DRILLING LOG
KLIEN = PELAKSANA PEMBANGUNAN DAN PEMELIHARAAN PERGEDUNGAN / TIPE BOR = ROTARY DRILLING Remarks.

PERALATAN PONDOK MODERN DARUSSALAM GONTOR MULAI = 28 JULI 2016 UD = Undisturb Sample

NAMA PROYEK = PEMBANGUNAN MENARA MASJID SELESAI = 29 JULI 2016 CS = Core Sample

TITIK BOR = BH-1 MASTER BOR = OSIAS TENIS SPT = SPT Test

MUKA AIR TANAH = -3.00 METER


LOKASI PROYEK = PONDOK MODERN DARUSSALAM, GONTOR - PONOROGO
UD / CS SPT TEST Standard Penetration Test
Elevation (LWL) in m

Relative Density or

General Remarks
Thickness in m

Blows per each

Type of Soil

Consistency
Depth in m

N - Value
Scale in m

N-Value Blows/30
15 cm
Legend

Colour

Sample Code

Sample Code
Depth in m

Depth in m

15 cm

15 cm

15 cm
cm
0 10 20 30 40 50
0
0.00 0.00 START OF BORING

1
1.00 -1.00 -1.00

-2.00 3 1 1 2 3 2
2.00 -2.00 -2.00 SPT 1
SOFT TO SPT -2.50
MEDIUM 3 s/d 5 3
3.00 -3.00 -3.00

4.00 -4.00 -4.00 -4.00 SPT 2 5 1 2 3 5 4


-4.50
5
5.00 -5.00 -5.00
LEMPUNG
BERLANAU
6.00 -6.00 -6.00 -6.00 SPT 3 6 1 2 4 6 6
-6.50

7.00 -7.00 -7.00 -7.00 UD 01


7
-7.50
MEDIUM TO SPT 8
8.00 -8.00 -8.00 -8.00 SPT 4 10 2 5 5 10
STIFF 6 s/d 10
-8.50

9.00 -9.00 -9.00 9


COKLAT
10.00 -10.00 -10.00
TERANG -10.00 SPT 5 10 2 4 6 10 10
-10.50

11.00 -11.00 -11.00 11

12.00 -12.00 -12.00 -12.00 SPT 6 12 3 5 7 12 12


-12.50

13.00 -13.00 -13.00 LEMPUNG LANAU SPT 13


STIFF
BERPASIR 11 s/d 12

14.00 -14.00 -14.00 -14.00 SPT 7 11 2 4 7 11 14


-14.50

15.00 -15.00 -15.00 -15.00 UD 02 15


-15.50

16.00 -16.00 -16.00 -16.00 SPT 8 13 3 5 8 13 16


-16.50

17.00 -17.00 -17.00 17


SPT
LANAU BERPASIR STIFF
12 s/d 13
18.00 -18.00 -18.00 -18.00 SPT 9 12 3 5 7 12 18
-18.50

19.00 -19.00 -19.00 19

20.00 -20.00 -20.00 -20.00 SPT 10 18 3 7 11 18 20


-20.50

21.00 -21.00 -21.00 21

SPT
22.00 -22.00 -22.00 VERY STIFF
18 s/d 22
-22.00 -22.00 SPT 11 19 4 7 12 19 22
-22.50 UD 03 -22.50

23.00 -23.00 -23.00 23

24.00 -24.00 -24.00 -24.00 SPT 12 22 5 8 14 22 24


-24.50
LEMPUNG ABU-ABU
25.00 -25.00 -25.00 BERLANAU GELAP 25

26.00 -26.00 -26.00 -26.00 SPT 13 17 4 7 10 17 26


-26.50

27.00 -27.00 -27.00 27


SPT
VERY STIFF
17 s/d 21
28.00 -28.00 -28.00 -28.00 SPT 14 17 3 6 11 17 28
-28.50

29.00 -29.00 -29.00 29

30.00 -30.00 -30.00 -29.50 -30.00 SPT 15 21 4 8 13 21 30


-30.00 UD 04 -30.50

END OF BORING