Supplier Project
Location ARM Contact
Supplier Code Part No.
Risk Assessment Part Name
New : Site Technology Process Change Level/Date
Other Risks User Plant(s)
11. Design Verification Plan & Report (DVP&R) Approved DVP&R including Test Data and Closure of Design Review Issues
12. Production Drawing & Specification Release Released Production Drawings and Specifications with Special (SRC, Major, etc.)
Characteristics Identified
13. Critical Subcontractor APQP Reviews Initial Supplier APQP Status Report Matrix with Open Issues for all Critical to Program
Subcontractors. Supplier APQP Status Reports Samples with Planned Timing Dates, Lead
Responsibility and Program Need Dates.
14. Process Design Review(s) Final Process Design Review, prior to Production tooling launch with Minutes and Open Issues
20. Subcontractor Purchase Orders P.O's issued to Subcontractors with commitment dates for samples / PPAP
21. Subcontractor PPAP Approval Completed Critical Supplier APQP Status Report Matrix with Closed Issues and Approved PPAP
for Subcontractor Materials/Parts
22. Measurement Systems Evaluation Matrix of GR&R, Calibration Results (including Bias, Linearity and Stability) and Approval
Date with Data Analysis Samples
26. Production Trial Run Production Readiness Audit Results, Process Sign-Off Form or equivalent, Run at Rate Data
and Open Issues Matrix
27. Production Control Plan Approved Production Control Plan
28. Process Capability Studies Matrix of Capability Results and Equipment / Tooling Approval Date with Data Analysis
Samples
29. Production Validation Plan & Report (PVP&R) Approved PVP&R including Test Data
30. Production Part Approval Process (PPAP) Approved PPAP Package (including ArvinMeritor Approvals, if not approved by the
ArvinMeritor plant to be self-certifying)
31. Initial Production Shipment Initial Production Shipment completed including trail of ArvinMeritor Releases, EDI/e-Kanban
(if required), ASNs (if required) and Complete Shipping Documentation.
32. Production Ramp-Up Plan Time period and rates of ramp-up to full production volumes
33. Full Production Date Production volumes achieved, all issues closed and project targets met
NOTE: A documented supplier Recovery Plan is required for any deliverable rated "Yellow" or "Red".
RESPONSIBILITY GUIDE
CFT = Cross Functional Team
Project Manager & CFT
Product Engineering
Sales
Manufacturing Engineering
Manufacturing Engineering & CFT
Procurement
Project Manager & Quality
RESPONSIBILITY GUIDE
CFT = Cross Functional Team
Manufacturing Engineering
Materials & Logistics
Quality
Quality & Manufacturing
Supplier B Project F
Location C ARM Contact G
Supplier Code D Part No. H
Risk Assessment E Part Name I
New : Site Technology Process Change Level/Date J
Other Risks User Plant(s) K
Suppliers requested to complete this report for a particular project are required to submit updates per the
direction of the ArvinMeritor Project Manager, Buyer or Forward Program Specialist. All blue shaded fields should
be completed by ArvinMeritor before giving the form to the supplier to prepare their initial submittal. All * fields
must be filled in for the initial supplier submittal.
Suppliers requested to complete this report for a particular project are required to submit updates per the
direction of the ArvinMeritor Project Manager, Buyer or Forward Program Specialist. All blue shaded fields should
be completed by ArvinMeritor before giving the form to the supplier to prepare their initial submittal. All * fields
must be filled in for the initial supplier submittal.
AB Supplier's Initial Signature of supplier's project management to approve that the supplier will meet the
Commitment commitment dates made on the Initial APQP Critical Supplier Status Report.
Approval
AC ArvinMeritor's Initial Signature of ArvinMeritor Project Management that the supplier's commitment dates are
Commitment satisfactory to meet the overall project timing.
Approval
AD Comments Enter any additional comments regarding the status of the project.