32 33 34 35 36 37 38

75655

1030 12000 12000 12000 12000 12000 12000 2625 1500

750 750

2 1 75 75
...026 ...025 C-1
E N.T.C.= 0.000 REC REC
...035 D-3

75
1040 1500 5250 5250 5250 5250 5250
C-1 5250
N.T.C.= 0.000 N.T.C.= 0.000 N.T.C.= 0.000 N.T.C.= 0.000
750 1875 1875 750 750 1875 1875 750 750 1875 1875 750 750 1875 1875 750 750 1875 1875 750 D-3 750 1875 1875 750
750 750 N.T.C.= 0.000 N.P.T.= 0.000 ( • ) 48 #8
D-3
1 D-3 E #4 @20

750
...026 3 D-3

1500

1500

1500

1500

1500
N.T.C.= 0.000

1210
E #4 @20

1500
...026 N.T.C.= 0.000
N.T.C.= 0.000
D-3
3200

1160 1160

1500
1210 1160 1330 CT-2 CT-2 1160 CT-2
=

2690
=

2740

2740

2740
1160

2450

2450
== MURO N.T.C.= -0.850 MURO CT-2 1160 = MURO

3440
N.T.C.= 0.000 CT-2A E #4 @20
CT-2 EXISTENTE EXISTENTE = CT-2 = EXISTENTE

4440

4440
CT-2 CT-2
CT-2 N.T.C.= -0.850

8450
E #4 @20

700
1400 750

750
N.T.C.= 0.000

6950

2200

2200
2150

2150

2150

2150

2150

2150
CT-2

450
1160 250

450

450

450
=
4500

4500
N.T.C.= -0.850

3800
N.T.C.= -0.850
E #4 @20

2800

2800
N.T.C.= -0.850 CT-2 CT-2
2350

2350

2350

2350

2350

2350
2350
N.T.C.= 0.000
N.T.C.= 0.000 MURO EXISTENTE /
B2

9000
CT-2 EXISTING WALL
N.T.C.= 0.000

10500
9000
N.T.C.= -0.850
1435

1435

1435

1435

1435

1435
C ARMADO DE

6850

6850

2250
8300
...030
6850

CONTRATRABE
9000

N.T.C.= -0.850

9000

9000
8550
N.T.C.= -0.850
N.T.C.= 0.000

225
N.T.C.= 0.000
4500

4500
FRAMED COLUMN C-1
2315

N.T.C.= 0.000

3065

3065

3065
N.T.C.= -0.850

6200

6200

8300
CB-S18 N.T.C.= -0.850 1 : 25
ARMADO DE COLUMNA C-1

4765

4765

3700
750

8550
N.T.C.= -0.850
N.T.C.= -0.850
CB-S18 CB-S16A N.T.C.= -0.850
N.T.C.= -0.850
CB-S16B

200
B2 CB-S16B

CB-S16C
CB-S16C
CB-S16D
1160 170

1030 800 2700 1625 1000 1000 1625 1625 200 1600 200 1625 1625 1000 1000 1625 1625 200 1600 200 1625 1625 2000 1625 2055 1000 1000 1625 580 580
RUN OUT SLAB
4730 5675 5250 6750 5250 6750 5250 6750 5250 6750 5250 6320 5680 75 75
+/-0.000 +/-0.000
REC REC

75
PLANTA DE UBICACIÓN DE CABEZALES EJE B2 - 32,38
1 : 150

850
( • ) 12 #10
CT-2

B2 ( • ) 20 AD #6

9425
Acero faltante E #4 @15

685 2350 1400 3490 460 1040


12 #10 ARMADO CB-S16A
CT-2 GR #4 @15

2450
N.T.C.= 0.000 E #4 @15
+/-0.000 +/-0.000

Acero colocado CB-S16A

1600
850

E #4 @15
ARMADO CABEZAL / ACERO DE CONTRATRABE
FRAMED PILE CAP 5 #10 CT-2 / FRAMED
FOUDATION BEAM ( • ) 20 AD #6
N.T.C.= -0.850
( • ) 5 #10

REC
100
2450

GR #4 @15
CT-1 ACERO CT-1

2 SECCION
WH.71.20-Z_ZPS 026 1 : 25
1600

ACERO DE CABEZAL /
FRAMED PILE CAP
EJE
750 1875 1875 750
N.T.C.= -2.450
5250

75 75
VER DETALLE DE CB-S16B 5 #10 REC REC
CT-1/ SEE CT-1

REC
75
DETAIL ARMADO PILA
PLANTILLA DE CONCRETO
/ FRAMED PILE D-3
ARMADO PILA/ f´c=100kg/cm2 e=5cm
PILE FRAMED
D-3

750
DEMOLICIÓN DE MURO EXISTENTE CON
HERRAMIENTA MANUAL DE BAJO
IMPACTO RECUPERANDO ACERO DE
PILA/PILE PILA/PILE REFUERZO PARA UNIR A CABEZAL /
DEMOLITION OF EXISTING WALL WITH
LOW IMPACT HAND TOOLS KEEP

1500
REINFORCEMENT REBAR.
N.T.C.= -3.800

460
( • ) 48 #8
ACERO PRINCIPAL DE D-1 SE

90 200
CONECTARA CON ACERO DE

REC
PARRILLA DE LOSA EXISTENTE

75
CON GANCHO A 180° / MAIN
REBAR OF D-1 WILL BE E #4 @20 GR #4 @20 ( • ) 32 #8 E #4 @20 MURO EXISTENTE
( • ) 48 #8 E #4 @20
CONNECTED WITH EXISTING E #4 @20 E #4 @20

1 SECCION SLAB REBAR EXISTINF WITH


ESCARIFICACIÓN DE LOSA
EXISTENTE CON HERRAMIENTA E #4 @20
E #4 @20 E #4 @20 E #4 @20 E #4 @20
WH.71.20-Z_ZPS 021 1 : 25 HOOK AT 180° . MANUAL HASTA DESCUBRIR ACERO
EXISTETE

Notas/Notes: 5. Para sistema de anclaje se deberá trabajar este documento conjuntamente con

1. Materiales/ Materials:
documentos/ For anchorig system should be work this document together with
documents:
FRAMED COCRETE REINFORCEMENT SQUARE D-3
1 : 25
a) Concreto con resistencia a sulfatos/ C.7WYO.WH.72.20-S_SBG003/ SERIE
Concrete with sulphates resistance. f'c=280 kg/cm2 6. Para pilas ver planos/ For piles foundations see drawing
b) Acero de refuerzo longitudinal/ Reinforcement steel: fy=4200 kg/cm2 C.7WY0.WH.71.20-Z_ZPS001/SERIE Notas / Notes
c) Concreto para plantillas/ Concrete screed: f'c= 100kg/cm2 7. La especificacion de los componentes y la fijación (soldadura) del sistema de Rev. Modificación/Modification contents Fecha/Date Dibujó/Made by Revisó/Checked by
2. Recubrimiento libre 7.5 cms., medidos a partir del paño exterior del refuerzo tierras en columnas metalicas de nave será alcance de la ingeniería eléctrica de 1. Dimensiones en milímetros excepto donde se indique lo contrario/ Dimensions in millimeters except where A ISSUED FOR REVISION 18/12/18 KERC EAG
principal./Free coating 7.5 cm., measured from the outer cloth of the main este proyecto./ The components specification and the fixation (welding) of the indicated otherwise. 00 APPROVED FOR CONSTRUCTION 19/12/18 MIR EAG
reinforcement. grounding in steel structural columns will be the scope of the electrical engineering
3. El tamaño máximo del agregado grueso será de 19 mm./The maximum size of of this project. 2. Coordenadas y niveles en metros/ Coordinates and levels in meters.
the coarse aggregate will be 19 mm. 3.El nivel +-0.00 corresponde al nivel +4.75 m.s.n.m./Plant +-0.00=4.750 above sea level.
4. Se deberá prestar atención al M.A.C. especificado en planos de pilas de cada
zona/ Should be put attention to MAC specified in pile plans of each zone. Study
Customer Doc. No.: CU-LOGO
2017. In plans:
C.7WY0.WH.71.20-Z_ZPS001 to C.7WY0.WH.71.20-Z_ZPS008
C.S.-C.7WY0
Eje N.T.C.= VARIABLE DETAILING HOOK
Longitud de gancho estándar (ACI318)
Standard hook length (ACI318)
DIMENSION A OR G Nomenclatura / Abreviation: Project: Sub Supplier:
Ganchos de extremo recomendados / Recommended end hooks CN Canal/ Flume CT Contratrabe/Foundation Beam CROQUIS DE LOCALIZACIÓN / KEY PLAN AMLC Sub Supplier
D= Diametro final de curva / D= Finished bend diameter MR Muro de tabique refractario/ Refractories Wall MC Muro de concreto/Concrete Wall Doc No:
Ld Plant: Date Name
Gancho de 180°/180° degree hook Gancho de 90°/90° MB Muro de mampostería/ Mansonry Wall C Columna/Column
PROYECCIÓN DE Longitud de empalme (ACI318-14 Tabla 25.5.2.1)/ HOT STRIP MILL
d

D
J

CABEZAL/PILE CAP degree hook (Ld) DL Dala de concreto/ Simple Beam B Base/Base Made by 18/12/18 KERC
Overlap long (ACI318-14 Table 25.5.2.1) # Varilla/# Rebar D, in (mm)

26°4
PROJECTION ES Embebido/ Steel embedded L Losa/Slab Area: Checked by 18/12/18

2'36''
EAG

N
X= 666.00

A or G, ft-in (mm) J, ft-in (mm) A or G, ft-in (mm)


A25

4d OR . # Varilla/# Rebar Longitud de empalme/ T Trabe/ Beam Concrete TB Tableta de concreto/ Concrete Covering 18H
CIVIL WORKS Approved by 18/12/18 JDBC
180° Overlap long (Ld) 3 2 1/4 (60) 5 (125) 3 (80) 6 (155)
17H

C LF URN ACE
N.C.S.= VARIABLE 2 1/2 in (60 mm) MIN K Castillo/ Simple Column ZN Zuncho/Rebar hoop
16H

15H

3 64.8 cm 4 3 (80) 6 (155) 4 (105) 8 (200)


14H

Equiment: Material
D Dado/ Concrete Reinforcement Square E Estribo/Stirrup
BAY FOUNDATION HSM
13H

12H

4 86.4 cm 5 3 3/4 (95) 7 (180) 5 (130) 10 (250) Mass (kg)


A15a 11H 2K 3K 4K 5K 6K 7K

Z Zapata/ Individual footing F Grapa/ Cross ties


C L CH AR GING
10H
A14

DETAILING
X= 812.20
9H
HB
A13

Sub-Group:
8H

5 108.0 cm 6 4 1/2 (115) 8 (205) 6 (155) 1-0 (300) P Pila/Pile Foundation H.M.E. Hueco en muro eléctrico/Wall hole for electrical services
Ca Cb
X= 831.00

Security Level
B4 A12 B4
7H

DIMENSION
4E HA
A11

6H

CIMENTACIÓN/
A10 3E J1
X= 856.00 1K
B3 B3

CB Cabezal/ Header H.M.T. Hueco en muro tuberías/Wall hole for piping


2E 5H

6 129.6 cm 7 5 1/4 (135) 10 (250) 7 (175) 1-2 (375)


C L MILL 1E

Status
4H

FOUNDATION
X= 884.50
B2 B2 3H

PL Placa/Plate H.L.E. Hueco en losa eléctrico/Floor hole for electrical services


2H

7 188.2 cm 8 6 (155) 11 (275) 8 (205) 1-4 (425)


B1b B1b
J2

1H

Drawing Name DEEP FOUNDATION / DETAILS OF PILE CAPS Document


B1

VER NOTA 8
X= 919.60 1J 61J
B1
RA RB RC

TR Trinchera/Trench H.L.T. Hueco en losa tuberías/Floor hole for piping


22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

8 215.1 cm 9 9 1/2 (240) 1-3 (375) 11 3/4 (300) 1-7 (475)


I1

A1
X= 958.00
Type
RG Registro/Cable Duct Manhole N.T.C. Nivel tope de concreto/Top level of concrete
d

Y= 1255.00

Y= 1295.00

Y= 1335.00

Y= 1391.50

Y= 1393.50

Y= 1449.00

Y= 1499.00

Y= 1556.50

Y= 1566.50
9 242.0 cm 10 10 3/4 (275) 1-5 (425) 1-1 1/4 (335) 1-10 (550)
A OR G

12

ESC Escaleras/Stairs N.D.C. Nivel desplante de cimentación/Bottom level of foundation Material No Version
1 2 3a 4 5a 5b 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

Scale INDICADA Size A1


DETALLE A / DETAIL A 10 268.9 cm 11 12 (305) 1-7 (475) 1-2 3/4 (375) 2-0 (600)
1I 83I
12d

BE Banco eléctrico/Conduit Bank N.P.T. Nivel de piso terminado/Elevation at finish Sheet 001 No of Sheets 001
1 : 50 11 295.8 cm 14 18 1/4 (465) 2-3 (675) 1-9 3/4 (550) 2-7 (775)
LC Losa de cimentación/Foundation Slab N.I.H. Nivel inferior de hueco/Bottom level of hole
90° 12 322.7 cm 18 24 (610) 3-0 (925) 2-4 1/2 (725) 3-5 (1050) Nivel/Level ESC: INDICADA Drwg. No. PLM-D: Revision
N.S.A. Nivel superior de armado/Rebar top level
N.I.P. Nivel inferior de pila/ Bottom pile level
N.
N.C.S. Nivel concreto sano/Concrete level not contaminated
0 1.0 2.5 5 10 C.7WY0.WH.71.20-Z_ZPS 025 00

You might also like