DESIGN AND BUILD OF THE MARITIME INDUSTRY
AUTHORITY (MARINA) CENTRAL OFFICE BLDG.
PRE - DESIGN STUDIES AND RESEARCH, 4 5 2015 15 5 2015 84 84
PROJECT PROMOTION
CLERK OF WORK, SPECIFICATION WRITING, 18 5 2015 20 6 2015 212 212
BILL OF MATERIALS
ARCHITECTURAL DESIGNING/ DETAILING, PLANNING 22 6 2015 29 7 2015 236 236
ELECTRICAL, SANITARY AND PLUMBING LAYOUT 30 7 2015 22 8 2015 144 144
ARCHITECTURAL INTERIORS, SPACE PLANNING 28 12 2015 23 1 2016 148 148
FIELD SUPERINTENDENCE, PROJECT MANAGEMENT 25 1 2016 27 5 2016 648 648

DESIGN AND BUILD OF THE PROPOSED CONSTRUCTION


OF U.P. DEPT. OF COMPUTER SCIENCE BUILDING
PRE - DESIGN STUDIES, SCHEMATIC DESIGN 24 8 2015 4 9 2015 76 76
CLERK OF WORK, SPECIFICATION WRITING, 5 9 2015 17 9 2015 80 80
ARCHITECTURAL DESIGNING/ DETAILING, PLANNING 18 9 2015 28 10 2015 248 248
ARCHITECTURAL INTERIORS, SPACE PLANNING 29 10 2015 13 11 2015 140 140

DESIGN AND BUILD FOR THE CONSTRUCTION OF EIGHT


STOREY OPD & WARDS BUILDING (PHASE 1)
PRE - DESIGN STUDIES, SCHEMATIC DESIGN 14 11 2015 21 11 2015 32 32
CLERK OF WORK, SPECIFICATION WRITING, 23 11 2015 5 12 2015 76 76
ARCHITECTURAL DESIGNING/ DETAILING, PLANNING 7 12 2015 16 12 2015 68 68
ELECTRICAL, SANITARY AND PLUMBING LAYOUT 17 12 2015 23 12 2015 44 44

DESIGN AND BUILD OF MSU-IIT CSM RESEARCH BLDG.


ARCHITECTURAL DESIGNING/ DETAILING, PLANNING 28 5 2016 18 6 2016 136 136
ARCHITECTURAL INTERIORS, SPACE PLANNING 21 6 2016 2 7 2016 72 72

PROCUREMENT OF DESIGN & BUILD OF NEW BUILDING


OF GOV. CELESTINO GALLARES MEMORIAL REGIONAL
HOSPITAL (GCGMRH)
CLERK OF WORK, SPECIFICATION WRITING, 4 7 2016 6 8 2016 212 212
ARCHITECTURAL DESIGNING/ DETAILING, PLANNING 8 8 2016 3 9 2016 168 168

DESIGN AND BUILD FOR THE PROPOSED CONSTRUCTION


OF THREE (3) LEVEL STEEL PARKING BUILDING - BATASAN
PRE - DESIGN STUDIES, SCHEMATIC DESIGN 5 9 2016 10 9 2016 44 44
CLERK OF WORK, SPECIFICATION WRITING, 13 9 2016 1 10 2016 124 124
ARCHITECTURAL DESIGNING/ DETAILING, PLANNING 4 10 2016 5 11 2016 188 188
MECHANICAL, ELECTRICAL, SANITARY 7 11 2016 21 11 2016 96 96
AND PLUMBING LAYOUT 0

DESIGN AND BUILD PROJECT FOR THE MSU-IIT CASS C


BUILDING PROJECT
PRE - DESIGN STUDIES, SCHEMATIC DESIGN 22 11 2016 3 12 2016 72 72
CLERK OF WORK, SPECIFICATION WRITING, 5 12 2016 23 12 2016 120 120
ARCHITECTURAL DESIGNING/ DETAILING, PLANNING 27 12 2016 21 1 2017 148 148
ELECTRICAL,SANITARY AND PLUMBING LAYOUT 23 1 2017 4 2 2017 84 84

DESIGN AND BUILD OF FORWARD OPERATING BASE (FOB)


& LIFFORAL OBSERVATORY STATION (LOS) BATANES FOR
THE PHILLIPINE NAVY(PN) 0
PRE - DESIGN STUDIES, SCHEMATIC DESIGN 6 2 2017 18 2 2017 88 88
CLERK OF WORK, SPECIFICATION WRITING, 20 2 2017 14 3 2017 144 144
ARCHITECTURAL DESIGNING/ DETAILING, PLANNING 15 3 2017 12 4 2017 192 192
ARCHITECTURAL INTERIORS, SPACE PLANNING 17 4 2017 29 4 2017 88 88

E.M. CUERPO EVENT CENTER


ELECTRICAL,SANITARY AND PLUMBING LAYOUT 2 5 2017 20 5 2017 124 124
ARCHITECTURAL INTERIORS, SPACE PLANNING 22 5 2017 2 6 2017 80 80