World Class Manufacturing: Scott Garberding Scott Garberding
World Class Manufacturing: Scott Garberding Scott Garberding
Manufacturing
Scott Garberding
Scott Garberding
Chrysler Group LLC 2010‐14 Business Plan
Chrysler Group LLC 2010 14 Business Plan
November 4, 2009
World Class Manufacturing (WCM) headlines
… From Turin they remark that the essential element in order to have
everything working well is the human component, since without full
involvement of the workers nothing could be made.
…In the internal ranking, the Marchionne Code, which is in the company language described as Fiat Group
Automobiles Production System (FAPS), finds its best application in Tychy Plant in Poland, and in Melfi Plant
in Italy. Now the attempt is to elevate to acceptable standard also Pomigliano Plant…
6, December 2007
Fiat Group focus – Holistic approach
World Class Manufacturing
Fiat Group
p • 20 Pillars
WCM Launch
C au c
One common
manufacturing
operating system
p g y
Chrysler Group LLC
Safety
deployment
Workplace
Cost
Values People involvement, value creation, customer satisfaction
Introduction of WCM Fatality
Severe
Injury
Lost Time
Injury
Near Misses
work day inccident rate
Unsafe Acts
15%
7% Teaching us to see new
opportunities
Lost w
35% improvement
Introduction of WCM
26
25
Rigorous methodology
f i
for improvements
t
Harbour Hours Peer Vehicle
24
23 5.7%
1.3%
22
9%
21
20
19
2004 2005 2006 2007 2008 2009 ytd E 2010E 2011 E
(Assembly)
Chrysler Group LLC 2010‐14 Business Plan November 4, 2009 6
New leadership model
Previous Structure
Previous Structure
Plant Manager
Current Structure
Plant Manager
Team Leader
Team Leader
Team Leader
Team Member Team Member
Direct
Communication
Fully engaged
Quick Decision
workforce Ownership at Making
Operator Level
Working together
Execution
Results
Before After
Flexion angle of the waist Flexion angle of the waist
Level 1 Level 2 Level 3 Level 1 Level 2 Level 3
More 15° ‐ 30° 0° ‐ 15° More 15° ‐ 30° 0° ‐ 15°
than 30° than 30
than 30°
52% elimination of ergonomic risks
Before After
• Inventory reduced
• Material delivered to point of use
57% reduction in operator walk time
• 57% reduction in operator walk time
Before After
Equipment Maintained
Equip
quip
co d o s
conditions o easy
for easy
Eq
hidden inspection
Equipment restored to original state
Before After
Improved work conditions
Prepare for
Prepare for
People
360 degree
Place
transformation
Passion
Process
Product
Chapter
Chapter
1st Plant
re‐opens Gold
11 begins
11 begins
11 “ends”
Silver
Bronze
Bankruptcy 4th Qtr ‘09 2010 2011 2012 2013 2014
Cost
Management / opportunities
Union identified 1st audits
audits
3rd party audits
leadership
training and World Class • Every plant – Every year
commitment Manufacturing teams
and training
30 Plants
30 Plants
• Increasing depth and rigor
Learning & implementation
Methods & results
Wide expansion
Injuries Operating cost
‐30%
‐8%
Manufacturing first‐time quality Productivity
+15% +10%
Employee involvement Projects
+100% +80%