EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Test Procedure or Method Statement shall be project specific and Proect Quality
A1
identified in the Project Quality Plan. Plan
SAES-A-004,
A2 List of piping and equipment included in the test
Para. 5.6.1
G.I-2.102,
A5 Control of pressurization.
Para. 5.16
SAES-L-150
A6 Test duration
Para. 5.12.2
SAES-L-004,
A7 Test medium. (G.I-2.102, Para. 5.3)
Para. 5.6.1
G.I-2.102,
A8 Special support requirements, if any to take the weight of test liquid
Para. 5.8
G.I-2.102,
A9 Chemical additives for treatment of test medium
Para. 5.4
G.I-2.102,
A10 Test Sequence
Para. 5.2 l
SAES-L-004,
A11 Minimum temperature allowed. (G.I-2.102, Para. 5.10
Para. 5.6.1
G.I-2.102,
A12 Inspection requirements
Para. 5.2 n
G.I-2.102,
A13 Areas to be kept free of people during the test or location of barriers.
Para. 5.11 to 5.14
G.I-2.102,
A14 Location of warning signs
Para. 5.11
G.I-2.102,
A15 Work permits required, if any
Para. 5.6
G.I-2.102,
A16 Test medium disposal requirements
Para. 5.20
G.I-2.102,
A17 Additional or special safety equipment required.
Para. 5.21
Page 1 of 3
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review of Pressure Testing Procedure SAIC-A-2001 25-May-05 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Safety Instruction Sheet (SIS) where required. (ie: Critical Plant Piping, G.I.-2.102, Para.
A18
Vessels, Pipelines) 5.2 t
G.I.-2.102, Para.
A19 Emergency communication required.
5.2 t
Hydrotest at top of vessel shall be 1.5 times the MAWP for ASME Div. 1 SAES-A-004,
A23
vessels and 1.25 times the MAWP for ASME Div. 2 vessels. Para. 6.3.1
G.I-2.102,
A26 Procedure on Repair of leaks
Para. 5.17
G.I-2.102,
A27 Safety procedure in depressurization
Para. 5.19
The procedure shall detail the flushing/cleaning requirements. As
minimum these are:
a. Proof of system completion to hold pressure by
SAES-A-004,
A28 Pre-Test Punchlisting.
Para. 5.6.1
b. Certificates of internal cleaning or line flushing.
(NOTE: Internal cleanliness may be in conjunction with
SAIC-L-2017 .)
The procedure contains Forms for recording the test, i.e: Pressure test SAES-A-004,
A29
Report Form, ie; SATR-A-2001. Para. 8.3
Pressure Test Diagram
B (Note: Diagram shall show the piping & equipment that are
included and excluded from the test. )
SAES-L-310,
B1 Pressure Test Diagram is assigned a Saudi Aramco Drawing number.
Sec . 7
Test limits are indicated. (Note: For complex systems, test limits are G.I.-2.102,
B2
identified by Test numbers.) Para. 5.2 a
G.I.-2.102,
B3 Indicate test manifold arrangements.
Para. 5.2 b
Page 2 of 3
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review of Pressure Testing Procedure SAIC-A-2001 25-May-05 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
G.I.-2.102,
B4 Shows location of blind flanges and isolation valves, if any.
Para. 5.2 c
Shows Location of check valves (Removal of flappers if G.I.-2.102,
B5
necessary) Para. 5.2 d
Indicates the test pressure and the test pressure limiting factor and/or G.I.-2.102,
B6
location of lowest rated component in determining the test pressure. Para. 5.2 e
G.I.-2.102,
B7 Shows locations of vents and drains.
Para. 5.2 f
G.I.-2.102,
B8 Shows relief valve sizing and set pressure
Para. 5.2 g
G.I.-2.102,
B9 The Minimum test temperature allowed is identified.
Para. 5.2 m
G.I.-2.102,
B10 Test Medium is identified.
Para. 5.2 h
REMARKS:
REFERENCE DOCUMENTS:
1. SAES-A-004, General Requirements for Pressure Testing, (30June, 2003),
2. SAES-L-150, Pressure Testing of Plant Piping and Pipelines, (30 September, 2003)
3. Saudi Aramco General Instruction, G.I.-2.102, Pressure Testing Safely, (22 July, 2001),
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
Page 3 of 3