DETOUR FOR ASPHALT ROAD CROSSING

4" HWYH 1080 UG FLOW LINE AND FOC

HWYH 1004

FLAGMAN
TYPE - 1 BARRICADES EVERY 15 METERS

FLAGMAN END OF ROAD 40 KM/HR DETOUR


WORK AHEAD

ROAD END 150 M (TYP.)

150 M (TYP.)
TO HAWIYA PLANT OLD ROAD
TYPE - 2 BARRICADES END OF
DETOUR 40 KM/HR
AHEAD ROAD WORK

Centre line of FOC Centre line of HWYH 1080 Flow line

TYPE - 1 BARRICADES EVERY 15 METERS

HWYH 1080 NATIONAL BUILDING COMPANY


NOTE: WIDTH OF DETOUR ROAD SHALL BE MINIMUM 5.00 METERS, DESCRIPTION: ASPHALT ROAD CROSSING
CONTINUOUS MAINTENANCE AND LIGHTING WILL BE PROVIDED PROJECT: KGW HWYH 1080
DATE: 22 DEC 2016
Controller By: Approved By:
DWG NO.: NBC/HWYH/DWG-1080/001