Mfar Constructions Pvt. Ltd.
422367610.xlsx
2.50
1.00
4.00
Page 2 of 25
ITTINA ABBY
Mfar Constructions Pvt. Ltd.
422367610.xlsx JOB # 030
2. CONCRETE WORKS
2.1.1 Foundation , Footing bases of Coluimns , Plinth beams Cum 1.00 15.00
2.2.1 Footing , Plinth Beams , and column pededtrals Cum. 1.00 10.00
2.2.2 Columns in all Shapes and all Levels Cum. 1.00 6.00
2.2.4 Roof slabs at all levels and heights in any shapes Cum. 1.00 9.00
2.2.9 Retaining wall , Drops , lift wall , Ribs upto 150mm thick Cum. 1.00 9.00
2.2.10 RCC Chajja / Lofts / Kitchen Platform / Counter slabs of 75mm thick Cum. 1.00 10.00
Page 3 of 25
ITTINA ABBY
Mfar Constructions Pvt. Ltd.
422367610.xlsx JOB # 030
2.3.1 Footing , Plinth Beams , and column pededtrals Cum. 1.00 4.00
2.3.4 Roof slabs at all levels and heights in any shapes Cum. 1.00 4.00
Page 4 of 25
ITTINA ABBY
Mfar Constructions Pvt. Ltd.
422367610.xlsx JOB # 030
ONCRETE WORKS
Output Per
Day(8 Hours)
9.00
8.00
150.00
7.50
5.00 74.39
7.50 7.44
7.50 1.49
1.00
7.00
5.00
1.14
8.00
20.00
Page 5 of 25
ITTINA ABBY
Mfar Constructions Pvt. Ltd.
422367610.xlsx JOB # 030
Output Per
Day(8 Hours)
30.00
25.00
30.00
Page 6 of 25
ITTINA ABBY
Mfar Constructions Pvt. Ltd.
422367610.xlsx JOB # 024
3. REINFORCEMENT WORKS
3.1.2 Above 12mm Dia Bar ( For Residential Buildings ) MT 1.00 2.00
REINFORCEMENT WORKS
Output Per
Day(8
Hours)
0.28
0.30
20.00
ITTINA ABBY
Mfar Constructions Pvt. Ltd.
422367610.xlsx JOB # 030
4.1.1 Footing , Plinth Beams , and column pedestrals Sqm. 1.00 2.00
4.1.2 Columns in all Shapes and all Levels Sqm. 1.00 2.00
4.1.4.1 Roof slabs at all levels and heights in any shapes - shuttering Sqm. 1.00 2.00
-
4.1.4.2 Sqm.
deshuttering
4.1.5 Sloped Chajja , Pardi Gutter Beam Concrete Sqm. 1.00 1.00
4.1.9 Retaining wall , Drops , lift wall , Ribs upto 150mm thick Sqm. 1.00 1.00
4.1.10 RCC Chajja / Lofts / Kitchen Platform / Counter slabs of 75mm th Sqm. 1.00 1.00
4.1.15 Scaffolding using horizontals and verticals pipes Sqm. 1.00 1.00
4.2.2 Columns in all Shapes and all Levels Sqm. 1.00 1.00
4.2.9 Retaining wall , Drops , lift wall , Ribs upto 150mm thick Sqm. 1.00 1.00
Output Per
Day(8
Hours)
14.00
15.00 683.84
20.00 56.99
3.80
20.00 1053.20
52.66
5.00 26.33
15.00 2.63
5.00
4.00
10.00
5.00
10.00
15.00
10.00
50.00
5.00
10.00
ITTINA ABBY
Mfar Constructions Pvt. Ltd.
422367610.xlsx JOB # 030
4.00
20.00
8.00
Project : Ittina Abby
Mfar Constructions Pvt. Ltd.
422367610.xlsx Job No. 30
5. MASONRY WORKS
5.2.2 Granite / Size Stone Masonry for plinth Cum 1.00 1.00
5.2.14 Extra over 5.2.1 for rough dressing in one side No 1.00
5.2.16 Extra over 5.2.1 for rough dressing in both sides No 1.00
5.2.19 Design Work in 4" /6" Block for Elevation Treatment Sqm 1.00 1.00
5.2.20 Shifting Blocks From Storage Area to Upper floors Per No. 1.00
Page 13 of 25
Project : Ittina Abby
Mfar Constructions Pvt. Ltd.
422367610.xlsx Job No. 30
Page 14 of 25
Project : Ittina Abby
Mfar Constructions Pvt. Ltd.
422367610.xlsx Job No. 30
5. MASONRY WORKS
Output Per
Day(8 Hours)
2.00
2.00
1.70
8.50
8.50
1.50
1.90
9.50
9.50
30.00
20.00
15.00
5.00
40.00
Page 15 of 25
Project : Ittina Abby
Mfar Constructions Pvt. Ltd.
422367610.xlsx Job No. 30
6. Plastering Works
Page 16 of 25
Project : Ittina Abby
Mfar Constructions Pvt. Ltd.
422367610.xlsx Job No. 30
Page 17 of 25
Project : Ittina Abby
Mfar Constructions Pvt. Ltd.
422367610.xlsx Job No. 30
6. Plastering Works
Output Per
Unskilled Day(8
Hours)
1.00 15.00
1.00 12.00
1.00 7.50
1.00 9.50
1.00 10.00
1.00 35.00
1.00 25.00
1.00 35.00
1.00 3.00
Page 18 of 25
Project : Ittina Abby
Mfar Constructions Pvt. Ltd.
422367610.xlsx Job No. 30
Output Per
Unskilled Day(8
Hours)
1.00 7.00
Page 19 of 25
Project : Ittina Abby
Mfar Constructions Pvt. Ltd.
422367610.xlsx Job No.: 30
Page 20 of 25
Project : Ittina Abby
Mfar Constructions Pvt. Ltd.
422367610.xlsx Job No.: 30
Output Per
Day(8
Hours)
10.00
20.00
20.00
10.00
Page 21 of 25
ITTINA ABBY
Mfar Constructions Pvt.Ltd 422367610.xlsx
JOB#030
9. PAINTING WORKS
30.00
20.00
20.32
36.60
15.00
30.00
Project : Ittina Abby
Mfar Constructions Pvt. Ltd.
422367610.xlsx Job No: 30
With Tools
Page 24 of 25
Project : Ittina Abby
Mfar Constructions Pvt. Ltd.
422367610.xlsx Job No: 30
Output Per
Day(8 Hours)
4.00
4.00
14.00
9.15
5.00
15.00
20.00
20.00
18.00
75.00
50.00
30.00
30.00
Page 25 of 25