Sequence of Ash Filling & Bund Raising work of Ash Dykes

Ash Balance
Sl. Constructio Jan' Feb' March' April' May' June' July'1 August' Sept Oct' Nov' Dec Jan' Feb' March' Apri May June' July' Aug' Sept' Oct' Nov' Dec' Jan' Feb' Mar'2
Activity Description UOM storage capacity as Filling Period April'20
No. n Period 18 18 18 18 18 18 8 18 '18 18 18 '18 19 19 19 l'19 '19 19 19 19 19 19 19 19 20 20 0
Capacity on date

2nd bund Raising filling of


Ash Pond-IA
Dyke-1A 2nd Raising filling Lacs 15.05.2017 to
1 11.00 4.5 Completed
up to lvl 343.0 M M3 31.07.2018

3rd bund Raising filling of


3rd bund Raising of Ash Pond-IB & II
Dyke-1B & II

Dyke- IB & II 3rd Raising


Lacs 15 20.05.2017 to 01.08.2018 to
2 filling up to lvl 343.0- 349.0 15
M3 (Approx) 31.03.2018 31.05.2019
M

3rd bund Raising of 3rd bund Raising filling of Ash Pond-IA


Dyke-1A
Dyke-1A 3rd Raising filling Lacs 12 01.10.2018 to 01.06.2019 to
3
lvl 343.0- 349.0 M M3 (Approx) 28.02.2019 30.04.2020
2n
d
Le Slurry filling in HCSD starter dyke (Lagoon-I) Bund Raising of HCSD starter dyke
vel (Lagoon-I)
HCSD starter dyke (lagoon- Lacs 25.06.2017 to bu
4 50 Lacs 32 Completed
I) M3 31.03.2019 nd
Ra
isi
ng Construction of embankment in balance portion Slurry filling in HCSD starter dyke (Lagoon-II)
HCSD starter dyke of (Lagoon-II)
(Construction of Lacs 30 lacs 01.04.2018 to 01.04.2019 to As
5 h
embankment/bund in M3 (Approx) 31.12.2018 31.12.2019
balance portion) (Lagoon-II) Po
nd
-IB
& Bund Raising
Dy of Ramatola
Ramatola (approx. 35 lacs Lacs 15.03.2018 to For emergency
6
already filled) last raising M3
3.50 lacs
30.06.2018 purpose ke
-II

NOTE: After completion of 3rd bund raising of Ash Dyke-IB & II to control the dust emssion the slurry will discharge (for minimum 1 month) in the dyke up to the existing ash level inside the dyke. Then the regular slurry discharge will run after filling
completed in Dyke-IA i.e from August'2018. This flow diagram has been prepared assuming the total ash to be disposed approximately 1.00 Lac/month & 1.5 lacs/month during monsoon period by lean slurry. Balance ash through HCSD system & except
monsoon period ash to be utilised outside as usual.
Sequence of Ash Filling through lean slurry & Bund Raising work of Ash Dykes

Ash
Sl. Constructio May' June' July' Aug' Sep Nov' Dec' Jan' Feb' March' April' May' June' July'1 August' Sept Oct' Nov' Dec Jan' Feb' March' April'
Activity Description UOM storage Filling Period Oct'17 May'19
No. n Period 17 17 17 17 t'17 17 17 18 18 18 18 18 18 8 18 '18 18 18 '18 19 19 19 19
Capacity

2nd bund Raising filling of


Ash Pond-IA
Dyke-1A 2nd Raising Lacs 15.05.2017 to
1 11.00 Completed
filling up to lvl 343.0 M M3 30.11.2017

3rd bund Raising of Dyke-1B & II


3rd bund Raising
Dyke- IB & Dyke-II 3rd filling of Ash Pond-IB & II
Lacs 15 20.05.2017 to 01.12.2017 to
2 Raising filling up to lvl
M3 (Approx) 30.11.2017 31.07.2018
343.0- 350.0 M

3rd bund Raising of Dyke-1A 3rd bund Raising filling of


Ash Pond-IA
Dyke-1A 3rd Raising Lacs 12 01.12.2017 to 01.08.2018 to
3
filling lvl 343.0- 350.0 M M3 (Approx) 31.05.2018 28.02.2019 No Dyke for bottom
2n ash filling
d
Le
vel
bu
NOTE: This flow diagram has been prepared assuming the total ash disposal approximately 1.65 Lac-1.8 Lac/month.
nd
Ra
isi
ng
of
As
h
Po
nd
-IB
&
Dy
ke
-II
Sequence of Ash Filling through lean slurry & Bund Raising work of Ash Dykes

Ash
Sl. Constructio May' June' July' Aug' Sep Nov' Dec' Jan' Feb' March' April' May' June' July'1 August' Sept Oct' Nov' Dec Jan' Feb' March' April' June'1 July' August' Sept' Oct' Nov' Dec' Jan' Feb'
Activity Description UOM storage Filling Period Oct'17 May'19 March'20
No. n Period 17 17 17 17 t'17 17 17 18 18 18 18 18 18 8 18 '18 18 18 '18 19 19 19 19 9 19 19 19 19 19 19 20 20
Capacity

2nd bund Raising filling of


Ash Pond-IA
Dyke-1A 2nd Raising Lacs 15.05.2017 to
1 11.00 Completed
filling up to lvl 343.0 M M3 30.11.2017

3rd bund Raising of Dyke-1B & II


(Stage-I) 3rd bund Raising
Dyke- IB & Dyke-II 3rd filling of Ash Pond-IB & II (Stage-I)
Lacs 15 20.05.2017 to 01.12.2017 to
2 Raising filling up to lvl
M3 (Approx) 30.11.2017 31.07.2018
342.0- 347.0 M (Stage-I)

3rd bund Raising of Dyke- 3rd bund Raising filling of


Dyke-1A 3rd Raising 1A (Stage-I) Ash Pond-IA (Stage-I)
Lacs 12 01.12.2017 to 01.08.2018 to
3 filling lvl 343- 347.0 M
M3 (Approx) 31.05.2018 28.02.2019
(Stage-I)
2n
d
Le 3rd bund Raising filling of Ash
Dyke- IB & Dyke-II 3rd vel 3rd bund Raising of Pond-IB & II (Stage-II)
Lacs 8 01.10.2018 to 01.03.2019 to bu
4 Raising filling lvl 347.0- Dyke-1B & II (Stage-II)
351 M (Stage-II)
M3 (Approx) 28.02.2019 31.07.2019 nd
Ra
isi
ng 3rd bund Raising of 3rd bund Raising filling of No Dyke for bottom
Dyke-1A 3rd Raising of Dyke-1A (Stage-II) Ash Pond-IA (Stage-II) ash filling
Lacs 8 01.03.2019 to 01.08.2019 to As
5 filling up to lvl 347.0-351
M (Stage-II)
M3 (Approx) 30.06.2019 31.12.2019 h
Po
nd
-IB
&
Dy
NOTE: This flow diagram has been prepared assuming the total ash disposal approximately 1.65 Lac-1.8 Lac/month.
ke
-II
Sequence of Ash Filling & Bund Raising work of Ash Dykes

Ash
Sl. Activity Constructio Filling March' April' May' June'1 July' August' Sept' Oct' Nov' Dec' Jan'1 Feb' March'1 April' May' June' July' Aug' Sept Oct' Nov' Dec' Jan' Feb' March'
UOM storage
No. Description n Period Period 16 16 16 6 16 16 16 16 16 16 7 17 7 17 17 17 17 17 '17 17 17 17 18 18 18
Capacity
Fil
lin
In progress g
after Pe
Ramatola bund Lacs completion 01.07.2016 to ri
1 2.40
raising 1st phase M3 the capacity 30.10.2016 od
will be 6 Lac Ist
Cum Le
ve
l
Dyke-1A 1st
Lacs 16.03.2015 to 21.03.2016 tobu 1st Raising Filling of Dyke-1A
2 Raising filling up 19.00
M3 15.03.2016 30.10.2016 nd
to lvl 338.0 M Ra
isi 2nd Level bund Raising of Ash Pond-IB & Dyke-II
ng 2nd Raising Filling of Dyke-1B & II
Dyke- IB & Dyke-II
of
2nd Raising Lacs 11.01.2016 to 1.11.2016 to As
3 10.50
filling up to lvl M3 15.10.2016 31.01.2017 h
344.0 M Po
nd
-IA
Dyke-1A 2nd 2nd bund Raising of Ash Pond-IA
Lacs 15 01.11.2016 to 01.02.2017 to 2nd bund Raising filling of Ash Pond-IA
4 Raising filling up
M3 (Approx) 31.01.2017 30.06.2017
to lvl 344.0 M

2nd Level bund Raising of Ash Pond-


IB & Dyke-II (Part-II) 3rd bund Raising of Dyke-1B & II 3rd bund No Dyke for bottom ash filling
Dyke- IB & Dyke-II Raising
Lacs 9 01.02.2017 to 01.06.2017 to filling of Ash
5 3rd Raising filling
up to lvl 349.0 M
M3 (Approx) 31.05.2016 31.08.2017 Pond-IB & II

2nd Level bund Raising of Ash Pond-IB & Dyke-II


163 Hact. Starter
Lacs 40 Lac 12.05.2016 to 11.02.2017 to
6 Ash Dyke (HCSD)
M3 Cum 10.02.2017 30.04.2019
System

3rd bund Raising filling of Ash


Dyke-1A 3rd Pond-IA
Lacs 10 01.10.2017 to 01.01.2018 to
7 Raising filling up
M3 (Approx) 31.12.2017 31.03.2018
to lvl 349.0 M

2nd Level bund Raising of Ash Pond-


IB & Dyke-II (Part-II)
Sequence of Ash Filling & Bund Raising work of Ash Dykes

Ash
Sl. Activity Constructio Filling Dec'1 Jan'1 Feb'1 March' April' May' June'1 July' August' Sept' Oct' Nov' Dec' Jan'1 Feb' March' April' May'
UOM storage
No. Description n Period Period 5 6 6 16 16 16 6 16 16 16 16 16 16 7 17 17 17 17
Capacity
Fil
Dyke-2 Ist raising linIst Raising (Part-II)Dyke-2 Filling
Lacs 21.12.2015 to g
1 filling (Part-II) up 5.50 Completed
M3 20.03.2016 Pe
to lvl 338.0 M
ri Ist Level bund
odRaising of Ash
Dyke-1A 1st Pond-IA
2 Raising filling up
Lacs
19.00
16.03.2015 to 21.03.2016 to 1st Raising Filling of Dyke-1A
M3 15.03.2016 12.10.2016
to lvl 338.0 M
2nd Level bund Raising of Ash Pond-IB &
Dyke- IB & Dyke-II Dyke-II
2nd Raising Lacs 11.01.2016 to 13.10.2016 to
3 10.50
filling up to lvl M3 10.07.2016 31.01.2017
344.0 M

Dyke-1A 2nd 10.50


Lacs 01.10.2016 to 01.02.2017 to
4 Raising filling up (Approxm 2nd bund Raising of Ash Pond-IA
M3 31.01.2017 31.05.2017
to lvl 344.0 M ately)

2nd Level bund Raising of Ash Pond-


IB & Dyke-II (Part-II)
TIRODA ASH DYKE

Activity
Sl. Capacit Activity
Activity Description UOM Start Mar'15 Apr'15 May'15 Jun'15 Jul'15 Aug'15 Sep'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Mar'16 Apr'16 May'16 Jun'16
No. y Finish Date
Date

1 Dyke-1A initial filling Lacs M3 5.34 Almost Full

2 Dyke-1A raising Lacs M3

3 Dyke-1B initial filling Lacs M3 12.27 31-Jan-14

4 Dyke-1B raising Lacs M3

5 Dyke-2 initial filling Lacs M3 17.75 15-Jul-14

6 Dyke-2 raising Lacs M3

7 Dyke-Ramatola initial filling Lacs M3 10

8 Dyke-Ramatola raising Lacs M3