You are on page 1of 2

Doc No.

ACCEPTANCE TEST
Rev. No.
PROCEDURE FOR
FIRE DETECTION AND ALARM Date
SYSTEM
Page No.

WALK THROUGH TEST


CHECKLIST

PROJECT: Upgrade of FDAS System at Petron Polypropylene Plant


PANEL _______________
LOCATION: PNOC, Batangas II, Mariveles, Bataan
Result
SN DEVICE DETAILS REMARKS
Pass Fail

Witnessed and Accepted

Chittick Fire and Security Corp


Date: Date :

Print Name and Signature Print Name and Signature


GCGI-TGPP
Date : Date :

Print Name and Signature Print Name and Signature

Protecting Life and Property Since 1948


Doc No.
ACCEPTANCE TEST
Rev. No.
PROCEDURE FOR
FIRE DETECTION AND ALARM Date
SYSTEM
Page No.

INITIATING DEVICE ALARM TEST (FDAS)


CHECKLIST

PROJECT: Upgrade of FDAS System at Petron Polypropylene Plant


PANEL _______________
LOCATION: PNOC, Batangas II, Mariveles, Bataan

INSTRUCTIONS:
1. Simulate an Alarm Condition by performing the following:
A. Activate the smoke detector with the use of smoke aerosol.
B. Activate the Manual Pull Station by pulling the lever and resetting with the key.
C. Short the wires terminated to the Pressure Switch from the interface module.
2. Check if Alarm indicator comes out on the Fire Alarm Panel.
3. Read on the LCD Display if the correct device/module address was displayed.
4. Check if the correct custom message is displayed.

RESULT
SN DEVICE DETAILS REMARKS
PASS FAIL

Witnessed and Accepted

Chittick Fire and Security Corp


Date: Date :

Print Name and Signature Print Name and Signature


TGPP-GCGI
Date : Date :

Print Name and Signature Print Name and Signature

Protecting Life and Property Since 1948

You might also like