Transmission Tower Erection is one of very serious construction activities

of Transmission Power system. In here we are discussing about the erection of tower
in high voltage transmission line. In our previous articles we have discussed about the
distribution line towers. Today we are plan to discuss on the safety measures which
need to perform while the erection of transmission towers.
As earlier said the construction and erection of transmission tower are one of really
important and major construction activity in electrical energy industry. So it is really
essential to have better safety measure to perform such tasks. In here we have
described some safety actions which we can perform while erection of transmission
towers.

1. The loading and unloading of the tower part should done very carefully and
systematically. When it’s perform by manually the respect person should
wear suitable safety gloves.

2. In most case the tower part are supplied by bottom to top of the tower. So
there should be some special and clear signalling or communication between
the persons who supply tower parts.

3. If any lifting equipment are used to lift such tower parts the lifting equipment
must test according to the standard loads.

4. The derrick which use before the erection of transmission tower need to
especially check for the respect strength and size.

5. It is better to avoid all activities of tower erection in rainy days to avoid any
hazards.

6. In heavy cloudy and lightning days it’s also better to avoid activities related
to tower erection to avoid lightning hazards which can potentially cause.

7. The person who work under tower erection work should equiped with all
safety tools such as, Safety belts, safety shoes, Helmets etc.
8. It is really essential to use safety belt which fitted to tower when that person
climbing into the tower.

9.The tower members are need to connect with the correct size of the nuts and bolts of
the sections of tower.

10. When unexpected heavy wind or storm it is really essential to take the
mitigatory measure for sudden causes. Every person who work near such
tower line should immediately walk away from the tower line to eliminate the
potential hazards.

11. A strong rope should use for guying and lifting items (Better to use
polypropylene rope) . After 5 time check the condition of the rope which use
. When the rope is not under good condition its should be immediately reject.
Even this activity fall into the electrical power system all the necessary safety
measures which need to consider on any construction activity need to apply for this
Transmission Tower Erection too.