Professional Documents
Culture Documents
Pengecoran DPT
Panjang Lebar Volume
No. Keterangan Tinggi (m)
(m) (m) (m3)
1 As 1 18.8 0.2 2.4 9.02
2 As E 24.8 0.2 2.4 11.90
3 As 5 18.8 0.2 2.4 9.02
3.2 0.2 2.4 1.54
2.45 0.2 2.4 1.18
3.75 0.2 1.8 1.35
4 As A 4.35 0.32 1.8 2.51
4.40 0.45 1.7 3.37
3.6 0.2 1.7 1.22
3.7 0.2 0.9 0.67
Total Volume Beton 41.78