Sand Dune
Compaction Test
Compacted Date for
1st Layer 2nd Layer conducted dates for Length of Sand Dune
both 1st and 2nd both 1st and 2nd link Road Request for
Sl.No Loc No. Tower Dozing Finish Material Material Layers Compacted Link road Inspection Ref. Removal from
. Type Date Laying Date Laying Date Layers (m) (in one Existing
Date No.
(0.25/0.5m) (0.25/0.5m) Layer) Access roads
1st Layer 2nd Layer 1st Layer 2nd Layer
42 AP - 16 AT+6