Professional Documents
Culture Documents
Threshold for
Sno Aspect Feature Case CE Eagle Eye Case CE Eagle Eye CASE CE Machine Understanding Remarks Loader Backhoe VC Grader CE Call Center for Recommended Actions for local troubleshooting ICT Support
Alerts Severity Customer CNHi Dealer
As is To be Design Support ticket creation
> upper or 1) Check Radiator for blockage & Clean radiator if required.
7 Coolant Temperature Gauge P P P analog signal same as TLB Major Yes No Yes Creation of Ticket 2) Check for external leakage of Coolant.
<= lower
3) Check for coolant level at recovery tank & fill coolant if required.
4) Check condition of cooling fan & fan belt.
5) Contact CNHi Dealer for further help
8 Coolant Temperature Pressure Switch-digital signal; same as TLB High Critical Yes No Yes Creation of Ticket
P P P valid after engine on
9 Fuel Level P P P < lower Major Yes No No No 1) Fill diesel to avoid air lock.
analog signal analog signal decrease in X% of
10 Fuel Pilferage S P Not related Major Yes No No No NA
fuel in Y time
13 Engine Status On/OFF;RPM threshold > 400 On/OFF;RPM ON/OFF Minor Yes No No No NA
P P P threshold > 400
19 Fuel Consumption-Ltr/Hr Reports S P P For information to be reflected on Web portal / Mobile app NA
1. 900-100 rpm
2. 1400-1700 rpm
20 S P P 3. 1000-2000 along For information to be reflected on Web portal / Mobile app NA
1. Idle with forward and
2.Backhoe reverse digital signals
3. Roading+Loader
Performance NA
MOBA Intelligent
P compaction system
21 Compaction Quality S P gives compaction NA NA
For VC quality info along with
GPS coordinates
22 Machine utilisation reports Basis the HMR and fuel For information to be reflected on Web portal / Mobile app NA
S P P consumption data
Possible by connecting
23 Tracking of machine as soon as it leaves * device to machine For information to be reflected on Web portal / Mobile app NA
factory even when machine is of S P battery and subject to
performance testing
To be developed for
29 Tow Away Alert NA NA Yes No No No NA
CASE CE requirement
PHASE - 2
31 Water in fuel S P S Phase-2 NA NA NA NA NA NA NA NA NA
Security/
Safety/
35 Time fencing for over working hours alerts S P - Phase-2 NA NA NA NA NA NA NA NA NA
Monitoring
Alert Description
1 Alerts needs to be configured for each machine
2 Only live alerts needs to be displayed. Alerts recorded in no GSM zone need not be displayed
3 Data privacy in terms of mobile number sharing needs to be verified
Severity Definition
Critical Alert is triggered as soon as it occurs(Event based alert)
Major Alert is resorded at regular sampling instance
Minor Alert is resorded at regular sampling instance
InformatioAlert is resorded at regular sampling instance
Motor Grader
1 Is the communication compliant to J1939 protocol?
2 CAN log is available?