Professional Documents
Culture Documents
Sumit Six Month Project Work Report
Sumit Six Month Project Work Report
ON
FLOATING CONCRETE
Submitted in partial fulfillment of the Requirements for the award of
Degree of Bachelor of Technology
In
Civil Engineering
SUBMITTED BY
1504431,1504433,1504470,1504472,
1504476,1504483
SUBMITTED TO
ON
FLOATING CONCRETE
Submitted in partial fulfillment of the Requirements for the award of
Degree of Bachelor of Technology
In
Civil Engineering
SUBMITTED BY
SUMIT KUMAR
(1504483)
SUBMITTED TO
Signature of Studen
SUMIT KUMAR
(Name of Student)
This is to certify that the above statement made by the candidate is correct of my
knowledge .
Signature of H.O.D.