You are on page 1of 5

Value Stream Mapping Process : Ring Eye Seal Date : Current

✘ Check Box
Check
Future
Check
200 Box 201 Box 202
Ideal
Timeline Operator

Ded. Proc. Shared Proc. Proc. Time

Verbal Info Proc. Cell Prod. Lead


Time
Weekly Orders
Production Control See Sched. Tel. Info Tel. Info

Monthly Orders
Elec. Info Man. Info
Trialco JCWPA
Monthly Forecast
Supplier/ OR Manual pull/
Customer Withdrawl

Production MRP/ Order


Control ERP Input
Other Info

Kanban Signal Production


Post Kanban Kanban

Withdrawl Kaizan Queue


2 1 1 1 1 Kanban Burst

Recieving Foundry - Foundry - Machining Deburr Inspect Recieving


Static Pour Heat Treat Load Store / WIP Safety
Leveling Stock

0X 0X
C/T : C/T : C/T : 15 min C/T : C/T :
Inventory First in, First out
C/O : 60 min C/O : C/O : 150 min C/O : C/O :
FIFO
Avail: Avail: Avail: Avail: Avail:
Push: Push Sequenced
FPY : 100% FPY : 100% FPY : FPY : FPY :
Matl. Move Pull :
OEE/Util : OEE/Util : OEE/Util : OEE/Util : OEE/Util :
OR

Shipment

External Warehouse
PLT Movement

Production Lead time Oven / Quality Problem Area


Production Cycle Efficiency Heat /Prep.

Metric / Data Box Definitions : Considerations : 22 Work day / month ; 1 shift => 7 hour (after PFD) = 7.5 Hour - 2 x 10 Min - 10 Min
T/T = Travel time L/T = Lead time C/O = Change over time C/Te = Cycle time (Oven, Equipment) Takt = Available work time per shift Define effective Work hour/day
Q/T = Queue time L/T = P/T + T/T P/T = Process time P/T = Q/T + C/T + C/O Perf = Performance Time customer demand qty. per shift x working day & calculate Takt time.
C/T = Cycle time PFD = Personal Fatigue & Delay Time C/Tt = Cycle time (Touch) FPY = First Pass Yield Av=Availability OEE = FPY * Av * Perf Record all your assumptions.
Value Stream Mapping
Process :

Queue Cycle ChangeoverTi Std. Units Processed WIP Distance to next Existing Existing Comments :
Zone Oper Step
Time Time me Inventory Finished process FPY OEE
Compatibility Report for Value Stream VSM.xls
Run on 5/14/2019 18:03

If the workbook is saved in an earlier file format or opened in


an earlier version of Microsoft Excel, the listed features will
not be available.

Minor loss of fidelity # of Version


occurrences

One or more objects in this workbook such as shapes, 5


WordArt, or text boxes may allow text to overflow the object
boundaries. Earlier versions of Excel do not recognize this
option and will hide overflowing text.
Value Stream Map'!A1:AS62
Excel 97-2003

You might also like