You are on page 1of 1

TEEMAGE BUILDERS (P) LTD

CASA GRANDE PROJECT 150 MM HCS SLAB LOAD TEST


SUMMARY REPORT 01.07.2019
Length / ID 6170 mm / 1HA 31
Thickness 150 mm
Screed concrete Tk 75 mm
Bearing 100 mm
Bench No. E 211
Strands 6 no's @ bottom
Camber 6 mm after screed concrete done
Load applied Rebound
Deflection
S.No. No. of Layers Date Time kN/m2 Value Remarks
(mm)
Bags Kg (mm)

1 0 01.07.2019 11.31 Am 0 0 0 0 4.91


2 1 01.07.2019 11.49 Am 1.29 39 975 0.56 6.63
3 2 01.07.2019 11.57 Am 2.58 78 1950 1.44 7.99
3 01.07.2019 12.01 Pm 3.02 91 2275 1.84 9.61
4 3 01.07.2019 12.05 Pm 3.88 117 2925 2.32 7.99
5 4 01.07.2019 12.29 Pm 4.01 121 3025 2.66 9.61 No Crack
6 4 01.07.2019 1.15 Pm 5.17 156 3900 3.57 Observed
11.24
7 4 01.07.2019 2.10 Pm 5.17 156 3900 3.72
8 5 01.07.2019 2.32 Pm 6.46 195 4875 4.59 12.89
9 6 01.07.2019 2.48 Pm 7.52 227 5675 5.44
14.29
10 6 01.07.2019 3.45 Pm 7.52 227 5675 5.67
11 7 01.07.2019 4.31 Pm 9.05 273 6825 6.69 15.58
12 8 01.07.2019 4.55 Pm 10.37 313 7825 13.00
16.64
13 8 01.07.2019 6.05 Pm 10.37 313 7825 14.84
14 8 01.07.2019 7.11 Pm 10.37 313 7825 15.23
15 8 01.07.2019 8.48 Pm 10.37 313 7825 15.51 Crack formed
@ 3 places at
16 8 01.07.2019 10.55 Pm 10.37 313 7825 15.73
End - 2 side
17 8 02.07.2019 2.00 Am 10.37 313 7825 15.83 from middle of
18 8 02.07.2019 3.57 Am 10.37 313 7825 16.07 slab
19 8 02.07.2019 5.24 Am 10.37 313 7825 16.13
20 8 02.07.2019 8.00 Am 10.37 313 7825 16.28
21 8 02.07.2019 11.00 Am 10.37 313 7825 16.53
full load removing after one hour 4.91