0% found this document useful (0 votes)
181 views2 pages

Construction Material Costs

This document provides a summary of costs for brickwall and wall elements of a construction project. It includes the following: 1) Brickwall costs for half brick walls reinforced with brick ties and plastered, totaling RM11,052.84. 2) Wall costs for installing aerated concrete blocks, mortar, ties and rendering, totaling RM14,296.99. 3) Painting costs for external and internal walls, amounting to RM3,535.00. The total costs summarized are for building external and internal brickwalls and walls.

Uploaded by

Kamarul Yoe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
181 views2 pages

Construction Material Costs

This document provides a summary of costs for brickwall and wall elements of a construction project. It includes the following: 1) Brickwall costs for half brick walls reinforced with brick ties and plastered, totaling RM11,052.84. 2) Wall costs for installing aerated concrete blocks, mortar, ties and rendering, totaling RM14,296.99. 3) Painting costs for external and internal walls, amounting to RM3,535.00. The total costs summarized are for building external and internal brickwalls and walls.

Uploaded by

Kamarul Yoe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

ITEM DESCRIPTION UNIT QTY RATE AMOUNT (RM)

ELEMENT NO 7: BRICKWALL

EXTERNAL AND INTERNAL WALL

Brickwall

Common clay brickwork in cement and sand(1:6)


mortar with plasticier (measured separately as
specified:

A Half brick (110mm thick) walls reinforced with brick


reinforcement at every fourth course, well lapped with
6mm Diameter mild steel bonding ties m2 155 20.00 3,100.00
-
Cement and sand (1:6) plaster mixed with approved
plasticiser specified: steel trowelled -
-
B 12mm Thick to wall and exposed columns m2 310 14.00 4,340.00
-
Prepare and apply one layer of undercoat and two
layers of emulsion paint as specified on: -
-
C a) external wall m2 87 15.00 1,305.00
b) internal wall m2 223 10.00 2,230.00

HOLLOW BLOCKS -
-
D supply and install ventilation block for the toilet
windows installation and ventilation works extra over
for door and window opening m2 3 27.70 77.84

-
-
-
-
TO SUMMARY 11,052.84
ITEM DESCRIPTION UNIT QTY RATE AMOUNT (RM)

ELEMENT NO 7: WALL

A 600mm x 200mm x 125mm STARKEN Autoclaved


Aerated Concrete block m2 155 40.00 6,200.00

B STARKEN mortar thin Bed Adhesive (40kg) m2 155 2.13 330.15

C ST 2 Column / Bean Soffit Tie nos 155 1.00 155.00

D Starken Skim Coat Base (40kg) m2 310 3.50 1,085.00

E Starken Skim Coat Finish (25kg) m2 310 1.20 372.00

F Render (40kg) m2 310 7.70 2,387.00

G Fibre Mesh 150mm x 50m m2 155 1.00 155.00

Prepare and apply one layer of undercoat and two


layers of emulsion paint as specified on: -
-
C a) external wall m2 87 15.00 1,305.00
b) internal wall m2 223 10.00 2,230.00

HOLLOW BLOCKS -
-
D supply and install ventilation block for the toilet
windows installation and ventilation works extra over
for door and window opening m2 3 27.70 77.84

TO SUMMARY 14,296.99