The document contains a log of events from an electrical substation control system on July 1, 2019. It records the opening and closing of the operator control panel door, a protection trip event causing a lockout that was later successfully automatically reclosed. It provides timing and details of the protection elements resetting, maximum fault currents on each phase, and current levels at the time of trip.
The document contains a log of events from an electrical substation control system on July 1, 2019. It records the opening and closing of the operator control panel door, a protection trip event causing a lockout that was later successfully automatically reclosed. It provides timing and details of the protection elements resetting, maximum fault currents on each phase, and current levels at the time of trip.
The document contains a log of events from an electrical substation control system on July 1, 2019. It records the opening and closing of the operator control panel door, a protection trip event causing a lockout that was later successfully automatically reclosed. It provides timing and details of the protection elements resetting, maximum fault currents on each phase, and current levels at the time of trip.
07/01/2019 15:27:15 448 Operator control panel door opened 07/01/2019 15:07:33 340 Operator control panel door closed 07/01/2019 15:07:29 120 Load Supply Off 07/01/2019 15:07:27 245 Last Good Value Trapped is 61 A 07/01/2019 15:07:25 32 Lockout 07/01/2019 15:07:24 993 Panel Trip Request 07/01/2019 15:07:19 332 Operator control panel door opened OPERACIÓN DE RECIERRE EXITOSO 07/01/2019 14:27:40 942 Protection Disk Reset 07/01/2019 14:27:40 844 All protection elements resetting 07/01/2019 14:27:40 805 Protection Group A Active 07/01/2019 14:27:40 782 Pickup 07/01/2019 14:27:40 746 Automatic Reclose 07/01/2019 14:27:39 870 Protection Disk Reset 07/01/2019 14:27:39 820 All protection elements resetting 07/01/2019 14:27:39 819 Measuring Frequency On Bushing Ci 07/01/2019 14:27:39 782 Phase C ‐ Maximum Current of 115 A during fault 07/01/2019 14:27:39 782 Phase B ‐ Maximum Current of 967 A during fault 07/01/2019 14:27:39 782 Phase A ‐ Maximum Current of 906 A during fault 07/01/2019 14:27:39 780 Current at trip C phase 87 A at the time of trip 07/01/2019 14:27:39 780 Current at trip B phase 914 A at the time of trip 07/01/2019 14:27:39 780 Current at trip A phase 867 A at the time of trip 07/01/2019 14:27:39 744 Protection Trip 1 07/01/2019 14:27:39 744 Phase Protection Trip 07/01/2019 14:27:39 744 Protection Group A Active 07/01/2019 14:27:39 744 Protection Trip Request 07/01/2019 14:27:39 693 Protection Group A Active 07/01/2019 14:27:39 669 Pickup