Advanced Product Quality Planning

Critical Supplier Status Report Date:

Supplier Project
Location ARM Contact
Supplier Code Part No.
Risk Assessment Part Name
New : Site Technology Process Change Level/Date
Other Risks User Plant(s)

Core Team Members Company/Title Phone/Fax/E-Mail

Build Level Material Quantity No. Concurred


Required Date SRCs Majors

Project Supplier Actual Supplier ARM


APQP Deliverable GYR Need Timing Closure Lead Resp Acceptance Remarks or
Status Date Date Date Initials Complete Assistance Required
1. Project Timeline
2. Preliminary Bill of Materials (BOM) G
3. Customer Inputs / Requirements Y
4. Approved ArvinMeritor P.O. / Contract R
5. Warranty & Quality Mitigation Plan
6. Prioritized Sourcing List / Sourcing Decision
7. Design Review(s)
8. Prototype Control Plans
9. Design FMEA
10. Prototype Builds
11. Design Verification Plan & Report (DVP&R)
12. Production Drawing & Spec. Release
13. Critical Subcontractor APQP Reviews
14. Process Design Review(s)
15. Pre-Launch Control Plan
16. Facilities, Equipment, Tools and Gages
17. Manufacturing Process Flow Chart
18. Process FMEA
19. Team Feasibility Commitment
20. Subcontractor Purchase Orders
21. Subcontractor PPAP Approval
22. Measurement Systems Evaluation
23. Operator Work Instructions
24. Packaging Specifications & Approvals
25. Manufacturing Team Training
26. Production Trial Run
27. Production Control Plan
28. Process Capability Studies
29. Production Validation Plan & Report (PVP&R)
30. Production Part Approval
31. Initial Production Shipment
32. Production Ramp-up Plan
33. Full Production Date

Initial Commitment Approval:


Supplier Project Manager ARM Project Manager
COMMENTS:

GP 7.4.14 F2, Rev. A 1-Jul-2004, APQP Status Report


ArvinMeritor APQP - Critical Supplier Status Report Evidence and Responsibility Matrix

APQP DELIVERABLE DOCUMENTED EVIDENCE


1.        Project Timeline Complete project timeline defining, at a minimum, the Tasks associated with the APQP
Deliverables in this Status Report. Supplier Project Schedule must meet ArvinMeritor's
defined milestones.

2.        Preliminary Bill of Materials (BOM) Preliminary Engineering or Manufacuring Bill of Materials


3.        Customer Inputs / Requirements Complete Customer requirements including Design Criteria, Program Requirements, SQSR
Manual Requirements.
4.        Approved ArvinMeritor P.O. / Contract Supplier P.O. Acknowledgement mailed back to ArvinMeritor (Contract Award Date to be
shown in the Project Schedule).
5.        Warranty & Quality Mitigation Plan Gap Analysis of Past Warranty & Quality Issues, Mitigation Action Plan (or Failure Mode
Analsis - FMA).
6.        Prioritized Sourcing List / Sourcing Decision Approved Sourcing List Planned Sourcing Dates and Subcontractor Leadtimes to be shown in
Project Schedule)
7.        Design Review(s) Final Design Review, prior to Production tooling launch with Minutes and Open Issues
8.        Prototype Control Plans Approved Prototype Control Plans
9.        Design Failure Mode & Effects Analysis (DFMEA) Production Level DFMEA with Pareto of High Severity/High RPN Items and Completed
Recommended Actions
10.      Prototype Builds Prototype Part Delivery and Required Part Documentation per Prototype Purchase Order
(Project Schedule to include Prototype Part Design, Tooling, Manufacture and Assembly).

11.     Design Verification Plan & Report (DVP&R) Approved DVP&R including Test Data and Closure of Design Review Issues
12.     Production Drawing & Specification Release Released Production Drawings and Specifications with Special (SRC, Major, etc.)
Characteristics Identified
13.   Critical Subcontractor APQP Reviews Initial Supplier APQP Status Report Matrix with Open Issues for all Critical to Program
Subcontractors. Supplier APQP Status Reports Samples with Planned Timing Dates, Lead
Responsibility and Program Need Dates.
14.     Process Design Review(s) Final Process Design Review, prior to Production tooling launch with Minutes and Open Issues

15.     Pre-Launch Control Plan Approved Pre-Launch Control Plan


16.     Facilities, Equipment, Tools and Gages Facilities, Equipment, Tools and Gages complete and available (Project Schedule to include
Facilities, Production Equipment/Tools and Gage Design, Fabrication, Qualification and
Installation).
17.     Manufacturing Process Flow Chart Production Level Manufacturing Process Flow Chart
18.     Process Failure Mode & Effects Analysis (PFMEA) Production Level PFMEA with Pareto of High Severity/High RPN Items and Completed
Recommended Actions
19.     Team Feasibility Commitment Completed Team Feasibility Commitment for Production Design (per AIAG APQP Manual)

20.     Subcontractor Purchase Orders P.O's issued to Subcontractors with commitment dates for samples / PPAP
21.     Subcontractor PPAP Approval Completed Critical Supplier APQP Status Report Matrix with Closed Issues and Approved PPAP
for Subcontractor Materials/Parts
22.     Measurement Systems Evaluation Matrix of GR&R, Calibration Results (including Bias, Linearity and Stability) and Approval
Date with Data Analysis Samples

GP 7.4.14 F2, Rev. A 1-Jul-2004, Required Evidence Page 2 of 8


ArvinMeritor APQP - Critical Supplier Status Report Evidence and Responsibility Matrix

APQP DELIVERABLE DOCUMENTED EVIDENCE


23.     Operator Work Instructions Matrix of Work Instructions with Completion Status and Instruction Samples
24.     Packaging Specifications & Approvals Packaging & Labeling Specifications and Evaluation Approvals with contingency packaging
plans
25.     Manufacturing Team Training Manufacturing Team (Operators, Product Auditors, etc.) Training Records

26.     Production Trial Run Production Readiness Audit Results, Process Sign-Off Form or equivalent, Run at Rate Data
and Open Issues Matrix
27.     Production Control Plan Approved Production Control Plan
28.     Process Capability Studies Matrix of Capability Results and Equipment / Tooling Approval Date with Data Analysis
Samples
29.     Production Validation Plan & Report (PVP&R) Approved PVP&R including Test Data
30.     Production Part Approval Process (PPAP) Approved PPAP Package (including ArvinMeritor Approvals, if not approved by the
ArvinMeritor plant to be self-certifying)
31.     Initial Production Shipment Initial Production Shipment completed including trail of ArvinMeritor Releases, EDI/e-Kanban
(if required), ASNs (if required) and Complete Shipping Documentation.
32.     Production Ramp-Up Plan Time period and rates of ramp-up to full production volumes
33.    Full Production Date Production volumes achieved, all issues closed and project targets met
NOTE: A documented supplier Recovery Plan is required for any deliverable rated "Yellow" or "Red".

GP 7.4.14 F2, Rev. A 1-Jul-2004, Required Evidence Page 3 of 8


plier Status Report Evidence and Responsibility Matrix

RESPONSIBILITY GUIDE
CFT = Cross Functional Team
Project Manager & CFT

Product Engineering
Sales

Sales & Project Manager

Product Engineering & Quality

Procurement & Project Manager

Project Manager & CFT


Quality & Product Engineering
Product Engineering & CFT

Project Manager & CFT

Product Engineering & CFT


Product Engineering & CFT

Project Manager & CFT

Project Manager & CFT

Quality & Manufacturing Engineering


Manufacturing Engineering & Quality

Manufacturing Engineering
Manufacturing Engineering & CFT

Project Manager & CFT

Procurement
Project Manager & Quality

Quality & Metrology

GP 7.4.14 F2, Rev. A 1-Jul-2004, Required Evidence Page 4 of 8


plier Status Report Evidence and Responsibility Matrix

RESPONSIBILITY GUIDE
CFT = Cross Functional Team
Manufacturing Engineering
Materials & Logistics

Manufacturing & Human Resources

Quality & Manufacturing

Quality
Quality & Manufacturing

Product Engineering & CFT


Quality

Materials & Logistics

Materials & Logistics


Project Manager & CFT
ble rated "Yellow" or "Red".

GP 7.4.14 F2, Rev. A 1-Jul-2004, Required Evidence Page 5 of 8


Advanced Product Quality Planning
Critical Supplier Status Report Date: A

Supplier B Project F
Location C ARM Contact G
Supplier Code D Part No. H
Risk Assessment E Part Name I
New : Site Technology Process Change Level/Date J
Other Risks User Plant(s) K

Core Team Members Company/Title Phone/Fax/E-Mail


L M N

Build Level Material Quantity No. Concurred


Required Date SRCs Majors
O P Q R S

Project Supplier Actual Supplier ARM


APQP Deliverable GYR Need Timing Closure Lead Resp Acceptance Remarks or
T Status Date Date Date Initials Complete Assistance Required
1. Project Timeline U V W X Y Z AA
2. Preliminary Bill of Materials (BOM) G
3. Customer Inputs / Requirements Y
4. Approved ArvinMeritor P.O. / Contract R
5. Warranty & Quality Mitigation Plan
6. Prioritized Sourcing List / Sourcing Decision
7. Design Review(s)
8. Prototype Control Plans
9. Design FMEA
10. Prototype Builds
11. Design Verification Plan & Report (DVP&R)
12. Production Drawing & Spec. Release
13. Critical Subcontractor APQP Reviews
14. Process Design Review(s)
15. Pre-Launch Control Plan
16. Facilities, Equipment, Tools and Gages
17. Manufacturing Process Flow Chart
18. Process FMEA
19. Team Feasibility Commitment
20. Subcontractor Purchase Orders
21. Subcontractor PPAP Approval
22. Measurement Systems Evaluation
23. Operator Work Instructions
24. Packaging Specifications & Approvals
25. Manufacturing Team Training
26. Production Trial Run
27. Production Control Plan
28. Process Capability Studies
29. Production Validation Plan & Report (PVP&R)
30. Production Part Approval
31. Initial Production Shipment
32. Production Ramp-up Plan
33. Full Production Date

Initial Commitment Approval: AB AC


Supplier Project Manager ARM Project Manager
COMMENTS: AD

GP 7.4.14 F2, Rev. A 1-Jul-2004, Coded Report Form


ArvinMeritor APQP - Key Supplier Status Report Instructions

Suppliers requested to complete this report for a particular project are required to submit updates per the
direction of the ArvinMeritor Project Manager, Buyer or Forward Program Specialist. All blue shaded fields should
be completed by ArvinMeritor before giving the form to the supplier to prepare their initial submittal. All * fields
must be filled in for the initial supplier submittal.

Code Field Instruction


A * Date Enter the current date.
B * Supplier Enter the company name.
C * Location Enter the location of the facility manufacturing the product being supplied to ArvinMeritor.
D * Supplier Code Enter the DUNS number for the facility listed in item C.
E * Risk Assessment This section identifies risk associated with the supplier and/or product. Check the boxes, as
appropriate, for new sites new technology, or new processes. If applicable, briefly describe
other risks and check the box.
F * Project Enter the name of the ArvinMeritor project.
G * ARM Contact Enter the name of the ArvinMeritor Contact that this APQP Critical Supplier Status Report is to
be sent to on a defined periodic basis.
H * Part No. Enter the part number or lead part number for families of parts (ie., same part, different color)
being supplied to ArvinMeritor. For families of parts, attach a list of all part numbers
associated with the lead part number to the status report.
I * Part Name Enter the name of the part (should match print title block).
J * Change Level Enter the latest engineering release notice level and date associated with the lead part
number.
K * User Plant(s) Enter the name of the ArvinMeritor plant(s) to which the lead part number will be shipped for
assembly or manufacture into the next higher system, subsystem or component.
L * Core Team Members Enter supplier's core APQP team members. The first team member to be noted must be the
supplier's project manager.
M * Company / Title Identify the company and title of each core team member.
N * Phone / Fax / Email List each core team member's phone and fax numbers, and email address.
O * Build Level List each prototype, pilot, pre-production, etc. build up to and including the initial production
build required by ArvinMeritor (for initial submittal only required to fill in what Build Levels are
known at that time).
P * Material Required Enter the ArvinMeritor material required date (MRD) for each build listed in item O (for initial
Date submittal only required to fill in what MRDs are known at that time).
Q * Quantity Enter the quantity required to support each build listed in item O. If unknown, put TBD until
known.
R SRCs Enter the number of safety related characteristics (SRCs) concurred with ArvinMeritor for each
build listed in item O.
S Majors Enter the number of major characteristics concurred with ArvinMeritor for each build listed in
item O.
T * APQP Deliverable A list of the APQP documents, tasks and disciplines which must be completed to support an
ArvinMeritor project (Refer to the "Required Evidence" sheet and AIAG APQP Manual for a
complete description of each deliverable and the evidence required for closure).
U G Y R Status Enter G, Y or R, as appropriate. GYR assesses whether the expectations of the deliverable will
be completed in time to meet the project need date.
Red (High Risk): R ratings are given prior to the Project Need Date to indicate a
deliverable will not meet the Project Need Date or quality expectations. R signifies the
project is at risk and needs immediate management attention. Any deliverable not
completed by its Project Need Date must be carry an R rating until the deliverable is
completed.
Yellow (Low Risk): Y ratings are given prior to the Project Need Date to indicate an
deliverable may not meet the Program Need Date or quality expectations. To be considered
Y, a recovery plan must be in place for the deliverable. Y ratings indicate the need for
project management attention. A Y rating can only be given to an deliverable prior to the
Project Need Date.
Green (No Risk): G ratings are given before the Project Need Date to indicate the
deliverable will meet the Project Need Date and will meet all quality expectations. G ratings
given on the Project Need Date indicate the deliverable is complete and meets all quality
expectations listed on the "Required Evidence" sheet and AIAG APQP Manual for that
deliverable. No risk to other deliverables is apparent.
NOTE: The supplier must have a documented Recovery Plan for any deliverable
rated "Yellow" or "Red".
V * Project Need Date Enter the last possible date the deliverable can be completed without adversely affecting
quality, cost or timing of another deliverable or the project itself.
W * Supplier Timing Date Enter the date the deliverable is currently planned to be completed. Whenever timing
changes, there should be comments in the "Remarks" column that explain why the original
date was revised.

GP 7.4.14 F2, Rev. A 1-Jul-2004, Code Instructions Page 7 of 8


ArvinMeritor APQP - Key Supplier Status Report Instructions

Suppliers requested to complete this report for a particular project are required to submit updates per the
direction of the ArvinMeritor Project Manager, Buyer or Forward Program Specialist. All blue shaded fields should
be completed by ArvinMeritor before giving the form to the supplier to prepare their initial submittal. All * fields
must be filled in for the initial supplier submittal.

Code Field Instruction


X Actual Closure Date Enter the date the deliverable was successfully completed. Successful completion means that
all expectations listed on the "Required Evidence" sheet and AIAG APQP Manual for the
deliverable have been met.
Y * Supplier Lead Resp If an deliverable is reported as Yellow or Red, assign the deliverable to a team member and
Initials enter their initials in the box. The responsible engineer's full name and phone number must
be listed in the Core Team Member block.
Z ARM Acceptance For those boxes that are not shaded gray, note the initials of the ArvinMeritor person who
Complete reviewed and accepted the supplier's evidence of completion for that deliverable.
AA Remarks or For any APQP deliverable reported as Yellow or Red, enter a brief remark addressing the
Assistance Required situation. If the original timing has been revised, note the reason for the timing change.

AB Supplier's Initial Signature of supplier's project management to approve that the supplier will meet the
Commitment commitment dates made on the Initial APQP Critical Supplier Status Report.
Approval
AC ArvinMeritor's Initial Signature of ArvinMeritor Project Management that the supplier's commitment dates are
Commitment satisfactory to meet the overall project timing.
Approval
AD Comments Enter any additional comments regarding the status of the project.

GP 7.4.14 F2, Rev. A 1-Jul-2004, Code Instructions Page 8 of 8