RENCANA BIAYA ANGGARAN (RAB)


PEKERJAAN PEMASANGAN KERAMIK HALAMAN SURAU AL-MUNAWWARAH
RT.02 / RW.02 KELURAHAN PEKAN ARBA KECAMATAN TEMBILAHAN

NO URAIAN VOLUME SATUAN HARGA JUMLAH KET


1 Keramik ukuran 40x40 cm 210 kotak 85,000.00 17,850,000.00
2 Dempul keramik 20 bungkus 12,000.00 240,000.00
3 Semen 90 Sak 65,000.00 5,850,000.00
4 Pasir 30 Kubik 120,000.00 3,600,000.00
5 Upah 120 Kotak 35,000.00 4,200,000.00
Jumlah I 31,740,000.00

II. RENCANA BIAYA ANGGARAN (RAB)


PEKERJAAN PEMBANGUNAN PAGAR HALAMAN SURAU AL-MUNAWWARAH
RT.02 / RW.02 KELURAHAN PEKAN ARBA KECAMATAN TEMBILAHAN

NO URAIAN VOLUME SATUAN HARGA JUMLAH KET


1 Kayu Bakau Panjang 6 M 220 Batang 12,000.00 2,640,000.00
2 Besi ulir diameter 10 MM 47 Batang 64,000.00 3,008,000.00
3 Besi Polos diameter 6 MM 20 Batang 22,000.00 440,000.00
4 Semen 75 Sag 65,000.00 4,875,000.00
5 Pasir 12 Kubik 120,000.00 1,440,000.00
6 Batu Kerikil 6 Kubik 300,000.00 1,800,000.00
7 Bata Merah 5400 Buah 800.00 4,320,000.00
8 Papan Mal 3 suku 30 Keping 40,000.00 1,200,000.00
9 Kayu Reng isi 4 4 Ikat 85,000.00 340,000.00
10 Kawat Beton 6 Kg 25,000.00 150,000.00
11 Paku 5 Kg 18,000.00 90,000.00
12 Upah 24 Meter 350,000.00 8,400,000.00
Jumlah II 28,703,000.00
Jumlah I & II 60,443,000.00

Pekan Arba, Mei 2019

Pengurus Surau Al-Munawwarah


RT.02 / RW.02 Kelurahan Pekan Arba
Kecamatan Tembilahan,

Bendahara Umum, Seksi Pembangunan,

ABDURRAHMAN H. AHSAN
Ketua Umum,

H.M. DARWIS, S.Pdi

You might also like