You are on page 1of 2

Locations and Accommodations SEMINARS

Hotel Reservations must be made 4 weeks Confirmation Letter and Time/Location: All seminar registrations will Cable-Stayed Bridges: Key Design,
prior to the seminar. Rates apply only the day be confirmed by email within one week of receiving your registration.
before and the last day of the seminar. Seminar time, location and hotel information will be included with 1801 Alexander Bell Drive Construction, and Management Issues
your confirmation letter. Seminar fees include all course materials. Reston, Virginia, 20191-4382
Fees do not include hotel accommodations or meals. Hotel reserva-
tions should be made early as discounted rates are subject to cut-off REGISTER
San Francisco, CA dates.
ONLINE
NOW!
For faster and immediate registration register online! Go to: www.asce.org/conted/seminars

June 24-25, 2010 Instructor Substitution: ASCE reserves the right to substitute an
ASCE Individual Member #_______________________________________________________
equally-qualified instructor for any seminar should unforeseen circum-
Holiday Inn Fisherman’s Wharf stances arise.
(ASCE membership numbers are NOT TRANSFERABLE within any given company)

1300 Columbus Avenue Cancellations: Cancellations must be made in writing via email or fax
Name_ ________________________________________________________________________________
and must include registrant’s name, confirmation # and name/date of
San Francisco, CA 94133
Cable-Stayed
the seminar. If you cancel 7 business days or less prior to the seminar
Title______________________________________________ Nickname for Badge____________________
start date, no refund/credit/personal transfers will be issued. You may
800-942-7348 transfer your registration to another registrant with no penalty up until Company______________________________________________________________________________
ASCE Hotel Rate: $145 Single/Double the day of the seminar.* No credits/ refunds/personal transfers will be

Bridges: Key Design,


issued for no shows. If ASCE must cancel a seminar due to insufficient Address________________________________________________________________________________
enrollment, your registration fee will be refunded in full. ASCE is not
responsible for non-refundable expenses such as airfare, hotels, trans- City_ _____________________________________________ State________________ Zip______________

Construction, and
fer fees, or any other expenses associated with a cancellation.
*Price differential will be charged if a non-member is replacing a mem- Telephone_________________________________________ Fax_ _________________________________
ber. Transfer may only be used one time, no multiple transfers allowed.
CEUs/Certificates: One (1.0) CEU equals ten contact hours of instruc- Email (required for confirmation)_________________________________________________________________
tion. A CEU certificate will be issued to each person who successfully
completes a seminar and a permanent record will remain on file with
ASCE. One (1.0) Continuing Education Unit (CEU) = Ten (10) Profes-
Your Florida P.E. License #_____________________________________ Expiration Date_______________
Management Issues
sional Development Hours. Payment Information: Must be complete before processing can occur.
Send a Team and Save: Register three or more from one organization
to the same seminar/date/location and save 10% on each seminar A check for $________ is enclosed
Visit ASCE Publications at registration. Registrations must be made at the same time to receive
http://pubs.asce.org/journals/ Charge my credit card:
this discount.
On-Site Registration: Registration is available on-site at the seminar;
San Francisco, CA / June 24-25, 2010
Card Number:__________________________________________________________
however, we cannot guarantee that course materials will be available
that day. Course notes and other materials will be mailed to you ap- Exp. Date:_____________________________________________________________
Send a Team and Save 10% proximately four weeks after the seminar. Please be sure to contact
Register three or more from one organization for the ASCE no later than the day before the seminar to confirm that the Name (exactly as it appears on card):____________________________________________
same seminar/date/location and save 10% on each seminar will be held as planned.
seminar registration. Registrations must be made at Dress: Casual business attire is appropriate for all seminars. If faxing, a copy of check or purchase order is required. 10B R18 6
the same time to receive this discount. Discount reg-
Discounted Airfares: Use American Airlines and save money on
istrations cannot be done online. They must be faxed
airfares when traveling to ASCE Seminars. Call American Airlines at Locations Please check one n Learn developments in design criteria for cable-stayed bridges
to 703-295-6144.

NONPROFIT ORGANIZATION
1-800-433-1790 and refer to ID number A1319SS, 7 days a week from
San Francisco, CA/June 24-25, 2010 71502010
7:00 AM to 12:00 midnight Eastern Time. If you wish to use a travel n Understand key design issues and construction methods for

PERMIT NO. 4924


agency, you must tell your agent to book your reservation under the Fees Please check one cable-stayed bridges

U.S. POSTAGE

DENVER, CO
above ID number to receive your discount.
A copy of your check or PO is required when faxing your

PAID
Rental Cars: Special rates are available with Enterprise Rent-A-Car. registration
Visit www.enterprise.com or call 1-800-736-8222 to make a reserva- n Learn about wind induced cable vibrations and their mitigation
ONLINE tion. Please use Code 16VCS73 and Password ASC to obtain your $1,195 Member
COURSES discounted rates. $1,415 Non-Member n Examine the possibilities of selecting among various cable-stayed
Membership: Go to www.asce.org to join ASCE and save on future
ASCE Distance Learning bridge configurations
continuing education opportunities. Enter 09CEFCAT in the promotion
ASCE offers online courses on a variety of code section of the membership application. Designing Modern Timber Bridges V06
n Learn how to avoid errors related to constructability issues
technical and management topics, as well as DISTANCE LEARNING COURSES $300 Ind. $899 Org.*
courses on DVD and CD. For a complete list- (add $6.95 for shipping first item, $2.50 each additional item)*

ing of these courses or to register, please go


Return Policy: If you’re not completely satisfied with your purchase, *additional cost outside the USA and for overnight delivery. n Learn strategies to avoid large discrepancies between engineers’
return it undamaged within 30 days (90 days for international orders)
to http://store.asce.org/view. ASCE for a full refund, exchange, or credit on your purchase price. Returns
*Individual Price/Organization Price. If purchased at the individual price, the
tape may be used solely by the individual for educational purposes. It may estimates and bid prices
not be duplicated, sold or rented to others.
members receive discounts of 15% or more only accepted if you have not already received CEUs for the item. If
on most online courses. Volume discounts your return is not due to our error, we will deduct the shipping costs
from your refund. Returns accepted at warehouse only. If you wish to
available.
return a product, please refer to your packing list, call 1-800-548-2723,
or email distancelearning@asce.org for instructions. Please do not
return any items to our Reston, VA address.
CEUS/PDHS
CEUs/Exams: CEUs will only be granted to the person who originally
ASCE has been approved as an Authorized Provider by the ordered the product. Additional exams are available for some courses
International Association for Continuing Education and Train-

1.4
ing (IACET), 1760 Old Meadow Road, Suite 500, McLean, VA
for a fee of $50 each. Exams must be taken within one year of receipt How to reach us:
of course. A passing score of 70% or higher is required to receive
22102. In addition, ASCE follows NCEES guidelines on con-
CEUs. Exams may be retaken up to three times without additional Mail: ASCE Continuing Education Dept.
tinuing professional competency. Since continuing educa-
charge. P.O. Box 79162
tion requirements for P.E. license renewal vary from state to Baltimore, MD 21279-0162
state, ASCE strongly recommends that individuals regularly Fulfillment/Shipping: Orders are processed within 24 hours of receipt.
All products are sent via UPS Ground unless otherwise requested. Phone: 1-800-548-2723
check with their state registration board(s) on their specific This is an ASCE Continuing Education Course
continuing education requirements that affect P.E. licensure Online Courses: Log-in and Password information is sent to the email 703-295-6300 (international)
NOT JUNK MAIL. If you don’t need CEU’s

CEUs
and the ability to renew licensure. For details on your state’s address provided with the order within 24 hours of receipt. All online Fax: 703-295-6144 please pass this on to someone who does.
requirements, please go to: http://www.ncees.org/licensure/ courses expire one year after receipt of log-in and password. All materi- Email: seminars@asce.org
licensing_boards/. als will be accessed online. No course material will be shipped.
Mail-FAX entire back panel with registration info
A M E R I C A N S O C I E T Y O F C I V I L E N G I N E E R S C O N T I N U I N G E D U C AT I O N

Cable-Stayed Bridges: Key Design, Construction, and Management Issues


Purpose and Background Who Should Attend?
Cable-stayed bridges have provided economical solutions for long span crossings for several de- This seminar will benefit federal, state and municipal engineers and administrators involved in the Summary Outline TIME: 8:30am – 4:30pm

cades. Currently in the U.S., many more bridges of this type are being planned, designed, are out procurement and maintenance of cable-stayed bridges, as well as contractors and consortia inter- DAY 1 Tendering and Contract Documents
for tender or are already under construction. However, this new form of bridge construction has not ested in cable-stayed design-build and/or design-build-operate projects. It also will benefit contrac- Introduction • Why are there so many claims based on
been without its problems, many of which have resulted in litigation. This very timely seminar will tors who wish to understand the key aspects of the erection engineering constraints and possibilities • Define objectives of the seminar deficient cable-stayed bridge documents? How
deal with both the design and construction aspects of cable-stayed bridges. • Brief review of the historic development of to deal with this.
offered by various cable-stayed bridge designs and architects who are involved in cable-stayed bridge
cable-stayed bridges, with particular emphasis • Capital cost management prior to contract
The seminar will cover aspects relating to planning, design, procurement, construction and main- aesthetics and want to learn more about the other aspects relating to cable-stayed bridges. on aspects unique to North America tender
tenance of cable-stayed bridges. It will highlight the key issues of which you need to be aware to • Discussion of defining features: cable fan ar-
achieve success on cable-stayed bridge projects. rangements, tower Configurations deck to tower Designing for Constructibility
Seminar Instructors
connections, multi-span bridges • Overview of the construction process
The seminar will discuss the different stages of a cable-stayed project and will provide strategies for Don Bergman, P.Eng., Don has 28 years of experience in design and erection engineering for long • Understanding the role of the players
how problems can be avoided, or mitigated once they occur. The interaction of various decisions in span cable-stayed bridges. His projects include the design or erection engineering of more than Planning and Bridge Concept Selection • Strategy for management of these issues (part-
the planning and design process will be illustrated by discussing their consequences on the construc- 25 cable-stayed bridges worldwide. He has functioned in the roles of designer, project manager, • Project concept selection: is a cable-stayed nering, win-win)
tion and maintenance of the structure. bridge the appropriate choice? Cable stayed Review of Key Issues and Question Period
resident engineer and lead erection engineer on major cable-stayed bridges. Most recently he has
bridge type selection.
The information provided in this seminar will allow managers of cable-stayed bridge projects to been in charge of final detailed design and provision of construction engineering for the Golden • Signature cable-stayed bridges. DAY 2
develop a good understanding of the key engineering and management issues that are unique to Ears Bridge in Vancouver, the first multi-pan cable-stayed bridge in North America, and the John J Cases studies of half a dozen state of the art
these structures. The important aspects of planning, designing, tendering, constructing and maintain- Audubon Bridge in Louisiana, which will be the longest span cable-stayed bridge in North America Design Development cable-stayed bridges which are either under
ing cable-stayed bridges will be examined in sufficient detail so that you will be able to ask the right when complete. Successful strategies to deal with: construction or just completed in Europe, Asia
• Selection of appropriate design criteria and the US.
questions during the development of the project and ensure that they are completely answered. This
Dr. Andrew Griezic, P.Eng.,P.E., joined Buckland & Taylor Ltd. in 1997. Since that time he has de- • What issues are well covered by design codes?
seminar will provide you with a series of tools that will make your next cable-stayed bridge project • Where design codes may not apply The case studies will cover:
more successful. veloped extensive experience in design check, detailed construction engineering analysis, modeling
• Critical design issues: foundations, superstruc- • Project organization
and design of erection schemes and temporary works for cable-stayed bridges. He has worked on ture, articulation, aerodynamics, seismic input • Structure description
design or construction engineering for seven cable-stayed bridges. He was the Project Manager for and design, cables, fatigue • Key design features
Seminar Benefits
the detailed design and construction engineering of North Arm Bridge, the first extradosed bridge • Technological advances
– Learn developments in design criteria for cable-stayed bridges in North America. Strategies for Durability • Construction challenges and construction
• Principles and practice procedure
– Understand key design issues and construction methods for cable-stayed bridges • Roles of QA and QC • Cost of bridge
Dr. Peter Taylor, P.Eng., P.E., has been actively involved in the design and construction of more
– Learn about wind induced cable vibrations and their mitigation than 20 cable-stayed bridges around the world for over 40 years. He has filled the roles of designer, • Cable vibration and fatigue • Review of construction schedule
• Strategies for a trouble free structure throughout • Comparison with similar structures
– Examine the possibilities of selecting among various cable-stayed bridge configurations contractor’s project manager and contractor’s erection engineer on a variety of cable-stayed bridges its design life
– Learn how to avoid errors related to constructability issues and thus has a wide appreciation of all aspects of these bridges. • Strategies for dealing with the structure once it
is in operation
– Learn strategies to avoid large discrepancies between engineers’ estimates and bid prices

Learning Outcomes Live Interactive Webinars -


After attending this seminar you will have a good understanding of: Exceptionally convenient and very cost-effective! No Travel! Pay one site reg-
– Historic development of the cable-stayed bridge form istration fee and unlimited number of participants can attend from that site!
Get real time answers to your questions, while earning one PDH per seminar hour.
– Context where cable-stayed bridges are appropriate Visit: http://www.asce.org/webinar/list for a complete listing. Designing Modern Timber Bridges
– The pros and cons of various deck and tower configurations
This DVD course examines the different types of timber bridge superstructures in use today,
– Superstructure and deck design issues the basics of wood as an engineering material, and the different types of structural wood
– Dead and live load carrying mechanisms
– Aerodynamic design and construction considerations In-House Presentations products, wood mechanical connections, and preservative treatments. Design procedures for
wood construction are also reviewed. The course focuses on the design of two main types
– Seismic criteria and design Let us come to you. of timber bridge superstructures: 1) those composed of longitudinal girders with transverse
– Effects of creep and shrinkage ASCE seminars can be: decks, and 2) those composed of longitudinal decks, and covers the use of sawn lumber and
– Cable types and installation technology • Presented at your organization glued-laminated timbers in both of these main superstructure types. The course concludes
– Wind induced cable vibration mechanisms and their mitigation • Scheduled at your convenience with a discussion of issues related to timber bridge inspection, maintenance, and rehabilitation.
– Construction methods and issues • Tailored to the needs of your staff 6 hours. 0.6 CEUs
An on-site program can reduce the per
Assessment of Learning Outcomes person cost by more than 25% and
Students’ achievement of the learning outcomes will be assessed through a series of problem-solving your total training cost by 50%
design exercises, class discussion following the presentation of each major topic, and through short
case studies.

You might also like