A Lift plan will specify a minimum distance that A) THE ELECTRICITY WILL ARC ESPECIALLY
Health
your jib must be kept away from Overhead lines IN WET WEATHER
16 & 4 b) explain why your jib must be kept away. B) DEATH, ELECTROCUTION OR LIFE
Safety
c) What would happen if contact was made CHANGING INJURIES
State the functions or job role of the A) PLANS THE LIFTS
following personnel: B) SUPERVISES THE LIFTS
Machine a) Appointed Person,
8 Specific 4 b) Crane Supervisor,
C) ATTACHES AND DETACHES THE LOADS
c) Slinger, D) GUIDE THE LOAD AND DIRECT THE
d) Signaller. CRANE OPERATOR
ESCAPE ROUTES
FIRST AID KITS
FIRST AIDERS
Health
List SIX typical subject areas that should be FIRE PROCEDURES
15 & 3 covered in a site induction.
Safety TOILETS
SMOKING AREA
TRAFFIC ROUTES
PEDESTRIAN ROUTES
Machine CAST IN BASE, CRUCIFORM AND RAIL
33 Specific 3 Describe the 3 main type of Tower Crane base
MOUNTED
Machine Why should tools and spare components not be THEY CAN CAUSE TRIPS, INJURIES AND
36 Specific 3 left lying on the decks or landings? DAMAGES BY THEIR FALLING
GIVES AUDIBLE/VISUAL WARNINGS WHEN
Machine What is the main purpose of the Rated Capacity
37 Specific 3 Indicator (RGI)?
THE LOAD IS APPROACHING OR EXCEEDING
THE RATED CAPACITY
If assisting in erecting a tower crane, why is it
Machine TO AVOID ANY INCIDENTS, ACCIDENTS AND
41 Specific 3 important that the manufacturer's procedures are
followed precisely? DAMAGE
Machine What makes up the total (or gross) weight of a THE LOAD, LIFTING ACCESSORIES AND THE
51 Specific 3 load that is to be lifted? HOOK BLOCK
THE LOAD CAN SWING
Machine Name THREE ways in which wind speed can SLOW OR INCREASE THE SLEW SPEEDS
56 Specific 3 affect the lifting operation. SHUT DOWN LIFTING OPERATIONS
CAN PUT THE SLINGER IN DANGER
Two cranes are working in the same vicinity that
Machine encroach the operating radius of each. What COORDINATION BETWEEN THEM AND
60 Specific 3 actions would the lift plan or method statement POSSIBLY LIMITS ON THE SLEW
normally specify?
THE CRANE MUST BE IN GOOD WORKING
Machine When a crane is sent out on hire what condition
74 Specific 3 must the crane be in?
CONDITION, FULLY MAINTAINED WITH A
CURRENT FULL EXAMINATION
Health ENCASE OF HEAD STRIKE WITH TOWER
Why would hard hats (head protection) be
1 & 2 needed when climbinq a tower crane?
FRAME AND FOR FALLING OBJECTS WHILST
Safety
CLIMBING
Health
IDENTIFIES THE POSSIBLE AND PUTS
5 & 2 What is the purpose of a risk assessment?
Safety CONTROL MEASURES ON THEM
Machine Which parts of the crane is the radius (for lifting) FROM CENTER OF THE SLEW RING TO THE
26 Specific 2 measured from? CENTER OF THE HOOK BLOCK
a) Where must the load radius diagram be A) BASE OF THE CRANE
Machine
28 Specific 2 located and B) SWL AT DIFFERENT RADIUS AND
b) what information must it contain? NUMBER OF ROPE FALLS
a) In what environments are luffing units A) IN BUILT UP AND TIGHT AREAS
Machine
31 Specific 2 commonly used and B) THEY CAN JIB UP TO SLEW WITHOUT
b) why? HAVING BUILDINGS UNDER THE LOAD
Machine Name TWO ways that wet weather can affect REDUCE VISIBILITY, THE LOAD CAN BE
49 Specific 2 lifting operations. HEAVIER AND CEASE ANY LIFTS
During the lifting operation, part of the task
cannot be carried out as detailed in the lift plan.
Machine A) MUST STOP
54 Specific 2 a) What initially must happen to the lifting
B) THE AP
operation.
b) who authorises any chanqes?
If a load is slewed rather quickly, what TWO THE LOAD CENTRE MOVES OUTWARDS,
Machine
57 Specific 2 initial effects does it have on the load whilst INCREASE THE RADIUS, LOAD TRAILS THE
slewing? JIB AND MAY SWING
HOOK BLOCK MUST BE CHECKED FOR
Machine If the hook block inadvertently (accidentally) DAMAGE; THE HOIST DRUM AND PULLEYS
59 Specific 2 lands, what course of action should be taken? FOR ROPE CROSS-OVER AND ROPE
ALIGNMENT ON THE PULLEYS
At the end of the shift: A) AS CLEAN AS POSSIBLE
Machine a) how should cab cleanliness be maintained
61 Specific 2 and
B) TO MAINTAIN HYGIENE AND COMFY
b) explain why? WORKING CONDITIONS
Machine What checks should be made to the ground THE GROUND CHECKED DAILY AND
67 Specific 2 conditions and when should these be made? SUPPORT IS MAINTAINED
Machine When should maximum permissible wind speeds WHEN A LOAD HAS A LARGE SURFACE AND
69 Specific 2 be reduced? FOR FOLDING JIBS
BATTERY POWER, SPARE BATTERY, THE
Machine What checks should be made to the transmitter
71 Specific 2 of a remote-controlled tower crane before work?
TRANSMITTING RANGE AND THE CONTROL
FUNCTIONS WORK CORRECTLY
Machine AS A SAFETY MEASURE TO PREVENT THE
73 Specific 2 Why would a load require netting?
LOAD TO FALL
PROOF THAT HE HAS THE SKILL, BETTER
Health
How can a qualification or card benefit a crane PROMOTIONAL PROSPECTS, PROOF THAT
7 & 1 operator?
Safety ARE LEGAL AND AND LEGITIMATE TO THE
OPERATOR CARD
Machine What prevents the hook block from contacting A CUT-OUT SWITCH UNIT ON THE HOIST
24 Specific 1 the jib pulley? DRUM
Machine Apart from the operator, who else may need to SITE MANAGERS, CRANE ENGINEERS, AP'S
27 Specific 1 use the machine's Operator's Manual? AND SLINGERS
Machine What is the purpose of counterweight(s) on the TO BALANCE WEIGHT OF THE LOAD AND JIB
29 Specific 1 crane? AND TO AVOID OVERTURNING
Machine SO THEY CAN TRAVEL AND COVER A
30 Specific 1 Why are some tower cranes rail mounted?
BROADER AREA
Machine If fitted, what is the purpose of the flags situated
35 Specific 1 on the jib?
SHOWS THE RADIUS OF THE CRANE
Machine Apart from lifting using the hook, what other type NONE, TOWER CRANES ARE DESIGNED
47 Specific 1 of work can tower cranes undertake? ONLY FOR VERTICAL LIFTING
Machine THE JIB BENDS WHEN HEAVY LOADS ARE
48 Specific 1 What is jib deflection and when does it occur?
LIFTED
Machine If facing the crane whilst using a remote control
50 Specific 1 what could happen?
WE COULD GO IN THE WRONG DIRECTION
a) How does the number of lines or falls of rope A) MORE LINES, MORE LIFTING CAPACITY
Machine affect the lifting capacity for the crane and LESS LINES, LESS LIFTING CAPACITY
32 Specific b) how is hoist speed affected when the number B) MORE LINES, LESS SPEED
of lines (or falls of rope) is reduced? LESS LINES, MORE SPEED
Name FIVE requirements that must be followed if
Machine
34 Specific accessing the end of the jib for maintenance
purposes.
Name THREE ways that a crane operator can
Machine WORK SAFELY, CAREFULLY, PROFICIENTLY,
42 Specific
contribute in ensuring repeat business with the
FOLLOW LIFT PLANS AND BE RELIABLE
client or principal contractor.
Machine What effect can a swinging load have on a CAN INCREASE THE RADIUS AND AFFECT
53 Specific crane? THE CRANE'S STABILITY
Only two legs of an 8 tonne four-legged chain
Machine
58 Specific sling are being used. 4 TONNES
What is the maximum load that can be lifted?
Machine What problems can be created when operating
64 Specific the crane in high-speed drive?
Machine At the end of the shift what position should the AS PER MANUFACTURER'S REQUIREMENTS
70 Specific trolley and jibs be left in and why? TO ASSIST WITH FREE SLEW