Harga Perhitungan Sendiri (HPS)

DAFTAR HARGA SATUAN BAHAN DAN UPAH

KEGIATAN : PEMELIHARAAN RUTIN/BERKALA AREA JAKABARING SPORT CITY


PEKERJAAN : PENGADAAN INSTALASI TATA UDARA PENDINGIN RUANGAN GEDUNG
BPKAD EX BP 7. PALEMBANG
INSTANSI : BADAN PENGELOLA KEUANGAN DAN ASET DAERAH (BPKAD)
LOKASI : PALEMBANG - SUMATERA SELATAN
TAHUN : 2016

NO URAIAN SATUAN

1 Kepala Tukang Oh
2 Tukang Oh
3 Mandor Oh
4 Pekerja Tidak Terlatih Oh
5 Pekerja Terlatih Oh
6 Tukang las Oh
7 Instalasi Listrik titik

B BAHAN
1 AC Split Duct 36.000 BTU ( 4 PK ) unit
2 AC Split Duct 42.000 BTU ( 4,5 PK ) unit
3 AC Split Duct 48.000 BTU ( 6 PK ) unit
4 Alumunium tape roll
5 Bayonet + plain m2
6 Besi Hollow Galvanis 2 x 4 Btg
7 Box Plenum Duct + Peredam suara Bh
8 Box R.A.G 100 X 30 Cm Bh
9 Box R.A.G 100 X 50 Cm Bh
10 Box R.A.G 30 X 20 Cm Bh
11 Box R.A.G 30 X 25 Cm Bh
12 Box R.A.G 35 X 20 Cm Bh
13 Box R.A.G 45 X 20 Cm Bh
14 Box R.A.G 50 X 20Cm Bh
15 Box R.A.G 50 X 25 Cm Bh
16 Box R.A.G 55 X 25 Cm Bh
17 Box R.A.G 85 X 25 Cm Bh
18 Box R.A.G 90 X 30 Cm Bh
19 Box R.A.G 95 X 30 Cm Bh
20 Box S.A.D 25 X 25 Cm Bh
21 Box S.A.G 75 X 8 Cm Bh
22 Box S.A.G 85 X 8 Cm Bh
23 Breaket indoor + outdoor set

Page 1 of 30
NO URAIAN SATUAN

24 Cat dasar Kg
25 Cat Tembok mutu B, Anti Lumut dan Jamur kg
26 Conduit Pipa dia.20 Btg
27 Cornes (bubuk Semen putih utk gypsum) kg
28 Downlight 1.5 inch bh
29 Downlight 5 inch bh

Page 2 of 30
NO URAIAN SATUAN
30 Drainpen 75 x 180 cm + pipa pvc isolasi unit
31 Filter filedown bh
32 Filter Filedown R.Koridoor bh
33 Fitting plafond listrik bh
34 Flesibel Duct
35 Gantungan siku long drat m2
36 Grill main hole maintenance 0,8 m x 1,5 m Ls
37 Gypsum Board ( 120 x 240 x 9 ) mm lbr
38 Isolasi pipa tembaga roll
39 Jasa Pemasangan Unit AC R Koridoor Ls
40 Kabel Control 3 x 2,5 mm m
41 Kabel Control 4x2,5mm m
42 Kabel NYM 2 X 2,5 mm m
43 Kabel Termostrart m
44 Kawat las perak btg
45 L Bow bh
46 Lampu SL 18 Watt bh
47 Lampu SL 8 Watt bh
48 Lampu TLED bh
49 Lem TD Duct kaleng
50 Lem Vynil kg
51 Mangkok bh
52 Material Bantu lot
53 Material Pemasangan unit unit
54 MCB bh
55 MCB Box isi 4 grup bh
56 Mounting Outdoor Indoor bh
57 Nut 12" buah
58 Paku Biasa bermacam ukuran 2" - 5"
59 Paku Gypsum kg
60 Paku Sekrup 3,5" kg
61 Penambahan Freon R 410 ls
62 Penampang Drain unit
63 Pipa Drain + Isolasi m
65 Pipa Tembaga 3/8 + Isolasi Termaflex ( Tebal ) m
66 Pipa Tembaga 5/8 + Isolasi Termaflex ( Tebal ) m
67 R.A.G 100 X 50 Cm Bh
68 R.A.G 30 X 20 Cm
69 R.A.G 30 X 25 Cm
70 R.A.G 35 X 20 Cm Bh
71 R.A.G 35 X 20 Cm
72 R.A.G 45 X 20 Cm Bh
73 R.A.G 50 X 20 Cm Bh
74 R.A.G 50 X 25 Cm
75 R.A.G 55 X 25 Cm Bh
76 R.A.G 85 X 25 Cm Bh

Page 3 of 30
NO URAIAN SATUAN
77 R.A.G 90 X 30 Cm
78 R.A.G 95 X 30 Cm
79 Running Start Up ( Test Comesioning ) unit
80 S. A. G (Suply Air Gril) 100 x 10 cm unit
81 S.A.D 25 X 25 Cm Bh
82 S.A.G 100 X 30 Cm Bh
83 S.A.G 20 X 20 Cm unit
84 S.A.G 75 X 8 Cm Bh
85 S.A.G 85 X 8 Cm Bh
86 Saklar bh
87 Sealant buah
88 Suppot Indoor Outdoor unit
89 T Duss bh
90 TD Duct Panel embossed + embossed m2
91 Textil Tape roll
92 Tray Besi siku dan galvalum unit
93 Wallpaper m2

Page 4 of 30
TAR HARGA SATUAN BAHAN DAN UPAH DAFTAR HARGA SATUAN BAHAN DAN UPAH

HARAAN RUTIN/BERKALA AREA JAKABARING SPORT CITY


DAAN INSTALASI TATA UDARA PENDINGIN RUANGAN GEDUNG
EX BP 7. PALEMBANG PEKERJAAN
PENGELOLA KEUANGAN DAN ASET DAERAH (BPKAD)
LOKASI
TAHUN

HRG SATUAN N
O
(RUPIAH) (RUPIAH)

A
###
###
###
###
###
###

###

Page 5 of 30
HRG SATUAN N
O
(RUPIAH) (RUPIAH)
###

###

Page 6 of 30
HRG SATUAN N
O
(RUPIAH) (RUPIAH)
###
###
###
###

###

###

hpl

Page 7 of 30
HRG SATUAN N
O
(RUPIAH) (RUPIAH)

Page 8 of 30
Harga Perhitungan Sendiri (HPS)

ANALISA HARGA SATUAN PEKERJAAN

KEGIATAN : PEMELIHARAAN RUTIN/BERKALA AREA JAKABARING SPORT CITY


PEKERJAAN : PENGADAAN INSTALASI TATA UDARA PENDINGIN RUANGAN GEDUNG BPKAD E
INSTANSI : BADAN PENGELOLA KEUANGAN DAN ASET DAERAH (BPKAD)
LOKASI : PALEMBANG - SUMATERA SELATAN
TAHUN : 2016

NO. HARGA SATUAN (Rp


URAIAN PEKERJAAN
ANALISA BAHAN
1 10 M2 Bongkaran Plafond + Rangka
0.6 Oh Tukang
0.06 Oh Kepala Tukang
2 Oh Pekerja terlatih
Jumlah per 10m2
Jumlah per 1m2

2 1 m² Langit-Langit Gypsumboard, tebal 9 mm + Rangka Besi Hollow


0.364 lbr Gypsum Board ( 120 x 240 x 9 ) mm -
0.11 kg Paku Sekrup 3,5" -
2.5 btg Besi Hollow Galvanis 2 x 4 -
0.06 kg Paku Biasa bermacam ukuran 2" - 5" -
0.04 kg Paku Gypsum -
0.3 kg Cornes (bubuk Semen putih utk gypsum) -
0.025 roll Textil Tape -
0.26 Oh Pekerja terlatih
0.4 Oh Tukang
0.04 Oh Kepala tukang
0.013 Oh Mandor

3 1 m² Mengecat Plafond
0.1 kg Cat dasar -
0.28 kg Cat Tembok mutu B, Anti Lumut dan Jamur -
0.1 kg Cornes (bubuk Semen putih utk gypsum) -
0.02 Oh Pekerja terlatih
0.063 Oh Tukang
0.0063 Oh Kepala tukang
0.0025 Oh Mandor

4 PEKERJAAN DUCTING
Untuk 1 m² membutuhkan material dan upah sebagai berikut
0.400 Oh Kepala tukang
0.400 Oh Mandor
0.300 Oh tukang
0.300 Oh Pekerja Terlatih
1.338 m2 TD Duct Panel embossed + embossed -
0.439 m2 Bayonet + plain -
0.7 roll Alumunium tape -
0.2 kaleng Lem TD Duct -

Page 9 of 30
NO. HARGA SATUAN (Rp
URAIAN PEKERJAAN
ANALISA BAHAN
0.2 buah Sealant -
0.5 m2 Gantungan siku long drat -
0.5 buah Nut 12" -

5 PEKERJAAN PEMASANGAN UNIT AC SPLIT DUCTING


1.000 Oh Kepala tukang
0.680 Oh Mandor
0.500 Oh tukang
0.300 Oh Pekerja Terlatih
1.000 Ls Material Pemasangan unit

6 PEKERJAAN ACCESSORIES
0.400 Oh Kepala tukang
0.200 Oh Mandor
0.200 Oh tukang
0.200 Oh Pekerja Terlatih
9.000 buah Nut 12"
1.000 roll Isolasi pipa tembaga
1.000 ls Grill main hole maintenance 0,8 m x 1,5 m

Page 10 of 30
O
W
N
LISA HARGA SATUAN PEKERJAAN E
R

TA UDARA PENDINGIN RUANGAN GEDUNG BPKAD EX BP 7. PALEMBANG E


SLOKASI
T
TAHUN
I
M
A
HARGA SATUAN (Rp) JUMLAH T
UPAH SATUAN E

(
- -
- - O
E
- -
- )
TOTAL -

-
-
-
-
-
-
-
- -
- -
- -
- -
TOTAL -

-
-
-
- -
- -
- -
- -
TOTAL -
###
Untuk 10 m² membongkar lantai diper
- -
- -
- -
- -
-
-
-
-

Page 11 of 30
HARGA SATUAN (Rp) JUMLAH
UPAH SATUAN
-
-
-
TOTAL -

###
- -
- -
- -
- -
- -
TOTAL -

- -
- -
- -
- -
- -
- -
- -
TOTAL -

Page 12 of 30
Harga Perhitungan Sendiri (HPS)

RENCANA ANGGARAN BIAYA

KEGIATAN : PEMELIHARAAN RUTIN/BERKALA AREA JAKABARING SPORT CITY


PEKERJAAN : PENGADAAN INSTALASI TATA UDARA PENDINGIN RUANGAN GEDUNG BPKAD EX BP 7. PA
INSTANSI : BADAN PENGELOLA KEUANGAN DAN ASET DAERAH (BPKAD)
LOKASI : PALEMBANG - SUMATERA SELATAN
TAHUN : 2016

NO. URAIAN PEKERJAAN VOLUME SATUAN

A PEKERJAAN PERSIAPAN
1 Survey dan Pengukuran 1.0 Ls
2 Pembersihan Lokasi 1.0 Ls
3 Mobilisasi dan Demobilisasi 1.0 Ls

SUB TOTAL A

B PEKERJAAN PABRIKASI DAN PEMASANGAN PREIHSULATED ALUMINIUM DUCT


B1 PEKERJAAN DUCTING SUPPLAY DAN DUCTING RETURN LANTAI 1
1 Ducting Dimensi 30" X 12" 23.0 M²
2 Ducting Dimensi 26" X 12" 10.0 M²
3 Ducting Dimensi 24" X 12" 18.0 M²
4 Ducting Dimensi 24" x 10" 22.0 M²
5 Ducting Dimensi 22" x 10" 3.0 M²
6 Ducting Dimensi 20" X 10" 20.0 M²
7 Ducting Dimensi 16" X 12" 8.0 M²
8 Ducting Dimensi 16" X 10" 30.0 M²
9 Ducting Dimensi 14" X 10" 8.0 M²
10 Ducting Dimensi 12" X 10" 26.0 M²
11 Ducting Dimensi 10" X 8" 25.0 M²
12 Ducting Dimensi 10" X 10" 19.0 M²
13 Box S.A.D 25 X 25 Cm 6.0 Bh
14 Box S.A.G 75 X 8 Cm 22.0 Bh
15 Box R.A.G 95 X 30 Cm 1.0 Bh
16 Box R.A.G 90 X 30 Cm 1.0 Bh
17 Box R.A.G 55 X 25 Cm 2.0 Bh
18 Box R.A.G 50 X 25 Cm 1.0 Bh
19 Box R.A.G 35 X 20 Cm 6.0 Bh
20 Box R.A.G 30 X 25 Cm 1.0 Bh
21 Box R.A.G 30 X 20 Cm 1.0 Bh
22 Box R.A.G 100 X 50 Cm 1.0 Bh
23 Box Plenum Duct + Peredam suara 6.0 Bh
24 S.A.G 75 X 8 Cm 24.0 Bh

Page 13 of 30
NO. URAIAN PEKERJAAN VOLUME SATUAN

25 S.A.D 25 X 25 Cm 7.0 Bh
26 R.A.G 100 X 50 Cm 1.0 Bh
27 R.A.G 95 X 30 Cm 1.0 Bh
28 R.A.G 90 X 30 Cm 1.0 Bh
29 R.A.G 50 X 25 Cm 1.0 Bh
30 R.A.G 30 X 25 Cm 1.0 Bh
31 R.A.G 35 X 20 Cm 6.0 Bh
32 R.A.G 30 X 20 Cm 1.0 Bh
33 Flesibel Duct 80.0 M

SUB TOTAL B1

B2 PEKERJAAN DUCTING SUPPLAY DAN DUCTING RETURN LANTAI 2


1 Ducting Dimensi 30" X 12" 35.0 M²
2 Ducting Dimensi 26" X 12" 5.0 M²
3 Ducting Dimensi 24" X 12" 2.0 M²
4 Ducting Dimensi 24" x 10" 12.0 M²
5 Ducting Dimensi 22" x 12" 3.0 M²
6 Ducting Dimensi 22" x 10" 10.0 M²
7 Ducting Dimensi 20" X 12" 4.0 M²
8 Ducting Dimensi 20" X 10" 11.0 M²
9 Ducting Dimensi 18" X 10" 12.0 M²
10 Ducting Dimensi 16" X 10" 5.0 M²
11 Ducting Dimensi 14" X 10" 29.0 M²
12 Ducting Dimensi 12" X 10" 17.0 M²
13 Ducting Dimensi 10" X 8" 18.0 M²
14 Ducting Dimensi 10" X 10" 20.0 M²
15 Box S.A.D 25 X 25 Cm 1.0 Bh
16 Box R.A.G 100 X 50 Cm 1.0 Bh
17 Box R.A.G 100 X 30 Cm 1.0 Bh
18 Box S.A.G 85 X 8 Cm 11.0 Bh
19 Box S.A.G 75 X 8 Cm 14.0 Bh
20 Box R.A.G 85 X 25 Cm 1.0 Bh
21 Box R.A.G 55 X 25 Cm 3.0 Bh
22 Box R.A.G 50 X 20Cm 3.0 Bh
23 Box R.A.G 45 X 20 Cm 1.0 Bh
24 Box R.A.G 35 X 20 Cm 3.0 Bh
25 Box Plenum Duct + Peredam suara 6.0 Bh
26 S.A.G 100 X 30 Cm 1.0 Bh
27 S.A.G 85 X 8 Cm 11.0 Bh
28 S.A.G 75 X 8 Cm 14.0 Bh
29 S.A.D 25 X 25 Cm 1.0 Bh
30 R.A.G 100 X 50 Cm 1.0 Bh
31 R.A.G 85 X 25 Cm 1.0 Bh
32 R.A.G 55 X 25 Cm 3.0 Bh
33 R.A.G 50 X 20 Cm 3.0 Bh

Page 14 of 30
NO. URAIAN PEKERJAAN VOLUME SATUAN

34 R.A.G 45 X 20 Cm 1.0 Bh
35 R.A.G 35 X 20 Cm 3.0 Bh
36 Flesibel Duct 72.0 M

SUB TOTAL B2

C PEKERJAAN UNIT LANTAI 1 DAN LANTAI 2


1 Pipa Tembaga 5/8 + Isolasi Termaflex ( Tebal ) 178.0 M
2 Pipa Tembaga 3/8 + Isolasi Termaflex ( Tebal ) 178.0 M
3 Pipa Drain + Isolasi 205.0 M
4 Kabel Control 4x2,5mm 215.0 M
5 Penambahan Freon R 410 12.0 Unit
6 Penampang Drain 12.0 M
7 Kabel Termostrart 125.0 M
8 Filter Filedown 12.0 Bh
9 Suppot Indoor Outdoor 12.0 Unit
10 Tray Besi siku dan galvalum 1.0 Ls
12 Jasa Pemasangan Unit AC 12.0 Unit
13 Running Start Up ( Test Comesioning ) 12.0 Unit
14 Material Bantu 12.0 Unit
15 AC Split Duct 48.000 BTU ( 6 PK ) 6.0 Unit
16 AC Split Duct 42.000 BTU ( 4,5 PK ) 3.0 Unit
17 AC Split Duct 36.000 BTU ( 4 PK ) 3.0 Unit

SUB TOTAL C

D PEKERJAAN LAIN LAIN


1 Administarsi dan Dokumentasi 1.0 Ls
2 Pembuatan Shop Drawing & Asbult Drawing 1.0 Ls
3 Pembersihan Akhir 1.0 Ls

SUB TOTAL D

Page 15 of 30
ANGGARAN BIAYA

RUANGAN GEDUNG BPKAD EX BP 7. PALEMBANG :


:
:

HARGA JUMLAH
SATUAN HARGA

A.
###
###
###

SUB TOTAL A Rp -

B
RUANG TAMU GUBERNUR
###
###
###
###

###

TOILET
###
###

Page 16 of 30
HARGA JUMLAH
SATUAN HARGA

Rp -

RUANG TAMU GUBERNUR


###
###
###

SNI. 1.14

SUB TOTAL D

Page 17 of 30
HARGA JUMLAH
SATUAN HARGA

Rp -

Rp -

Rp -

JUMLAH Rp -
PPN (10%) Rp -
TOTAL Rp -
PEMBULATAN Rp -

Page 18 of 30
REKAPITULASI RENCANA ANGGARAN BIAYA

KEGIATAN : PEMELIHARAAN RUTIN/BERKALA AREA JAKABARING SPORT CITY


PEKERJAAN : PENGADAAN INSTALASI TATA UDARA PENDINGIN RUANGAN GEDUNG BPK
INSTANSI : BADAN PENGELOLA KEUANGAN DAN ASET DAERAH (BPKAD)
LOKASI : PALEMBANG - SUMATERA SELATAN
TAHUN : 2016

NO URAIAN PEKERJAAN

A PEKERJAAN PERSIAPAN

B PEKERJAAN PABRIKASI DAN PEMASANGAN PREIHSULATED ALUMINIUM DUCT


B1 PEKERJAAN DUCTING SUPPLAY DAN DUCTING RETURN LANTAI 1

B2 PEKERJAAN DUCTING SUPPLAY DAN DUCTING RETURN LANTAI 2

C PEKERJAAN UNIT LANTAI 1 DAN LANTAI 2

D PEKERJAAN LAIN LAIN

JUMLAH
PPN (10%)
TOTAL
PEMBULATAN

Terbilang :

Diperiksa Oleh,
Asisten Teknis PU Cipta Karya
Provinsi Sumsel

Ir. Imam Santoso


Nip.19631002199502100

Menyetujui,
Pejabat Pelaksana Teknis Kegiatan (PPTK )

Page 19 of 30
BPKAD Prvinsi Sumsel

Lamuda Marbun, SE, Msi


Nip.196709151991031006

Page 20 of 30
REKAPITULASI RENCANA ANGGARAN BIAYA

UTIN/BERKALA AREA JAKABARING SPORT CITY


LASI TATA UDARA PENDINGIN RUANGAN GEDUNG BPKAD EX BP 7. PALEMBANG
A KEUANGAN DAN ASET DAERAH (BPKAD) ###
###

URAIAN PEKERJAAN JUMLAH

Rp -

EMASANGAN PREIHSULATED ALUMINIUM DUCT B


Y DAN DUCTING RETURN LANTAI 1 Rp -

Y DAN DUCTING RETURN LANTAI 2 Rp -

Rp -

Rp -

Rp -
Rp -
Rp -
Rp -

###
Dibuat oleh Dibuat Oleh,
Konsultan Perencana Konsultan Perencana
CV Multibina Konsultan

Muhtazili, ST Muhtazili, ST
Direktur Direktur

Mengetahui, Mengetahui,
Kuasa Hukum Pengguna Anggaran
Kuasa(KPA)
Hukum Pengguna Anggaran (KPA)

Page 21 of 30
BPKAD Prvinsi Sumsel BPKAD Provinsi Sumsel

Laonma Pasindak lbn Tobing,


Laonma
SE Pasindak lbn Tobing, SE
Nip.196310121984031002 Nip. 196310121984031002

Page 22 of 30
PROGRAM TERBILANG

Masukkan nilai angka yang


Bilangan Yang Dimaksud - dimaksud (akan
Trilyun - dalam huruf)
diterjemahkan
Ratus Milyar -
Puluhan Milyar -
Ratus Juta -
Puluhan Juta -
Ratus Ribu -
Puluhan Ribu -
Ratusan -
Puluhan -
#N/A Rupiah -
Sen -
-

Cek Bilangan -
Terbilang:
Hasil (akan keluar otomatis).
NG

sukkan nilai angka yang


aksud (akan
rjemahkan dalam huruf)

ok!