You are on page 1of 2

PLAN VIEW = View from the top

Dimension

1 2
■7 ~

-7 ~
26-0'
y-
16’-0"

Dimension Line
Indicates distance Extension Line
from outside edge of
Detail wall to outside edge
Call-out = of wall TYP = Typical Note
See Detail 1
on Sheet Leader Line
A-506
6" CONCRETE GARAGE FOUNDATION W^LL, TYP

F .u
2-0" CONCRETE FOOTING, TYP

11
t
7-0 C
CD
1
BOTTOM OF FOUNDATION WALL
LO DETAIL, TYP; SEE 1/A-506
THROUGH-WALL
INSTRUMENTATION

E t 4ft CONDUIT TO GARAGE


SLAB (3-0" ABOVE
o
CO
o BASEMENT SLAB)
CM
T.O. GARAGE FOUNDATION
EL. -0-5' 9 =F CM
st-
i CD
Is- CD

1
T.O. GARAGE FOUNDATION AT FRONT OPENINGS
Ob
EL. -2-8" * C/L C/L
E.1 C/L © ©
Elevation Symbol
O
1
00 i
oo
Shows dimension
from edge of wall to
CM

SLAB ON GRADE
CO
ABOVE
00
CO
center line of column
Hidden Line
o

C.1
1
Ob
T.O. GARAGE FOUNDATION AT SOUTH DOOR 10" SONO TUBE FOOTINGS FOR
EL. -2-1 3/4 * BREEZEWAY COLUMNS, PROVIDE
3 #4 REINFORCING, TYP. -

T.O = Top Of... C/L = Center Line

Location Reference Mark


N
or
Column Line Refence
E W
Typical orientation UNO (Unless Noted Otherwise)

S
Elevation View = Side view from the outside
Section Cut - See Section
1 on Sheet A-304
A.1 A B D
(shown below) F

1
A-304

12 SOIL GAS
12 \ 4 VENT
4
R2

12 12

9.67 9.67

4 B.O. CEILING JOISTS


EL. +19-7 1/4 ii

2k
ALIGN

2k 2k

2
D
©
(*>
12 B
12
22 12
12 9.67
9.67 4
4
12
4
T.O. SECOND FLOOR SUBFLOOR
$ EL. +10-6 1/4 11

ALIGN
B.O. FLOOR JOISTS ±k 2k 2k. 2k
$ EL. +9'-3 3/8 11

© F F

28
CONDUIT FOR FUTURE GAS I
FURNACE SUPPLY/EXHAUST A A

© E3
U E3 E4 □ E3 □ E3

T.O. FIRST FLOOR SUBFLOOR F4 F'0 F9 F10 E11 E11


II
EL. +0-2 3/8 Or
$
T.O. FOUNDATION WALL CONNECTION FOR
r
EL. +0-0
CONDUIT SUMP
PUMP OUTLET CONNECTION /
FUTURE MULTISPLIT
OUTDOOR UNIT
r 1'5
FOR FUTURE CONNECTION
CONNECTION FOR FUTURE
AIR-TO-AIR FOR CENTRAL
HIGH VELOCITY HVAC J HI
OUTDOOR UNIT AIR-TO-AIR
OUTDOOR UNIT
AIR-TO-AIR OUTDOOR UNIT
(SEE GENERAL SHEET
NOTE #10)
B Jt
J'L
l_ J
RIGHT SIDE (EAST) ELEVATION
2 SCALE: 1/4" = 1'-0"

3 4 5 6 7

Cross Section 2'-0" 32'-0' 2'-0"


-><- -><-

UNVENTED UPPER ROOF ASSEMBLY:


ASPHALT SHINGLES,
8'-0"

CONTINUOUS FULLY-ADHERED PEEL AND STICK ROOF MEMBRANE,


PLYWOOD SHEATHING WITH H-CLIPS,

View =
5" OF FOIL-FACED POLYISOCYANURATE IN 3 LAYERS (1-1/2", 2", 1-1/2"
CONTINUOUS FULLY-ADHERED AIR BARRIER MEMBRANE
1/2" PLYWOOD SHEATHING WITH H-CLIPS,
5 1-3/4" X 11-7/8" LSL ENGINEERED ROOF RAFTERS AT 24" 0,C,
CELLULOSE INSULATION,
A-508
4" GWB

4 T.O. ROOF RIDGE


EL. +27'-5 3/8" \
IN SECTION

Side view of a
T.O. 4/12 ROOF STRUCTURAL RIDGB
$ EL. +26-11 1/2 =l
y \ 2
4 T.O. 9.67/12 ROOF STRUCTURAL F^DGE
EL. +26-10 1/8 \ y
I/
I
A-508

1'--’ 1 -4"
T
L VF y
-

cut through the 4 B.O. CEILING JOISTS


EL. +19'-7 1/4
T-4'
FF
— ATTIC ASSEMBLY:
LI
1%" x 114 " LSL ENGINEERED
JOISTS AT 24" O.C.,
1'-4"

building
I' GWB y \
CN

o M
CD

4
/
3 r-4"

A-508
-------

4 T.O. SECOND FLOOR SUBFLOOR


EL. +10'-6 1/4"
£3

l
. =L

I
__1

■ 2r = ±(-|s
f
4 B.O. FLOOR JOISTS
EL. +9'-3 3/8" — 2ND FLOOR ASSEMBLY:
T & G FLOOR SHEATHING,
14" DEEP OPEN WEB WOOD JOIST AT 24" O.C.,

Detail Call Out OPEN CELL SPRAY


FOAM INSULATION
eg

o
CT>
I' GWB

Indicates see Detail


(0.5 PCF) AT RIM
JOIST OF 1ST AND

4 T.O. FIRST FLOOR SUBFLOOR 2ND FLOOR FRAMING


EL. +0'-2 3/8" y \
1
4 on Sheet A-508 4
4
T.O. FOUNDATION WALL
EL. +0'-0
GRADE
EL. -0'-3 5/8’ ■1
o r-
4 T.O. FOUNDATION WALL SHELR
EL. -1'-2
— 1ST FLOOR ASSEMBLY:
l" T & G FLOOR SHEATHING,
5
A-402
y;

T 14" DEEP OPEN WEB WOOD JOIST

00

ajL—MU—LM—Li

4 T.O. BASEMENT SLAB


EL.-9-11 1/2" - ___
I TT7
t
1SS:
w

4 T.O. FOOTING
EL. -10-5 1/2
=l i i=i i i=i 11= TTT TTT

:|
” TTT :|jj=||
ii'G

— BASEMENT FLOOR ASSEMBLY:

BUILDING SECTION
1 SCALE: 1/4" = 1'-0"

You might also like