Professional Documents
Culture Documents
Corrigendum Addendum
Corrigendum Addendum
th
Ref No.: RFP No. 04/2019 and RFP no. 05/2019 Corrigendum/Addendum dated 16 March 2019
Clarifications against the Request for Proposal (RFP) for Selection of Agency for Mining, transportation, Stocking and Loading of Sand
1. Annexure III Corrigendum In case of four sand Ghats with Sl. No. 52, 53, 54 and 55 in the Sabibganj District, namely Naximal,
Dahujor, Gopaldih and Kushma, a single common stockyard shall be developed
2. Form D and If a Bidder applies for 5 No Change in Terms and Conditions of the tender
Form I Sand Ghats, 3 with
area less than 5 Ha
If a Bidder applies for 3 Sand Ghats of Area less than 5 Ha, it need to submit its proposal against
and 2 with area more
the RFP no. 4/2019 and submit:-
than 5 Ha,
Three EMDs for 3 Sand Ghats i.e. 3 EMDs of INR 2,00,000/- each OR one EMD of INR
How many EMDs
6,00,000/-
need to be
submitted one or Only one technical bid against RFP no. 4/2019
two Only one financial bid as per Form-I, however, three separate prices to be provided by the
How many Bidder for three separate Sand Ghats.
technical bids to be
submitted one or Additionally, If the same Bidder applies for 2 Sand Ghats of Area more than 5 Ha, it need to submit
two its proposal against the RFP no. 452019 and submit:-
How many Two EMDs for 2 Sand Ghats i.e. 2EMDs of INR 2,00,000/- each OR one EMD of INR
financial bids to be 4,00,000/-
submitted one or Only one technical bid against RFP no. 4/2019
two
Only one financial bid as per Form-I, however, two separate prices to be provided by the Bidder
for two separate Sand Ghats.
3. Clause 18.5 How much land is required for the stockyard of area less than 5 Ha No Change in Terms and Conditions of the tender
4. Clause 9.4 (i) What would happen, in case the financial quote of two bidders be In case the lowest price quotation for any sand Ghat
equal found to be quoted by two or more bidders, the
JSMDC reserves the right to invite fresh financial
proposal from the Lowest Bidders, however, the
new financial quote should be lower than the L1
quote received at the first place.
5. 10.2 If the work is done in Financial Year 2017-18 while the payment has No Change in Terms and Conditions of the tender
been made in Financial Year 2018-19, whether such work be Please refer to the clause no. 10.2,
considered in qualification or not.