You are on page 1of 9

Over Current Setting Only

NEW RELAY SETTING (SITE) EXISTING SETTING NEW IMPLEMENT SETTING


Transformer 110 % Transformer rated 275kV 132kV 33kV 275kV 132kV 33kV 275kV 132kV 33kV
New OC settings (Plug) Comment Priority 1 (100% Priority 2 (100%- Priority 3 (above
Substation Transformer Rating(MVA) current (A) Plug Plug Plug IDMT HIGHSET IDMT HIGHSET IDMT HIGHSET IDMT HIGHSET IDMT HIGHSET IDMT HIGHSET Remark
TMS TMS TMS CT Ratio Remarks CT Ratio Remarks CT Ratio Remarks CT Ratio Remarks CT Ratio Remarks CT Ratio Angle Remarks & below) 110%) 110%)
HV LV 275kV 132kV 33kV 275kV 132kV 33kV Amp % Amp % Amp % Plug TMS Plug T(sec) Plug TMS Plug T(sec) Plug TMS Plug T(sec) Plug TMS Plug T(sec) Plug TMS Plug T(sec) Plug TMS Plug T(sec) 275kV 132kV 33kV
275/33kV T1 30 30 69 - 577 0.693 - 0.962 0.70 111.1% 0.25 - - - 0.97 110.9% 0.1 100 1 0.7 0.25 - - - - - - - - 600 1 0.97 0.1 - - Directional 100 1 0.7 0.25 - - - - - - - - 600 1 0.97 0.1 - - Directional
Balingian 275/33kV T2 30 30 69 - 577 0.693 - 0.962 0.70 111.1% 0.25 - - - 0.97 110.9% 0.1 100 1 0.7 0.25 - - - - - - - - 600 1 0.97 0.1 - - Directional 100 1 0.7 0.25 - - - - - - - - 600 1 0.97 0.1 - - Directional
Betong 275/33kV T1 10 10 23 - 192 1.155 - 3.208 1.16 110.5% 0.29 - - 3.21 110.1% 0.17 100 5 1.75 0.23 15.00 - - - - - - - 300 5 5.00 0.13 - - Non - Directional 100 5 1.20 0.30 ─ ─ - - − − − − 300 5 3.25 0.17 − − Non - Directional 117% - 171% BET 275&33KV *maintenance HBL 27/09/17 (TMS only able to set 0.3 for HV)
275/132/33kV T1 (Auto) 240 240 554 1155 - 0.739 0.770 - 0.74 110.1% 0.25 0.77 110.0% 0.25 - - - 750 1 0.80 0.25 - - 1500 1 0.80 0.25 - - - - - - - - - 750 1 1500 1 - - - 120% 114% -
275/132/33kV T2(Auto) 240 240 554 1155 - 0.739 0.770 - 0.74 110.1% 0.25 0.77 110.0% 0.25 - - - 750 1 0.80 0.25 - - 1500 1 0.80 0.25 - - - - - - - - - 750 1 1500 1 - - - 120% 114% -
BIN 275&33KV
275/33kV T1 120 120 277 - 2309 1.109 - 0.924 1.11 110.1% 0.90 - - - 0.93 110.7% 0.2 250 1 1.20 0.90 - - - - - - - - 2500 1 1.00 0.20 10.00 0.00 Directional 250 1 - - 2500 1 Directional 120% - 119%
Bintulu 275/33kV T2 120 120 277 - 2309 1.109 - 0.924 1.11 110.1% 0.90 - - - 0.93 110.7% 0.2 250 1 1.20 0.90 - - - - - - - - 2500 1 1.00 0.20 10.00 0.00 Directional 250 1 - - 2500 1 Directional 120% - 119%
135.4/36.2kV T1 (old) 82.3 82.3 - 396 1584 - 0.990 0.990 - - - 1.00 111.1% 0.5 1.00 111.1% 0.45 - - - - - - 400 1 1.00 0.50 - - 1600 1 1.00 0.45 - - Non Directional - - 400 1 1600 1 Non Directional - 111% 111%
DES 132&33KV
135.4/36.2kV T2 (Old) 82.3 82.3 - 396 1584 - 0.990 0.990 - - - 1.00 111.1% 0.5 1.00 111.1% 0.45 - - - - - - 400 1 1.00 0.50 - - 1600 1 1.00 0.45 - - Non Directional - - 400 1 1600 1 Non Directional - 111% 111%
132/33kV T1 ( New) 120 120 - 577 2309 - 0.962 0.962 - - - 0.97 110.9% 0.22 1.00 114.3% 0.1 - - - - - - 600 1 0.96 0.24 - - Line CB 2400 1 0.96 0.10 - - Directional - - 600 1 2400 1 Directional - 109% 109%
DES 132&33KV
Deshon 132/33kV T2( New) 120 120 - 577 2309 - 0.962 0.962 - - - 0.97 110.9% 0.22 1.00 114.3% 0.1 - - - - - - 600 1 0.96 0.24 - - Line CB 2400 1 0.96 0.10 - - Directional - - 600 1 2400 1 Directional - 109% 109%
275.8/35.6kV T1 32.4 32.4 75 - 624 0.748 - 0.779 0.75 110.3% 0.45 - - - 0.73 103.0% 0.3 100 1 0.65 0.45 - - - - - - - - 800 1 0.65 0.30 - - Non - Directional 100 1 0.75 0.45 - - - - - - - - 800 1 0.73 0.30 - - Non - Directional 96% - 91%
ENG 275&33kV
Engkilili 275/35.6kV T2 30 30 69 - 577 0.693 - 0.722 0.70 111.1% 0.45 - - - 0.73 111.3% 0.3 100 1 0.65 0.45 - - - - - - - - 800 1 0.65 0.30 - - Non - Directional 100 1 0.70 0.45 - - - - - - - - 800 1 0.73 0.30 - - Non - Directional 100% - 91%
275/132/33kV T1 (Auto) 240 80 554 1155 1540 0.924 0.962 0.962 0.93 110.7% 0.12 0.97 110.9% 0.35 0.97 110.9% 0.1 600 1 0.92 0.45 - - 1200 1 0.95 0.35 - - 1600 1 1.00 0.20 - - Directional 600 1 0.93 0.45 - - 1200 1 0.97 0.35 - - 1600 1 1.00 0.10 - - Directional 110% 110% 114%
ENT 275/132/33 K
Entinggan 275/132/33kV T2(Auto) 240 80 554 1155 1540 0.924 0.962 0.962 0.93 110.7% 0.12 0.97 110.9% 0.35 0.97 110.9% 0.1 600 1 0.92 0.45 - - 1200 1 0.95 0.35 - - 1600 1 1.00 0.20 - - Directional 600 1 0.93 0.45 - - 1200 1 0.97 0.35 - - 1600 1 1.00 0.10 - - Directional 110% 110% 114%
275/34.9kV T1 120 120 277 - 2309 0.924 - 0.924 0.93 110.7% 0.375 - - - 0.93 110.7% 0.35 300 1 0.84 0.38 6.00 0.05 - - - - - - 2500 1 1.00 0.35 Directional 300 1 0.93 0.375 - - - - - - - - 2500 1 0.93 0.35 - - 30⁰ (Torque) Directional 100% - 119% **Plug revised to 0.93 for both LV & HV Txf 1 and Txf 2
KMN 275KV KMN 33KV
Kemena 275/34.9kV T2 120 120 277 - 2309 0.924 - 0.924 0.93 110.7% 0.375 - - - 0.93 110.7% 0.35 300 1 0.84 0.38 6.00 0.05 - - - - - - 2500 1 1.00 0.35 Directional 300 1 0.93 0.375 - - - - - - - - 2500 1 0.93 0.35 - - 30⁰ (Torque) Trip angle: ± 90⁰ 100% - 119% Highset setting has been defeated at site 31/07/17
Kemantan 275/132/33kV T1 (Auto) 88.5 45 204 426 866 1.022 1.065 1.083 1.03 110.9% 0.65 1.07 110.6% 0.65 1.09 110.8% 0.35 200 1 1.00 0.65 - - 400 1 1.00 0.65 - - 800 1 1.00 0.35 - - 200 1 400 1 800 1 108% 103% 101%
275/132/33kV T2(Auto) 88.5 45 204 426 866 1.022 1.065 1.083 1.03 110.9% 0.65 1.07 110.6% 0.65 1.09 110.8% 0.35 200 1 1.00 0.65 - - 400 1 1.00 0.65 - - 800 1 - - - - 200 1 400 1 800 1 108% 103% 101%
KEM
275/132/33kV T1 (Auto) 240 240 554 1155 - 0.924 0.962 - 0.93 110.7% 0.45 0.97 110.9% 0.35 - - - 600 1 0.93 0.45 - - 1200 1 0.97 0.35 - - - - - - - - 600 1 1200 1 - -
275/132/33KV
275/132/33kV T2(Auto) 240 240 554 1155 - 0.924 0.962 - 0.93 110.7% 0.45 0.97 110.9% 0.35 - - - 600 1 0.93 0.45 - - 1200 1 0.97 0.35 - - - - - - - - 600 1 1200 1 - -
132/33kV T1 21.6 21.6 - 104 416 - 1.039 0.831 - - - 1.04 110.1% 0.5 0.84 111.1% 0.5 - - - - - - 100 1 1.00 0.50 - - 500 1 0.75 0.50 - - - - 100 1 500 1 - 105% 99%
132/33kV T2 22 22 - 106 423 - 0.588 0.706 - - - 0.59 110.4% 0.35 0.71 110.7% 0.1 - - - - - - 180 1 0.59 0.35 - - 600 1 0.71 0.10 - - - - 180 1 0.59 0.35 - - 600 1 0.71 0.35 - -
Kapit 132/33kV 30 30 - 144 577 - 0.289 0.962 - - - 0.29 110.5% 0.41 0.97 110.9% 0.3 - - - - - - 500 1 0.31 0.35 - - 600 1 1.05 0.30 - - - - 500 1 600 1 - 118% 120% KPT 132&33KV
Lachau 275/33kV 30 30 69 - 577 0.693 - 0.722 0.70 111.1% 0.565 - - 0.73 111.3% 0.3 100 1 0.75 0.565 - - - - - - - - 800 1 0.85 0.30 - - 100 1 0.75 0.560 - - 800 1 0.85 0.30 Non-Directional 119% - 129% LAC 275&33KV *check 08.09.2017
275/132/33kV T1 (Auto) 200 200 462 962 - 0.924 0.962 - 0.95 113.1% 0.125 1.00 114.3% 0.125 - - - 500 1 1.05 0.125 6.30 - 1000 1 1.05 0.125 5.25 - - - - - - - 500 1 0.95 0.125 6.30 1000 1 1.00 0.125 5.25 - - - - - 125% 120% -
275/132/33kV T2 (Auto) 200 200 462 962 - 0.924 0.962 - 0.95 113.1% 0.125 1.00 114.3% 0.125 - - - 500 1 1.05 0.125 6.30 - 1000 1 1.05 0.125 5.25 - - - - - - - 500 1 0.95 0.125 6.30 1000 1 1.00 0.125 5.25 - - - - - 125% 120% -
MAM 275/132/33K
132/33kV T1 (Auto) 80 80 - 385 1540 - 0.962 0.962 - - - 1.00 114.3% 0.2 1.00 114.3% 0.1 - - - - - - 400 1 1.00 0.20 7.70 - 1600 1 1.00 0.10 19.60 - - - - - 400 1 1.00 0.20 7.70 - 1600 1 1.00 0.10 19.60 - 120% 114% ** Transformer 132/33kV 1 & 2 OC Setting Has Been Updated (03/04/2017)
Mambong 132/33kV T2 (Auto) 80 80 - 385 1540 - 0.962 0.962 - - - 1.00 114.3% 0.2 1.00 114.3% 0.1 - - - - - - 400 1 1.00 0.20 7.70 - 1600 1 1.00 0.10 19.60 - - - - - 400 1 1.00 0.20 7.70 - 1600 1 1.00 0.10 19.60 - 120% 114% Highset setting has been defeated at site
275/33kV T1 120 120 277 - 2309 0.924 - 0.924 0.93 110.7% 0.30 - - - 0.93 110.7% 0.1 300 1 1.00 0.30 - - - - - - - - 2500 1 1.00 0.10 - - 300 1 0.93 0.10 - - 2500 1 33kV Directional Commissioning 12.06.2017
Mapai 275/33kV T2 120 120 277 - 2309 0.924 - 0.924 0.93 110.7% 0.30 - - - 0.93 110.7% 0.1 300 1 1.00 0.30 - - - - - - - - 2500 1 1.00 0.10 - - 300 1 0.93 0.10 - - 2500 1 33kV Directional Commissioning 12.06.2017
275/33kV T1 120 120 277 - 2309 1.109 - 0.924 1.11 110.1% 0.50 - - - 0.93 110.7% 0.3 250 1 1.30 0.50 - - - - - - - - 2500 1 1.00 0.30 - - 250 1 - - 2500 1 129% - 119%
MAT 275&33KV
Matang 275/33kV T2 120 120 277 - 2309 1.109 - 0.924 1.11 110.1% 0.50 - - - 0.93 110.7% 0.3 250 1 1.30 0.50 - - - - - - - - 2500 1 1.00 0.30 - - 250 1 - - 2500 1 129% - 119%
132/33 T1 120 120 - 577 2309 - 0.962 0.962 - - - 0.97 110.9% 0.97 110.9% - - - - - - 600 1 0.97 0.21 - - 2400 1 0.97 0.10
Mendu 132/33 T2 120 120 - 577 2309 - 0.962 0.962 - - - 0.97 110.9% 0.97 110.9% - - - - - - 600 1 0.97 0.21 2400 1 0.97 0.10
275/33kV T1 30 30 69 - 577 0.693 - 0.722 0.70 111.1% 0.35 - - - 0.73 111.3% 0.1 100 1 0.75 0.35 - - - - - - - - 800 1 0.78 0.10 - - Directional 100 1 - - 800 1 Directional 119% - 118%
MRJ 275&33kv
Murum Junction 275/33kV T2 30 30 69 - 577 0.693 - 0.722 0.70 111.1% 0.35 - - - 0.73 111.3% 0.1 100 1 0.75 0.35 - - - - - - - - 800 1 0.78 0.10 - - Directional 100 1 - - 800 1 Directional 119% - 118%
132/33kV T1 80 80 - 385 1540 - 0.962 0.962 - - - 1.00 114.3% 0.5 1.00 114.3% 0.1 - - - - - - 400 1 1.00 0.55 11.00 0.00 1600 1 1.00 0.10 - - Directional - - - - - - 400 1 1.00 0.55 11.00 0.00 1600 1 1.00 0.10 - - Directional - 114% 114%
MTB 132&33KV
132/33kV T2 80 80 - 385 1540 - 0.962 0.962 - - - 1.00 114.3% 0.5 1.00 114.3% 0.1 - - - - - - 400 1 1.00 0.55 11.00 0.00 1600 1 1.00 0.10 - - Directional - - - - - - 400 1 1.00 0.55 11.00 0.00 1600 1 1.00 0.10 - - Directional - 114% 114%
132/33kV T3 80 80 - 385 1540 - 0.962 0.962 - - - 0.97 110.9% 0.45 0.97 110.9% 0.2 - - - - - - 400 1 1.00 0.450 - - 1600 1 1.00 0.20 - - Directional - - - - - - 400 1 1.00 0.45 - - 1600 1 1.00 0.20 - - Directional - 102% 102% ** Transofrmer 3 & 4 OC Setting Has Been Updated (17/04/2017)
MTB 132&33KV
Muara Tabuan 132/33kV T4 80 80 - 385 1540 - 0.962 0.962 - - - 0.97 110.9% 0.45 0.97 110.9% 0.2 - - - - - - 400 1 1.00 0.450 - - 1600 1 1.00 0.20 - - Directional - - - - - - 400 1 1.00 0.45 - - 1600 1 1.00 0.20 - - Directional - 102% 102% Both HV & LV OC plugs were set to 1.00 instead 0.97 as proposed due to relay limitation
40 40 - 192 770 0.962 0.962 - - - 0.97 110.9% 0.25 0.97 110.9% 0.1 - - - - - - 200 1 1.00 0.25 - - 800 1 1.00 0.25 - - Directional - - - - - - 200 1 0.97 0.25 - - 800 1 0.97 0.25 - - Directional - 114% 114%
MTD 132&33KV
Matadeng 132/33kV T2 40 40 - 192 770 0.962 0.962 - - - 0.97 110.9% 0.25 0.97 110.9% 0.1 - - - - - - 200 1 1.00 0.25 - - 800 1 1.00 0.25 - - Directional - - - - - - 200 1 0.97 0.25 - - 800 1 0.97 0.25 - - Directional - 114% 114%
275/132/33kV T1 (Auto) 240 80 554 1155 1540 0.924 0.962 3.849 0.93 110.7% 0.97 111% 0.50 14.3% 600 1 0.84 0.50 6.00 0.01 1200 1 0.72 0.50 - - 400 1 1.50 0.50 - - Non - Directional 600 1 0.93 0.50 1200 1 0.97 0.50 1600 1 0.50 0.50 Non - Directional revised on 08.07.2017 ** remarks on 33kV & HS at HV side disable
Oya 275/132/33kV T2(Auto) 240 80 554 1155 1540 0.924 0.962 3.849 0.93 110.7% 0.97 111% 0.50 14.3% 600 1 0.84 0.50 6.00 0.01 1200 1 0.72 0.50 - - 400 1 1.50 0.50 - - Non - Directional 600 1 0.93 0.50 1200 1 0.97 0.50 1600 1 0.50 0.50 Non - Directional revised on 15.07.2017 ** remarks on 33kV & HS at HV side disable
132/33kV T1 40 40 - 192 770 - 0.962 0.962 - - - 0.97 110.9% 0.28 0.97 110.9% 0.1 - - - - - - 200 1 1.00 0.25 - - 800 1 1.00 0.10 - - Directional - - - - - - 200 1 0.97 0.29 - - 800 1 0.97 0.29 - - Directional - 114% 114%
PTN 132&33KV
Petian 132/33kV T2 40 40 - 192 770 - 0.962 0.962 - - - 0.97 110.9% 0.28 0.97 110.9% 0.1 - - - - - - 200 1 1.00 0.25 - - 800 1 1.00 0.10 - - Directional - - - - - - 200 1 0.97 0.29 - - 800 1 0.97 0.29 - - Directional - 114% 114%
132/33kV T1 120 120 - 577 2309 - 0.962 0.962 - - - 0.97 110.9% 0.3 0.97 110.9% 0.1 - - - - - - 600 1 0.97 0.30 - - 2400 1 0.97 0.10 Directional - - 600 1 2400 1 Directional
Samajaya 132/33kV T2 120 120 - 577 2309 - 0.962 0.962 - - - 0.97 110.9% 0.3 0.97 110.9% 0.1 - - - - - - 600 1 0.97 0.30 - - 2400 1 0.97 0.10 Directional - - 600 1 2400 1 Directional
275/143/35kV T1 (Auto) 240 240 554 1155 - 0.924 0.962 - 0.93 110.7% 0.6 0.97 110.9% 0.5 - - - 600 1 0.85 0.60 - - 1200 1 0.87 0.50 - - - - - - - - - 600 1 1200 1 - - - 101% 99% -
275/143/35kV T2 (Auto) 240 240 554 1155 - 0.924 0.962 - 0.93 110.7% 0.6 0.97 110.9% 0.5 - - - 600 1 0.85 0.60 - - 1200 1 0.87 0.50 - - - - - - - - - 600 1 1200 1 - - - 101% 99% -
275/143/35kV T3(Auto) 240 240 554 1155 - 0.924 0.962 - 0.93 110.7% 0.6 0.97 110.9% 0.5 - - - 600 1 0.85 0.60 - - 1200 1 0.87 0.50 - - - - - - - - - 600 1 1200 1 - - - 101% 99% -
275/143/35kV T4 (Auto) 240 240 554 1155 - 0.924 0.962 - 0.93 110.7% 0.6 0.97 110.9% 0.5 - - - 101% 99% - SAM
600 1 0.85 0.60 - - 1200 1 0.87 0.50 - - - - - - - - - 600 1 1200 1 - - -
275/132/33KV
132/36kV T1 80 80 - 385 1540 - 0.962 0.962 - - - 0.97 110.9% 0.25 0.97 110.9% 0.1 - - - - - - 400 1 0.87 0.25 - - 1600 1 0.87 0.10 - - Directional - - 400 1 1600 1 Directional - 99% 99%
132/36kV T2 80 80 - 385 1540 - 0.962 0.962 - - - 0.97 110.9% 0.25 0.97 110.9% 0.1 - - - - - - 400 1 0.87 0.25 - - 1600 1 0.87 0.10 - - Directional - - 400 1 1600 1 Directional - 99% 99%
Samalaju 132/36kV T3 80 80 - 385 1540 - 0.962 0.962 - - - 0.97 110.9% 0.25 0.97 110.9% - - - - - - 400 1 0.87 0.25 - - 1600 1 0.87 0.10 - - Directional - - 400 1 1600 1 Directional - 99% 99%
132/36kV T1 80 80 - 385 1540 - 0.970 0.970 - - - 0.97 110.9% 0.5 0.97 110.9% 0.1 - - - - - - 400 1 0.63 0.50 7.00 0.01 1600 1 0.80 0.10 - - Directional - - - - - - 400 1 0.97 0.50 - - 1600 1 0.97 0.10 - - Directional - 72% 91% change 03.07.2017 and HS disable
SLM 132&33KV
Salim 132/36kV T2 80 80 - 385 1540 - 0.970 0.970 - - - 0.97 110.9% 0.5 0.97 110.9% 0.1 - - - - - - 400 1 0.63 0.50 7.00 0.01 1600 1 0.80 0.10 - - Directional - - - - - - 400 1 0.97 0.50 - - 1600 1 0.97 0.10 - - Directional - 72% 91% change 03.07.2017 and HS disable
Sarikei 132/33kV T1 (old) 22 22 - 106 423 - 0.882 1.059 - - - 0.90 112.2% 0.60 1.10 114.3% 0.10 - - - - - - 120 1 0.90 0.50 - - 400 1 1.00 0.50 - - Directional - - 120 1 400 1 Directional - 112% 103%
SAR 132&33KV
132/33kV T2 (old) 22 22 - 106 423 - 0.882 1.059 - - - 0.90 112.2% 0.60 1.10 114.3% 0.10 - - - - - - 120 1 0.90 0.50 - - 400 1 1.00 0.50 - - Directional - - 120 1 400 1 Directional - 112% 103%
132/33kV T1 (new) 80 80 - 385 1540 - 0.962 0.962 - - - 0.97 110.9% 0.23 0.97 110.9% 0.1 - - - - - - 400 1 0.88 0.20 - - 1600 1 0.88 0.10 - - Directional - - 400 1 1600 1 Directional -
132/33kV T2 (new) 80 80 - 385 1540 - 0.962 0.962 - - - 0.97 110.9% 0.23 0.97 110.9% 0.1 - - - - - - 400 1 0.88 0.20 - - 1600 1 0.88 0.10 - - Directional - - 400 1 1600 1 Directional -
132/36kV T1 80 80 - 385 1540 - 0.962 0.962 - - - 1.00 114.3% 0.35 1.00 114.3% 0.15 - - - - - - 400 1 0.90 0.55 9.90 0s 1600 1 0.90 0.15 - - Directional - - - - - - 400 1 1.00 0.55 - - 1600 1 1.00 0.15 0.00 - Directional - 102% 102%
SEJ 132&33KV
Sejingkat 132/36kV T2 80 80 - 385 1540 - 0.962 0.962 - - - 1.00 114.3% 0.35 1.00 114.3% 0.15 - - - - - - 400 1 0.90 0.55 9.90 0s 1600 1 0.90 0.15 - - Directional - - - - - - 400 1 1.00 0.55 - - 1600 1 1.00 0.15 0.00 - Directional - 102% 102%
275/132/33kV T1 (Auto) 240 40 554 1155 770 0.924 0.962 0.962 0.93 110.7% 0.05 0.97 110.9% 0.25 0.97 110.9% 0.1 600 1 1.25 1.00 - - 1200 1 0.85 0.25 - - 800 1 1.00 0.10 - - Directional 600 1 1200 1 800 1 Directional 149% 97% 114%
SLG 132KV SLG 275&33KV
Selangau 275/132/33kV T2(Auto) 240 40 554 1155 770 0.924 0.962 0.962 0.93 110.7% 0.05 0.97 110.9% 0.25 0.97 110.9% 0.1 600 1 1.25 1.00 - - 1200 1 0.85 0.25 - - 800 1 1.00 0.10 - - Directional 600 1 1200 1 800 1 Directional 149% 97% 114%
132/36kV T1 80 80 - 385 1540 - 0.962 1.026 - - - 1.00 114.3% 0.3 1.05 112.5% 0.3 - - - - - - 400 1 1.00 0.30 8.75 0.00 Line CB 1500 1 1.05 0.30 16.00 0.00 Non - Directional - - 400 1 1500 1 Non - Directional - 114% 112%
SGO 132&33KV
Semenggo 132/36kV T2 80 80 - 385 1540 - 0.962 0.962 - - - 1.00 114.3% 0.3 1.00 114.3% 0.3 - - - - - - 400 1 1.00 0.30 8.75 0.00 Line CB 1600 1 1.00 0.30 13.50 0.00 Directional - - 400 1 1600 1 Directional - 114% 114%
132/36kV T1 80 80 - 385 1540 - N/A 0.962 - - - - - - 0.97 110.9% 0.32 - - - - - - No CB 1600 1 1.10 0.30 - - Non - Directional - - 1600 1 Non - Directional - N/A 125%
TAR 33KV
Sg.Biawak 132/36kV T2 80 80 - 385 1540 - N/A 0.962 - - - - - - 0.97 110.9% 0.32 - - - - - - No CB 1600 1 1.10 0.30 - - Non - Directional - - 1600 1 Non - Directional - N/A 125%
132/33kV T1 80 80 - 385 1540 - 0.962 0.962 - - - 0.97 110.9% 0.97 110.9% - - - - - - 400 1 0.97 0.24 - - 1600 1 0.97 0.24
Sg. Maaw 132/33kV T2 80 80 - 385 1540 - 0.962 0.962 - - - 0.97 110.9% 0.97 110.9% - - - - - - 400 1 0.97 0.24 - - 1600 1 0.97 0.24
275/33kV T1 120 120 277 - 2309 0.924 - 0.924 0.93 110.7% 0.35 - - - 0.93 110.7% 0.35 300 1 0.80 0.35 - - - 2500 1 0.80 0.10 - - Directional 300 1 0.93 0.35 - - - 2500 1 0.93 0.35 - - Directional 95% - 95% *confirmed on 04/08/17
SIM 275&33KV
Similajau 275/33kV T2 120 120 277 - 2309 0.924 - 0.924 0.93 110.7% 0.35 - - - 0.93 110.7% 0.35 300 1 0.80 0.35 - - - 2500 1 0.80 0.10 - - Directional 300 1 0.93 0.35 - - - 2500 1 0.93 0.35 - - Directional 95% - 95%
132/36kV T1 80 80 - 385 1540 - 0.962 0.962 - - - 0.97 110.9% 0.35 0.97 110.9% 0.1 - - - - - - 400 1 0.880 0.350 - - 1600 1 0.88 0.10 - - Directional - - 400 1 1600 1 Directional - 100% 100%
STA 132&33KV
Stakan 132/36kV T2 80 80 - 385 1540 - 0.962 0.962 - - - 0.97 110.9% 0.35 0.97 110.9% 0.1 - - - - - - 400 1 0.880 0.350 - - 1600 1 0.88 0.10 - - Directional - - 400 1 1600 1 Directional - 100% 100%
132/33kV T1 80 80 - 385 1540 - 1.069 1.283 - - - 1.10 113.2% 0.2 1.30 111.5% 0.35 - - - - - - 360 1 1.150 0.250 - - 1200 1 1.35 0.35 - - Directional - - - - - - 360 1 1.10 0.20 - - 1200 1 1.30 0.35 - - Directional - 118% 115%
TGM1 132&33KV
Tg. Manis 1 132/33kV T2 80 80 - 385 1540 - 1.069 1.283 - - - 1.10 113.2% 0.2 1.30 111.5% 0.35 - - - - - - 360 1 1.150 0.250 - - 1200 1 1.35 0.35 - - Directional - - - - - - 360 1 1.10 0.20 - - 1200 1 1.30 0.35 - - Directional - 118% 115%
132/33kV T1 (new) 80 80 - 385 1540 - 0.962 0.962 - - - 0.97 110.9% 0.2 0.97 110.9% 0.1 - - - - - - 400 1 0.970 0.200 - - 1600 1 0.970 0.100 - - Non - Directional - - 400 1 1600 1 Non - Directional - 110% 110%
Tg.Manis 2 132/33kV T2 (new) 80 80 - 385 1540 - 0.962 0.962 - - - 0.97 110.9% 0.2 0.97 110.9% 0.1 - - - - - - 400 1 0.970 0.200 - - 1600 1 0.970 0.100 - - Non - Directional - - 400 1 1600 1 Non - Directional - 110% 110%
132/33kV T1 120 120 - 577 2309 - N/A 0.924 - - - - - - 0.93 110.7% 0.5 - - - - - - No CB 2500 1 1.000 0.500 - - Directional - - 2500 1 Directional - N/A 119%
KID 33KV
Tg.Kidurong 132/33kV T2 120 120 - 577 2309 - N/A 0.924 - - - - - - 0.93 110.7% 0.5 - - - - - - No CB 2500 1 1.000 0.500 - - Directional - - 2500 1 Directional - N/A 119%
Tudan 275/34.9kV T1 120 120 277 - 2309 0.924 - 0.924 0.93 110.7% 0.425 - - - 0.93 110.7% 300 1 1.000 0.425 - - - - - - 2500 1 1.000 0.400 7.000 0.100 Directional 300 1 - - 2500 1 Directional 119% - 119%
TUD 275&33KV
275/34.9kV T2 120 120 277 - 2309 0.924 - 0.924 0.93 110.7% 0.425 - - - 0.93 110.7% 300 1 1.000 0.425 - - - - - - 2500 1 1.000 0.400 7.000 0.100 Directional 300 1 - - 2500 1 Directional 119% - 119%
275/132/33kV T1 (Auto) 240 80 554 - 1540 0.924 - 0.962 0.93 110.7% 0.33 - - - 0.93 106.3% 600 1 0.93 0.33 - - - - - - 1600 1 0.97 0.1 - - Directional
275/132/33kV T1 (Auto) 240 80 554 - 1540 0.924 - 0.962 0.93 110.7% 0.33 - - - 0.93 106.3% 600 1 0.93 0.33 - - - - - - 1600 1 0.97 0.1 - - Directional
EF Setting Only

Transformer 275kV 132kV 33kV


Substation Transformer Rating(MVA)
IDMT HIGHSET IDMT HIGHSET IDMT HIGHSET
CT Ratio Remarks CT Ratio Remarks CT Ratio Remarks
HV LV Plug TMS Plug T(sec) Plug TMS Plug T(sec) Plug TMS Plug T(sec)
275/33kV T1 30 30 100 1 - - - - - - - - 600 1 0.1 0.1 - - Directional
Balingian 275/33kV T2 30 30 100 1 - - - - - - - - 600 1 0.1 0.1 - - Directional
Betong 275/33kV T1 10 10 100 5 0.5 0.425 - - - - - - - - 300 5 1 0.3 - -
275/132/33kV T1 (Auto) 240 240 750 1 0.2 0.8 - - 1500 1 0.2 0.375 - - - - - - - -
275/132/33kV T2(Auto) 240 240 750 1 0.2 0.8 - - 1500 1 0.2 0.375 - - - - - - - -
275/33kV T1 120 120 250 1 0.3 0.8 - - - - - - - - 2500 1 0.1 0.8 - - Non - Directional
Bintulu 275/33kV T2 120 120 250 1 0.3 0.8 - - - - - - - - 2500 1 0.1 0.8 - - Non - Directional
135.4/36.2kV T1 (old) 82.3 82.3 - - - - - - 400 1 - - - - 1600 1 0.2 0.65 - - Non - Directional
135.4/36.2kV T2 (Old) 82.3 82.3 - - - - - - 400 1 - - - - 1600 1 0.2 0.65 - - Non - Directional
132/33kV T1 (New) 120 120 - - - - - - 600 1 - - - - 2400 1 0.1 0.1 - - Directional
Deshon 132/33kV T2 (New) 120 120 - - - - - - 600 1 - - - - 2400 1 0.1 0.1 - - Directional
275.8/35.6kV T1 32.4 32.4 100 1 0.2 1 - - - - - - - - 800 1 0.2 0.55 - -
Engkilili 275/35.6kV T2 30 30 100 1 - - - - - - - - - - 800 1 0.2 0.55 - -
275/132/33kV T1 (Auto) 240 80 600 1 - - - - 1200 1 - - - - 1600 1 0.1 0.1 - - Directional
Entinggan 275/132/33kV T2(Auto) 240 80 600 1 - - - - 1200 1 - - - - 1600 1 0.1 0.1 - - Directional
275/34.9kV T1 120 120 300 1 0.2 1 - - - - - - - - 2500 1 0.2 0.35 - - Directional
Kemena 275/34.9kV T2 120 120 300 1 0.2 1 - - - - - - - - 2500 1 0.2 0.35 - - Directional
289/146/36kV T1 (Auto) 88.5 45 200 1 0.5 0.6 - - Line CB 400 1 0.50 0.80 - - no CB 800 1 0.2 0.275 - - -
289/146/36kV T2 (Auto) 88.5 45 200 1 0.5 0.6 - - Line CB 400 1 0.50 0.80 - - no CB 800 1 0.2 0.275 - - -
132.4/35.6kV T1 21.6 21.6 - - - - - 100 1 - - - - 500 1 0.2 0.25 - - Non - Directional
Kemantan 132/33kV T2 22 22 600 1 0.1 0.10
Kapit 132/36kV T1 30 30 - - - - - - 500 1 0.10 0.10 - - Line CB 600 1 - - Directional
Lachau 275/36kV T1 30 30 100 1 0.2 0.65 - - - - - - - - 800 1 0.20 - - - EF disabled
275/143 T1 (Auto) 200 200 500 1 0.25 0.25 6.75 1000 1 0.25 0.25 7.00 - - - - - - - -
275/143 T2 (Auto) 200 200 500 1 0.25 0.25 6.75 1000 1 0.25 0.25 7.00 - - - - - - - -
132/36kV T1 80 80 - - - - - - 400 1 0.30 0.275 - - 1600 1 0.10 0.70 - - Non - Directional
Mambong 132/36kV T2 80 80 - - - - - - 400 1 0.30 0.275 - - 1600 1 0.10 0.70 - - Non - Directional
275/33kV T1 120 120 2500 1 0.10 0.10
Mapai 275/33kV T2 120 120 2500 1 0.10 0.10
275/33kV T1 120 120 250 1 0.10 0.50 - - Line CB - - - - - - 2500 1 0.10 0.90 - - Non - Directional
Matang 275/33kV T2 120 120 250 1 0.10 0.50 - - Line CB - - - - - - 2500 1 0.10 0.90 - - Non - Directional
275/36kV T1 30 30 100 1 0.10 1.00 - - Non-Directional - - - - - - 800 1 0.10 0.10 - - Directional
Murum Junction 275/36kV T2 30 30 100 1 0.10 1.00 - - Non-Directional - - - - - - 800 1 0.10 0.10 - - Directional
132/36kV T1 80 80 - - - - - - 400 1 0.30 0.275 - - Non - Directional 1600 1 0.10 0.75 - - Directional
132/36kV T2 80 80 - - - - - - 400 1 0.30 0.275 - - Non - Directional 1600 1 0.10 0.75 - - Directional
132/36kV T3 80 80 - - - - - - 400 1 0.30 0.275 - - Non - Directional 1600 1 0.10 0.75 - - Directional
Muara Tabuan 132/36kV T4 80 80 - - - - - - 400 1 0.30 0.275 - - Non - Directional 1600 1 0.10 0.75 - - Directional
132/33kV T1 40 40 - - - - - - 200 1 0.10 0.15 - - 800 1 - - - - Directional
Matadeng 132/33kV T2 40 40 - - - - - - 200 1 0.10 0.15 - - 800 1 - - - - Directional
275/132/33kV T1 (Auto) 240 80 600 1 0.20 1.00 - - 1200 1 0.10 1.00 - - 1600 1 0.20 0.50 - - Non - Directional
Oya 275/132/33kV T2(Auto) 240 80 600 1 0.20 1.00 - - 1200 1 0.10 1.00 - - 1600 1 0.20 0.50 - - Non - Directional
132/33kV T1 40 40 - - - - - - 200 1 - - - - 800 1 - - - - Directional
Petian 132/33kV T2 40 40 - - - - - - 200 1 - - - - 800 1 - - - - Directional
132/33kV T1 120 120 - - - - - - 600 1 - - - - 2400 1 0.10 0.10 - - Directional
Samajaya 132/33kV T2 120 120 - - - - - - 600 1 - - - - 2400 1 0.10 0.10 - - Directional
275/143/35kV T1 (Auto) 240 240 600 1 - - - - 1200 1 - - - - - - - - - - -
275/143/35kV T2 (Auto) 240 240 600 1 - - - - 1200 1 - - - - - - - - - - -
275/143/35kV T3(Auto) 240 240 600 1 - - - - 1200 1 0.50 0.50 - - - - - - - - -
275/143/35kV T4 (Auto) 240 240 600 1 - - - - 1200 1 0.50 0.50 - - - - - - - - -
132/36kV T1 80 80 - - - - - - 400 1 1.00 1.00 - - 1600 1 - - - - Directional
132/36kV T2 80 80 - - - - - - 400 1 1.00 1.00 - - 1600 1 - - - - Directional
Samalaju 132/36kV T3 80 80 - - - - - - 400 1 1.00 1.00 - - 1600 1 - - - - Directional
132/36kV T2 80 80 - - - - - - 400 1 0.30 1.00 1600 1 0.05 0.60 - - Directional
Salim 132/36kV T3 80 80 - - - - - - 400 1 0.30 1.00 1600 1 0.05 0.60 - - Directional
132/33kV T1 (old) 22 22 - - - - - - 120 1 0.50 1.00 - - 400 1 0.20 0.40 - - Directional

Sarikei
132/33kV T2 (old) 22 22 - - - - - - 120 1 0.50 1.00 - - 400 1 0.20 0.40 - - Directional
132/33kV T1 (new) 80 80 - - - - - - 400 1 - - - - 1600 1 0.10 0.10 - - Directional
Sarikei 132/33kV T2 (new) 80 80 - - - - - - 400 1 - - - - 1600 1 0.10 0.10 - - Directional
132/36kV T1 80 80 - - - - - - 400 1 0.30 0.275 1600 1 0.10 0.70 - - Directional
Sejingkat 132/36kV T2 80 80 - - - - - - 400 1 0.30 0.275 1600 1 0.10 0.70 - - Directional
275/132/33kV T1 (Auto) 240 80 600 1 - - - - 1200 1 - - - - 800 1 0.10 0.10 - - Directional
Selangau 275/132/33kV T2(Auto) 240 80 600 1 - - - - 1200 1 - - - - 800 1 0.10 0.10 - - Directional
132/36kV T1 80 80 - - - - - - 400 1 0.30 0.275 - - Line CB 1500 1 0.15 0.575 Non - Directional
Semenggo 132/36kV T2 80 80 - - - - - - 400 1 0.30 0.275 - - Line CB 1600 1 0.15 0.575 Directional
132/36kV T1 80 80 - - - - - - - - - - - - No CB 1600 1 0.20 0.10 . - Non - Directional
Sg.Biawak 132/36kV T2 80 80 - - - - - - - - - - - - No CB 1600 1 0.20 0.10 - - Non - Directional
275/33kV T1 120 120 300 1 - - - - - - - - - - 2500 1 - - - - Directional
Similajau 275/33kV T2 120 120 300 1 - - - - - - - - - - 2500 1 - - - - Directional
132/36kV T1 80 80 - - - - - - 400 1 - - - - 1600 1 0.10 0.10 - - Directional
Stakan 132/36kV T2 80 80 - - - - - - 400 1 - - - - 1600 1 0.10 0.10 - - Directional
132/33kV T1 80 80 - - - - - - 360 1 - - - - 1200 1 0.20 0.10 - - Directional
Tg. Manis 1 132/33kV T2 80 80 - - - - - - 360 1 - - - - 1200 1 0.20 0.10 - - Directional
132/33kV T1 (new) 80 80 - - - - - - 400 1 - - - - 1600 1 0.10 0.10 - - Directional
Tg.Manis 2 132/33kV T2 (new) 80 80 - - - - - - 400 1 - - - - 1600 1 0.10 0.10 - - Directional
132/33kV T1 120 120 - - - - - - - - - - - - No CB 2500 1 0.10 0.80 - - Directional
Tg.Kidurong 132/33kV T2 120 120 - - - - - - - - - - - - No CB 2500 1 0.10 0.80 - - Directional
Tudan 275/34.9kV T1 120 120 300 1 0.20 0.50 - - - - - - - - 2500 1 0.10 0.80 - - Directional
275/34.9kV T2 120 120 300 1 0.20 0.50 - - - - - - - - 2500 1 0.10 0.80 - - Directional
SBEF Setting Only

Transformer 33kV
Substation Circuit Rating(MVA)
CT Ratio Stage 1 Stage 2 Remarks
HV LV Plug TMS
Betong 275/33kV T1 10 10 300 5 - - - -
275/132/33kV T1 (Auto) 240 240 - - - - - -
275/132/33kV T2(Auto) 240 240 - - - - - -
275/33kV T1 120 120 2500 1 - - - -
Bintulu 275/33kV T2 120 120 2500 1 - - - -
ok to change
1600 1 0.1 - 4 5
135.4/36.2kV T1 (old) 82.3 82.3 stage 1 = 3s
ok to change
1600 1 0.1 - 4 5
135.4/36.2kV T2 (Old) 82.3 82.3 stage 1 = 3s
132/33kV T1 ( New) 120 120 2400 1 0.1 - 3 5
Deshon 132/33kV T2( New) 120 120 2400 1 0.1 - 3 5
275.8/35.6kV T1 32.4 32.4 800 1 0.15 - 3 5
Engkilili 275/35.6kV T2 30 30 600 1 0.2 - 3 5
275/132/33kV T1 (Auto) 240 80 1600 1 0.1 - 3 5
Entinggan 275/132/33kV T2(Auto) 240 80 1600 1 0.1 - 3 5
275/34.9kV T1 120 120 2100 1 0.2 - 3 5 *confirm on 31/07/17
Kemena 275/34.9kV T2 120 120 2100 1 0.2 - 3 5
Kemantan 289/146/36kV T1 (Auto) 88.5 45 800 1 0.2 - 4 8 *simulate
289/146/36kV T2 (Auto) 88.5 45 800 1 0.2 - 4 8
132.4/35.6kV T1 21.6 21.6 500 1 0.20 - 5 - trip txf only
Kapit 132/36kV T1 30 30 600 1 0.20 - 60 min 3
Lachau 275/36kV T1 30 30 800 1 0.10 - 3 5 *check 08.09.2017
275/143 T1 (Auto) 200 200 - - - - - -
275/143 T2 (Auto) 200 200 - - - - - -
132/36kV T1 80 80 1600 1 0.05 - 0 0.5 LTI curve 0.65 *simulate
Mambong 132/36kV T2 80 80 1600 1 0.05 - 0 0.5 LTI curve 0.65
275/33kV T1 120 120 2500 1 0.1 - 3 5 Commissioning 12.06.2017
Mapai 275/33kV T2 120 120 2500 1 0.1 - 3 5 Commissioning 12.06.2017
Proposed: 0.2A
2500 1 0.1 - Stage 1 = 4s
275/33kV T1 120 120 2 5 Stage 2 = 5s
Proposed: 0.2A
2500 1 0.1 - Stage 1 = 4s
Matang 275/33kV T2 120 120 2 5 Stage 2 = 5s
275/36kV T1 30 30 800 1 0.1 - 3 5
Murum Junction 275/36kV T2 30 30 800 1 0.1 - 3 5
132/36kV T1 80 80 1600 1 0.2 - 0 0.5 Simulation: fault current is too small (~40A) and SBEF has no operation
132/36kV T2 80 80 1600 1 0.2 - 0 0.5 "
132/36kV T3 80 80 1600 1 0.2 - 2 3 "
Muara Tabuan 132/36kV T4 80 80 1600 1 0.2 - 2 3 "
ok to change
800 1 0.2 - 2 5
132/33kV T1 40 40 stage 1 = 3s
ok to change
800 1 0.2 - 2 5
Matadeng 132/33kV T2 40 40 stage 1 = 3s
275/132/33kV T1 (Auto) 240 80 800 1 0.2 - 3 5 revised on 08.07.2017 ** remarks on 33kV
Oya 275/132/33kV T2(Auto) 240 80 800 1 0.2 - 3 5 revised on 08.07.2017 ** remarks on 33kV
132/33kV T1 40 40 800 1 0.2 - 3 5 revised on 06.07.2017
Petian 132/33kV T2 40 40 800 1 0.2 - 3 5 revised on 06.07.2017
275/33kV T1 120 120 2400 1 0.1 - 3 5
Samajaya
Transformer 33kV
Substation Circuit Rating(MVA)
CT Ratio Stage 1 Stage 2 Remarks
HV LV Plug TMS
Samajaya 275/33kV T2 120 120 2400 1 0.1 - 3 5
275/143/35kV T1 (Auto) 240 240 - - - - - -
275/143/35kV T2 (Auto) 240 240 - - - - - -
275/143/35kV T3(Auto) 240 240 - - - - - -
275/143/35kV T4 (Auto) 240 240 - - - - - -
132/36kV T1 80 80 1600 1 0.10 - 3.00 5.00
132/36kV T2 80 80 1600 1 0.10 - 3.00 5.00
Stage 1
= 2.5
1600 1 - 1.00 3.00
Stage 2=
Samalaju 132/36kV T3 80 80 0.1 *simulate
Proposed: 0.2A
800 1 0.2 - 2 5 Stage 1 = 3s
132/36kV T2 80 80 Stage 2 = 5s
Proposed: 0.2A
800 1 0.2 - 2 5 Stage 1 = 3s
Salim 132/36kV T3 80 80 Stage 2 = 5s
132/33kV T1 (old) 22 22 400 1 0.1 - 4 5 *CT ratio of 400/1A is insufficient
132/33kV T2 (old) 22 22 400 1 0.1 - 4 5
132/33kV T1 (new) 80 80 1600 1 0.1 - 3 5
Sarikei 132/33kV T2 (new) 80 80 1600 1 0.1 - 3 5
132/36kV T1 80 80 800 1 0.05 - 0 0.5 SI CURVE 0.65 *grading is sufficient
Sejingkat 132/36kV T2 80 80 800 1 0.05 - 0 0.5 SI CURVE 0.65
275/132/33kV T1 (Auto) 240 80 1600 1 0.2 - 3 5
Selangau 275/132/33kV T2(Auto) 240 80 1600 1 0.2 - 3 5
132/36kV T1 80 80 - - - - - -
Semenggo 132/36kV T2 80 80 800 1 0.2 - 0 5.0 *grading is sufficient
132/36kV T1 80 80 1600 1 0.2 - 5 5.05 *LV EF to set directional in order to have sufficient grading
Sg.Biawak 132/36kV T2 80 80 1600 1 0.2 - 5 5.05
275/33kV T1 120 120 2500 1 0.5 - 3 5 *ok to change plug setting to 0.1A
Similajau 275/33kV T2 120 120 2500 1 1.0 - 2 5
132/36kV T1 80 80 1600 1 0.10 - 3.00 5.00
Stakan 132/36kV T2 80 80 1600 1 0.10 - 3.00 5.00
132/33kV T1 80 80 1600 1 0.2 - 4 5 *grading is sufficient
Tg.Manis A 132/33kV T2 80 80 1600 1 0.2 - 4 5
132/33kV T1 (new) 80 80 1600 1 0.1 - 3 5
Tg.Manis B 132/33kV T2 (new) 80 80 1600 1 0.1 - 3 5
132/33kV T1 120 120 2500 1 0.2 - 0.30 0.50 SPAJ11C
Tg.Kidurong 132/33kV T2 120 120 2500 1 0.2 - 0.30 0.50
Stage 1=
0.1
2500 1 - 0.8 1
Stage 2=
275/34.9kV T1 ∞ *simulate
Stage 1=
0.1
2500 1 - 0.8 1
Stage 2=
Tudan 275/34.9kV T2 ∞
Over Current Setting Only
Date Version : 01/04/2019

Transformer 110 % Transformer rated 275kV 132kV 33kV


New OC settings (Plug)
Substation Circuit Rating(MVA) current (A) IDMT HIGHSET IDMT HIGHSET IDMT HIGHSET
CT Ratio Remarks CT Ratio Remarks CT Ratio Angle Remarks
HV LV 275kV 132kV 33kV 275kV 132kV 33kV Plug TMS Plug T(sec) Plug TMS Plug T(sec) Plug TMS Plug T(sec)
Astana 132/33kV T1 120 120 - 577 2309 - 0.9623 1.1547 - - - - - - - 600 1 0.97 0.25 - - Non-Directional 2000 1 1.16 0.1 - - 30° Directional
132/33kV T2 120 120 - 577 2309 - 0.9623 1.1547 - - - - - - - 600 1 0.97 0.25 - - Non-Directional 2000 1 1.16 0.1 - - 30° Directional
Balingian 275/33kV T1 30 30 69 - 577 0.693 - 0.962 100 1 0.7 0.25 - - - - - - - - - - 600 1 0.97 0.10 - - 30° Directional
275/33kV T2 30 30 69 - 577 0.693 - 0.962 100 1 0.7 0.25 - - - - - - - - - - 600 1 0.97 0.10 - - 30° Directional
Betong 275/33kV T1 10 10 23 - 192 1.155 - 3.208 100 5 1.75 0.25 ─ ─ Non-Directional - - − − − − - 300 5 5.00 0.30 − − - Non - Directional HV intertrip LV LV NoIntertrip HV
Bintulu 275/132/33kV T1 (Auto) 240 240 554 1155 - 0.739 0.770 - 750 1 0.74 0.25 - - Non-Directional 1500 1 0.80 0.25 - - Non-Directional - - - - - - - - HV intertrip LV(132) LV(132) intertrip HV
275/132/33kV T2(Auto) 240 240 554 1155 - 0.739 0.770 - 750 1 0.74 0.25 - - Non-Directional 1500 1 0.80 0.25 - - Non-Directional - - - - - - - - HV intertrip LV(132) LV(132) intertrip HV
275/33kV T1 120 120 277 - 2309 1.109 - 0.924 250 1 1.15 0.90 - - Non-Directional - - - - - - - 2500 1 0.93 0.20 - - No angle Directional HV intertrip LV LV Intertrip HV Disable LV OC HS on 06/03/18
275/33kV T2 120 120 277 - 2309 1.109 - 0.924 250 1 1.15 0.90 - - Non-Directional - - - - - - - 2500 1 0.93 0.20 - - No angle Directional HV intertrip LV LV Intertrip HV Disable LV OC HS on 06/03/19
Deshon 135.4/36.2kV T1 (Old) 82.3 82.3 - 396 1584 - 0.990 0.990 - - - - - - - 400 1 1.00 0.50 - - Non-Directional 1600 1 1.00 0.45 - - No angle Non Directional HV intertrip LV LV NoIntertrip HV
135.4/36.2kV T2 (Old) 82.3 82.3 - 396 1584 - 0.990 0.990 - - - - - - - 400 1 1.00 0.50 - - Non-Directional 1600 1 1.00 0.45 - - No angle Non Directional HV intertrip LV LV NoIntertrip HV
132/33kV T1 (New) 120 120 - 577 2309 - 0.962 0.962 - - - - - - - 600 1 0.96 0.24 - - Non-Directional 2400 1 1.00 0.10 - - 30⁰ Directional HV intertrip LV LV Intertrip HV
132/33kV T2 (New) 120 120 - 577 2309 - 0.962 0.962 - - - - - - - 600 1 0.96 0.24 - - Non-Directional 2400 1 1.00 0.10 - - 30⁰ Directional HV intertrip LV LV Intertrip HV
Engkilili 275.8/35.6kV T1 32.4 32.4 75 - 624 0.748 - 0.779 100 1 0.75 0.45 - - Non-Directional - - - - - - - 800 1 0.78 0.30 - - - Non - Directional HV intertrip LV LV NoIntertrip HV
275/35.6kV T2 30 30 69 - 577 0.693 - 0.722 100 1 0.70 0.45 - - Non-Directional - - - - - - - 800 1 0.73 0.30 - - - Non - Directional HV intertrip LV LV NoIntertrip HV
Entinggan 275/132/33kV T1 (Auto) 240 80 554 1155 1540 0.924 0.962 0.962 600 1 0.93 0.45 - - Non-Directional 1200 1 0.97 0.35 - - Non-Directional 1600 1 1.00 0.10 - - - Directional HV intertrip LV; LV intertrip Tertirary; Tertirary NO Intertrip HV
- - - - - - 1600 1 1.00 0.375 - - - Non Directional
275/132/33kV T2 (Auto) 240 80 554 1155 1540 0.924 0.962 0.962 600 1 0.93 0.45 - - Non-Directional 1200 1 0.97 0.35 - - Non-Directional 1600 1 1.00 0.10 - - - Directional HV intertrip LV; LV intertrip Tertirary; Tertirary NO Intertrip HV
- - - - - - 1600 1 1.00 0.375 - - - Non Directional
Kemena 275/34.9kV T1 120 120 277 - 2309 0.924 - 0.924 250 1 1.11 0.375 - - Non-Directional - - - - - - - 2500 1 0.93 0.35 - - 30⁰ Directional HV intertrip LV LV NoIntertrip HV CT ratio change for T1 only on 06/03/18
275/34.9kV T2 120 120 277 - 2309 0.924 - 0.924 300 1 0.93 0.375 - - Non-Directional - - - - - - - 2500 1 0.93 0.35 - - 30⁰ Directional HV intertrip LV LV NoIntertrip HV
Kemantan 275/132/33kV T1 (Auto) 240 240 554 1155 - 0.924 0.962 - 600 1 0.93 0.45 - - Non-Directional 1200 1 0.97 0.35 - - Non-Directional - - - - - - - - 33kV side connected to reactor
275/132/33kV T2 (Auto) 240 240 554 1155 - 0.924 0.962 - 600 1 0.93 0.45 Non-Directional 1200 1 0.97 0.35 Non-Directional - - - - - - - - 33kV side connected to reactor
132/33kV T1 22 22 - 106 423 - 1.059 0.847 - - - - - - - 180 1 0.59 0.54 Non-Directional 400 1 1.06 0.10 30° Directional
132/33kV T2 21.6 21.6 - 104 416 - 0.577 0.693 - - - - - - - 100 1 1.00 0.50 - - Non-Directional 500 1 0.84 0.10 - - 30° Directional
Kapit 132/33kV 30 30 - 144 577 - 0.289 0.962 - - - - - - - 500 1 0.31 0.35 Non-Directional 600 1 1.05 0.30 ?? Directional
Lachau 275/33kV 30 30 69 - 577 0.693 - 0.722 100 1 0.75 0.560 - - Non-Directional - - - - - - - 800 1 0.85 0.30 - - - Non-Directional HV intertrip LV LV NoIntertrip HV
Mambong 275/132/33kV T1 (Auto) 200 200 462 962 - 0.924 0.962 - 500 1 0.95 0.125 - - Non-Directional 1000 1 1.00 0.125 - - Non-Directional - - - - - - - - HV intertrip LV LV NoIntertrip HV
275/132/33kV T2 (Auto) 200 200 462 962 - 0.924 0.962 - 500 1 0.95 0.125 - - Non-Directional 1000 1 1.00 0.125 - - Non-Directional - - - - - - - - HV intertrip LV LV NoIntertrip HV
132/33kV T1 (Auto) 80 80 - 385 1540 - 0.962 0.962 - - - - - - - 400 1 1.00 0.40 - - Non-Directional 1600 1 1.00 0.10 - - 30° Directional HV intertrip LV LV NoIntertrip HV
132/33kV T2 (Auto) 80 80 - 385 1540 - 0.962 0.962 - - - - - - - 400 1 1.00 0.40 - - Non-Directional 1600 1 1.00 0.10 - - 30° Directional HV intertrip LV LV NoIntertrip HV
BENGKAYANG L1 & L2 600 1259.67 1250 1 0.67 1.5 - - Non-Directional - - - - - - - - - - - - - - -
**100% rating
275/33kV T1 120 120 277 - 2309 0.924 - 0.924 300 1 1.00 0.30 - - Non-Directional - - - - - - - 2500 1 1.00 0.10 - - ?? Directional
Mapai 275/33kV T2 120 120 277 - 2309 0.924 - 0.924 300 1 1.00 0.30 - - Non-Directional - - - - - - - 2500 1 1.00 0.10 - - ?? Directional
Marudi Junction 275/33kV T1 120 120 277 2309 0.924 0.962 300 1 0.93 0.27 Non-Directional 2400 1 0.97 0.10 - - 30° Directional
275/33kV T2 120 120 277 2309 0.924 0.962 300 1 0.93 0.27 Non-Directional 2400 1 0.97 0.10 - - 30° Directional
Matang 275/33kV T1 120 120 277 - 2309 1.109 - 0.924 250 1 1.25 0.50 - - Non-Directional - - - - - - - 2500 1 1.00 0.43 - - - Non - Directional HV & LV Combined TRIPPING
275/33kV T2 120 120 277 - 2309 1.109 - 0.924 250 1 1.25 0.50 - - Non-Directional - - - - - - - 2500 1 1.00 0.43 - - - Non - Directional HV & LV Combined TRIPPING
Mendu 132/33 T1 120 120 - 577 2309 - 0.962 0.962 - - - - - - - 600 1 0.97 0.43 Non-Directional 2400 1 0.97 0.10 - - ?? Directional
132/33 T2 120 120 - 577 2309 - 0.962 0.962 - - - - - - - 600 1 0.97 0.43 Non-Directional 2400 1 0.97 0.10 - - ?? Directional
Murum Junction 275/33kV T1 30 30 69 - 577 0.693 - 0.722 100 1 0.75 0.35 - - Non-Directional - - - - - - - 800 1 0.73 0.10 - - 45⁰ Directional HV intertrip LV LV Intertrip HV
275/33kV T2 30 30 69 - 577 0.693 - 0.722 100 1 0.75 0.35 - - Non-Directional - - - - - - - 800 1 0.73 0.10 - - 45⁰ Directional HV intertrip LV LV Intertrip HV
Muara Tabuan 132/33kV T1 80 80 - 385 1540 - 0.962 0.962 - - - - - - - 400 1 1.00 0.55 11.00 0.00 Non-Directional 1600 1 1.00 0.10 - - +30⁰ Directional HV intertrip LV LV NoIntertrip HV
132/33kV T2 80 80 - 385 1540 - 0.962 0.962 - - - - - - - 400 1 1.00 0.55 11.00 0.00 Non-Directional 1600 1 1.00 0.10 - - +45⁰ Directional HV intertrip LV LV NoIntertrip HV
132/33kV T3 80 80 - 385 1540 - 0.962 0.962 - - - - - - - 400 1 1.00 0.45 - - Non-Directional 1600 1 1.00 0.20 - - +30⁰ Directional HV intertrip LV LV NoIntertrip HV
132/33kV T4 80 80 - 385 1540 - 0.962 0.962 - - - - - - - 400 1 1.00 0.45 - - Non-Directional 1600 1 1.00 0.20 - - +30⁰ Directional HV intertrip LV LV NoIntertrip HV
Matadeng 132/33kV T1 40 40 - 192 770 0.962 0.962 - - - - - - - 200 1 0.97 0.25 - - Non-Directional 800 1 0.97 0.25 - - +30⁰ Directional HV intertrip LV LV NoIntertrip HV
132/33kV T2 40 40 - 192 770 0.962 0.962 - - - - - - - 200 1 0.97 0.25 - - Non-Directional 800 1 0.97 0.25 - - +30⁰ Directional HV intertrip LV LV NoIntertrip HV
Oya 240 80 554 1155 1540 0.924 0.962 3.849 600 1 0.93 0.40 - - Non-Directional 1200 1 0.97 0.30 - - Non-Directional 1600 1 0.97 0.10 - - +45⁰ Directional
275/132/33kV T1 (Auto)
- - - - 0.97 0.50 - - - Non-Directional
240 80 554 1155 1540 0.924 0.962 3.849 600 1 0.93 0.40 - - Non-Directional 1200 1 0.97 0.30 - - Non-Directional 1600 1 0.97 0.10 - - +45⁰ Directional
275/132/33kV T2(Auto)
- - - - 0.97 0.50 - - - Non-Directional
Petian 132/33kV T1 40 40 - 192 770 - 0.962 0.962 - - - - - - - 200 1 0.97 0.35 - - Non-Directional 800 1 0.97 0.10 - - +45⁰ Directional HV intertrip LV LV NoIntertrip HV
132/33kV T2 40 40 - 192 770 - 0.962 0.962 - - - - - - - 200 1 0.97 0.35 - - Non-Directional 800 1 0.97 0.10 - - +45⁰ Directional HV intertrip LV LV NoIntertrip HV
Samajaya 132/33kV T1 120 120 - 577 2309 - 0.962 0.962 - - - - - - - 600 1 0.97 0.35 - - Non-Directional 2400 1 1.00 0.10 - - +30⁰ Directional HV intertrip LV LV Intertrip HV
132/33kV T2 120 120 - 577 2309 - 0.962 0.962 - - - - - - - 600 1 0.97 0.35 - - Non-Directional 2400 1 1.00 0.10 - - +30⁰ Directional HV intertrip LV LV Intertrip HV
Samalaju A 275/143/35kV T1 (Auto) 240 240 554 1155 - 0.924 0.962 - 600 1 0.93 0.60 - - Non-Directional 1200 1 0.97 0.50 - - Non-Directional - - - - - - - - HV intertrip LV 132 132LV NoIntertrip HV
275/143/35kV T2 (Auto) 240 240 554 1155 - 0.924 0.962 - 600 1 0.93 0.60 - - Non-Directional 1200 1 0.97 0.50 - - Non-Directional - - - - - - - - HV intertrip LV 132 132LV NoIntertrip HV
275/143/35kV T3 (Auto) 240 240 554 1155 - 0.924 0.962 - 600 1 0.93 0.60 - - Non-Directional 1200 1 0.97 0.50 - - Non-Directional - - - - - - - - HV intertrip LV 132 132LV NoIntertrip HV
275/143/35kV T4 (Auto) 240 240 554 1155 - 0.924 0.962 - 600 1 0.93 0.60 - - Non-Directional 1200 1 0.97 0.50 - - Non-Directional - - - - - - - - HV intertrip LV 132 132LV NoIntertrip HV
132/36kV T1 80 80 - 385 1540 - 0.962 0.962 - - - - - - - 400 1 0.97 0.53 - - Non-Directional 1600 1 0.97 0.10 - - 30⁰ Directional HV intertrip LV LV NoIntertrip HV
132/36kV T2 80 80 - 385 1540 - 0.962 0.962 - - - - - - - 400 1 0.97 0.53 - - Non-Directional 1600 1 0.97 0.10 - - 30⁰ Directional HV intertrip LV LV NoIntertrip HV
132/36kV T3 80 80 - 385 1540 - 0.962 0.962 - - - - - - - 400 1 0.97 0.53 - - Non-Directional 1600 1 0.97 0.10 - - 30⁰ Directional HV intertrip LV LV NO ntertrip HV
Samalaju B 275/132/33kV T3 (Auto) 240 240 554 1155 0.924 0.962 600 1 0.93 1.00 - - Non-Directional 1200 1 0.97 1.00 - - Non-Directional - - - - - - - -
275/132/33kV T4 (Auto) 240 240 554 1155 0.924 0.962 600 1 0.93 1.00 - - Non-Directional 1200 1 0.97 1.00 - - Non-Directional - - - - - - - -
132/33kV T2 80 80 385 1540 0.962 0.962 600 1 0.93 1.00 - - Non-Directional 400 1 0.97 0.35 - - Non-Directional 1600 1 0.97 0.10 - - 30⁰ Directional
132/33kV T3 80 80 385 1540 0.962 0.962 600 1 0.93 1.00 - - Non-Directional 400 1 0.97 0.35 - - Non-Directional 1600 1 0.97 0.10 - - 30⁰ Directional
Salim 132/36kV T1 80 80 - 385 1540 - 0.970 0.970 - - - - - - - 400 1 0.97 0.50 - - Non-Directional 1600 1 0.97 0.10 - - 30⁰ Directional HV intertrip LV LV NoIntertrip HV
132/36kV T2 80 80 - 385 1540 - 0.970 0.970 - - - - - - - 400 1 0.97 0.50 - - Non-Directional 1600 1 0.97 0.10 - - 30⁰ Directional HV intertrip LV LV NoIntertrip HV
Sarikei 132/33kV T1 (new) 80 80 - 385 1540 - 0.962 0.962 - - - - - - - 400 1 0.97 0.35 - - Non-Directional 1600 1 0.97 0.10 - - 30⁰ Directional HV intertrip LV LV Intertrip HV
132/33kV T2 (new) 80 80 - 385 1540 - 0.962 0.962 - - - - - - - 400 1 0.97 0.35 - - Non-Directional 1600 1 0.97 0.10 - - 30⁰ Directional HV intertrip LV LV Intertrip HV
Sejingkat 132/36kV T1 80 80 - 385 1540 - 0.962 0.962 - - - - - - - 400 1 1.00 0.55 10 0.0 Non-Directional 1600 1 1.00 0.15 - - +30⁰ Directional HV intertrip LV LV NoIntertrip HV
132/36kV T2 80 80 - 385 1540 - 0.962 0.962 - - - - - - - 400 1 1.00 0.55 10 0.0 Non-Directional 1600 1 1.00 0.15 - - +30⁰ Directional HV intertrip LV LV NoIntertrip HV
132/36kV T3 120 120 - 577 2309 0.962 0.962 - - - - - - - 600 1 0.97 0.30 - - Non-Directional 2400 1 0.97 0.10 - - +30⁰ Directional
132/36kV T4 120 120 - 577 2309 0.962 0.962 - - - - - - - 600 1 0.97 0.30 - - Non-Directional 2400 1 0.97 0.10 - - +30⁰ Directional
Selangau 240 40 554 1155 770 0.924 0.962 0.962 600 1 1.25 1.00 - - Non-Directional 1200 1 0.97 0.25 - - Non-Directional 800 1 0.97 0.25 25.00 - +30⁰ Directional HV intertrip LV &Tertiary Lv intertrip Tertirary Tertirary NO Intertrip HV
275/132/33kV T1 (Auto)
- - - - Non-Directional Non-Dir OC to be implemented
240 40 554 1155 770 0.924 0.962 0.962 600 1 1.25 1.00 - - Non-Directional 1200 1 0.97 0.25 - - Non-Directional 800 1 0.97 0.25 25.00 - +30⁰ Directional HV intertrip LV &Tertiary Lv intertrip Tertirary Tertirary NO Intertrip HV
275/132/33kV T2(Auto)
- - - - Non-Directional Non-Dir OC to be implemented
Semenggo 132/36kV T1 80 80 - 385 1540 - 0.962 1.026 - - - - - - - 400 1 1.00 0.35 - - Non-Directional 1500 1 1.05 0.35 - - - Non - Directional HV intertrip LV LV Intertrip HV
132/36kV T2 80 80 - 385 1540 - 0.962 0.962 - - - - - - - 400 1 1.00 0.35 - - Non-Directional 1600 1 1.00 0.30 - - +30⁰ Directional HV intertrip LV LV Intertrip HV
Sg.Biawak 132/36kV T1 80 80 - 385 1540 - N/A 0.962 - - - - - - - - - - - - - - 1600 1 0.97 0.32 - - - Non - Directional
132/36kV T2 80 80 - 385 1540 - N/A 0.962 - - - - - - - - - - - - - - 1600 1 0.97 0.32 - - - Non - Directional
Sg. Maaw 132/33kV T1 80 80 - 385 1540 - 0.962 0.962 - - - - - - - 400 1 0.97 0.24 - - Non-Directional 1600 1 0.97 0.24 10.00 0.10 30⁰ Directional HV intertrip LV LV Intertrip HV
132/33kV T2 80 80 - 385 1540 - 0.962 0.962 - - - - - - - 400 1 0.97 0.24 - - Non-Directional 1600 1 0.97 0.24 10.00 0.10 30⁰ Directional HV intertrip LV LV Intertrip HV
Similajau 275/33kV T1 120 120 277 - 2309 0.924 - 0.924 300 1 0.93 0.35 - - Non-Directional - - - - - - - 2500 1 0.93 0.35 - - 45⁰ Directional HV intertrip LV LV NoIntertrip HV
275/33kV T2 120 120 277 - 2309 0.924 - 0.924 300 1 0.93 0.35 - - Non-Directional - - - - - - - 2500 1 0.93 0.35 - - 45⁰ Directional HV intertrip LV LV NoIntertrip HV
Stakan 132/36kV T1 80 80 - 385 1540 - 0.962 0.962 - - - - - - - 400 1 0.970 0.580 - - Non-Directional 1600 1 0.97 0.10 - - 45⁰ Directional HV intertrip LV LV Intertrip HV
132/36kV T2 80 80 - 385 1540 - 0.962 0.962 - - - - - - - 400 1 0.970 0.580 - - Non-Directional 1600 1 0.97 0.10 - - 45⁰ Directional HV intertrip LV LV Intertrip HV
Tg. Manis 1 132/33kV T1 80 80 - 385 1540 - 1.069 1.283 - - - - - - - 360 1 1.10 0.47 - - Non-Directional 1200 1 1.30 0.35 - - +30⁰ Non-Directional HV intertrip LV LV Intertrip HV
132/33kV T2 80 80 - 385 1540 - 1.069 1.283 - - - - - - - 360 1 1.10 0.47 - - Non-Directional 1200 1 1.30 0.35 - - +30⁰ Non-Directional HV intertrip LV LV Intertrip HV
Tg.Manis 2 132/33kV T1 (new) 80 80 - 385 1540 - 0.962 0.962 - - - - - - - 400 1 0.970 0.200 - - Non-Directional 1600 1 0.970 0.100 - - 30⁰ Directional HV intertrip LV LV Intertrip HV
132/33kV T2 (new) 80 80 - 385 1540 - 0.962 0.962 - - - - - - - 400 1 0.970 0.200 - - Non-Directional 1600 1 0.970 0.100 - - 30⁰ Directional HV intertrip LV LV Intertrip HV
Tg.Kidurong 132/33kV T1 120 120 - 577 2309 - N/A 0.924 - - - - - - - - - - - - - NO OC PROTECTION 2500 1 0.930 0.500 - - 30⁰ Directional HV intertrip LV LV NoIntertrip HV

132/33kV T2 120 120 - 577 2309 - N/A 0.924 - - - - - - - - - - - - - NO OC PROTECTION 2500 1 0.930 0.500 - - 30⁰ Directional HV intertrip LV LV NoIntertrip HV

Tudan 275/34.9kV T1 120 120 277 - 2309 0.924 - 0.924 300 1 0.930 0.43 - - Non-Directional - - - - - - - 2500 1 1.000 0.400 - - 30⁰ Directional HV intertrip LV LV Intertrip HV
275/34.9kV T2 120 120 277 - 2309 0.924 - 0.924 300 1 0.930 0.43 - - Non-Directional - - - - - - - 2500 1 1.000 0.400 - - 30⁰ Directional HV intertrip LV LV Intertrip HV
275/132/33kV T1 (Auto) 240 80 554 - 1540 0.924 - 0.962 600 1 0.930 0.37 - - Non-Directional 1200 1 0.97 0.29 - - Non-Directional 1600 1 1.000 0.100 - - 30⁰ Directional HV intertrip LV LV Intertrip HV
275/132/33kV T2 (Auto) 240 80 554 - 1540 0.924 - 0.962 600 1 0.930 0.37 - - Non-Directional 1200 1 0.97 0.29 - - Non-Directional 1600 1 1.000 0.100 - - 30⁰ Directional HV intertrip LV LV Intertrip HV
Earth Fault (EF) Setting Only

Date Version : 01/04/2019

Transformer 275kV 132kV 33kV


Substation Circuit Rating(MVA) IDMT HIGHSET IDMT HIGHSET IDMT HIGHSET
CT Ratio Remarks CT Ratio Remarks CT Ratio Angle Remarks
HV LV Plug TMS Plug T(sec) Plug TMS Plug T(sec) Plug TMS Plug T(sec)
Astana 132/33kV T1 120 120 - - - - - - - 600 1 - - - - - 2000 1 0.1 0.1 - - 0° Directional
132/33kV T2 120 120 - - - - - - - 600 1 - - - - - 2000 1 0.1 0.1 - - 0° Directional
Balingian 275/33kV T1 30 30 100 1 - - - - - - - - - - - - 600 1 0.1 0.1 - - 0° Directional
275/33kV T2 30 30 100 1 - - - - - - - - - - - - 600 1 0.1 0.1 - - 0° Directional
Betong 275/33kV T1 10 10 100 5 10.00 0.425 ─ ─ Non-Directional - - - - − − - 300 5 1.00 0.3 − − - Non - Directional HV intertrip LV LV NoIntertrip HV
Bintulu 275/132/33kV T1 (Auto) 240 240 750 1 0.20 0.80 - - Non-Directional 1500 1 0.20 0.375 - - Non-Directional - - - - - - - - HV intertrip LV(132) LV(132) intertrip HV
275/132/33kV T2(Auto) 240 240 750 1 0.20 0.80 - - Non-Directional 1500 1 0.20 0.375 - - Non-Directional - - - - - - - - HV intertrip LV(132) LV(132) intertrip HV
275/33kV T1 120 120 250 1 3.00 0.80 - - Non-Directional - - - - - - - 2500 1 0.10 0.80 - - No angle Directional HV intertrip LV LV Intertrip HV Disable LV OC HS on 06/03/18
275/33kV T2 120 120 250 1 3.00 0.80 - - Non-Directional - - - - - - - 2500 1 0.10 0.80 - - No angle Directional HV intertrip LV LV Intertrip HV Disable LV OC HS on 06/03/19
Deshon 135.4/36.2kV T1 (Old) 82.3 82.3 - - - - - - - 400 1 - - - - Non-Directional 1600 1 0.20 0.65 - - No angle Non Directional HV intertrip LV LV NoIntertrip HV
135.4/36.2kV T2 (Old) 82.3 82.3 - - - - - - - 400 1 - - - - Non-Directional 1600 1 0.20 0.65 - - No angle Non Directional HV intertrip LV LV NoIntertrip HV
132/33kV T1 (New) 120 120 - - - - - - - 600 1 - - - - Non-Directional 2400 1 0.10 0.10 - - 0° Directional HV intertrip LV LV Intertrip HV
132/33kV T2 (New) 120 120 - - - - - - - 600 1 - - - - Non-Directional 2400 1 0.10 0.10 - - 0° Directional HV intertrip LV LV Intertrip HV
Engkilili 275.8/35.6kV T1 32.4 32.4 100 1 0.20 1.00 - - Non-Directional - - - - - 800 1 0.20 0.55 - - - Directional HV intertrip LV LV NoIntertrip HV
275/35.6kV T2 30 30 100 1 0.20 1.00 - - Non-Directional - - - - - 800 1 0.20 0.55 - - - Directional HV intertrip LV LV NoIntertrip HV
Entinggan 275/132/33kV T1 (Auto) 240 80 600 1 - - - - Non-Directional 1200 1 - - - - Non-Directional 1600 1 0.10 0.10 - - - Directional HV intertrip LV; LV intertrip Tertirary; Tertirary NO Intertrip HV
- - - - - - - 1600 1 - - - - - Non Directional
275/132/33kV T2 (Auto) 240 80 600 1 - - - - Non-Directional 1200 1 - - - - Non-Directional 1600 1 0.10 0.10 - - - Directional HV intertrip LV; LV intertrip Tertirary; Tertirary NO Intertrip HV
- - - - - - - 1600 1 - - - - - Non Directional
Kemena 275/34.9kV T1 120 120 250 1 0.20 1.000 - - Non-Directional - - - - - - - 2500 1 0.20 0.35 - - - Directional HV intertrip LV LV NoIntertrip HV CT ratio change for T1 only on 06/03/18
275/34.9kV T2 120 120 300 1 0.20 1.000 - - Non-Directional - - - - - - - 2500 1 0.20 0.35 - - - Directional HV intertrip LV LV NoIntertrip HV
Kemantan 275/132/33kV T1 (Auto) 240 240 200 1 0.50 0.60 - - Non-Directional 400 1 0.50 0.80 - - Non-Directional 800 1 0.20 0.275 - - - -
275/132/33kV T2 (Auto) 240 240 200 1 0.50 0.60 - - Non-Directional 400 1 0.50 0.80 - - Non-Directional 800 1 0.20 0.275 - - - -
132/33kV T1 22 22 - - - - - - - 180 1 - - - - Non-Directional 400 1 0.10 0.10 - - Directional
132/33kV T2 21.6 21.6 - - - - - - - 100 1 - - - - Non-Directional 500 1 0.10 0.10 - - Directional
Kapit 132/33kV 30 30 - - - - - - - 500 1 0.10 0.10 - - Non-Directional 600 1 - - - - - -
Lachau 275/33kV 30 30 100 1 0.20 0.650 - - Non-Directional - - - - - 800 1 0.10 ∞ - - - Non-Directional HV intertrip LV LV NoIntertrip HV
Mambong 275/132/33kV T1 (Auto) 200 200 500 1 0.25 0.250 6.75 - Non-Directional 1000 1 0.25 0.250 7.00 - Non-Directional - - - - - - - - HV intertrip LV LV NoIntertrip HV
275/132/33kV T2 (Auto) 200 200 500 1 0.25 0.250 6.75 - Non-Directional 1000 1 0.25 0.250 7.00 - Non-Directional - - - - - - - - HV intertrip LV LV NoIntertrip HV
132/33kV T1 (Auto) 80 80 - - - - - - - 400 1 - - - - Non-Directional 1600 1 0.10 0.70 - - Directional HV intertrip LV LV NoIntertrip HV
132/33kV T2 (Auto) 80 80 - - - - - - - 400 1 - - - - Non-Directional 1600 1 0.10 0.70 - - Directional HV intertrip LV LV NoIntertrip HV
BENGKAYANG L1 & L2 600 - - - - - - - - - - - - - - - - - -
Mapai 275/33kV T1 120 120 300 1 - - - - - - - - - - - - 2500 1 0.10 0.10 - - Directional
275/33kV T2 120 120 300 1 - - - - - - - - - - - - 2500 1 0.10 0.10 - - Directional
Marudi Junction 275/33kV T1 120 120 300 1 - - - - - - - - - - - - 2400 1 0.10 0.10 - - Directional
275/33kV T2 120 120 300 1 - - - - - - - - - - - - 2400 1 0.10 0.10 - - Directional
Matang 275/33kV T1 120 120 250 1 0.10 0.50 - - Non-Directional - - - - - - - 2500 1 - - - - - Non - Directional HV & LV Combined TRIPPING
275/33kV T2 120 120 250 1 0.10 0.50 - - Non-Directional - - - - - - - 2500 1 - - - - - Non - Directional HV & LV Combined TRIPPING
Mendu 132/33 T1 120 120 600 1 - - - - - 2400 1 0.10 0.10 - - Directional
132/33 T2 120 120 600 1 - - - - - 2400 1 0.10 0.10 - - Directional
Murum Junction 275/33kV T1 30 30 100 1 0.10 0.10 - - Non-Directional - - - - - - - 800 1 0.10 0.10 - - Directional HV intertrip LV LV Intertrip HV
275/33kV T2 30 30 100 1 0.10 0.10 - - Non-Directional - - - - - - - 800 1 0.10 0.10 - - Directional HV intertrip LV LV Intertrip HV
Muara Tabuan 132/33kV T1 80 80 - - - - - - - 400 1 0.30 0.275 - - Non-Directional 1600 1 2.40 1.00 - - Directional HV intertrip LV LV NoIntertrip HV
132/33kV T2 80 80 - - - - - - - 400 1 0.30 0.275 - - Non-Directional 1600 1 2.40 1.00 - - Directional HV intertrip LV LV NoIntertrip HV
132/33kV T3 80 80 - - - - - - - 400 1 0.30 0.275 - - Non-Directional 1600 1 0.10 0.75 - - Directional HV intertrip LV LV NoIntertrip HV
132/33kV T4 80 80 - - - - - - - 400 1 0.30 0.275 - - Non-Directional 1600 1 0.10 0.75 - - Directional HV intertrip LV LV NoIntertrip HV
Matadeng 132/33kV T1 40 40 - - - - - - - 200 1 - - - - - 800 1 0.10 0.10 - - 0⁰ Directional HV intertrip LV LV NoIntertrip HV
132/33kV T2 40 40 - - - - - - - 200 1 - - - - - 800 1 0.10 0.10 - - 0⁰ Directional HV intertrip LV LV NoIntertrip HV
Oya 275/132/33kV T1 (Auto) 240 80 600 1 - - - - - 1200 1 - - - - - 1600 1 0.10 0.10 - - 0⁰ Directional
275/132/33kV T2(Auto) 240 80 600 1 - - - - - 1200 1 - - - - - 1600 1 0.10 0.10 - - 0⁰ Directional
Petian 132/33kV T1 40 40 - - - - - - - 200 1 - - - - - 800 1 0.10 0.10 - - 0⁰ Directional HV intertrip LV LV NoIntertrip HV
132/33kV T2 40 40 - - - - - - - 200 1 - - - - - 800 1 0.10 0.10 - - 0⁰ Directional HV intertrip LV LV NoIntertrip HV
Samajaya 132/33kV T1 120 120 - - - - - - - 600 1 - - - - Non-Directional 2400 1 0.10 0.10 - - 0⁰ Directional HV intertrip LV LV Intertrip HV
132/33kV T2 120 120 - - - - - - - 600 1 - - - - Non-Directional 2400 1 0.10 0.10 - - 0⁰ Directional HV intertrip LV LV Intertrip HV
Samalaju A 275/143/35kV T1 (Auto) 240 240 600 1 - - - - - 1200 1 - - - - - - - - - - - - - HV intertrip LV 132 132LV NoIntertrip HV
275/143/35kV T2 (Auto) 240 240 600 1 - - - - - 1200 1 - - - - - - - - - - - - - HV intertrip LV 132 132LV NoIntertrip HV
275/143/35kV T3 (Auto) 240 240 600 1 - - - - - 1200 1 0.50 0.50 - - Non-Directional - - - - - - - - HV intertrip LV 132 132LV NoIntertrip HV
275/143/35kV T4 (Auto) 240 240 600 1 - - - - - 1200 1 0.50 0.50 - - Non-Directional - - - - - - - - HV intertrip LV 132 132LV NoIntertrip HV
132/36kV T1 80 80 - - - - - - - 400 1 1.00 1.00 - - Non-Directional 1600 1 - - 0⁰ Directional HV intertrip LV LV NoIntertrip HV
132/36kV T2 80 80 - - - - - - - 400 1 1.00 1.00 - - Non-Directional 1600 1 - - 0⁰ Directional HV intertrip LV LV NoIntertrip HV
132/36kV T3 80 80 - - - - - - - 400 1 1.00 1.00 - - Non-Directional 1600 1 - - 0⁰ Directional HV intertrip LV LV NO ntertrip HV
Samalaju B 275/132/33kV T3 (Auto) 240 240 600 1 - - - - - 1200 1 - - - - - - - - - - - - -
275/132/33kV T4 (Auto) 240 240 600 1 - - - - - 1200 1 - - - - - - - - - - - - -
132/33kV T2 80 80 600 1 - - - - - 400 1 - - - - - 1600 1 0.10 0.10 - - 0⁰ Directional
132/33kV T3 80 80 600 1 - - - - - 400 1 - - - - - 1600 1 0.10 0.10 - - 0⁰ Directional
Salim 132/36kV T1 80 80 - - - - - - - 400 1 0.30 1.00 - - Non-Directional 1600 1 0.05 0.60 - - Non-Directional HV intertrip LV LV NoIntertrip HV
132/36kV T2 80 80 - - - - - - - 400 1 0.30 1.00 - - Non-Directional 1600 1 0.05 0.60 - - Non-Directional HV intertrip LV LV NoIntertrip HV
Sarikei 132/33kV T1 (new) 80 80 - - - - - - - 400 1 - - - - - 1600 1 0.10 0.10 - - 0⁰ Directional HV intertrip LV LV Intertrip HV
132/33kV T2 (new) 80 80 - - - - - - - 400 1 - - - - - 1600 1 0.10 0.10 - - 0⁰ Directional HV intertrip LV LV Intertrip HV
Sejingkat 132/36kV T1 80 80 - - - - - - - 400 1 0.30 0.275 - - Non-Directional 1600 1 0.10 0.70 - - Directional HV intertrip LV LV NoIntertrip HV
132/36kV T2 80 80 - - - - - - - 400 1 0.30 0.275 - - Non-Directional 1600 1 0.10 0.70 - - Directional HV intertrip LV LV NoIntertrip HV
132/36kV T3 120 120 - - - - - - - 600 1 - - - - - 2400 1 0.10 0.10 - - 0⁰ Directional
132/36kV T4 120 120 - - - - - - - 600 1 - - - - - 2400 1 0.10 0.10 - - 0⁰ Directional
Selangau 275/132/33kV T1 (Auto) 240 40 600 1 - - - - - 1200 1 - - - - - 800 1 0.10 0.10 - - Directional HV intertrip LV &Tertiary Lv intertrip Tertirary Tertirary NO Intertrip HV
275/132/33kV T2 (Auto) 240 40 600 1 - - - - - 1200 1 - - - - - 800 1 0.10 0.10 - - Directional HV intertrip LV &Tertiary Lv intertrip Tertirary Tertirary NO Intertrip HV
Semenggo 132/36kV T1 80 80 - - - - - - - 400 1 0.30 0.275 - - Non-Directional 1500 1 0.15 0.575 - - Non - Directional HV intertrip LV LV Intertrip HV
132/36kV T2 80 80 - - - - - - - 400 1 0.30 0.275 - - Non-Directional 1600 1 0.15 0.575 - - Directional HV intertrip LV LV Intertrip HV
Sg.Biawak 132/36kV T1 80 80 - - - - - - - - - - - - - - 1600 1 - - - - - Non - Directional
132/36kV T2 80 80 - - - - - - - - - - - - - - 1600 1 - - - - - Non - Directional
Sg. Maaw 132/33kV T1 80 80 - - - - - - - 400 1 - - - - - 1600 1 0.10 0.10 - - Directional HV intertrip LV LV Intertrip HV
132/33kV T2 80 80 - - - - - - - 400 1 - - - - - 1600 1 0.10 0.10 - - Directional HV intertrip LV LV Intertrip HV
Similajau 275/33kV T1 120 120 300 1 - - - - - - - - - - - - 2500 1 - - - - - Directional HV intertrip LV LV NoIntertrip HV
275/33kV T2 120 120 300 1 - - - - - - - - - - - - 2500 1 - - - - - Directional HV intertrip LV LV NoIntertrip HV
Stakan 132/36kV T1 80 80 - - - - - - - 400 1 - - - - - 1600 1 0.10 0.10 - - Directional HV intertrip LV LV Intertrip HV
132/36kV T2 80 80 - - - - - - - 400 1 - - - - - 1600 1 0.10 0.10 - - Directional HV intertrip LV LV Intertrip HV
Tg. Manis 1 132/33kV T1 80 80 - - - - - - - 360 1 - - - - - 1200 1 0.20 1.00 - - - Non-Directional HV intertrip LV LV Intertrip HV
132/33kV T2 80 80 - - - - - - - 360 1 - - - - - 1200 1 0.20 1.00 - - - Non-Directional HV intertrip LV LV Intertrip HV
Tg.Manis 2 132/33kV T1 (new) 80 80 - - - - - - - 400 1 - - - - - 1600 1 0.10 0.10 - - Directional HV intertrip LV LV Intertrip HV
132/33kV T2 (new) 80 80 - - - - - - - 400 1 - - - - - 1600 1 0.10 0.10 - - Directional HV intertrip LV LV Intertrip HV
Tg.Kidurong 132/33kV T1 120 120 - - - - - - - - - - - - - NO OC 2500 1 0.10 0.80 - - Directional HV intertrip LV LV NoIntertrip HV
PROTECTION
132/33kV T2 120 120 - - - - - - - - - - - - - NO OC 2500 1 0.10 0.80 - - Directional HV intertrip LV LV NoIntertrip HV
PROTECTION
Tudan 275/34.9kV T1 120 120 300 1 - - - - Non-Directional - - - - - - - 2500 1 0.10 0.80 - - Directional HV intertrip LV LV Intertrip HV
275/34.9kV T2 120 120 300 1 - - - - Non-Directional - - - - - - - 2500 1 0.10 0.80 - - Directional HV intertrip LV LV Intertrip HV
275/132/33kV T1 (Auto) 240 80 600 1 - - - - Non-Directional 1200 1 - - - - Non-Directional 1600 1 0.10 0.10 - - Directional HV intertrip LV LV Intertrip HV
275/132/33kV T2 (Auto) 240 80 600 1 - - - - Non-Directional 1200 1 - - - - Non-Directional 1600 1 0.10 0.10 - - Directional HV intertrip LV LV Intertrip HV
Standby Earth Fault (SBEF) Setting Only
Date Version : 01/04/2019

Transformer 275kV 132kV 33kV


Substation Circuit Rating(MVA) DT DT DT
CT Ratio Remarks CT Ratio Remarks CT Ratio Remarks
HV LV Plug Stage 1 Stage 2 Plug Stage 1 Stage 2 Plug Stage 1 Stage 2
Astana 132/33kV T1 120 120 - - - - - - 600 1 - - - - 2000 1 0.2 3 5
132/33kV T2 120 120 - - - - - - 600 1 - - - - 2000 1 0.2 3 5
Balingian 275/33kV T1 30 30 100 1 - - - - - - 0.1 3 5 For testing only 600 1 0.1 3 5
275/33kV T2 30 30 100 1 - - - - - - 0.1 3 5 For testing only 600 1 0.1 3 5
Betong 275/33kV T1 10 10 100 5 ─ ─ ─ ─ - - - - - - 300 5 − − −
Bintulu 275/132/33kV T1 (Auto) 240 240 750 1 - - - - 1500 1 - - - - - - - - -
275/132/33kV T2(Auto) 240 240 750 1 - - - - 1500 1 - - - - - - - - -
275/33kV T1 120 120 250 1 - - - - - - - - - - 2500 1 - - -
275/33kV T2 120 120 250 1 - - - - - - - - - - 2500 1 - - -
Deshon 135.4/36.2kV T1 (Old) 82.3 82.3 - - - - - - 400 1 - - - - 1600 1 0.1 4 5
135.4/36.2kV T2 (Old) 82.3 82.3 - - - - - - 400 1 - - - - 1600 1 0.1 4 5
132/33kV T1 (New) 120 120 - - - - - - 600 1 - - - - 2400 1 0.1 3 5
132/33kV T2 (New) 120 120 - - - - - - 600 1 - - - - 2400 1 0.1 3 5
Engkilili 275.8/35.6kV T1 32.4 32.4 100 1 - - - - - - - - - - 800 1 0.15 3 5
275/35.6kV T2 30 30 100 1 - - - - - - - - - - 800 1 0.2 3 5
Entinggan 275/132/33kV T1 (Auto) 240 80 600 1 - - - - 1200 1 - - - - 1600 1 0.2 3 5
275/132/33kV T2 (Auto) 240 80 600 1 - - - - 1200 1 - - - - 1600 1 0.2 3 5
Kemena 275/34.9kV T1 120 120 250 1 - - - - - - - - - - 2500 1 0.2 3 5
275/34.9kV T2 120 120 300 1 - - - - - - - - - - 2500 1 0.2 3 5
Kemantan 275/132/33kV T1 (Auto) 240 240 600 1 - - - - 1200 1 - - - - 800 1 0.2 4 8
275/132/33kV T2 (Auto) 240 240 600 1 - - - - 1200 1 - - - - 800 1 0.2 4 8
132/33kV T1 22 22 - - - - - - 180 1 - - - - 400 1 0.4 3 5
132/33kV T2 21.6 21.6 - - - - - - 100 1 - - - - 500 1 0.32 3 5
Kapit 132/33kV 30 30 - - - - - - 500 1 - - - - 600 1 0.2 60min 3
Lachau 275/33kV 30 30 100 1 - - - - - - - - - - 800 1 0.1 3 5
Mambong 275/132/33kV T1 (Auto) 200 200 500 1 - - - - 1000 1 - - - - - - - - -
275/132/33kV T2 (Auto) 200 200 500 1 - - - - 1000 1 - - - - - - - - -
132/33kV T1 (Auto) 80 80 - - - - - - 400 1 - - - - 1600 1 0.20 3 5
132/33kV T2 (Auto) 80 80 - - - - - - 400 1 - - - - 1600 1 0.20 3 5
BENGKAYANG L1 & L2 600 - - - - - - - - - - - - - - - - -
Mapai 275/33kV T1 120 120 300 1 - - - - - - - - - - 2500 1 0.10 3 5
275/33kV T2 120 120 300 1 - - - - - - - - - - 2500 1 0.10 3 5
Marudi Junction 275/33kV T1 120 120 300 1 - - - - - - - - - - 2400 1 0.10 3 5
275/33kV T2 120 120 300 1 - - - - - - - - - - 2400 1 0.10 3 5
Matang 275/33kV T1 120 120 250 1 - - - - - - - - - - 2500 1 0.30 4 6
275/33kV T2 120 120 250 1 - - - - - - - - - - 2500 1 0.30 4 6
Mendu 132/33 T1 120 120 - - - - - - 600 1 - - - - 2400 1 0.10 3 5
132/33 T2 120 120 - - - - - - 600 1 - - - - 2400 1 0.10 3 5
Murum Junction 275/33kV T1 30 30 100 1 - - - - - - - - - - 800 1 0.10 3 5
275/33kV T2 30 30 100 1 - - - - - - - - - - 800 1 0.10 3 5
Muara Tabuan 132/33kV T1 80 80 - - - - - - 400 1 - - - - 1600 1 0.30 4 5
132/33kV T2 80 80 - - - - - - 400 1 - - - - 1600 1 0.30 4 5
132/33kV T3 80 80 - - - - - - 400 1 - - - - 1600 1 0.20 2 3
132/33kV T4 80 80 - - - - - - 400 1 - - - - 1600 1 0.20 2 3
Matadeng 132/33kV T1 40 40 - - - - - - 200 1 - - - - 800 1 0.20 2 5
132/33kV T2 40 40 - - - - - - 200 1 - - - - 800 1 0.20 2 5
Oya 275/132/33kV T1 (Auto) 240 80 600 1 - - - - 1200 1 - - - - 1600 1 0.20 3 5
275/132/33kV T2(Auto) 240 80 600 1 - - - - 1200 1 - - - - 1600 1 0.20 3 5
Petian 132/33kV T1 40 40 - - - - - - 200 1 - - - - 800 1 0.35 3 5
132/33kV T2 40 40 - - - - - - 200 1 - - - - 800 1 0.35 3 5
Samajaya 132/33kV T1 120 120 - - - - - - 600 1 - - - - 2400 1 0.20 3 5
132/33kV T2 120 120 - - - - - - 600 1 - - - - 2400 1 0.20 3 5
Samalaju A 275/143/35kV T1 (Auto) 240 240 600 1 - - - - 1200 1 - - - - - - - - -
275/143/35kV T2 (Auto) 240 240 600 1 - - - - 1200 1 - - - - - - - - -
275/143/35kV T3 (Auto) 240 240 600 1 - - - - 1200 1 - - - - - - - - -
275/143/35kV T4 (Auto) 240 240 600 1 - - - - 1200 1 - - - - - - - - -
132/36kV T1 80 80 - - - - - - 400 1 - - - - 1600 1 0.10 3 5
132/36kV T2 80 80 - - - - - - 400 1 - - - - 1600 1 0.10 3 5
132/36kV T3 80 80 - - - - - - 400 1 - - - - 1600 1 0.10 3 5
Samalaju B 275/132/33kV T3 (Auto) 240 240 600 1 - - - - 1200 1 - - - - - - - - -
275/132/33kV T4 (Auto) 240 240 600 1 - - - - 1200 1 - - - - - - - - -
132/33kV T2 80 80 600 1 - - - - 400 1 - - - - 1600 1 0.10 3 5
132/33kV T3 80 80 600 1 - - - - 400 1 - - - - 1600 1 0.10 3 5
Salim 132/36kV T1 80 80 - - - - - - 400 1 - - - - 1600 1 0.20 2 5
132/36kV T2 80 80 - - - - - - 400 1 - - - - 1600 1 0.20 2 5
Sarikei 132/33kV T1 (new) 80 80 - - - - - - 400 1 - - - - 1600 1 0.25 3 5
132/33kV T2 (new) 80 80 - - - - - - 400 1 - - - - 1600 1 0.25 3 5
Sejingkat 132/36kV T1 80 80 - - - - - - 400 1 - - - - 1600 1 0.35 5 6
132/36kV T2 80 80 - - - - - - 400 1 - - - - 1600 1 0.35 5 6
132/36kV T3 120 120 - - - - - - 600 1 - - - - 2400 1 0.10 3 5
132/36kV T4 120 120 - - - - - - 600 1 - - - - 2400 1 0.10 3 5
Selangau 275/132/33kV T1 (Auto) 240 40 600 1 - - - - 1200 1 - - - - 800 1 0.20 3 5
275/132/33kV T2 (Auto) 240 40 600 1 - - - - 1200 1 - - - - 800 1 0.20 3 5
Semenggo 132/36kV T1 80 80 - - - - - - 400 1 - - - - 1500 1 - - -
132/36kV T2 80 80 - - - - - - 400 1 - - - - 1600 1 0.20 3 5
Sg.Biawak 132/36kV T1 80 80 - - - - - - - - - - - - 1600 1 0.20 5 5.05
132/36kV T2 80 80 - - - - - - - - - - - - 1600 1 0.20 5 5.05
Sg. Maaw 132/33kV T1 80 80 - - - - - - 400 1 - - - - 1600 1 0.10 3 5
132/33kV T2 80 80 - - - - - - 400 1 - - - - 1600 1 0.10 3 5
Similajau 275/33kV T1 120 120 300 1 - - - - - - - - - - 2500 1 0.10 3 5
275/33kV T2 120 120 300 1 - - - - - - - - - - 2500 1 0.10 3 5
Stakan 132/36kV T1 80 80 - - - - - - 400 1 - - - - 1600 1 0.20 3 5
132/36kV T2 80 80 - - - - - - 400 1 - - - - 1600 1 0.20 3 5
Tg. Manis 1 132/33kV T1 80 80 - - - - - - 360 1 - - - - 1200 1 0.10 4 5
132/33kV T2 80 80 - - - - - - 360 1 - - - - 1200 1 0.10 4 5
Tg.Manis 2 132/33kV T1 (new) 80 80 - - - - - - 400 1 - - - - 1600 1 0.10 3 5
132/33kV T2 (new) 80 80 - - - - - - 400 1 - - - - 1600 1 0.10 3 5
Tg.Kidurong 132/33kV T1 120 120 - - - - - - - - - - - - 2500 1 0.30 3 5
132/33kV T2 120 120 - - - - - - - - - - - - 2500 1 0.30 3 5
Tudan 275/34.9kV T1 120 120 300 1 - - - - - - - - - - 2500 1 0.10 3 5
275/34.9kV T2 120 120 300 1 - - - - - - - - - - 2500 1 0.10 3 5
Tudan

275/132/33kV T1 (Auto) 240 80 600 1 - - - - 1200 1 - - - - 1600 1 0.10 3 5


275/132/33kV T2 (Auto) 240 80 600 1 - - - - 1200 1 - - - - 1600 1 0.10 3 5