Rp 133,930.00
Profit Dan Overhead (10%) Rp 13,393.00
Jumlah Rp 147,323.00
C Rp 122,930.00
Profit Dan Overhead (10%) Rp 12,293.00
Jumlah Rp 135,223.00

SPL 1 Unit Pasang Pintu Kaca Tempered, Tebal 12 Mm, Uk. 1.065 x 216 cm
2.415 M2 Pintu Kaca Tempered 12 mm @ Rp #N/A Rp #N/A
1.000 Oh Pekerja @ Rp #N/A Rp #N/A
2.500 Oh Tukang Besi @ Rp #N/A Rp #N/A
0.250 Oh Kepala Tukang Besi @ Rp #N/A Rp #N/A
0.050 Oh Mandor @ Rp #N/A Rp #N/A
1.000 Set Frame List, Baut / Sekrup DLL Rp #N/A
1.000 Ls Alat bantu + Fabrikasi dll Rp #N/A
Rp #N/A
Profit Dan Overhead (7,5%) Rp #N/A
Jumlah Rp #N/A

1 Unit Pasang Pintu Kaca Tempered, Tebal 12 Mm, Uk. 75 x 216 cm


1.701 M2 Pintu Kaca Tempered 12 mm @ Rp #N/A Rp #N/A
1.000 Oh Pekerja @ Rp 70,000.00 Rp 70,000.00
2.500 Oh Tukang Besi @ Rp 90,000.00 Rp 225,000.00
0.250 Oh Kepala Tukang Besi @ Rp 95,000.00 Rp 23,750.00
0.814 m2 Kaca Ryben 5mm @ Rp 139,755.00 Rp 113,699.08
8.800 m Karet List Kaca @ Rp 2,500.00 Rp 22,000.00
1.000 Ls Alat Bantu + Assesories @ Rp 61,969.91 Rp 61,969.91
0.085 Oh Pekerja @ Rp 70,000.00 Rp 5,950.00
0.085 Oh Tukang besi @ Rp 90,000.00 Rp 7,650.00
0.009 Oh Kepala Tukang Besi @ Rp 95,000.00 Rp 855.00
0.005 Oh Mandor @ Rp 115,000.00 Rp 575.00
Rp #N/A
Rp #N/A
Rp #N/A

1 Bh Memasang Jendela Kaca Rangka Alluminium Ukuran (0.82x0.605)m


3.135 m Bingkai Jendela Aluminium Warna (2"x1") @ Rp 90,000.00 Rp 282,150.00
0.373 m Kaca Ryben 5mm @ Rp 139,755.00 Rp 52,191.50
2.000 Buah Engsel jendela Kw.1 @ Rp 31,779.00 Rp 63,558.00
6.270 m Karet List Kaca @ Rp 2,500.00 Rp 15,675.00
1.000 Ls Alat Bantu + Assesories @ Rp 41,357.45 Rp 41,357.45
0.042 Oh Pekerja @ Rp 70,000.00 Rp 2,951.80
0.042 Oh Tukang besi @ Rp 90,000.00 Rp 3,795.17
0.004 Oh Kepala Tukang Besi @ Rp 95,000.00 Rp 424.17
0.002 Oh Mandor @ Rp 115,000.00 Rp 278.30
Rp 462,381.38

SPL 1 Bh Pasang Pintu Aluminium


1.000 Bh Pintu Aluminium, Uk. 60 x 200 @ Rp 1,250,000.00 Rp 1,250,000.00
1.050 Oh Pekerja @ Rp 70,000.00 Rp 73,500.00
L.6 1.050 Oh Tukang besi @ Rp 90,000.00 Rp 94,500.00
0.105 Oh Kepala Tukang Besi @ Rp 95,000.00 Rp 9,975.00
0.0052 Oh Mandor @ Rp 115,000.00 Rp 598.00
Rp 1,428,573.00
Profit Dan Overhead (10%) Rp 142,857.30
Jumlah Rp 1,571,430.30

SPL 1 M2 Memasang Jendela Kaca Rangka Alluminium


4.400 m Bingkai Jendela Aluminium Warna (2"x1") @ Rp 90,000.00 Rp 396,000.00
0.891 m Kaca bening 5 mm @ Rp 129,045.00 Rp 114,979.10
8.800 m Karet List Kaca @ Rp 2,500.00 Rp 22,000.00
1.000 Ls Alat Bantu + Assesories @ Rp 53,297.91 Rp 53,297.91
0.085 Oh Pekerja @ Rp 70,000.00 Rp 5,950.00
0.085 Oh Tukang besi @ Rp 90,000.00 Rp 7,650.00
0.009 Oh Kepala Tukang Besi @ Rp 95,000.00 Rp 855.00
0.005 Oh Mandor @ Rp 115,000.00 Rp 575.00
Rp 601,307.00
Profit Dan Overhead (10%) Rp 60,130.70
Jumlah Rp 661,437.70

PEKERJAAN KUNCI DAN KACA

L.6.2 Memasang 1 Bh kunci tanam biasa


1.000 Bh Kunci tanam biasa (2 x Slag) @ Rp 214,000.00 Rp 214,000.00
0.010 Oh Pekerja @ Rp 70,000.00 Rp 700.00
0.500 Oh Tukang kayu @ Rp 90,000.00 Rp 45,000.00
0.010 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 950.00
0.005 Oh Mandor @ Rp 115,000.00 Rp 575.00
Rp 261,225.00
Profit Dan Overhead (10%) Rp 26,122.50
Jumlah Rp 287,347.50

L.6.4 Memasang 1 Bh kunci silinder


1.000 Bh Kunci tanam silinder @ Rp 350,000.00 Rp 350,000.00
0.005 Oh Pekerja @ Rp 70,000.00 Rp 350.00
0.500 Oh Tukang kayu @ Rp 90,000.00 Rp 45,000.00
0.005 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 475.00
0.0025 Oh Mandor @ Rp 115,000.00 Rp 287.50
Rp 396,112.50
Profit Dan Overhead (10%) Rp 39,611.25
Jumlah Rp 435,723.75

L.6.5 Memasang 1 Bh engsel pintu


1.000 Bh Engsel pintu Kw.1 @ Rp 35,310.00 Rp 35,310.00
0.015 Oh Pekerja @ Rp 70,000.00 Rp 1,050.00
0.150 Oh Tukang kayu @ Rp 90,000.00 Rp 13,500.00
0.015 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 1,425.00
0.0008 Oh Mandor @ Rp 115,000.00 Rp 86.25
Rp 51,371.25
Profit Dan Overhead (10%) Rp 5,137.13
Jumlah Rp 56,508.38

SPL Memasang 1 Psg Flooring Engsel pintu


1.000 Psg Flooring engsel @ Rp 900,000.00 Rp 900,000.00
0.015 Oh Pekerja @ Rp 70,000.00 Rp 1,050.00
0.300 Oh Tukang kayu @ Rp 90,000.00 Rp 27,000.00
0.030 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 2,850.00
0.0008 Oh Mandor @ Rp 115,000.00 Rp 86.25
Rp 930,986.25
Profit Dan Overhead (10%) Rp 93,098.63
Jumlah Rp 1,024,084.88

L.6.6 Memasang 1 Bh engsel jendela


1.000 Bh Engsel jendela Kw.1 @ Rp 31,779.00 Rp 31,779.00
0.010 Oh Pekerja @ Rp 70,000.00 Rp 700.00
0.100 Oh Tukang kayu @ Rp 90,000.00 Rp 9,000.00
0.010 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 950.00
0.0005 Oh Mandor @ Rp 115,000.00 Rp 57.50
Rp 42,486.50
Profit Dan Overhead (10%) Rp 4,248.65
Jumlah Rp 46,735.15

L.6.9 Memasang 1 Bh kait angin


1.000 Bh Kait angin @ Rp 20,000.00 Rp 20,000.00
0.015 Oh Pekerja @ Rp 70,000.00 Rp 1,050.00
0.150 Oh Tukang kayu @ Rp 90,000.00 Rp 13,500.00
0.015 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 1,425.00
0.00075 Oh Mandor @ Rp 115,000.00 Rp 86.25
Rp 36,061.25
Profit Dan Overhead (10%) Rp 3,606.13
Jumlah Rp 39,667.38
SPL Memasang 1 Bh grendel jendela
1.000 Bh Grendel jendela Kw.1 @ Rp 9,345.00 Rp 9,345.00
0.010 Oh Pekerja @ Rp 70,000.00 Rp 700.00
0.100 Oh Tukang kayu @ Rp 90,000.00 Rp 9,000.00
0.010 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 950.00
0.00050 Oh Mandor @ Rp 115,000.00 Rp 57.50
Rp 20,052.50
Profit Dan Overhead (10%) Rp 2,005.25
Jumlah Rp 22,057.75
L.6.10 Memasang 1 Bh door closer
1.000 Bh Door closer/espanyolet @ Rp 107,000.00 Rp 107,000.00
0.050 Oh Pekerja @ Rp 70,000.00 Rp 3,500.00
0.500 Oh Tukang kayu @ Rp 90,000.00 Rp 45,000.00
0.050 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 4,750.00
0.0025 Oh Mandor @ Rp 115,000.00 Rp 287.50
Rp 160,537.50
Profit Dan Overhead (10%) Rp 16,053.75
Jumlah Rp 176,591.25
L.6.11 Memasang 1 Bh kunci selot
A 1.000 Bh Kunci selot @ Rp 500,000.00 Rp 500,000.00
B 1.000 Bh Kunci selot biasa @ Rp 225,000.00 Rp 225,000.00
0.020 Oh Pekerja @ Rp 70,000.00 Rp 1,400.00
0.200 Oh Tukang kayu @ Rp 90,000.00 Rp 18,000.00
0.020 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 1,900.00
0.0010 Oh Mandor @ Rp 115,000.00 Rp 115.00
Juml. A Rp 521,415.00
Profit Dan Overhead (10%) Rp 52,141.50
Jumlah Rp 573,556.50
Juml. B Rp 246,415.00
Profit Dan Overhead (10%) Rp 24,641.50
Jumlah Rp 271,056.50

L.6.12 Memasang 1 Bh pegangan pintu/door holder


1.000 Bh Door Holder @ Rp 150,000.00 Rp 150,000.00
0.050 Oh Pekerja @ Rp 70,000.00 Rp 3,500.00
0.500 Oh Tukang kayu @ Rp 90,000.00 Rp 45,000.00
0.050 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 4,750.00
0.0025 Oh Mandor @ Rp 115,000.00 Rp 287.50
Rp 203,537.50
Profit Dan Overhead (10%) Rp 20,353.75
Jumlah Rp 223,891.25
L.6.17 Memasang 1 M2 kaca, tebal 5 mm
1.100 M2 Kaca Ryben 5mm @ Rp 139,755.00 Rp 153,730.50
0.015 Oh Pekerja @ Rp 70,000.00 Rp 1,050.00
0.150 Oh Tukang kayu @ Rp 90,000.00 Rp 13,500.00
0.015 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 1,425.00
0.00075 Oh Mandor @ Rp 115,000.00 Rp 86.25
Rp 169,791.75
Profit Dan Overhead (10%) Rp 16,979.18
Jumlah Rp 186,770.93

M.6 Memasang 1 M2 kaca, tebal 5 mm


1.100 M2 Kaca bening 5 mm @ Rp 129,045.00 Rp 141,949.50
0.015 Oh Pekerja @ Rp 70,000.00 Rp 1,050.00
0.150 Oh Tukang kayu @ Rp 90,000.00 Rp 13,500.00
0.015 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 1,425.00
0.00075 Oh Mandor @ Rp 115,000.00 Rp 86.25
Rp 158,010.75
Profit Dan Overhead (10%) Rp 15,801.08
Jumlah Rp 173,811.83

Memasang 1 M2 kaca, tebal 8 mm


1.100 M2 Kaca Stopsol Laminated 8 mm @ Rp 667,700.00 Rp 734,470.00
0.015 Oh Pekerja @ Rp 70,000.00 Rp 1,050.00
0.150 Oh Tukang kayu @ Rp 90,000.00 Rp 13,500.00
0.015 Oh Kepala Tukang Kayu @ Rp 95,000.00 Rp 1,425.00
0.00075 Oh Mandor @ Rp 115,000.00 Rp 86.25
Rp 750,531.25
Rp 75,053.13
Rp 825,584.38

PEKERJAAN PENUTUP LANTAI DAN DINDING

M.6.13 Memasang 1 M2 lantai Keramik Anti Noda T = 1 cm, ukuran (60x60) cm


3.100 Bh Tegel keramik Anti noda, T = 1 Cm, 60 x 60 Cm @ Rp 62,500.00 Rp 193,750.00
9.600 Kg Semen Portland @ Rp 1,275.00 Rp 12,240.00
0.045 M3 Pasir pasang @ Rp 135,000.00 Rp 6,075.00
1.500 Kg Semen warna @ Rp 15,750.00 Rp 23,625.00
0.250 Oh Pekerja @ Rp 70,000.00 Rp 17,500.00
0.120 Oh Tukang batu @ Rp 90,000.00 Rp 10,800.00
0.012 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 1,140.00
0.013 Oh Mandor @ Rp 115,000.00 Rp 1,495.00
Rp 266,625.00
Rp 19,996.88
Rp 286,621.88

Memasang 1 M2 lantai Keramik Anti Noda T = 1 cm, ukuran (20x60) cm


9.160 Bh Tegel keramik Anti noda, T = 1 Cm, 20 x 60 Cm @ Rp 27,010.80 Rp 247,418.97
9.800 Kg Semen Portland @ Rp 1,275.00 Rp 12,495.00
0.045 M3 Pasir pasang @ Rp 135,000.00 Rp 6,075.00
1.300 Kg Semen warna @ Rp 15,750.00 Rp 20,475.00
0.250 Oh Pekerja @ Rp 70,000.00 Rp 17,500.00
0.120 Oh Tukang batu @ Rp 90,000.00 Rp 10,800.00
0.012 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 1,140.00
0.013 Oh Mandor @ Rp 115,000.00 Rp 1,495.00
Rp 317,398.97
Profit Dan Overhead (7,5%) Rp 23,804.92
Jumlah Rp 341,203.89

Memasang 1 M2 lantai keramik ukuran (40x40) cm


6.630 Bh Tegel keramik 40 x 40 cm (Warna) @ Rp 9,666.67 Rp 64,090.00
9.800 Kg Semen Portland @ Rp 1,275.00 Rp 12,495.00
0.045 M3 Pasir pasang @ Rp 135,000.00 Rp 6,075.00
1.300 Kg Semen warna @ Rp 15,750.00 Rp 20,475.00
0.700 Oh Pekerja @ Rp 70,000.00 Rp 49,000.00
0.350 Oh Tukang batu @ Rp 90,000.00 Rp 31,500.00
0.035 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 3,325.00
0.035 Oh Mandor @ Rp 115,000.00 Rp 4,025.00
Rp 190,985.00
Profit Dan Overhead (10%) Rp 19,098.50
Jumlah Rp 210,083.50

Memasang 1 M2 lantai keramik ukuran (30x30) cm


11.870 Bh Tegel keramik 30 x 30 cm (Putih) @ Rp 5,679.55 Rp 67,416.20
10.000 Kg Semen Portland @ Rp 1,275.00 Rp 12,750.00
0.045 M3 Pasir pasang @ Rp 135,000.00 Rp 6,075.00
1.500 Kg Semen warna @ Rp 15,750.00 Rp 23,625.00
0.700 Oh Pekerja @ Rp 70,000.00 Rp 49,000.00
0.350 Oh Tukang batu @ Rp 90,000.00 Rp 31,500.00
0.035 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 3,325.00
0.035 Oh Mandor @ Rp 115,000.00 Rp 4,025.00
Rp 197,716.20
Profit Dan Overhead (10%) Rp 19,771.62
Jumlah Rp 217,487.83

Memasang 1 M2 lantai keramik ukuran (20x20) cm


26.500 Bh Tegel keramik 20 x 20 cm (kasar) @ Rp 1,920.00 Rp 50,880.00
10.400 Kg Semen Portland @ Rp 1,275.00 Rp 13,260.00
0.045 M3 Pasir pasang @ Rp 135,000.00 Rp 6,075.00
1.620 Kg Semen warna @ Rp 15,750.00 Rp 25,515.00
0.620 Oh Pekerja @ Rp 70,000.00 Rp 43,400.00
0.350 Oh Tukang batu @ Rp 90,000.00 Rp 31,500.00
0.035 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 3,325.00
0.030 Oh Mandor @ Rp 115,000.00 Rp 3,450.00
Rp 177,405.00
Profit Dan Overhead (10%) Rp 17,740.50
Jumlah Rp 195,145.50

SPL Memasang 1 M2 dinding keramik ukuran (20x25) cm


21.000 Bh Tegel keramik 20 x 25 cm ( warna ) @ Rp 3,243.80 Rp 68,119.80
9.300 Kg Semen Portland @ Rp 1,275.00 Rp 11,857.50
0.018 M3 Pasir pasang @ Rp 135,000.00 Rp 2,430.00
1.940 Kg Semen warna @ Rp 15,750.00 Rp 30,555.00
0.600 Oh Pekerja @ Rp 70,000.00 Rp 42,000.00
0.450 Oh Tukang batu @ Rp 90,000.00 Rp 40,500.00
0.045 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 4,275.00
0.030 Oh Mandor @ Rp 115,000.00 Rp 3,450.00
Rp 203,187.30
Profit Dan Overhead (10%) Rp 20,318.73
Jumlah Rp 223,506.03

SPL Memasang 1 M2 dinding keramik ukuran (30x50) cm


7.000 Bh Tegel keramik 30 x 50 Cm @ Rp 7,428.57 Rp 52,000.00
9.300 Kg Semen Portland @ Rp 1,275.00 Rp 11,857.50
0.018 M3 Pasir pasang @ Rp 135,000.00 Rp 2,430.00
1.940 Kg Semen warna @ Rp 15,750.00 Rp 30,555.00
0.600 Oh Pekerja @ Rp 70,000.00 Rp 42,000.00
0.450 Oh Tukang batu @ Rp 90,000.00 Rp 40,500.00
0.045 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 4,275.00
0.030 Oh Mandor @ Rp 115,000.00 Rp 3,450.00
Rp 187,067.50
Profit Dan Overhead (10%) Rp 18,706.75
Jumlah Rp 205,774.25

SPL Memasang 1 M plint Keramik ukuran (10 x 40) cm


1.700 Bh Plint Keramik 10 x 40 cm @ Rp 18,000.00 Rp 30,600.00
1.140 Kg Semen Portland @ Rp 1,275.00 Rp 1,453.50
0.003 M3 Pasir pasang @ Rp 135,000.00 Rp 405.00
0.100 Kg Semen warna @ Rp 15,750.00 Rp 1,575.00
0.090 Oh Pekerja @ Rp 70,000.00 Rp 6,300.00
0.090 Oh Tukang batu @ Rp 90,000.00 Rp 8,100.00
0.009 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 855.00
0.005 Oh Mandor @ Rp 115,000.00 Rp 575.00
Rp 49,863.50
Profit Dan Overhead (10%) Rp 4,986.35
Jumlah Rp 54,849.85

M.6.43 - SPL Memasang 1 M2 lantai Granit


1.060 Bh Granit Lantai Type Starwhite, t = 2 cm @ Rp 420,000.00 Rp 445,200.00
8.190 Kg Semen Portland @ Rp 1,275.00 Rp 10,442.25
0.045 M3 Pasir pasang @ Rp 135,000.00 Rp 6,075.00
0.650 Kg Semen warna @ Rp 15,750.00 Rp 10,237.50
0.620 Oh Pekerja @ Rp 70,000.00 Rp 43,400.00
0.350 Oh Tukang batu @ Rp 90,000.00 Rp 31,500.00
0.035 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 3,325.00
0.030 Oh Mandor @ Rp 115,000.00 Rp 3,450.00
Rp 553,629.75
Profit Dan Overhead (10%) Rp 55,362.98
Jumlah Rp 608,992.73

M.6.43 - SPL Memasang 1 M2 lantai Marmer


1.060 Bh Marmer Lantai Ex Ujungpandang, t = 2 cm @ Rp 638,000.00 Rp 676,280.00
8.190 Kg Semen Portland @ Rp 1,275.00 Rp 10,442.25
0.045 M3 Pasir pasang @ Rp 135,000.00 Rp 6,075.00
0.650 Kg Semen warna @ Rp 15,750.00 Rp 10,237.50
0.620 Oh Pekerja @ Rp 70,000.00 Rp 43,400.00
0.350 Oh Tukang batu @ Rp 90,000.00 Rp 31,500.00
0.035 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 3,325.00
0.030 Oh Mandor @ Rp 115,000.00 Rp 3,450.00
Rp 784,709.75
Profit Dan Overhead (10%) Rp 78,470.98
Jumlah Rp 863,180.73
M.6.55 - SPL Memasang 1 M2 dinding Granit
1.020 M2 Granit Dinding Type Starwhite, t = 2 cm @ Rp 420,000.00 Rp 428,400.00
2.000 Bh Paku Pancing @ Rp 27,500.00 Rp 55,000.00
12.440 Kg Semen Portland @ Rp 1,275.00 Rp 15,861.00
0.025 M3 Pasir pasang @ Rp 135,000.00 Rp 3,375.00
0.650 Kg Semen warna @ Rp 15,750.00 Rp 10,237.50
0.720 Oh Pekerja @ Rp 70,000.00 Rp 50,400.00
0.650 Oh Tukang batu @ Rp 90,000.00 Rp 58,500.00
0.065 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 6,175.00
0.035 Oh Mandor @ Rp 115,000.00 Rp 4,025.00
Rp 631,973.50
Profit Dan Overhead (10%) Rp 63,197.35
Jumlah Rp 695,170.85

M.6.58 - SPL Memasang 1 M2 dinding batu Alam Undersheet


1.100 M2 Batu Alam Undersheet @ Rp 190,000.00 Rp 209,000.00
11.750 Kg Semen Portland @ Rp 1,275.00 Rp 14,981.25
0.035 M3 Pasir pasang @ Rp 135,000.00 Rp 4,725.00
0.620 Oh Pekerja @ Rp 70,000.00 Rp 43,400.00
0.350 Oh Tukang batu @ Rp 90,000.00 Rp 31,500.00
0.035 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 3,325.00
0.030 Oh Mandor @ Rp 115,000.00 Rp 3,450.00
Rp 310,381.25
Profit Dan Overhead (10%) Rp 31,038.13
Jumlah Rp 341,419.38

M.6.28 - SPL Memasang 1 M plint Granit


1.700 Bh Plint Granit Type Starwhite, t = 2 cm @ Rp 35,000.00 Rp 59,500.00
1.140 Kg Semen Portland @ Rp 1,275.00 Rp 1,453.50
0.003 M3 Pasir pasang @ Rp 135,000.00 Rp 405.00
0.100 Kg Semen warna @ Rp 15,750.00 Rp 1,575.00
0.090 Oh Pekerja @ Rp 70,000.00 Rp 6,300.00
0.090 Oh Tukang batu @ Rp 90,000.00 Rp 8,100.00
0.009 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 855.00
0.005 Oh Mandor @ Rp 115,000.00 Rp 575.00
Rp 78,763.50
Profit Dan Overhead (10%) Rp 7,876.35
Jumlah Rp 86,639.85

M.6.44 Memasang 1 M2 lantai karpet


1.050 M2 karpet KW 1 @ Rp 350,000.00 Rp 367,500.00
0.350 Kg lem karpet @ Rp 17,500.00 Rp 6,125.00
0.170 Oh Pekerja @ Rp 70,000.00 Rp 11,900.00
0.170 Oh Tukang batu @ Rp 90,000.00 Rp 15,300.00
0.017 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 1,615.00
0.009 Oh Mandor @ Rp 115,000.00 Rp 1,035.00
Rp 403,475.00
Profit Dan Overhead (10%) Rp 40,347.50
Jumlah Rp 443,822.50

M.6.45 Memasang 1 M2 lantai underlayer


1.050 M2 Underlayer/rubber corrugate @ Rp 75,000.00 Rp 78,750.00
0.350 Kg lem karpet @ Rp 17,500.00 Rp 6,125.00
0.120 Oh Pekerja @ Rp 70,000.00 Rp 8,400.00
0.120 Oh Tukang batu @ Rp 90,000.00 Rp 10,800.00
0.012 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 1,140.00
0.006 Oh Mandor @ Rp 115,000.00 Rp 690.00
Rp 105,905.00
Profit Dan Overhead (10%) Rp 10,590.50
Jumlah Rp 116,495.50

SPL Memasang 1 M2 lantai Koral Sikat


16.667 Kg Koral Sikat @ Rp 4,800.00 Rp 80,001.60
0.235 Kg Semen Portland @ Rp 1,275.00 Rp 299.63
N.6 0.035 M3 Pasir pasang @ Rp 135,000.00 Rp 4,725.00
0.500 Ltr HCL @ Rp 7,500.00 Rp 3,750.00
0.620 Oh Pekerja @ Rp 70,000.00 Rp 43,400.00
0.350 Oh Tukang batu @ Rp 90,000.00 Rp 31,500.00
0.035 Oh Kepala Tukang Batu @ Rp 95,000.00 Rp 3,325.00
0.030 Oh Mandor @ Rp 115,000.00 Rp 3,450.00
Rp 170,451.23
Profit Dan Overhead (10%) Rp 17,045.12
Jumlah Rp 187,496.35

PEKERJAAN PENGECATAN

N.6.8 Mengecat 1 M2 bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
0.200 Kg Cat meni @ Rp 23,063.00 Rp 4,612.60
0.150 Kg Dempul @ Rp 24,610.00 Rp 3,691.50
0.170 Kg Cat dasar @ Rp 19,000.00 Rp 3,230.00
0.260 Kg Cat kayu @ Rp 59,192.00 Rp 15,389.92
0.070 Oh Pekerja @ Rp 70,000.00 Rp 4,900.00
0.009 Oh Tukang cat @ Rp 90,000.00 Rp 810.00
0.006 Oh Kepala Tukang Cat @ Rp 95,000.00 Rp 570.00
0.0025 Oh Mandor @ Rp 115,000.00 Rp 287.50
Rp 33,491.52
Profit Dan Overhead (10%) Rp 3,349.15
Jumlah Rp 36,840.67

N.6.10 - SPL Melabur 1 M2 bidang Batu Alam dengan Coating


0.360 Ltr Coating @ Rp 55,000.00 Rp 19,800.00
0.040 Oh Pekerja @ Rp 70,000.00 Rp 2,800.00
0.063 Oh Tukang cat @ Rp 90,000.00 Rp 5,670.00
0.063 Oh Kepala Tukang Cat @ Rp 95,000.00 Rp 5,985.00
0.0025 Oh Mandor @ Rp 115,000.00 Rp 287.50
Rp 34,542.50
Profit Dan Overhead (10%) Rp 3,454.25
Jumlah Rp 37,996.75

N.6.14 Mengecat 1 M2 tembok baru (1 lapis plamir, 1 lapis cat dasar, dan 2 lapis cat penutup)
0.100 Kg Plamur tembok @ Rp 11,697.00 Rp 1,169.70
0.100 Kg Cat dasar @ Rp 19,000.00 Rp 1,900.00
0.260 Kg Cat tembok Kw. 1 @ Rp 60,060.00 Rp 15,615.60
0.020 Oh Pekerja @ Rp 70,000.00 Rp 1,400.00
0.063 Oh Tukang cat @ Rp 90,000.00 Rp 5,670.00
0.0063 Oh Kepala Tukang Cat @ Rp 95,000.00 Rp 598.50
0.0025 Oh Mandor @ Rp 115,000.00 Rp 287.50
Rp 26,641.30
Profit Dan Overhead (10%) Rp 2,664.13
Jumlah Rp 29,305.43

N.6.14 - SPL Mengecat 1 M2 tembok baru (1 lapis plamir, 1 lapis cat dasar, dan 2 lapis cat penutup), (Eksterior)
0.100 Kg Plamur tembok @ Rp 11,697.00 Rp 1,169.70
0.100 Kg Cat dasar @ Rp 19,000.00 Rp 1,900.00
0.260 Kg Cat tembok Kw. 1 @ Rp 60,060.00 Rp 15,615.60
0.020 Oh Pekerja @ Rp 70,000.00 Rp 1,400.00
0.063 Oh Tukang cat @ Rp 90,000.00 Rp 5,670.00
0.0063 Oh Kepala Tukang Cat @ Rp 95,000.00 Rp 598.50
0.0025 Oh Mandor @ Rp 115,000.00 Rp 287.50
Rp 26,641.30
Profit Dan Overhead (10%) Rp 2,664.13
Jumlah Rp 29,305.43

N.6.23 Mengecat 1 M2 permukaan baja lapis seng (galbani) secara manual sistem 1 lapis
cat mutakhir dengan tebal 200 µm
0.300 Kg Cat Zincromate @ Rp 40,000.00 Rp 12,000.00
0.006 Oh Pekerja @ Rp 70,000.00 Rp 420.00
0.060 Oh Tukang cat @ Rp 90,000.00 Rp 5,400.00
0.012 Oh Kepala Tukang Cat @ Rp 95,000.00 Rp 1,140.00
0.006 Oh Mandor @ Rp 115,000.00 Rp 690.00
Rp 19,650.00
Profit Dan Overhead (10%) Rp 1,965.00
Jumlah Rp 21,615.00

N.6.25 Mengecat 1 M2 permukaan baja lapis seng (galbani) secara semprot manual sistem 3 lapis
(airless spray) dengan sistem 1 lapis cat mutakhir dengan tebal 200 µm
0.300 Kg Cat Zincromate @ Rp 40,000.00 Rp 12,000.00
0.400 Oh Pekerja @ Rp 70,000.00 Rp 28,000.00
0.700 Oh Tukang cat @ Rp 90,000.00 Rp 63,000.00
0.200 Oh Kepala Tukang Cat @ Rp 95,000.00 Rp 19,000.00
0.200 Oh Mandor @ Rp 115,000.00 Rp 23,000.00
Rp 145,000.00
Profit Dan Overhead (10%) Rp 14,500.00
Jumlah Rp 159,500.00

PEKERJAAN LISTRIK

SPL - 01 Mengerjakan 1 Titik Instalasi Penerangan


10.000 M' Kabel NYM (2x2,5) mm @ Rp 8,873.00 Rp 88,730.00
4.000 Bh Klem Kabel No. 10 @ Rp 5,350.00 Rp 21,400.00
1.000 Bh Pipa Instalasi Listrik @ Rp 34,240.00 Rp 34,240.00
1.000 Bh Inbow Dos @ Rp 3,745.00 Rp 3,745.00
4.000 Bh Las Dop @ Rp 3,623.00 Rp 14,492.00
1.000 Bh Isolasi @ Rp 8,820.00 Rp 8,820.00
1.000 Bh T - Dos 5/8" @ Rp 12,600.00 Rp 12,600.00
0.100 Ls Alat bantu @ Rp 10,000.00 Rp 1,000.00
0.500 Oh Tukang listrik @ Rp 105,000.00 Rp 52,500.00
0.200 Oh Kepala Tukang listrik @ Rp 95,000.00 Rp 19,000.00
Rp 256,527.00
Profit Dan Overhead (10%) Rp 25,652.70
Jumlah Rp 282,179.70

SPL - 02 Mengerjakan 1 Titik Instalasi Stop Kontak


12.000 M' Kabel NYM (3x2,5) mm @ Rp 11,340.00 Rp 136,080.00
3.000 Bh Klem Kabel No. 10 @ Rp 5,350.00 Rp 16,050.00
1.000 Bh Pipa Instalasi Listrik @ Rp 34,240.00 Rp 34,240.00
1.000 Bh Inbow Dos @ Rp 3,745.00 Rp 3,745.00
4.000 Bh Las Dop @ Rp 3,623.00 Rp 14,492.00
1.000 Bh Isolasi @ Rp 8,820.00 Rp 8,820.00
1.000 Bh T - Dos 5/8" @ Rp 12,600.00 Rp 12,600.00
0.100 Ls Alat bantu @ Rp 10,000.00 Rp 1,000.00
0.500 Oh Tukang listrik @ Rp 105,000.00 Rp 52,500.00
0.200 Oh Kepala Tukang listrik @ Rp 95,000.00 Rp 19,000.00
Rp 298,527.00
Profit Dan Overhead (10%) Rp 29,852.70
Jumlah Rp 328,379.70

You might also like