Proper Electrical maintenance is a necessary part of any type of industry for reducing the
production cost and making it profitable so that it must be armed with an approved Maintenance
schedule and trained electrical maintenance staff. By good knowledge of maintenance, fault can
be detected easily well as so some factor can be minimized such as breakdown, accident, failure
of equipment etc. Preventive maintenance and predictive maintenance both play an important
role to increase the life of the equipment. All the equipments should be inspected as per
maintenance schedule and incipient faults should be found out and rectified in time. Every
equipment has a self life so the users should remember its life and keep the spare parts or
equipment for replacement. If proper maintenance is not done timely then there are chances of
flash, spark or of burnt equipment. If we choose right path with proper expertise in maintenance we
can save time and cost up to 30- 40%. Maintenance and operation of all machinery are necessary
to make it beneficial to Industry. A regular and organized scheme of maintenance may ensure
continued satisfactory and safe operation of electrical equipment. Using substitute spare parts of
different ratings at the times results in dangerous situation. The electrical maintenance is very
essential for power equipment’s, switch boards, power distribution board, motor, control gear,
transformer bus bars, wiring, light fittings etc.
Always try to replace same rating of spare parts or equipment.
Wherever it requires modifying the control circuit of any equipment/drive information should
be given to all concerned staff.
At the time of maintenance of substation, shut down should be taken from the power
distribution station authority.
Danger tags board should be provided where work is going on.
Machines and equipment are always in motion with electrical power and they require regular
maintenance to avoid breakdowns.
Potential ignition sources The followings may be the causes of explosion in the hazardous area.
Evidence of rusting, corrosion, and deterioration of the varnish or paint should be checked
and corrective action should be taken properly.
In order to ensure all the equipments are working within optimum operating efficiency and to give
uninterrupted service, regular preventive maintenance shall be carried-out of all the electrical plant
and equipment and also to ensure the safety against the electrical shocks to the operational and
maintenance personnel. Each Tankage facility shall ensure the compliance of
procedures/periodicity etc. as stipulated in OISD - 137 and 148 and carry out the maintenance of
the different equipments/ plants in the manner described below:
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
i) Transformer
Maintenance of Transformers shall be carried out as per the below given schedule and
records maintained.
Sl.No. Frequency of maintenance Proforma No. Remarks
1 Daily IOT/PBT/MD/E/01 -------
2 Weekly IOT/PBT/MD/E/02 -------
3 Monthly IOT/PBT/MD/E/03 -------
4 Half yearly IOT/PBT/MD/E/04 -------
IOT/PBT/MD/E/05 Includes Shutdown
5 Yearly
inspection & testing
ii) HT Panels
Maintenance of HT shall be carried out as per the below given schedule and records maintained.
Includes Shutdown
IOT/PBT/MD/E/14 B
inspection & testing
IOT/PBT/MD/E/14 C
IOT/PBT/MD/E/14 D
IOT/PBT/MD/E/14 E
v) DG set
Maintenance of DG set shall be carried out as per the below given schedule and records
maintained.
Maintenance of High Mast shall be carried out as per the below given schedule and records
maintained.
Sl.No. Frequency of maintenance Proforma No. Remarks
Includes Shutdown
1 Half-Yearly IOT/PBT/MD/E/26
inspection & testing
x) Electric Heat Tracing
Sl.No. Frequency of maintenance Proforma No. Remarks
1 Weekly IOT/PBT/MD/E/27 -------
2 Monthly IOT/PBT/MD/E/28 -------
Includes Shutdown
3 Half-Yearly IOT/PBT/MD/E/29
inspection & testing
xi) HVAC system
Sl.No. Frequency of maintenance Proforma No. Remarks
1 Weekly IOT/PBT/MD/E/30 -------
Includes Shutdown
2 Monthly IOT/PBT/MD/E/31
inspection & testing
xii) Pressurisation system
Sl.No. Frequency of maintenance Proforma No. Remarks
1 Weekly IOT/PBT/MD/E/32 -------
Includes Shutdown
2 Monthly IOT/PBT/MD/E/33
inspection & testing
xiii) Earthing
Maintenance of earthing shall be carried out as per the below given schedule and records
maintained.
Sl.No. Frequency of maintenance Proforma No. Remarks
1 Half- Yearly IOT/PBT/MD/E/34 -------
xiv) Lighting fixture and JB
Sl.No. Frequency of maintenance Proforma No. Remarks
1 Weekly IOT/PBT/MD/E/35 -------
2 Monthly IOT/PBT/MD/E/36 -------
3 Quarterly IOT/PBT/MD/E/37 -------
Includes Shutdown
4 Half-Yearly IOT/PBT/MD/E/38
inspection & testing
xv) Relays and meters
Sl.No. Frequency of maintenance Proforma No. Remarks
Includes Shutdown
1 Yearly IOT/PBT/MD/E/39
inspection & testing
xvi) Flame proof and weather proof equipments
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
1 External damages
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Examine the condition of soak pit and for any clogs in the oil
5 drain.
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
1 General cleanliness.
2 Weather protection.
4 External damage.
6 Ventilation system.
7 Accessibility of maintenance/operation.
9 Corrosion effects.
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
3 Internal damages
Protection, control and interlock circuits
4
Circuit breaker (rack-inout mechanism,
5
Simultaneous closing/opening of all the three phases.
6
7 Contactor operation
9 Safety shutters
Tightness of all bolts, cable connections, and terminals
10
Condition of contacts, contact alignment, and clearances
11 with live parts
Breaker closing and opening time & total relay operating
12 time
Checking and calibration of relays
13
Note: - Yearly inspection to be carried out as per OISD-137 standard.
Remarks ______________________________________________________________________
Work carried out from ______________ to ______________________
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
A B C D
LOCATION
NDE DE DE NDE
VERTICAL
HORIZONTAL
AXIAL
OPERATING PARAMETERS
SKETCH TO BE DRAWN
PUMP SUCTION PRESSURE: _________________________ KG/CM2
PUMP DISCHARGE PRESSURE: ______________________ KG/CM2
PRODUCT: ______________________ (AS PER ISO-2372)
TO BE SUBMITTED ALONGWITH FORMAT NO. IOT/PBT/MD/E/13A/B/C.
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
(A) I.R. Value in Mega Ohm with Star point connected. (Applied voltage = 2.5 KV, DC)
R-Y-B. Phase
Connected Vs Earth
(B)I.R. Value in Mega Ohm with the star point open. (applied voltage = 2.5 KV, DC)
(A) INSULATION RESISTANCE OF SPACE HEATER _______MEGA OHM (MEASURED WITH 500 VOLT
HAND OPERATED MEGGER)
DATE OF TESTING :
(A) INSULATION RESISTANCE OF SPACE HEATER _______MEGA OHM (MEASURED WITH 500 VOLT
HAND OPERATED MEGGER)
(MEASURED WI
TH DIGITAL MULTIMETER)
DATE OF TESTING :
P1____________ °C
P2____________ °C
P3____________ °C
REMARKS:
SIGNATURE:-
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC
IOT UTKAL ENERGY SERVICES LIMITED
PARDIP BOOT TERMINAL
Tech (E)
EE/EIC SIC