Consolidated values
R $ mi, Apr / 12
Urban mobility
2 380.0 361.0 19.0
1
Code-P2
Document Content
• Stadium
• Urban mobility
• Airport
2
Code-P3
District resource (R
5.3 - - 806.9 *
Intervention type: Reconstruction $ mi)
Capacity: 70,000 places Execution Gov. District Gov. District Gov. District Gov. District
* The figures for executive and environmental certification project are included in the value of works of the stadium. The value already considers the estimated costs (not yet contracted) of: seats, lawn, drainage and irrigation system, visual
and acoustic communication, electronic scoreboards and video screens. NOTE 1: The environment consists of terrace and parking and is not included in the value of the stadium work. NOTE 2: The value of the works of the stadium is
considered the tax exemption regarding the Recopa.
Legend: Recopa - Special Taxation System for Construction, Expansion, Reform or Modernization of Football Stadiums
3
Code-P4
Document Content
• Stadium
• Urban mobility
• Airport
4
Code-P5
DF-047 Expansion
References:
Brasilia
Road National
Pilot Plan Stadium
Hotel sector
modal:
Subway
5
Code-P6
District resource (R
3.0 - - 10.9
Description: Connects the airport to Terminal Asa Sul $ mi)
(TAS)
Federal Funding
Scope: 6.4 km and 5 stations Resource (R $ mi)
- - - 263.0
Responsible: District government
6
Code-P7
Brasilia: DF-047
monitoring April 2012
District resource (R
8.0 - - 4.3
Description: Expanding capacity of DF-047 $ mi)
highway (airport access).
Federal Funding
Scope: 2.1 km and 2 special works of art
Resource (R $ mi)
- - - 98.0
Responsible: District government
7
Code-P8
Document Content
• Stadium
• Urban mobility
• Airport
8
Code-P9
•Investment:
Investment: R $ 6.4 million
¹ Works carried out by Infraero. It does not include the value of environmental licensing, which is defined from the licensing process with the competent environmental agency. ² It is understood as Environmental Permit only essential stage for the start of
work. NOTE: The values for the Basic and projects are contemplated in the South Expansion Project of TPS. Legend: IBRAM - Brasilia Environmental Institute.
9
Code-P10
Federal resource (R $
Project: Operating module - - - 4.6
mi)
¹ basic design value included in the administrative costs of INFRAERO. Note: Executive Project under the
responsibility of the contractor
10
Code-P11
Granting
Executive Subscription
Process Construction
project Agreement
(auction)
Signature Phase
Situation uninitiated completed not Started
Responsible: Federal Government / the Contrato³
Dealer
¹ dates informed by the Administrator / SIA / GOPS to be confirmed after the signing of the contract ² Estimated and informed the
Administrator / SIA / GOPS for execution of Phase 1B
³ The contract signing process involves the analysis phase of the qualification documents, resources, approval and call for contract signing
11