Sequence of Filling in Ash Dykes - 14.02.2018
Sequence of Filling in Ash Dykes - 14.02.2018
Ash Balance
Sl. Constructio Jan' Feb' March' April' May' June' July'1 August' Sept Oct' Nov' Dec Jan' Feb' March' Apri May June' July' Aug' Sept' Oct' Nov' Dec' Jan' Feb' Mar'2
Activity Description UOM storage capacity as Filling Period April'20
No. n Period 18 18 18 18 18 18 8 18 '18 18 18 '18 19 19 19 l'19 '19 19 19 19 19 19 19 19 20 20 0
Capacity on date
NOTE: After completion of 3rd bund raising of Ash Dyke-IB & II to control the dust emssion the slurry will discharge (for minimum 1 month) in the dyke up to the existing ash level inside the dyke. Then the regular slurry discharge will run after filling
completed in Dyke-IA i.e from August'2018. This flow diagram has been prepared assuming the total ash to be disposed approximately 1.00 Lac/month & 1.5 lacs/month during monsoon period by lean slurry. Balance ash through HCSD system & except
monsoon period ash to be utilised outside as usual.
Sequence of Ash Filling through lean slurry & Bund Raising work of Ash Dykes
Ash
Sl. Constructio May' June' July' Aug' Sep Nov' Dec' Jan' Feb' March' April' May' June' July'1 August' Sept Oct' Nov' Dec Jan' Feb' March' April'
Activity Description UOM storage Filling Period Oct'17 May'19
No. n Period 17 17 17 17 t'17 17 17 18 18 18 18 18 18 8 18 '18 18 18 '18 19 19 19 19
Capacity
Ash
Sl. Constructio May' June' July' Aug' Sep Nov' Dec' Jan' Feb' March' April' May' June' July'1 August' Sept Oct' Nov' Dec Jan' Feb' March' April' June'1 July' August' Sept' Oct' Nov' Dec' Jan' Feb'
Activity Description UOM storage Filling Period Oct'17 May'19 March'20
No. n Period 17 17 17 17 t'17 17 17 18 18 18 18 18 18 8 18 '18 18 18 '18 19 19 19 19 9 19 19 19 19 19 19 20 20
Capacity
Ash
Sl. Activity Constructio Filling March' April' May' June'1 July' August' Sept' Oct' Nov' Dec' Jan'1 Feb' March'1 April' May' June' July' Aug' Sept Oct' Nov' Dec' Jan' Feb' March'
UOM storage
No. Description n Period Period 16 16 16 6 16 16 16 16 16 16 7 17 7 17 17 17 17 17 '17 17 17 17 18 18 18
Capacity
Fil
lin
In progress g
after Pe
Ramatola bund Lacs completion 01.07.2016 to ri
1 2.40
raising 1st phase M3 the capacity 30.10.2016 od
will be 6 Lac Ist
Cum Le
ve
l
Dyke-1A 1st
Lacs 16.03.2015 to 21.03.2016 tobu 1st Raising Filling of Dyke-1A
2 Raising filling up 19.00
M3 15.03.2016 30.10.2016 nd
to lvl 338.0 M Ra
isi 2nd Level bund Raising of Ash Pond-IB & Dyke-II
ng 2nd Raising Filling of Dyke-1B & II
Dyke- IB & Dyke-II
of
2nd Raising Lacs 11.01.2016 to 1.11.2016 to As
3 10.50
filling up to lvl M3 15.10.2016 31.01.2017 h
344.0 M Po
nd
-IA
Dyke-1A 2nd 2nd bund Raising of Ash Pond-IA
Lacs 15 01.11.2016 to 01.02.2017 to 2nd bund Raising filling of Ash Pond-IA
4 Raising filling up
M3 (Approx) 31.01.2017 30.06.2017
to lvl 344.0 M
Ash
Sl. Activity Constructio Filling Dec'1 Jan'1 Feb'1 March' April' May' June'1 July' August' Sept' Oct' Nov' Dec' Jan'1 Feb' March' April' May'
UOM storage
No. Description n Period Period 5 6 6 16 16 16 6 16 16 16 16 16 16 7 17 17 17 17
Capacity
Fil
Dyke-2 Ist raising linIst Raising (Part-II)Dyke-2 Filling
Lacs 21.12.2015 to g
1 filling (Part-II) up 5.50 Completed
M3 20.03.2016 Pe
to lvl 338.0 M
ri Ist Level bund
odRaising of Ash
Dyke-1A 1st Pond-IA
2 Raising filling up
Lacs
19.00
16.03.2015 to 21.03.2016 to 1st Raising Filling of Dyke-1A
M3 15.03.2016 12.10.2016
to lvl 338.0 M
2nd Level bund Raising of Ash Pond-IB &
Dyke- IB & Dyke-II Dyke-II
2nd Raising Lacs 11.01.2016 to 13.10.2016 to
3 10.50
filling up to lvl M3 10.07.2016 31.01.2017
344.0 M
Activity
Sl. Capacit Activity
Activity Description UOM Start Mar'15 Apr'15 May'15 Jun'15 Jul'15 Aug'15 Sep'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Mar'16 Apr'16 May'16 Jun'16
No. y Finish Date
Date