You are on page 1of 3

KEC INTERNATIONAL LTD 15-May-19

CONTRACT No. N-12037


400kV DC OHL NEW RUWAIS GRID STATION - NEW BAB GRID STATION
ACCESS ROADS/LINK ROADS/PLATFORMS PROGRESS CHART
Compacted Date for Compaction Test
1st Layer 2nd Layer both 1st and 2nd conducted dates for Length of Sand Dune
both 1st and 2nd link Road Request for
Sl.No Loc No. Tower Dozing Finish Material Material Layers Link road
Compacted (m) Inspection Ref. Removal from
. Type Date Laying Date Laying Date Layers (in one Existing
(0.25/0.5m) (0.25/0.5m) Date Layer) No. Access roads
1st Layer 2nd Layer 1st Layer 2nd Layer

1 AP - 20 DE+0 13-Jun-13 N12037/C/PF/001


Diverted Road due to gantry 13-Jun-13 - 15-Jun-13
2 AP - 19 BAT 90+0 15-May-13 15-Jun-13 16-Jun-13 N12037/C/PF/002

3 18/15 S+6 14-May-13 16-Jun-13 17-Jun-13 N12037/C/PF/003

4 18/14 S+0 13-May-13 17-Jun-13 18-Jun-13 N12037/C/PF/004

5 18/13 S+0 12-May-13 18-Jun-13 19-Jun-13 19-Jun-13 N12037/C/PF/005

6 18/12 S+3 22-Jun-13 N12037/C/PF/006

7 18/11 S+6 11-May-13 19-Jun-13 20-Jun-13 20-Jun-13 N12037/C/PF/007

8 18/10 S+6 9-May-13 20-Jun-13 N12037/C/PF/008 Sand Dune


Removal from
9 18/9 S+6 9-May-13 22-Jun-13 N12037/C/PF/009 Existing
Diverted Road due to 220KV conductor 22-Jun-13 - Access roads
from AP - 19
10 18/8 AT+4 8-May-13 to AP-18
Diverted Road due to 220KV conductor completed on
20th April
11 18/7 S+0 7-May-13 2013
12 18/6 S+6 6-May-13
13 18/5 S+6 5-May-13
14 18/4 S+4 4-May-13
15 18/3 S+6 4-May-13
16 18/2 S+6 2-May-13
17 18/1 S+6 2-May-13
18 AP - 18 BAT 60+6 15-May-13

PLATFORMS/LINK ROADS PROGRESS CHART 1 of 3

Sand Dune
Compaction Test
Compacted Date for
1st Layer 2nd Layer conducted dates for Length of Sand Dune
both 1st and 2nd both 1st and 2nd link Road Request for
Sl.No Loc No. Tower Dozing Finish Material Material Layers Compacted Link road Inspection Ref. Removal from
. Type Date Laying Date Laying Date Layers (m) (in one Existing
Date No.
(0.25/0.5m) (0.25/0.5m) Layer) Access roads
1st Layer 2nd Layer 1st Layer 2nd Layer

19 17/9 S+6 3-Jun-13


20 17/8 S+6 4-Jun-13
Sand Dune
21 17/7 S+6 Removal from
Existing
22 17/6 S+6 Access roads
from AP - 18
23 17/5 S+6 to AP-17
completed on
24 17/4 S+6 30th April
2013
25 17/3 S+6
26 17/2 S+6
27 17/1 S+6
28 AP - 17 BAT 90+6
29 16/13 S+2
30 16/12 S+2
31 16/11 S+2
32 16/10 S+2 Sand Dune
Removal from
33 16/9 S+2 Existing
Access roads
34 16/8 S+2 from AP - 17
35 16/7 S+2 to AP-16 work
started from
36 16/6 S+2 15th May
2013 and
37 16/5 S+2 completed on
30th May
38 16/4 S+2 2013
39 16/3 S+2
40 16/2 S+6
41 16/1 S+6

PLATFORMS/LINK ROADS PROGRESS CHART 2 of 3


15th May
2013 and
completed on
30th May
Compaction Test 2013
Compacted Date for
1st Layer 2nd Layer conducted dates for Length of Sand Dune
both 1st and 2nd both 1st and 2nd link Road Request for
Sl.No Loc No. Tower Dozing Finish Material Material Layers Compacted Link road Inspection Ref. Removal from
. Type Date Laying Date Laying Date Layers (m) (in one Existing
Date No.
(0.25/0.5m) (0.25/0.5m) Layer) Access roads
1st Layer 2nd Layer 1st Layer 2nd Layer

42 AP - 16 AT+6