OWNER:
LOCATION: Panabo City, Davao del Norte, Philippines
Slab on Fill
37.80 cu.m. Total Volume
V. Eaves Ceiling
145 pcs 110mm x 3m Brown Oak UPVC Planks PHP 286.65
27 pcs PVC End Moulding PHP 94.50
22 lgth Metal Furrings PHP 130.00
5 lgth Carrying Channels PHP 160.00
48 pcs W-Clip PHP 10.00
5 box 3/4' Ø x 5/32' Blind Rivets PHP -
5 box 1/2' Ø x 1/8' Blind Rivets PHP -
3 box 1/8' Drill bit PHP -
3 box 5/32' Drill bit PHP -
Sub Total
Labor Cost
Total Direct Cost
Profit
OCM
Total Cost
sqm
Unit Price
VIII. Plumbing
7 pcs. Water Closet PHP -
7 pcs. Lavatory PHP -
7 pcs. Faucet PHP -
7 pcs. 4" x 4" Floor Drain PHP -
7 pcs. Hose Bibb PHP -
13 pcs. 4" Ø PVC Cleanout PHP -
42 pcs. 4" Ø PVC Pipe S-1000 PHP -
31 pcs. 4" Ø PVC WYE PHP -
7 pcs. 4" X 2" PVC WYE REDUCER PHP -
20 pcs. 4" x 45 PVC Elbow PHP -
22 pcs. 4" PVC Coupling PHP -
4 pcs. 4" PVC Tee PHP -
7 pcs. 4" P-Trap PHP -
30 pcs. 4" PVC Elbow PHP -
pcs. PHP -
pcs. PHP -
pcs. PHP -
Sub Total
Labor Cost
Total Direct Cost
Profit
OCM
Total Cost
ls
Unit Price
PHP 53,648.40
PHP 53,648.40
PHP 18,776.94
PHP 72,425.34
PHP 7,242.53
PHP 8,691.04
PHP 88,358.91
206.34
PHP 428.22
PHP 38,351.58
PHP 38,351.58
PHP 13,423.05
PHP 51,774.63
PHP 5,177.46
PHP 6,212.96
PHP 63,165.05
191.76
PHP 329.40
PHP 52,567.82
PHP 52,567.82
PHP 18,398.74
PHP 70,966.56
PHP 7,096.66
PHP 8,515.99
PHP 86,579.20
55.33
PHP 1,564.65
PHP 68,246.96
PHP 15,475.50
PHP 29,403.45
PHP 113,125.91
PHP 39,594.07
PHP 152,719.97
PHP 19,057.82
PHP 4,321.50
PHP 8,210.85
PHP 31,590.17
PHP 11,056.56
PHP 42,646.72
PHP 69,457.50
PHP 18,900.00
PHP 35,910.00
PHP 124,267.50
PHP 43,493.63
PHP 167,761.13
PHP 76,195.00
PHP 17,230.00
PHP 32,737.00
PHP 126,162.00
PHP 44,156.70
PHP 170,318.70
PHP 395,145.57
PHP 138,300.95
PHP 533,446.52
PHP 53,344.65
PHP 64,013.58
PHP 650,804.75
111.85
PHP 5,818.34
PHP 109,200.00
PHP 2,862.72
PHP 112,062.72
PHP 39,221.95
PHP 151,284.67
PHP 37,128.00
PHP 13,860.00
PHP 2,620.80
PHP 53,608.80
PHP 18,763.08
PHP 72,371.88
PHP 52,637.06
PHP 1,378.16
PHP 54,015.22
PHP 18,905.33
PHP 72,920.55
PHP 212,957.56
PHP 15,169.62
PHP 228,127.17
PHP 79,844.51
PHP 307,971.69
PHP 490.00
PHP 448,303.92
PHP 156,734.87
PHP 605,038.79
PHP 60,503.88
PHP 72,604.65
PHP 738,147.32
9,603.26
PHP 76.86
PHP -
PHP 14,820.00
PHP 9,120.00
PHP 1,920.00
PHP -
PHP -
PHP -
PHP -
PHP 25,860.00
PHP 9,051.00
PHP 34,911.00
PHP 3,491.10
PHP 4,189.32
PHP 42,591.42
666.00
PHP 63.95
inforcing Steel)
PHP 4,380.00
PHP 6,860.00
PHP 15,790.00
PHP 4,950.00
PHP 1,543.50
PHP 33,523.50
PHP 11,733.23
PHP 45,256.73
PHP 4,525.67
PHP 5,430.81
PHP 55,213.20
10.00
PHP 5,521.32
PHP 2,119.84
PHP 480.69
PHP 913.31
PHP 3,513.84
PHP 1,229.85
PHP 4,743.69
PHP 474.37
PHP 569.24
PHP 5,787.30
1.00
PHP 5,787.30
PHP -
PHP -
PHP -
PHP -
PHP -
PHP -
PHP -
PHP -
PHP -
PHP -
PHP -
PHP -
PHP -
PHP -
PHP -
PHP -
PHP -
PHP -
PHP -
PHP -
PHP -
PHP -
PHP -
1.00
PHP -
PHP -
PHP -
PHP 14,700.00
PHP 19,250.00
PHP 20,820.00
PHP -
PHP -
PHP -
PHP -
PHP 54,770.00
PHP 19,169.50
PHP 73,939.50
PHP 7,393.95
PHP 8,872.74
PHP 90,206.19
1.00
PHP 90,206.19
DETAILED ESTIMATED MATERIALS
Structural Excavation
CF - 1 F-1 F-2
Length 3.5 meter Length 2.3 meter Length 2.5 meter
Width 1.8 meter Width 2.3 meter Width 2.5 meter
Height 2 meter Height 2 meter Height 2 meter
Units 2 Units 8 Units 7
Total Vol. 25.20 Cu. Mtr. Total Vol. 84.64 Cu. Mtr. Total Vol. 87.50 Cu. Mtr.
F-3
Length 1.5 meter
Width 1.5 meter
Height 2 meter
Units 2
Total Vol. 9.00 Cu. Mtr.
Backfill
CF - 1 F-1 F-2
Length 3.5 meter Length 2.3 meter Length 2.5 meter
Width 1.8 meter Width 2.3 meter Width 2.5 meter
Height 0.3 meter Height 0.3 meter Height 0.3 meter
Units 2 Units 8 Units 7
Total Vol. 3.78 Cu. Mtr. Total Vol. 12.70 Cu. Mtr. Total Vol. 13.13 Cu. Mtr.
F-3
Length 1.5 meter
Width 1.5 meter
Height 0.3 meter
Units 2
Total Vol. 1.35 Cu. Mtr.
Gravelfill
CF - 1 F-1 F-2
Length 3.5 meter Length 2.3 meter Length 2.5 meter
Width 1.8 meter Width 2.3 meter Width 2.5 meter
Height 0.1 meter Height 0.1 meter Height 0.1 meter
Units 2 Units 8 Units 7
Total Vol. 1.26 Cu. Mtr. Total Vol. 4.23 Cu. Mtr. Total Vol. 4.38 Cu. Mtr.
CF - 1 F-1 F-2
Length 3.5 meter Length 2.3 meter Length 2.5 meter
Width 1.8 meter Width 2.3 meter Width 2.5 meter
Height 0.3 meter Height 0.3 meter Height 0.3 meter
Units 2 Units 8 Units 7
Total Vol. 3.78 Cu. Mtr. Total Vol. 12.70 Cu. Mtr. Total Vol. 13.13 Cu. Mtr.
F-3
Length 1.5 meter
Width 1.5 meter
Height 0.3 meter
Units 2
Total Vol. 1.35 Cu. Mtr.
SLAB ON FILL
Length 18 meter
Width 21 meter
Height 0.1 meter
Units 1
Total Vol. 37.80 Cu. Mtr.
STEEL WORKS
a
LENGTH 3.5 METER
WIDTH 1.8 METER
THICKNESS 0.3 METER
UNITS 2
MAIN REIFORCEMENTS
LENGTH OF 1 HOOK/BEND NET LENGTH NO. OF CUT BARS IN 1 TOTAL LENGTH OF TOTAL NO. OF 16mm Ø
REINFORCING CUT-BAR (m) (m) FOOTING REINFORCEMENT 6 METER DRB (pcs)
(m) IN ONE SIDE
TIE WIRE
TOTAL NO. OF TOTAL LENGTH OF TIES QUANTITY OF TIES IN
LENGTH OF 1 TIE (m)
INTERSECTIONS/TIES (m) KILOGRAMS
F-1
LENGTH 2.3 METER
WIDTH 2.3 METER
THICKNESS 0.3 METER
UNITS 8
MAIN REIFORCEMENTS
LENGTH OF 1 HOOK/BEND NET LENGTH NO. OF CUT BARS IN 1 TOTAL LENGTH OF TOTAL NO. OF 16mm Ø
REINFORCING CUT-BAR (m) (m) FOOTING REINFORCEMENT 6 METER DRB (pcs)
(m) IN ONE SIDE
LENGTH OF 1 HOOK/BEND NET LENGTH NO. OF CUT BARS IN 1 TOTAL LENGTH OF TOTAL NO. OF 16mm Ø
REINFORCING CUT-BAR (m) (m) FOOTING REINFORCEMENT 6 METER DRB (pcs)
(m) IN ONE SIDE
TIE WIRE
TOTAL NO. OF TOTAL LENGTH OF TIES QUANTITY OF TIES IN
INTERSECTIONS/TIES LENGTH OF 1 TIE (m) (m) KILOGRAMS
1568 0.4 627.2 12.5 kgs. No. 16 GI Tie Wire
F-2
LENGTH 2.5 METER
WIDTH 2.5 METER
THICKNESS 0.3 METER
UNITS 7
MAIN REIFORCEMENTS
LENGTH OF 1
HOOK/BEND NET LENGTH NO. OF CUT BARS IN 1 TOTAL LENGTH OF TOTAL NO. OF 16mm Ø
REINFORCING CUT-BAR (m) (m) FOOTING REINFORCEMENT 6 METER DRB (pcs)
(m) IN ONE SIDE
2.35 0.20 2.55 18 321.30 54
LENGTH OF 1 HOOK/BEND NET LENGTH NO. OF CUT BARS IN 1 TOTAL LENGTH OF TOTAL NO. OF 16mm Ø
REINFORCING CUT-BAR (m) (m) FOOTING REINFORCEMENT 6 METER DRB (pcs)
(m) IN ONE SIDE
TIE WIRE
TOTAL NO. OF TOTAL LENGTH OF TIES QUANTITY OF TIES IN
LENGTH OF 1 TIE (m)
INTERSECTIONS/TIES (m) KILOGRAMS
2268 0.4 907.2 18.1 kgs. No. 16 GI Tie Wire
F-3
LENGTH 1.5 METER
WIDTH 1.5 METER
THICKNESS 0.3 METER
UNITS 7
MAIN REIFORCEMENTS
LENGTH OF 1 HOOK/BEND NET LENGTH NO. OF CUT BARS IN 1 TOTAL LENGTH OF TOTAL NO. OF 16mm Ø
REINFORCING CUT-BAR (m) (m) FOOTING REINFORCEMENT 6 METER DRB (pcs)
(m) IN ONE SIDE
1.35 0.20 1.55 10 108.50 18
LENGTH OF 1 HOOK/BEND NET LENGTH NO. OF CUT BARS IN 1 TOTAL LENGTH OF TOTAL NO. OF 16mm Ø
REINFORCING CUT-BAR (m) (m) FOOTING REINFORCEMENT 6 METER DRB (pcs)
(m) IN ONE SIDE
TIE WIRE
TOTAL NO. OF TOTAL LENGTH OF TIES QUANTITY OF TIES IN
LENGTH OF 1 TIE (m)
INTERSECTIONS/TIES (m) KILOGRAMS
700 0.4 280 5.6 kgs. No. 16 GI Tie Wire
PED 1
LENGTH 0.6 METER
WIDTH 0.4 METER
HEIGHT 2.15 METER
UNITS 10
MAIN REIFORCEMENTS
NET
NO. MAIN BARS IN 1 LENGTH OF 1 MAIN BAR LENGTH OF TOTAL LENGTH OF MAIN TOTAL LENGTH OF
COLUMN FROM FOOTING TO ROOF BEND 1 MAIN BAR BARS IN 1 COLUMN MAIN REINFORCEMENT
BEAM (m)
(m)
LATERAL TIES
NO. OF LATERAL TIES IN 1 TOTAL LENGTH OF TOTAL NO. OF LATERAL TOTAL LENGTH OF
COLUMN SPACED @ LENGTH OF 1 LATERAL TIE LATERAL TIES IN 1 TIES (pcs) LATERAL TIES (m)
100mm O.C. (pcs.) COLUMN
TIE WIRE
TOTAL NO. OF TOTAL LENGTH OF TIES QUANTITY OF TIES IN
INTERSECTIONS/TIES LENGTH OF 1 TIE (m) (m) KILOGRAMS
PED 2
LENGTH 0.4 METER
WIDTH 0.4 METER
HEIGHT 2.15 METER
UNITS 9
MAIN REIFORCEMENTS
NET
LENGTH OF 1 MAIN BAR TOTAL LENGTH OF
NO. MAIN BARS IN 1 LENGTH OF TOTAL LENGTH OF MAIN MAIN
FROM FOOTING TO ROOF BEND REINFORCEMENT
COLUMN 1 MAIN BAR BARS IN 1 COLUMN
BEAM (m) (m)
LATERAL TIES
NO. OF LATERAL TIES IN 1 TOTAL LENGTH OF TOTAL NO. OF LATERAL TOTAL LENGTH OF
COLUMN SPACED @ LENGTH OF 1 LATERAL TIE LATERAL TIES IN 1 TIES (pcs) LATERAL TIES (m)
100mm O.C. (pcs.) COLUMN
TIE WIRE
TOTAL NO. OF TOTAL LENGTH OF TIES QUANTITY OF TIES IN
LENGTH OF 1 TIE (m)
INTERSECTIONS/TIES (m) KILOGRAMS
PED 3
LENGTH 0.3 METER
WIDTH 0.3 METER
HEIGHT 2.15 METER
UNITS 2
MAIN REIFORCEMENTS
NET
LENGTH OF 1 MAIN BAR TOTAL LENGTH OF
NO. MAIN BARS IN 1 LENGTH OF TOTAL LENGTH OF MAIN MAIN
FROM FOOTING TO ROOF BEND REINFORCEMENT
COLUMN 1 MAIN BAR BARS IN 1 COLUMN
BEAM (m)
(m)
23 1.06 23.85 45 48
TIE WIRE
TOTAL NO. OF TOTAL LENGTH OF TIES QUANTITY OF TIES IN
LENGTH OF 1 TIE (m)
INTERSECTIONS/TIES (m) KILOGRAMS
SLAB ON FILL
THICKNESS 0.1 METER
LENGTH 18
WIDTH 21
AREA 378 SQ.M.
UNITS 1
MAIN REIFORCEMENTS
LENGTH OF TOTAL NO. OF BARS (pcs.) LENGTH OF 1 REINF. CUT- TOTAL LENGTH OF TOTAL NO. OF 10mm
SPACING (m)
SLAB BAR (m) REINFORCEMENT (m) Ø 6 METER DRB (pcs)
18 0.40 46 20.85 959.10 160
TEMP BARS
LENGTH OF TOTAL NO. OF BARS (pcs.) LENGTH OF 1 REINF. CUT- TOTAL LENGTH OF TOTAL NO. OF 10mm
SPACING (m)
SLAB BAR (m) REINFORCEMENT (m) Ø 6 METER DRB (pcs)
21 0.40 54 17.85 954.98 159
TIE WIRE
TOTAL NO. OF TOTAL LENGTH OF TIES QUANTITY OF TIES IN
LENGTH OF 1 TIE (m)
INTERSECTIONS/TIES (m) KILOGRAMS
TIE WIRE
QUANTITY OF TIES IN
FLOOR AREA MULTIPLIER UNITS KILOGRAMS
15.2250 0.632 4 38.5 kgs. No. 16 GI Tie Wire
TIE WIRE
QUANTITY OF TIES IN
FLOOR AREA MULTIPLIER UNITS KILOGRAMS
15.1158 0.632 1 9.6 kgs. No. 16 GI Tie Wire
TIE WIRE
QUANTITY OF TIES IN
FLOOR AREA MULTIPLIER UNITS KILOGRAMS
15.0975 0.632 2 19.1 kgs. No. 16 GI Tie Wire
TIE WIRE
QUANTITY OF TIES IN
FLOOR AREA MULTIPLIER UNITS KILOGRAMS
TIE WIRE
QUANTITY OF TIES IN
FLOOR AREA MULTIPLIER UNITS KILOGRAMS
15.2076 0.632 1 9.6 kgs. No. 16 GI Tie Wire
TIE WIRE
QUANTITY OF TIES IN
FLOOR AREA MULTIPLIER UNITS
KILOGRAMS
TIE WIRE
QUANTITY OF TIES IN
FLOOR AREA MULTIPLIER UNITS KILOGRAMS
10.7966 0.632 2 13.6 kgs. No. 16 GI Tie Wire
TIE WIRE
QUANTITY OF TIES IN
FLOOR AREA MULTIPLIER UNITS
KILOGRAMS
1.4791 0.632 2 1.9 kgs. No. 16 GI Tie Wire
TIE WIRE
QUANTITY OF TIES IN
FLOOR AREA MULTIPLIER UNITS KILOGRAMS
3.233979 0.632 2 4.1 kgs. No. 16 GI Tie Wire
TILE WORKS
GROUND FLOOR
AREA 333 sq.m.
UNITS 1
TILE SIZE 0.6 0.6
TILE AREA 0.36
FLOOR AREA MULTIPLIER (TILES) 5% ALLOWANCE FOR MULTIPLIER (CEMENT MULTIPLIER (TILE MULTIPLIER (CEMENT
CUTTING AND EDGES MORTAR) ADHESIVE) JOINT FILLER)
TILE (pcs.) CEMENT MORTAR (BAGS TILE ADHESIVE (BAGS) CEMENT JOINT FILLER
OF CEMENT) (KGS)
971 29 37 167
SECOND LEVEL
AREA 333 sq.m.
UNITS 1
TILE SIZE 0.6 0.6
TILE AREA 0.36
TOILET
AREA 3.6 sq.m.
UNITS 7
TILE SIZE 0.3 0.3
TILE AREA 0.09
CEILING WORKS
GROUND FLOOR
WALL PARTITION
4" CHB @ WF1
PERIMETER 10.00 METER
HEIGHT OF BUILDING 3.5 METER
WINDOWS/DOORS 0.00 SQ. MTR.
AREA OF WALL 35.00 SQ. MTR.
NET AREA OF WALL 35.00 SQ. MTR.
NO. OF CHB BAGS OF CEMENT CU. M. OF SAND (CEMENT MORTAR) CEMENT MORTAR
(PLASTERING) 2 SIDES (PLASTERING) 2 SIDES BAGS OF CEMENT (SAND) CU. M.
SUMMARY
NO. OF CHB 438 PCS
BAGS OF CEMENT 28 BAGS
CU. M. OF SAND 15.79 CU. M.
LENGTH OF VERTICAL LENGTH OF HOR. REINF. TOTAL LENGTH IN METERS TOTAL NO. OF 10mm Ø
REINF. 6 METER DRB (pcs)
102.55 75.25 177.80 30
TIE WIRE
MULTIPLIER 40 cm TIE TOTAL AREA KGS OF TIE WIRE
STAIR SLAB
STAIR SLAB
Length 1.8 meter
Width 0.3 meter
Height 0.025 meter
Units 19
Total Vol. 0.26 Cu. Mtr.
LANDING
Length 1.962 meter
Width 1.8 meter
Height 0.1 meter
Units 1
Total Vol. 0.35 Cu. Mtr.
LANDING
Length 1.954 meter
Width 1.8 meter
Height 0.1 meter
Units 1
Total Vol. 0.35 Cu. Mtr.
260
51
TOTAL NO. OF 10mm
Ø 6 METER DRB (pcs)
40
31
36
7
TOTAL NO. OF 10mm
Ø 6 METER DRB (pcs)
88 83 37.4
319 19.7
1291 216.7
MULTIPLIER (CEMENT
JOINT FILLER)
0.50
MULTIPLIER (CEMENT
JOINT FILLER)
0.50
MULTIPLIER (CEMENT
JOINT FILLER)
0.50
MULTIPLIER FOR
CEMENT MORTAR
(SAND)
0.435
CEMENT MORTAR
(SAND) CU. M.
15.23
8.65 0.48 0.96
2' x 4' 9mm THK Gypsum Board
3/4' Ø x 5/32' Blind Rivets
1/2' Ø x 1/8' Blind Rivets
1/8' Drill bit
5/32' Drill bit
Water Closet
Lavatory
Faucet
4" x 4" Floor Drain
Hose Bibb
4" Ø PVC Cleanout
4" Ø PVC Pipe S-1000
4" Ø PVC WYE
4" X 2" PVC WYE REDUCER
4" x 45 PVC Elbow
4" PVC Coupling
4" PVC Tee
4" P-Trap
600mm x 600mm Floor Tiles
300mm x 300mm Unglazed Floor Tiles