Concreto Armado
Concreto Armado
- Side L= 40.2m
- Side B = 22.8 m
h= = = 491.66 so.
b= so.
- Secondary beams , and wall anchor Lan = 120 mm
- Primary beams ;
- Dead load.-
- Live load .-
- M(AB) =
- M(B) =
- M(BC) = M(C) =
- Specifications
b=1 ; slab
- Formulas
m= ; =
As =
Para un d = 0.057 m; b = 1.0 m
- Load meter
work as T beam
a= ; bf = bw + = 300+800+800 = 1900 mm
= bw + 2 = 300 + 2 = 1687.5 mm
M(AB) = =
M(B) = =
M(BC,C) = =
- Asf (AB) = 7.09 ; a = 0.99 cm (rect)
- = ; b = 0.3 m
d = 0.40 m
m=
As =
Asmin = = 2.86
Asmin = = 3.5
- Y Reactions forces
Ra = 97.78 kN Re = 253.44 kN
Rb = 273.36 kN Rf = 248.86 kN
Rc = 248.86 kN Rg = 273.36 kN
Rd = 253.44 kN Rh = 97.78 kN
-Shear Force that Concrete Assume
S= ; 3/8'' Av = 1.42
S(B1) = 0.285 m
S(B2) = 0.389 m
Smax = = 200 mm
S(C1) = 0.544 m
S(C2) = 0.450 m
- Dead load
M(AB) =
- M(BA)= -(
-M(BA) =
- M(BC)= -(
M(BC) =
- M(CB)= -(
M(CB) =
- M(CD) =
- M(DC) =
- M(DE)= -(
M(DE) =
- M(ED)= -(
)
- Check Nodes
- Node A, M (AB) = 0
=0
=-30.82 ...(2)
=0
0 = 0 ...(3)
=0
= 30.87 ...(4)
- Node E, M(ED) = 0
+ + = -338.08 ...(6)
=
M(AB) = 0 kN.m
= 550.08/EI M(BA) = 428.03 kN.m
M(BC) = -428.23 kN.m
= -156.06/EI
M(CB) = 253.61 kN.m
=0 M(CD) = -253.61 kN.m
= 156.06/EI M(DC) = 428.63 kN.m
= -550.28/EI M(DE) = -428.63 kN.m
M(ED) = 0 kN.m
- Section AB
=0
- Section BC
=0
- Reactions
A'y = 187.97 kN
B'y = 667.98 kN
C'y = 478.61 kN
D'y = 667.68 kN
E'y = 187.97 kN
= = 0.268
As =
Asmin = 0.25 Asmin =
= 37.462 kN S = 0.860 m
= 217.132 kN S = 0.148 m
= 149.832 kN S = 0.215 m
= 88.402 kN S = 0.364 m
= 88.402 kN S = 0.364 m
= 149.832 kN S = 0.215 m
= 217.132 kN S = 0.148 m
Ld =