CONDITIONS OF USE:
GET
Engenheiros Consultores
de
Alfredo Costa Pereira e Raul Vasconcelos Bessa
AZ76 Consultores
de Investimentos
e Engenharia, Lda
KEY PLAN
6
4 5
STAIR
2
FFL - 04.500
SSL - 04.500
3 1
KEY ELEVATION
NOTES
01 - Refer to relevant sections of the Particular Specification / Plumbing
and Public Health.
11 - Information for hatched area in abeyance.
13 - Area subject to future F&B change.
SSL - 06.900
14 - Area subject to future SPA change.
15 - Area of future single storey extension.
SSL - 06.900
Core 2.5
STAIRCASE SC2.06
FFL - 04.500
SSL - 04.500
CORRIDOR
PLANT ROOM
F
Core 1.2
FFL - 04.500
CARPARK RAMP
SSL - 04.500
PLANT ROOM
FFL - 04.500
SSL - 04.500
STAIRCASE SC1.02
CARPARK RAMP
CONSTRUCTION ISSUE
E 20/03/2018 General Amendment JN PM
CONSTRUCTION ISSUE
D 14/09/2017 Minor Amendments JN PM
CONSTRUCTION ISSUE
C 16/05/2016 Minor Amendments JN PM
CONSTRUCTION ISSUE
G B 07/09/2015 Installation Details JN PM
CONSTRUCTION ISSUE
A 07/10/2014 Detailed Distribution JN PM
FFL - 04.500
Rev Date Issue Dwn Ckd
SSL - 04.500 - 04.350 - 04.500
STATUS
- 04.333 - 04.180
FOR CONSTRUCTION
PROJECT
WATERFRONT
COLOMBO
SRI LANKA
DISCIPLINE
DRAWING TITLE
FIRE PROTECTION
BUILDING 1
FFL - 04.500 LEVEL B1 CEILING PLAN - CENTRE
SSL - 04.500
H
Date Drawing No Revision
19.06.2014
Scale
1:100 @ A0
BS Job No
P-11301 E
1090
CAD File Name
P-11301_E.dwg
c