FOR CONSTRUCTION

SCHEDULE NO. 05 SCHEDULE NO. 06


CONCEALED FAN COIL UNITS EXPOSED FAN COIL UNITS
NOTES:

KEY PLAN

PLOT BOUNDARY LINE PLOT BOUNDARY LINE

A B C
SCHEDULE NO. 07
EXPOSED FAN COIL UNITS PLOT BOUNDARY LINE

SCHEDULE NO. 09 2 15/12/2016 AS CLOUDED A.R.


PUMPS SCHEDULE 1 25/08/2016 AS CLOUDED A.R.
0 26/06/2016 APPROVED ISSUE A.R.
Revision Date Revision Subject Approved

Job #
Designed
M.K.S./V.K./P.P.
D14114-0100D Drawn V.B./M.S.
Date
26/06/2016 Checked A.R.
Scale
NTS Approved
D.K.

Project Name:

DESIGN AND TD FOR


MBR DUBAI HILLS

MULBERRY PHASE III


SITE (PA-17_04)
30,859.09
SQM.

SCHEDULE NO. 14 AL KHAIL ROAD

CHEMICAL TREATMENT UNITS


PLOT NO. :PA_17_04 PROPOSED
COMMERCIAL

-
DEVELOPMENT

LOCATION : DUBAI
-

SCHEDULE NO. 10 CLIENT: Emaar Properties PJSC


SCHEDULE NO. 11 SCHEDULE NO. 12 SCHEDULE No. 13 P.O.Box 9440
HEAT EXCHANGER AIR SEPARATOR EXPANSION TANKS PRESSURIZATION UNIT Dubai
United Arab Emirates

OWNER: Emaar Properties PJSC


P.O.Box 9440
Dubai
United Arab Emirates

CONSULTANT:

SCHEDULE NO. 15
LPG PRV DETAILS

SUB-CONSULTANT:

DRAWING TITLE:

D14114-0100D MBR TD MH 603 2


PROJECT NO. BUILDING TYP PHASE TRADE SHEET NUMBER REV