2017 BUILDING MATERIAL PRICES SARAWAK - SIBU

2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

1. Cement

1.1 Ordinary Portland Cement, 50 kg bag Bag 60 Del 21.47 21.47 20.93 20.93 20.93 20.93 20.93 20.93 20.93 20.33 20.33 20.33

1.2 Ordinary Portland Cement in Bulk MT 60 Del 390.00 390.00 390.00 390.00 390.00 390.00 390.00 390.00 390.00 390.00 390.00 390.00

1.3 Lafarge Walcrete, 50kg/bag Bag 60 Del 390.00 390.00 390.00 390.00 390.00 390.00 390.00 390.00 390.00 390.00 390.00 390.00

2. Aggregate

2.1 Granite Aggregate 3/4" MT 60 Del 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00

3. Sand

3.1 Normal River Sand- Ex MT 30 Ex 40.67 40.67 40.67 40.67 40.67 40.67 40.67 40.67 40.67 40.67 40.67 40.67

3.2 Fine River Sand for Plastering -Ex MT 30 Ex 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00

3.3 Normal Mining Sand MT 30 Ex 46.67 46.67 46.67 46.67 46.67 46.67 46.67 46.67 46.67 46.67 46.67 46.67

3.4 Fine Mining Sand for Plastering MT 30 Ex 43.33 43.33 43.33 43.33 43.33 43.33 43.33 43.33 43.33 43.33 43.33 43.33

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 1/18
2017 BUILDING MATERIAL PRICES SARAWAK - SIBU

2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

4. Steel Reinforcement

4.1 Mild Steel Round Bar R10, MS146 MT 60 Del 3,031.00 2,800.00 2,763.33 2,710.00 2,602.00 2,522.00 2,650.00 3,123.33 3,123.33 2,870.00 2,900.00 3,150.00

4.2 Mild Steel Round Bar R12, MS146 MT 60 Del 3,031.00 2,905.00 2,853.33 2,783.33 2,670.00 2,590.00 2,695.00 3,168.33 3,168.33 2,920.00 2,950.00 3,200.00

4.3 Mild Steel Round Bar R16, MS146 MT 60 Del 3,031.00 2,905.00 2,853.33 2,783.33 2,670.00 2,590.00 2,695.00 3,168.33 3,168.33 2,920.00 2,950.00 3,200.00

4.4 High Tensile Deformed Bar-Y10, MS146 MT 60 Del 2,922.00 2,800.00 2,758.33 2,710.00 2,602.00 2,522.00 2,650.00 3,123.33 3,123.33 2,870.00 2,900.00 3,150.00

4.5 High Tensile Deformed Bar-Y12, MS146 MT 60 Del 2,922.00 2,800.00 2,758.33 2,710.00 2,602.00 2,522.00 2,650.00 3,123.33 3,123.33 2,870.00 2,900.00 3,150.00

4.6 High Tensile Deformed Bar-Y16, MS146 MT 60 Del 2,922.00 2,730.00 2,686.67 2,630.00 2,530.00 2,460.00 2,570.00 2,973.33 2,973.33 2,770.00 2,770.00 3,000.00

4.7 High Tensile Deformed Bar-Y20, MS146 MT 60 Del 2,922.00 2,730.00 2,686.67 2,630.00 2,530.00 2,460.00 2,570.00 2,973.33 2,973.33 2,770.00 2,770.00 3,000.00

4.8 High Tensile Deformed Bar-Y25, MS146 MT 60 Del 2,922.00 2,730.00 2,686.67 2,630.00 2,530.00 2,460.00 2,570.00 2,973.33 2,973.33 2,770.00 2,770.00 3,000.00

4.9 High Tensile Deformed Bar-Y32, MS146 MT 60 Del 2,922.00 2,730.00 2,686.67 2,630.00 2,530.00 2,460.00 2,570.00 2,973.33 2,973.33 2,770.00 2,770.00 3,000.00

4.10 BRC A6, MS145 m2 30 Del 7.17 7.17 7.17 7.17 7.17 7.17 7.17 7.87 7.87 7.45 7.45 7.70

4.11 BRC A7, MS145 m2 30 Del 9.00 9.00 9.00 9.00 9.00 9.00 9.00 10.67 10.67 9.95 9.95 10.25

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 2/18
2017 BUILDING MATERIAL PRICES SARAWAK - SIBU

2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

4.12 BRC A8, MS145 m2 30 Del 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.73 13.73 12.65 12.65 13.40

4.13 BRC A9, MS145 m2 30 Del 16.00 16.00 16.00 16.00 16.00 16.00 16.00 17.17 17.17 16.00 16.00 17.00

4.14 BRC A10, MS145 m2 30 Del 20.33 20.33 20.33 20.33 20.33 20.33 20.33 21.17 21.17 19.65 19.65 20.65

4.15 High Tensile Deformed Bar- Y40, MS146 MT 60 Del 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65

4.16 BRC B10, MS145 m2 60 Del 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65

4.17 BRC B9, MS145 m2 60 Del 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65

4.18 BRC B8, MS145 m2 60 Del 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65

4.19 BRC B7, MS145 m2 60 Del 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65

4.20 BRC B6, MS145 m2 60 Del 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65

4.21 BRC A12, MS145 m2 60 Del 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65

4.22 BRC A11, MS145 m2 60 Del 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65 20.65

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 3/18
2017 BUILDING MATERIAL PRICES SARAWAK - SIBU

2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

5. Ready Mixed Concrete

5.1 Ready Mix Concrete - Normal Mix - Grade15, Granite m3 30 Del 260.33 260.33 260.33 260.33 260.33 260.33 260.33 260.33 260.33 260.33 260.33 260.33

5.2 Ready Mix Concrete - Normal Mix - Grade 20, Granite m3 30 Del 266.67 266.67 266.67 266.67 266.67 266.67 266.67 266.67 266.67 266.67 266.67 266.67

5.3 Ready Mix Concrete - Normal Mix - Grade25, Granite m3 30 Del 268.33 268.33 268.33 268.33 268.33 268.33 268.33 268.33 268.33 268.33 268.33 268.33

5.4 Ready Mix Concrete - Normal Mix - Grade 30, Granite m3 30 Del 275.00 275.00 275.00 275.00 275.00 275.00 275.00 275.00 275.00 275.00 275.00 275.00

5.5 Ready Mix Concrete - Normal Mix - Grade 35, Granite m3 30 Del 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33

5.6 Ready Mix Concrete - Normal Mix - Grade 40, Granite m3 60 Del 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33

5.7 Ready Mix Concrete - Pump Mix - Grade 30, Granite m3 60 Del 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33

5.8 Ready Mix Concrete - Pump Mix - Grade 35, Granite m3 60 Del 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33

5.9 Ready Mix Concrete - Pump Mix - Grade 40, Granite m3 60 Del 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33 299.33

6. Bricks

6.1 Common Clay Bricks - Pallet Piece 30 Del 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 4/18
2017 BUILDING MATERIAL PRICES SARAWAK - SIBU

2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

6.2 Cement Sand Bricks - Pallet Piece 30 Del 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42

6.3 Smooth Face Facing Brick, Red Piece 30 Del 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

6.4 AAC, Light Weight Block - 100mm x 200mm x 600mm Piece 60 Del 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

6.5 AAC, Light Weight Block - 125mm x 200mm x 600mm Piece Piece 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

6.6 AAC, Light Weight Block - 150mm x 200mm x 600mm Piece Piece 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

6.7 AAC, Light Weight Block - 200mm x 200mm x 600mm Piece Piece 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

7. Roofing

7.1 Interlocking Concrete Tiles - Standard Duotone Colour 420mm x 330mm piece 60 Del 2.97 2.97 2.97 2.97 2.97 2.97 2.97 2.97 2.97 2.97 2.97 2.97

7.2 MS Decking - Step Roofing M350 G24, 0.53mm TCT, Clean Colourbond m2 30 Del 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00

MS Decking - Ajiya AP Rib Hi-Tensile G26, 0.47mm TCT, Clean


7.3 m2 30 Del 57.00 57.00 57.00 57.00 57.00 57.00 57.00 57.00 57.00 57.00 57.00 57.00
Colourbond (Comercial)

MS Decking - Ajiya AP Rib Hi- Tensile G24, 0.53mm TCT, Clean


7.4 m2 60 Del 64.00 64.00 64.00 64.00 64.00 64.00 64.00 64.00 64.00 64.00 64.00 64.00
Colourbond (Comercial)

MS Decking - Ajiya Euro Step Roofing M350 G28, 0.40mm TCT, Clean
7.5 m2 60 Del 50.67 50.67 50.67 50.67 50.67 50.67 50.67 50.67 50.67 50.67 50.67 50.67
Colourbond
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 5/18
2017 BUILDING MATERIAL PRICES SARAWAK - SIBU

2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

MS Decking - Ajiya Euro Step Roofing M350 G26, 0.47mm TCT, Clean
7.6 m2 60 Del 60.33 60.33 60.33 60.33 60.33 60.33 60.33 60.33 60.33 60.33 60.33 60.33
Colourbond

MS Decking - Ajiya AP Rib Hi-Tensile G28, 0.40mm TCT, Clean


7.7 m2 60 Del 50.33 50.33 50.33 50.33 50.33 50.33 50.33 50.33 50.33 50.33 50.33 50.33
Colourbond (Comercial)

7.8 MS Decking-Lysaght Colourbond-Spandex Hi- Ten 0.47mm TCT m2 60 Del 63.33 63.33 63.33 63.33 63.33 63.33 63.33 63.33 63.33 63.33 63.33 63.33

7.9 MS Decking-Lysaght Colourbond-Trimdex Hi-Ten 0.47mm TCT m2 60 Del 53.33 53.33 53.33 53.33 53.33 53.33 53.33 53.33 53.33 53.33 53.33 53.33

7.10 MS Decking-Lysaght Colourbond-Kliplok Hi-Ten 0.53mm TCT m2 60 Del 63.00 63.00 63.00 63.00 63.00 63.00 63.00 63.00 63.00 63.00 63.00 63.00

Corrugated Roofing Sheet-76mm Double Width, 1065mm x 2440mm x


7.11 sheet 30 Del 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67
4mm (Hume/Malex/UAC)

7.12 MS Decking -Spandec Hi-Ten 0.47mm TCT, Clean Colourbond m2 60 Del 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67

7.13 Corrugated Roofing Sheet- 3.0mm x 1024mm ft 60 Del 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67

7.14 Primaflex Corrugated Roofing Sheet- 610mm x 1220mm x 3.2mm ft 60 Del 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67

7.15 Primaflex Corrugated Roofing Sheet- 1220mm x 2440mm x 4.5mm ft 60 Del 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67

MS Decking - Ajiya Euro Step Roofing M350 G26, 0.53mm TCT, Clean
7.16 m2 60 Del 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67 32.67
Colourbond
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 6/18
2017 BUILDING MATERIAL PRICES SARAWAK - SIBU

2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

8. Walls & Floor Tiles

Glazed Ceramic Floor Tiles, Standard light Colour,200mm x 200mm x


8.1 Piece 60 Del 1.74 1.74 1.74 1.74 1.74 1.74 1.74 1.74 1.74 1.74 1.74 1.74
8mm - Grade 1

Glazed Ceramic Floor Tiles, Standard light Colour,300mm x 300mm x


8.2 Piece 60 Del 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94
8mm - Grade 1

Plain Homogeneous Floor Tiles, Standard light Colour, 200mm x 200mm


8.3 Piece 60 Del 3.03 3.03 3.03 3.03 3.03 3.03 3.03 3.03 3.03 3.03 3.03 3.03
x 8mm - Grade 1

Plain Homogeneous Floor Tiles, Standard light Colour, 300mm x 300mm


8.4 Piece 60 Del 3.94 3.94 3.94 3.94 3.94 3.94 3.94 3.94 3.94 3.94 3.94 3.94
x 8mm - Grade 1

Glazed Ceramic Wall Tiles, Standard light Colour, 200mm x 200mm x


8.5 Piece 60 Del 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28
6mm - Grade 1

Glazed Ceramic Wall Tiles, Standard light Colour, 200mm x 250mm x


8.6 Piece 60 Del 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52
6mm - Grade 1

8.7 Porcelain Tiles, Standard Colour, 300mm x 600mm x 9mm Piece 60 Del 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52

8.8 Porcelain Tiles, Standard Colour, 600mm x 600mm x 9mm Piece 60 Del 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52

9. Ceiling Board

Plain Cellulose Fibre Ceiling Sheet,610mm x 1220mm x3.2mm


9.1 Sheet 60 Del 5.90 5.90 5.90 5.90 5.90 5.90 5.90 5.90 5.90 5.90 5.90 5.90
(UAC/MALEX/HUME)

Plain Cellulose Fibre Ceiling Sheet,610mm x 1220mm x 4.5mm


9.2 Sheet 60 Del 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00
(UAC/MALEX/HUME)
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 7/18
2017 BUILDING MATERIAL PRICES SARAWAK - SIBU

2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

9.3 Plain Gysum Board, 610mm x 1220mm x 9.5mm, (Boral/Armstrong) Sheet 60 Del 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67

9.4 Plain Gypsum Ceiling Board, 1220mm x 2440mm x 12mm (Hume) Sheet 60 Del 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67

9.5 Plain Gypsum Ceiling Board, 1220mm x 2440mm x 9mm (Hume) Sheet 60 Del 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67

Plain Cellulose Fibre Ceiling Sheet, 1220mm x 2440mm x 6.0mm (UAC /


9.6 Sheet 60 Del 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67
Hume/ Malex)

Plain Cellulose Fibre Ceiling Sheet, 1220mm x 1220mm x 4.5mm (UAC /


9.7 Sheet 60 Del 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67
Hume/ Malex)

Plain Cellulose Fibre Ceiling Sheet, 1220mm x 1220mm x 3.2mm (UAC /


9.8 Sheet 60 Del 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67 7.67
Hume/ Malex)

10. Plumbing Works

10.1 Galvanised Iron Pipes, Class A 20mm Diameter (Maruichi), MS863 6m run 60 Del 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00

10.2 Galvanised Iron Pipes, Class B 25mm Diameter (Maruichi), MS863 6m run 60 Del 77.00 77.00 77.00 77.00 77.00 77.00 77.00 77.00 77.00 77.00 77.00 77.00

10.3 Galvanised Iron Pipes, Class C 25mm Diameter (Maruichi), MS863 6m run 60 Del 80.00 80.00 80.00 80.00 80.00 80.00 80.00 80.00 80.00 80.00 80.00 80.00

PVC Pressure Pipes Class D Grey Colour - 50mm Diameter (paling) ,


10.4 4m run 60 Del 16.67 16.67 16.67 16.67 16.67 16.67 16.67 16.67 16.67 16.67 16.67 16.67
MS628

PVC Pressure Pipes Class E Grey Colour - 25mm Diameter (paling) ,


10.5 6m run 60 Del 19.33 19.33 19.33 19.33 19.33 19.33 19.33 19.33 19.33 19.33 19.33 19.33
MS628
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 8/18
2017 BUILDING MATERIAL PRICES SARAWAK - SIBU

2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

PVC Pressure Pipes Class E Grey Colour - 50mm


10.6 6m run 60 Del 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00
Diameter (Dulon) , MS628

10.7 HDPE Pipe PN 16 - 25mm Diameter, MS 1058 100m roll 60 Del 273.33 273.33 273.33 273.33 273.33 273.33 273.33 273.33 273.33 273.33 273.33 273.33

10.8 HDPE Pipe PN 16 - 50mm Diameter, MS 1058 100m roll 60 Del 1,150.00 1,150.00 1,150.00 1,150.00 1,150.00 1,150.00 1,150.00 1,150.00 1,150.00 1,150.00 1,150.00 1,150.00

10.9 ABS Pipe PN 15 Class E - 20mm, MS1419 5.8m run 60 Del 21.67 21.67 21.67 21.67 21.67 21.67 21.67 21.67 21.67 21.67 21.67 21.67

10.10 ABS Pipe PN 15 Class E - 25mm, MS1419 5.8m run 60 Del 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00

PVC Pressure Pipes Class E, Grey Colour - 50mm


10.11 6m run 60 Del 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00
Diameter (Paling), MS 628

10.12 HDPE Pipe PN 16 - 110mm Diameter, MS 1058 100m roll 60 Del 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00

11. Sanitary Fitting

Polyethylene water tank (Polytank), Circular- 200 gallons,


11.1 Number 60 Del 270.00 270.00 270.00 270.00 270.00 270.00 270.00 270.00 270.00 270.00 270.00 270.00
MS 1225-weida equivelant

Fibre reinforced plastic sectional tank - 1000 litre / 220


11.2 6 panels 60 Del 2,100.00 2,100.00 2,100.00 2,100.00 2,100.00 2,100.00 2,100.00 2,100.00 2,100.00 2,100.00 2,100.00 2,100.00
gallons, Mui Tank. 6 Panels

Wash Hand Basin-560mm x 406mm, white colour,


11.3 Set 60 Del 81.67 81.67 81.67 81.67 81.67 81.67 81.67 84.33 92.67 101.83 101.83 101.83
Jacqueline WB, Claytan
Water Closet Western Type- Windsor with push button 6L
11.4 Set 60 Del 533.33 533.33 533.33 533.33 533.33 533.33 533.33 533.33 533.33 533.33 533.33 533.33
cistern, standard colour,Johnson-Windsor 140
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 9/18
2017 BUILDING MATERIAL PRICES SARAWAK - SIBU

2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Water Closet Western Type- WC 644, white colour without cistern,


11.5 Item 60 Del 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00
claytan

Water Closet Eastern Type- Bengal ACBL-000 without cistern, white


11.6 Item 60 Del 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00
colour, johnson-suisse

Urinal Bowl, santana 320 c/w hanger, flange, ceramic waste & cleaning
11.7 Iitem 60 Del 516.67 516.67 516.67 516.67 516.67 516.67 516.67 516.67 516.67 516.67 516.67 516.67
set, johnson-suisse

Stainless Steel Sinks - Single Bowl Single Drainer- Lay On Type,


11.8 Item 60 Del 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00
42"x18"

Claywood Squatting Pan, includes Integral 'S' Trap (White) - 585mm x


11.9 Item 60 Del 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00
310mm x 320mm, Johnson-Suisse

Wash Hand Basin - 460mm x 365mm x 825mm, Neptune Wall Hung


11.10 Set 60 Del 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00
Basin, Claytan

Water Closet Luton Type with push button 3L or 6L Cistern, Standard


11.11 Set 60 Del 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00
Colour, Johnson-Suisse

12. Paints

12.1 Paint-ICI dulux standard colour-Undercoat speed 5 Litres 60 Del 118.33 117.78 117.78 117.78 117.78 117.78 117.78 117.78 117.78 117.78 117.78 117.78

Paint-ICI dulux standard colour-external acrylic emulsion,


12.2 18 Litres 60 Del 128.33 129.44 129.44 129.44 129.44 129.44 129.44 129.44 129.44 129.44 129.44 129.44
weathershield

Paint-ICI dulux standard colour-internal emulsion luxury, water base,


12.3 5 Litres 60 Del 116.67 115.56 115.56 115.56 115.56 115.56 115.56 115.56 115.56 115.56 115.56 115.56
pearl glo

Paint-ICI dulux standard colour-internal emulsion luxury, water base,


12.4 5 Litres 60 Del 110.00 111.67 111.67 111.67 111.67 111.67 111.67 111.67 111.67 111.67 111.67 111.67
pentalite
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 10/18
2017 BUILDING MATERIAL PRICES SARAWAK - SIBU

2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

12.5 Paint-ICI dulux standard colour-timber/wood, timbertone, clear glossy 5 Litres 60 Del 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

12.6 Paint-Nippon standard colour-undercoat, 9000 undercoat 5 Litres 60 Del 65.00 65.00 65.00 65.00 65.00 65.00 65.00 65.00 65.00 65.00 65.00 65.00

12.7 Paint-Nippon standard colour-timber/wood, timber finish 5 Litres 60 Del 86.67 87.22 87.22 87.22 87.22 87.22 87.22 87.22 87.22 87.22 87.22 87.22

12.8 Paint-Nippon standard colour-gloss oil based, 9000 gloss finish 5 Litres 60 Del 95.33 95.44 95.44 95.44 95.44 95.44 95.44 95.44 95.44 95.44 95.44 95.44

Paint-Nippon standard colour-internal emulsion luxury, waterbase, satin


12.9 5 Litres 60 Del 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00
glo

Paint-Nippon-internal emulsion waterbase finish, standard colour-super


12.10 7 Litres 60 Del 49.33 49.11 49.11 49.11 49.11 49.11 49.11 49.11 49.11 49.11 49.11 49.11
matex

12.11 Paint-Nippon standard colour-external acrylic emulsion, weatherbond 5 Litres 60 Del 116.67 115.56 115.56 115.56 115.56 115.56 115.56 115.56 115.56 115.56 115.56 115.56

12.12 Paint - ICI Dulux Standard Colour Gloss Oilbased, Gloss Finish (5L) 5 Litres 60 Del 114.33 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78

Paint - ICI Dulux Standard Colour Internal Emulsion, Water Base,


12.13 Pentalite or Paint - Nippon - Internal Emulsion Water base Finish, 20 Litres 60 Del 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78
Standard Colour - Super Matex (20L)

Paint - ICI Dulux Standard Colour Internal Emulsion Luxury, Water


12.14 20 Litres 60 Del 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78
Base, Satin/Pearl Glo (20L)

Paint - ICI Dulux Standard Colour Internal Emulsion, Water Base,


12.15 Pentalite or Paint - Nippon - Internal Emulsion Water base Finish, 18 Litres 60 Del 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78
Standard Colour - Super Matex (18L)

Paint - ICI Dulux Standard Colour Internal Emulsion Luxury, Water


12.16 5 Litres 60 Del 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78
Base, Satin/Pearl Glo (5L)
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 11/18
2017 BUILDING MATERIAL PRICES SARAWAK - SIBU

2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Paint - ICI Dulux Standard Colour Gloss Oilbased, Gloss


12.17 20 Litres 60 Del 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78
Finish (20L)

Paint - ICI -Dulux Standard Colour External Acrylic


12.18 20 Litres 60 Del 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78
Emulsion, Weathershield

12.19 Paint - ICI Dulux Standard Colour - Undercoat, Speed 20 Litres 60 Del 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78

Paint-ICI dulux standard colour-external acrylic emulsion,


12.20 5 Litres 60 Del 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78 115.78
weathershield (5L)

13. Steel & Metal Sections

Square hollow sections-12mm x 12mm x 1.0mm


13.1 MT 60 Del 3,066.67 2,988.89 2,988.89 2,988.89 2,988.89 2,988.89 2,988.89 2,988.89 2,988.89 2,988.89 2,988.89 2,988.89
(0.357kg/m)

Square Hollow Sections - 50mm x 50mm x 3.0mm


13.2 MT 60 Del 3,200.00 3,066.67 3,066.67 3,066.67 3,066.67 3,066.67 3,066.67 3,066.67 3,066.67 3,066.67 3,066.67 3,066.67
(4.38kg/m)

Square Hollow Sections - 150mm x 150mm x 4.0mm


13.3 MT 60 Del 3,400.00 3,366.67 3,366.67 3,366.67 3,366.67 3,366.67 3,366.67 3,366.67 3,366.67 3,366.67 3,366.67 3,366.67
(20.20kg/m)

13.4 Universal beams-102mm x 102mm x 8.76mm (19.35kg/m) MT 60 Del 3,266.67 3,355.56 3,355.56 3,355.56 3,355.56 3,355.56 3,355.56 3,355.56 3,355.56 3,355.56 3,355.56 3,355.56

13.5 Universal beams-400mm x 400mm (2.17kg/m) MT 60 Del 3,420.00 3,393.33 3,393.33 3,393.33 3,393.33 3,393.33 3,393.33 3,393.33 3,393.33 3,393.33 3,393.33 3,393.33

13.6 Equal angles-38mm x 38mm x 3.8mm (2.17kg/m) MT 60 Del 2,683.33 2,677.78 2,677.78 2,677.78 2,677.78 2,677.78 2,677.78 2,677.78 2,677.78 2,677.78 2,677.78 2,677.78

13.7 Equal angles-50mm x 50mm x 4mm (3.06kg/m) MT 60 Del 2,850.00 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 12/18
2017 BUILDING MATERIAL PRICES SARAWAK - SIBU

2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Sheet Pile - FSP IIIA, 400mm x 150mm x 13.1mm


13.8 MT 60 Del 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67
(58.4kg/m x 12m L)

Square Hollow Sections - 150mm x 150mm x 4.0mm


13.9 MT 60 Del 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67
(20.20kg/m)

Square Hollow Sections - 150mm x 150mm x 5.0mm


13.10 MT 60 Del 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67
(22.30kg/m)

Square Hollow Sections - 19mm x 19mm x 1.6mm


13.11 MT 60 Del 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67 2,866.67
(0.857kg/m)

14. Plywood

14.1 Plywood-shuttering board, 4 x 8 x 12 mm Piece - 71.67 70.56 70.56 70.56 70.56 70.56 70.56 70.56 70.56 70.56 70.56 70.56

14.2 Mixed Medium Hardword Papan Plank (GMS) 1" x 6" MT - 1,690.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00

14.3 Marine Plywood - 18mm x 4' x 8' (Local Grade) 7 ply Piece 60 Del 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00

14.4 Marine Plywood - 12mm x 4' x 8' (Local Grade) 5 ply Piece 60 Del 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00

14.5 Tego Film Single Sided - 18mm x 4' x 8' (Local Grade) 7 ply Piece 60 Del 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00

Tego Film Single Sided - 12mm x 4' x 8' (BB/CC-Export


14.6 Piece 60 Del 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00
Grade) 7 PLY
Tego Film Single Sided - 18mm x 4' x 8' (BB/CC-Export
14.7 Piece 60 Del 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00
Grade) 9 ply
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 13/18
2017 BUILDING MATERIAL PRICES SARAWAK - SIBU

2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

14.8 Tego Film Single Sided - 12mm x 4' x 8' (Local Grade) 5 ply Piece 60 Del 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00

14.9 Shuttering Board - 18mm x 4' x 8' (Local Grade) 9 ply Piece 60 Del 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00

14.10 Shuttering Board - 18mm x 4' x 8' (Local Grade) 7 ply Piece 60 Del 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00

Shuttering Board - 12mm x 4' x 8' (BB/CC-Export Grade) 5


14.11 Piece 60 Del 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00
ply

14.12 Shuttering Board - 12mm x 4' x 8' (Local Grade) 5 ply Piece 60 Del 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00 1,720.00

15. Timber

15.1 GMS Heavy Hardwood, Balau 1 MT - 2,166.67 2,155.56 2,155.56 2,155.56 2,155.56 2,155.56 2,155.56 2,155.56 2,155.56 2,155.56 2,155.56 2,155.56

15.2 GMS light Hardword, Dark Red Meranti MT - 3,433.33 3,411.11 3,411.11 3,411.11 3,411.11 3,411.11 3,411.11 3,411.11 3,411.11 3,411.11 3,411.11 3,411.11

15.3 GMS Medium Hardword, Kapur MT - 2,400.00 2,433.33 2,433.33 2,433.33 2,433.33 2,433.33 2,433.33 2,433.33 2,433.33 2,433.33 2,433.33 2,433.33

15.4 Scantling Medium Hardword, Kapur MT - 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00

15.5 Scantling Mixed Medium Hardwood MT - 1,441.67 1,442.22 1,442.22 1,442.22 1,442.22 1,442.22 1,442.22 1,442.22 1,442.22 1,442.22 1,442.22 1,442.22

15.6 GMS Heavy Hardwood, Balau 2 MT - 3,400.00 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 14/18
2017 BUILDING MATERIAL PRICES SARAWAK - SIBU

2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

15.7 MLHW 3"x 6"x 8' up - Grade C MT 60 Del 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67

15.8 Timber Plank 2"x 8"x 14' - Grade C MT 60 Del 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67

15.9 MLHW 3"x 4"x 8' up - Mix Wood MT 60 Del 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67

15.10 MLHW 3"x 5"x 8' up - Grade C MT 60 Del 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67

15.11 MLHW 2"x 4"x 8' up - Mix Wood MT 60 Del 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67

15.12 MLHW 3"x 3"x 8' up - Grade C MT 60 Del 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67

15.13 MLHW 2"x 3"x 8' up - Mix Wood MT 60 Del 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67

15.14 MLHW 2"x 2"x 8' up (Hard Tanalised) Grade C MT 60 Del 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67

15.15 MLHW 2"x 2"x 8' up (Soft Tanalised) Grade C MT 60 Del 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67

15.16 MLHW 2"x 2"x 8' up (Soft) Grade C MT 60 Del 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67

15.17 MLHW 1"x 2"x 8' up - Local / Grade B MT 60 Del 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67

15.18 MLHW 1"x 2"x 8' up - Local / Mix Wood MT 60 Del 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67 3,466.67

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 15/18
2017 BUILDING MATERIAL PRICES SARAWAK - SIBU

2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

16. Glass

16.1 Clear Float Glass 5mm Thk, Local/Imported m2 - 54.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00

16.2 Figure/Obscured Glass 5mm Thk, Local/Imported, Inclusive Cutting m2 - 55.33 56.44 56.44 56.44 56.44 56.44 56.44 56.44 56.44 56.44 56.44 56.44

16.3 Tinted Float Glass 6mm Thk, Local / Imported, Inclusive of Cutting m2 - 70.33 69.44 69.44 69.44 69.44 69.44 69.44 69.44 69.44 69.44 69.44 69.44

17. Ironmongery

CL03-Duraset brand residential grade 3 cylindral knobsets -


17.1 Set 60 Del 49.43 49.43 44.83 44.83 44.83 44.83 44.83 44.83 44.83 44.83 44.83 44.83
PRIVACY-CL0363010

CL03-Duraset brand residential grade 3 cylindral knobsets -


17.2 Set 60 Del 43.33 43.33 45.50 45.50 45.50 45.50 45.50 45.50 45.50 45.50 45.50 45.50
PATIO-CL0363020

CL03-Duraset brand residential grade 3 cylindral knobsets -


17.3 Set 60 Del 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00
PASSAGE-CL0363030

17.4 Concorde 102mm x 76mm x 2.0mm SS hinge SUS 304 Pair 60 Del 45.00 45.00 40.67 40.67 40.67 40.67 40.67 40.67 40.67 40.67 40.67 40.67

CL03- Duraset Brand Residential Grade 3 Cylindrical Knobsets -


17.5 Set 60 Del 43.33 43.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33
ENTRANCE - CL0363000 -

17.6 GERE Heavy Duty Door Closer G803 Set 60 Del 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33

17.7 Leverset (Entrance) Doretti Set 60 Del 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 16/18
2017 BUILDING MATERIAL PRICES SARAWAK - SIBU

2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

18. Roof Insulation

18.1 Single Sided Woven Aluminium Foil (W118) - 1.25m x 48m m2 60 Del 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33

18.2 PGF EWBL 1.10 50mm x 1.22mm x 30m Roll 60 Del 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33

18.3 Double Sided Bubble Foil (B22BA/A-L) - 1.22m x 40m m2 60 Del 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33

18.4 Rockwool Thermal Rock B50, 1200mm (W) x 5000mm (L) x 50mm thick Roll 60 Del 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33

18.5 Double Sided Woven Foil (W228 FR) - 1.25m x 48m m2 60 Del 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33

18.6 Rockwool Thermal Rock B40, 1200mm (W) x 5000mm (L) x 75mm thick Roll 60 Del 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33

18.7 Rockwool Thermal Rock B40, 1200mm (W) x 5000mm (L) x 50mm thick Roll 60 Del 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33

19. Precast Concrete

19.1 RC Square Pile, 150mm x 150mm x 6m - starter with cast iron shoe Piece 60 Del 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33

19.2 RC Square Pile, 200mm x 200mm x 12m - extension Piece 60 Del 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33

19.3 RC Square Pile, 150mm x 150mm x 12m - extension Piece 60 Del 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 17/18
2017 BUILDING MATERIAL PRICES SARAWAK - SIBU

2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

19.4 RC Square Pile, 200mm x 200mm x 6m - extension Piece 60 Del 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33

19.5 RC Square Pile, 200mm x 200mm x 12m - starter with cast iron shoe Piece 60 Del 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33

19.6 RC Square Pile, 150mm x 150mm x 6m - extension Piece 60 Del 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33

19.7 RC Square Pile, 200mm x 200mm x 6m - starter with cast iron shoe Piece 60 Del 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33

19.8 RC Square Pile, 150mm x 150mm x 12m - starter with cast iron shoe Piece 60 Del 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33 47.33

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will