BTS Replacement

Scenario 1 BTS3012: double-density site Scenario 2 GUL co-site

S4/4/4 + S4/4/4 + S4/4/4 BTS3012 NodeB eNodeB

DBS3900/DBS5900: distributed site BTS3900/BTS5900:


multiple-density site
GUL co-cabinet
RRU

BBU
S12/12/12 BTS3900/BTS5900

1 OPEX Reduced
Energy Rent Maintenance

9000 Power consumption Equipment room rent


8000 reduced by 50% to 90% reduced by over 50%
7000
6000
5000
4000
3000
2000
Large capacity and Remote capacity expansion
1000 multiple RATs, occupying Faster voice problem handling
0 less cabinet footprint Improved antenna fault check
BTS312 BTS3012 BTS3900 DBS3900
DBS3900+tower-mounted efficiency
Main equipment power Temperature control equipment
RRUs, requiring no footprint Visualized IP site deployment
consumption (W) power consumption (W)

2 Smooth Evolution Supported 3 Network Capability Improved

Wider coverage More valued features


GBFD-119507 PS Downlink DTX
G900 G1800 GU900 GL1800 GBFD-119508 PS Uplink DTX
GBFD-115830 VAMOS
GBFD-115821 EICC
GBFD-115708 Um Interface
BTS3012 Speech Frame Repairing
DBS3900 GBFD-191205 GU@5MHz Joint
Scheduling
GBFD-200201 1.2 MHz Networking
for BCCH TRXs
...
Larger capacity
BTS3900
BTS3012
GSM BTS GUL base station BTS3X

12 TRXs (BTS312) 36 TRXs (QTRU) 72 TRXs