You are on page 1of 103

TENAGA KAPASITAS

ALAT ALAT

(HP) -
No. JENIS PERALATAN KODE
ALAT

HP Cp

1 2 2a 3 4

1. ASPHALT MIXING PLANT E01 315.0 64.0 T/Jam


2. ASPHALT FINISHER E02 55.0 7.3 Ton
3. ASPHALT SPRAYER E03 4.5 985.0 Liter
4. BULLDOZER 100-150 HP E04 145.0 - -
5. COMPRESSOR 4000-6500 L\M E05 55.0 5,200.0 CPM/(L/m)
6. CONCRETE MIXER 0.3-0.6 M3 E06 23.0 575.0 Liter
7. CRANE 10-15 TON E07 140.0 14.5 Ton
8. DUMP TRUCK 3.5 TON E08 110.0 3.5 Ton
9. DUMP TRUCK 10 TON E09 200.0 10.0 Ton
10. EXCAVATOR 80-140 HP E10 135.0 0.8 M3
11. FLAT BED TRUCK 3-4 M3 E11 197.0 9.5 ton
12. GENERATOR SET E12 175.0 134.0 KVA
13. MOTOR GRADER >100 HP E13 138.0 9,500.0 -
14. TRACK LOADER 75-100 HP E14 85.0 0.9 M3
15. WHEEL LOADER 1.0-1.6 M3 E15 100.0 1.2 M3
16. THREE WHEEL ROLLER 6-8 T E16 62.0 7.5 Ton
17. TANDEM ROLLER 6-8 T. E17 84.0 8.0 Ton
18. TIRE ROLLER 8-10 T. E18 105.5 9.7 Ton
19. VIBRATORY ROLLER 5-8 T. E19 83.5 7.5 Ton
20. CONCRETE VIBRATOR E20 6.2 24.0 -
21. STONE CRUSHER E21 215.0 74.0 T/Jam
22. WATER PUMP 70-100 mm E22 7.4 - -
23. WATER TANKER 3000-4500 L. E23 115.0 4,500.0 Liter
24. PEDESTRIAN ROLLER E24 9.2 855.0 Ton
25. TAMPER E25 5.1 135.0 Ton
26. JACK HAMMER E26 0.0 1,250.0 -
27. FULVI MIXER E27 341.0 1,990.0 -
28. CONCRETE PUMP E28 97.0 7.90 M3
29. TRAILER 20 TON E29 172.0 20.00 Ton
30 PILE DRIVER + HAMMER E30 25.5 2.50 Ton
31. CRANE ON TRACK 35 TON E31 132.0 35.00 Ton
32. WELDING SET E32 43.0 220.00 Amp
33. BORE PILE MACHINE E33 175.0 2,500.0 Meter
34. ASPHALT LIQUID MIXER E34 6.2 1,000.0 Liter
KETERANGAN : 1 Tingkat Suku Bunga
2 Upah Operator / Sopir / Mekanik
3 Upah Pembantu Operator/Sopir/Mekanik
4 Harga Bahan Bakar Bensin
5 Harga Bahan Bakar Solar
6 Minyak Pelumas
7 Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lem
8 Khusus AMP, biaya bahan bakar ditambah (untuk peman
9 AMP , Aspal Sprayer, Aspal Distribusi ditambah bahan b
###
ANALISA BIAYA SEWA PERALATAN PER JAM KERJ

HARGA ALAT YANG DIPAKAI NILAI FAKTOR BIAYA PASTI PER JAM
ALAT JAM SISA PENGEM- BIAYA
UMUR KERJA HARGA ALAT BALIAN PENGEM-
ALAT 1 TAHUN ALAT MODAL BALIAN
MODAL
(Tahun) (Tahun) (Jam) (Rp.) (Rp.) - (Rp.)

i(1+i)^A (B - C) x D
(10% X B) ----------- -----------
(1+i)^A-1 W

B A W B' C D e1

5 6 7 8 9 10 11

3,357,000,000 5.0 2,000.0 3,357,000,000 335,700,000 0.16275 245,851.33


2,235,000,000 5.0 2,000.0 2,235,000,000 223,500,000 0.16275 163,681.18
101,000,000 5.0 2,000.0 101,000,000 10,100,000 0.16275 7,396.78
2,315,000,000 5.0 2,000.0 2,315,000,000 231,500,000 0.16275 169,540.02
151,000,000 5.0 2,000.0 151,000,000 15,100,000 0.16275 11,058.55
59,636,000 5.0 2,000.0 59,636,000 5,963,600 0.16275 4,367.47
672,005,000 5.0 2,000.0 672,005,000 67,200,500 0.16275 49,214.57
201,000,000 5.0 2,000.0 201,000,000 20,100,000 0.16275 14,720.32
399,500,000 5.0 2,000.0 399,500,000 39,950,000 0.16275 29,257.55
1,121,500,000 5.0 2,000.0 1,121,500,000 112,150,000 0.16275 82,133.53
214,050,000 5.0 2,000.0 214,050,000 21,405,000 0.16275 15,676.04
442,359,000 5.0 2,000.0 442,359,000 44,235,900 0.16275 32,396.35
2,202,500,000 5.0 2,000.0 2,202,500,000 220,250,000 0.16275 161,301.03
1,140,475,941 5.0 2,000.0 1,140,475,941 114,047,594 0.16275 83,523.24
1,675,500,000 5.0 2,000.0 1,675,500,000 167,550,000 0.16275 122,705.96
304,050,000 5.0 2,000.0 304,050,000 30,405,000 0.16275 22,267.23
1,013,780,000 5.0 2,000.0 1,013,780,000 101,378,000 0.16275 74,244.61
1,419,314,000 5.0 2,000.0 1,419,314,000 141,931,400 0.16275 103,944.07
644,300,000 5.0 2,000.0 644,300,000 64,430,000 0.16275 47,185.59
12,500,000 4.0 2,000.0 12,500,000 1,250,000 0.16275 915.44
172,320,000 4.0 2,000.0 172,320,000 17,232,000 0.16275 12,619.93
7,467,000 4.0 2,000.0 7,467,000 746,700 0.16275 546.85
178,158,000 4.0 2,000.0 178,158,000 17,815,800 0.16275 13,047.48
66,738,056 4.0 2,000.0 66,738,056 6,673,806 0.16275 4,887.59
22,400,000 4.0 2,000.0 22,400,000 2,240,000 0.16275 1,640.47
24,680,000 4.0 2,000.0 24,680,000 2,468,000 0.16275 1,807.45
216,440,000 4.0 2,000.0 216,440,000 21,644,000 0.16275 15,851.08
168,052,000 4.0 2,000.0 168,052,000 16,805,200 0.16275 12,307.36
433,195,000 4.0 2,000.0 433,195,000 43,319,500 0.16275 31,725.22
373,450,000 4.0 2,000.0 373,450,000 37,345,000 0.16275 27,349.77
1,479,080,000 4.0 2,000.0 1,479,080,000 147,908,000 0.16275 108,321.06
26,140,000 4.0 2,000.0 26,140,000 2,614,000 0.16275 1,914.37
3,361,000,000 4.0 2,000.0 3,361,000,000 336,100,000 0.16275 246,144.27
6,720,000 4.0 2,000.0 7,200,500 672,000 0.16275 531.24
10 % per-tahun
21,429 Rupiah per-orang/jam
17,143 Rupiah per-orang/jam
6,500 Rupiah per-liter
8,000 Rupiah per-liter
45,000 Rupiah per-liter
N) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
kar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16)
Distribusi ditambah bahan bakar untuk pemanasan Aspal = 1/1000 x Kapasitas tangki aspal x harga bahan bakar solar ( lihat E 01 , E 03, E 41)
ERALATAN PER JAM KERJA (I)

BIAYA PASTI PER JAM BIAYA OPERASI PER JAM KERJA


ASURANSI TOTAL BAHAN BAKAR & PELUMAS WORKSHOP PERBAIKAN dan PERAWATAN
DAN BIAYA BAHAN MINYAK
LAIN-LAIN PASTI / JAM BAKAR PELUMAS BIAYA KOEF. BIAYA KOEF.

(Rp.) (Rp.) % % (Rp.) - (Rp.) -


f1 x HP x
0.002 x B 12 2.5 Harga BBM 0.0625 (g1 x B') 0.125
----------- (e1 + e2) s/d s/d + s/d ----- s/d
W 15 3 f2 x HP x 0.0875 W 0.175
Harga Olie
e2 E f1 f2 F g1 G g1

12 13 14 15 16 17 18 19

3,357.00 249,208.33 0.15 0.030 732,375.00 0.0875 146,869 0.1750


2,235.00 165,916.18 0.15 0.030 140,250.00 0.0875 97,781 0.1750
101.00 7,497.78 0.12 0.025 9,382.50 0.0625 3,156 0.1250
2,315.00 171,855.02 0.12 0.025 302,325.00 0.0625 72,344 0.1250
151.00 11,209.55 0.12 0.025 114,675.00 0.0625 4,719 0.1250
59.64 4,427.10 0.15 0.030 58,650.00 0.0875 2,609 0.1750
672.01 49,886.58 0.12 0.025 291,900.00 0.0625 21,000 0.1250
201.00 14,921.32 0.12 0.025 229,350.00 0.0625 6,281 0.1250
399.50 29,657.05 0.12 0.025 417,000.00 0.0625 12,484 0.1250
1,121.50 83,255.03 0.12 0.025 281,475.00 0.0625 35,047 0.1250
214.05 15,890.09 0.12 0.025 410,745.00 0.0625 6,689 0.1250
442.36 32,838.71 0.12 0.025 364,875.00 0.0625 13,824 0.1250
2,202.50 163,503.53 0.12 0.025 287,730.00 0.0625 68,828 0.1250
1,140.48 84,663.72 0.12 0.025 177,225.00 0.0625 35,640 0.1250
1,675.50 124,381.46 0.12 0.025 208,500.00 0.0625 52,359 0.1250
304.05 22,571.28 0.12 0.025 129,270.00 0.0625 9,502 0.1250
1,013.78 75,258.39 0.12 0.025 175,140.00 0.0625 31,681 0.1250
1,419.31 105,363.38 0.12 0.025 219,967.50 0.0625 44,354 0.1250
644.30 47,829.89 0.12 0.025 174,097.50 0.0625 20,134 0.1250
12.50 927.94 0.15 0.030 15,810.00 0.0875 547 0.1750
172.32 12,792.25 0.12 0.025 448,275.00 0.0625 5,385 0.1250
7.47 554.32 0.12 0.025 15,429.00 0.0625 233 0.1250
178.16 13,225.64 0.12 0.025 239,775.00 0.0625 5,567 0.1250
66.74 4,954.33 0.12 0.025 19,182.00 0.0625 2,086 0.1250
22.40 1,662.87 0.15 0.030 13,005.00 0.0875 980 0.1750
24.68 1,832.13 0.12 0.025 0.00 0.0625 771 0.1250
216.44 16,067.52 0.15 0.030 869,550.00 0.0875 9,469 0.1750
168.05 12,475.41 0.12 0.025 202,245.00 0.0625 5,252 0.1250
433.20 32,158.42 0.12 0.025 358,620.00 0.0625 13,537 0.1250
373.45 27,723.22 0.12 0.025 53,167.50 0.0625 11,670 0.1250
1,479.08 109,800.14 0.12 0.025 275,220.00 0.0625 46,221 0.1250
26.14 1,940.51 0.12 0.025 89,655.00 0.0625 817 0.1250
3,361.00 249,505.27 0.12 0.025 364,875.00 0.0625 105,031 0.1250
7.20 538.44 0.12 0.025 12,927.00 0.0625 225 0.1250

x Harga BBM Solar , (kolom 16)


solar ( lihat E 01 , E 03, E 41)
ER JAM KERJA TOTAL
ERBAIKAN dan PERAWATAN UPAH TOTAL BIAYA
OPERATOR PEMBANTU BIAYA SEWA ALAT
BIAYA / SOPIR OPERATOR OPERASI PER
/ SOPIR / JAM JAM KERJA
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) KET.
1 Orang 1 Orang
(g1 x B') Per Per
----------- Jam Kerja Jam Kerja F+G+H+I E+J
W = =
Rp21,428.6 Rp17,142.9
G H I J K L

20 21 22 23 24 25

293,737.50 21,428.57 17,142.86 1,211,552.68 1,460,761.01 Pek. Ringan


195,562.50 21,428.57 17,142.86 472,165.18 638,081.36 Pek. Ringan
6,312.50 21,428.57 17,142.86 57,422.68 64,920.46 Pek. Berat
144,687.50 21,428.57 17,142.86 557,927.68 729,782.69 Pek. Berat
9,437.50 21,428.57 17,142.86 167,402.68 178,612.23 Pek. Berat
5,218.15 21,428.57 17,142.86 105,048.65 109,475.76 Pek. Ringan
42,000.31 21,428.57 17,142.86 393,471.90 443,358.48 Pek. Berat
12,562.50 21,428.57 17,142.86 286,765.18 301,686.50 Pek. Berat
24,968.75 21,428.57 17,142.86 493,024.55 522,681.61 Pek. Berat
70,093.75 21,428.57 17,142.86 425,187.05 508,442.09 Pek. Berat
13,378.13 21,428.57 17,142.86 469,383.62 485,273.71 Pek. Berat
27,647.44 21,428.57 17,142.86 444,917.58 477,756.29 Pek. Berat
137,656.25 21,428.57 17,142.86 532,785.80 696,289.33 Pek. Berat
71,279.75 21,428.57 17,142.86 322,716.05 407,379.77 Pek. Berat
104,718.75 21,428.57 17,142.86 404,149.55 528,531.01 Pek. Berat
19,003.13 21,428.57 17,142.86 196,346.12 218,917.40 Pek. Berat
63,361.25 21,428.57 17,142.86 308,753.30 384,011.70 Pek. Berat
88,707.13 21,428.57 17,142.86 391,599.62 496,963.00 Pek. Berat
40,268.75 21,428.57 17,142.86 273,072.05 320,901.94 Pek. Berat
1,093.75 21,428.57 17,142.86 56,022.05 56,950.00 Pek. Ringan
10,770.00 21,428.57 17,142.86 503,001.43 515,793.68 Pek. Berat
466.69 21,428.57 17,142.86 54,700.46 55,254.78 Pek. Berat
11,134.88 21,428.57 17,142.86 295,048.74 308,274.38 Pek. Berat
4,171.13 21,428.57 17,142.86 64,010.12 68,964.45 Pek. Berat
1,960.00 21,428.57 17,142.86 54,516.43 56,179.30 Pek. Ringan
1,542.50 21,428.57 17,142.86 40,885.18 42,717.31 Pek. Berat
18,938.50 21,428.57 17,142.86 936,529.18 952,596.69 Pek. Ringan
10,503.25 21,428.57 17,142.86 256,571.30 269,046.72 Pek. Berat
27,074.69 21,428.57 17,142.86 437,803.46 469,961.88 Pek. Berat
23,340.63 21,428.57 17,142.86 126,749.87 154,473.09 Pek. Berat
92,442.50 21,428.57 17,142.86 452,455.18 562,255.31 Pek. Berat
1,633.75 21,428.57 17,142.86 130,677.05 132,617.57 Pek. Berat
210,062.50 21,428.57 17,142.86 718,540.18 968,045.45 Pek. Berat
450.03 21,428.57 17,142.86 52,173.48 52,711.92 Pek. Berat
URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan ASPHALT MIXING PLANT
2 Tenaga Pw 315.0
3 Kapasitas Cp 64.0
4 Alat a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 3,357,000,000.0

5 Kapastas tangki aspal Ca 47,000.00

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 335,700,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 245,851.33
W

b. Asuransi, dll = 0.002 x B F 3,357.00


W

Biaya Pasti per Jam = (E+F) G 249,208.33

C. BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar = (12%-15%) x Pw x Ms H1 378,000.00
Bahan Bakar Pemanasan Material = 12 ltr x Ms H2 4,300,800.00
dan aspal (Oil Heater)
Bahan Bakar Pemanas Aspal =1/1000 *Ca*Ms H3 376,000.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 425,250.00

3 Biaya bengkel (6.25% dan 8.75%) x B J 146,869


W
4 Biaya perbaikan (12,5 % - 17,5 %) x B K 293,737.50
W
5 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57
6 Pembantu Operator = ( 3 Orang / Jam ) x U2 M 51,428.57
Biaya Operasi per Jam = (H+I+J+K+L+M) P 5,993,513.39

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 6,242,721.72

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
8 Bahan bakar Batubara
URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan ASPHALT FINISHER
2 Tenaga Pw 55.0
3 Kapasitas Cp 7.3
4 Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 2,235,000,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 223,500,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 163,681.18
W

b. Asuransi, dll = 0.002 x B F 2,235.00


W

Biaya Pasti per Jam = (E+F) G 165,916.18

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 66,000.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 74,250.00

Biaya bengkel (6.25% dan 8.75%) x B J 97,781


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 195,562.50


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 472,165.18

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 638,081.36

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan ASPHALT SPRAYER
2 Tenaga Pw 4.5
3 Kapasitas Cp 985.0
4 Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 101,000,000

5 Kapastas tangki aspal Ca 985

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 10,100,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 7,396.78
W

b. Asuransi, dll = 0.002 x B F 101.00


W

Biaya Pasti per Jam = (E+F) G 7,497.78

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 4,320.00


Bahan Bakar Pemanas Aspal = 1/1000 *Ca*Ms H3 7,880.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 5,062.50

Biaya bengkel (6.25% dan 8.75%) x B J 3,156


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 2,525.00


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 61,515.18

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 69,012.96

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan BULLDOZER 100-150 HP
2 Tenaga Pw 145.0
3 Kapasitas Cp -
4 Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 2,315,000,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 231,500,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 169,540.02
W

b. Asuransi, dll = 0.002 x B F 2,315.00


W

Biaya Pasti per Jam = (E+F) G 171,855.02

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 139,200.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 163,125.00

Biaya bengkel (6.25% dan 8.75%) x B J 72,344


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 144,687.50


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 557,927.68

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 729,782.69

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan COMPRESSOR 4000-6500 L\M
2 Tenaga Pw 55.0
3 Kapasitas Cp 5,200.0
4 Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 151,000,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 15,100,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 11,058.55
W

b. Asuransi, dll = 0.002 x B F 151.00


W

Biaya Pasti per Jam = (E+F) G 11,209.55

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 52,800.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 61,875.00

Biaya bengkel (6.25% dan 8.75%) x B J 4,719


W
3 Perawatan dan (12,5 % - 17,5 %) x B K 9,437.50
perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 167,402.68

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 178,612.23

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3
2 Tenaga Pw 23.0
3 Kapasitas Cp 575.0
4 Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 59,636,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 5,963,600

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 4,367.47
W

b. Asuransi, dll = 0.002 x B F 59.64


W

Biaya Pasti per Jam = (E+F) G 4,427.10

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 27,600.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 31,050.00

Biaya bengkel (6.25% dan 8.75%) x B J 2,609


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 5,218.15


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 105,048.65

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 109,475.76

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan CRANE 10-15 TON
2 Tenaga Pw 140.0
3 Kapasitas Cp 14.5
4 Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 672,005,000
5

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 67,200,500

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 49,214.57
W

b. Asuransi, dll = 0.002 x B F 672.01


W

Biaya Pasti per Jam = (E+F) G 49,886.58

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 134,400.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 157,500.00

Biaya bengkel (6.25% dan 8.75%) x B J 21,000


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 42,000.31


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 393,471.90

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 443,358.48

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan DUMP TRUCK 3.5 TON
2 Tenaga Pw 110.0
3 Kapasitas Cp 3.5
4 Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 201,000,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 20,100,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 14,720.32
W

b. Asuransi, dll = 0.002 x B F 201.00


W

Biaya Pasti per Jam = (E+F) G 14,921.32

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 105,600.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 123,750.00

Biaya bengkel (6.25% dan 8.75%) x B J 6,281


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 12,562.50


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 286,765.18

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 301,686.50

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir / Mekanik U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan DUMP TRUCK 10 TON
2 Tenaga Pw 200.0
3 Kapasitas Cp 10.0
4 Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 399,500,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 39,950,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 29,257.55
W

b. Asuransi, dll = 0.002 x B F 399.50


W

Biaya Pasti per Jam = (E+F) G 29,657.05

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 192,000.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 225,000.00

Biaya bengkel (6.25% dan 8.75%) x B J 12,484


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 24,968.75


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 493,024.55

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 522,681.61

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir / Mekanik U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.


A. URAIAN PERALATAN
1 Jenis Peralatan EXCAVATOR 80-140 HP
2 Tenaga Pw 135.0
3 Kapasitas Cp 0.80
4 Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 1,121,500,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 112,150,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 82,133.53
W

b. Asuransi, dll = 0.002 x B F 1,121.50


W

Biaya Pasti per Jam = (E+F) G 83,255.03

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 129,600.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 151,875.00

Biaya bengkel (6.25% dan 8.75%) x B J 35,047


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 70,093.75


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 425,187.05

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 508,442.09

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan FLAT BED TRUCK 3-4 M3
2 Tenaga Pw 197.0
3 Kapasitas Cp 9.5
4 Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 214,050,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 21,405,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 15,676.04
W

b. Asuransi, dll = 0.002 x B F 214.05


W

Biaya Pasti per Jam = (E+F) G 15,890.09

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 189,120.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 221,625.00


Biaya bengkel (6.25% dan 8.75%) x B J 6,689
W

3 Perawatan dan (12,5 % - 17,5 %) x B K 13,378.13


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 469,383.62

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 485,273.71

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan GENERATOR SET
2 Tenaga Pw 175.0
3 Kapasitas Cp 134.0
4 Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 442,359,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 44,235,900
2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275
(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 32,396.35
W

b. Asuransi, dll = 0.002 x B F 442.36


W

Biaya Pasti per Jam = (E+F) G 32,838.71

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 168,000.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 196,875.00

Biaya bengkel (6.25% dan 8.75%) x B J 13,824


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 27,647.44


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 444,917.58

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 477,756.29

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.


A. URAIAN PERALATAN
1 Jenis Peralatan MOTOR GRADER >100 HP
2 Tenaga Pw 138.0
3 Kapasitas Cp 9,500.0
4 Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 2,202,500,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 220,250,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 161,301.03
W

b. Asuransi, dll = 0.002 x B F 2,202.50


W

Biaya Pasti per Jam = (E+F) G 163,503.53

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 132,480.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 155,250.00

Biaya bengkel (6.25% dan 8.75%) x B J 68,828


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 137,656.25


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 532,785.80

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 696,289.33


E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan TRACK LOADER 75-100 HP
2 Tenaga Pw 85.0
3 Kapasitas Cp 0.9
4 Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 1,140,475,941

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 114,047,594

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 83,523.24
W

b. Asuransi, dll = 0.002 x B F 1,140.48


W

Biaya Pasti per Jam = (E+F) G 84,663.72

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 81,600.00


2 Pelumas = (2.5%-3%) x Pw x Mp I 95,625.00

Biaya bengkel (6.25% dan 8.75%) x B J 35,640


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 71,279.75


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 322,716.05

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 407,379.77

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan WHEEL LOADER 1.0-1.6 M3
2 Tenaga Pw 100.0
3 Kapasitas Cp 1.2
4 Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 1,675,500,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 167,550,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 122,705.96
W

b. Asuransi, dll = 0.002 x B F 1,675.50


W

Biaya Pasti per Jam = (E+F) G 124,381.46

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 96,000.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 112,500.00

Biaya bengkel (6.25% dan 8.75%) x B J 52,359


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 104,718.75


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 404,149.55

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 528,531.01

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT


No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan THREE WHEEL ROLLER 6-8 T
2 Tenaga Pw 62.0
3 Kapasitas Cp 7.5
4 Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 304,050,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 30,405,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 22,267.23
W

b. Asuransi, dll = 0.002 x B F 304.05


W

Biaya Pasti per Jam = (E+F) G 22,571.28

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 59,520.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 69,750.00

Biaya bengkel (6.25% dan 8.75%) x B J 9,502


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 19,003.13


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 196,346.12


D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 218,917.40

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan TANDEM ROLLER 6-8 T.
2 Tenaga Pw 84.0
3 Kapasitas Cp 8.0
4 Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 1,013,780,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 101,378,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 74,244.61
W

b. Asuransi, dll = 0.002 x B F 1,013.78


W

Biaya Pasti per Jam = (E+F) G 75,258.39

C. BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar = (12%-15%) x Pw x Ms H 80,640.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 94,500.00

Biaya bengkel (6.25% dan 8.75%) x B J 31,681


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 63,361.25


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 308,753.30

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 384,011.70

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan TIRE ROLLER 8-10 T.
2 Tenaga Pw 105.5
3 Kapasitas Cp 9.7
4 Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 1,419,314,000
B. BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 141,931,400

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 103,944.07
W

b. Asuransi, dll = 0.002 x B F 1,419.31


W

Biaya Pasti per Jam = (E+F) G 105,363.38

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 101,280.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 118,687.50

Biaya bengkel (6.25% dan 8.75%) x B J 44,354


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 88,707.13


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 391,599.62

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 496,963.00

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan VIBRATORY ROLLER 5-8 T.
2 Tenaga Pw 83.5
3 Kapasitas Cp 7.5
4 Alat Baru : a. Umur Ekonomis A 5.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 644,300,000

B. BIAYA PASTI PER JAM KERJA BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 64,430,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 47,185.59
W

b. Asuransi, dll = 0.002 x B F 644.30


W

Biaya Pasti per Jam = (E+F) G 47,829.89

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 80,160.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 93,937.50

Biaya bengkel (6.25% dan 8.75%) x B J 20,134


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 40,268.75


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86
Biaya Operasi per Jam = (H+I+K+L+M) P 273,072.05

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 320,901.94

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan CONCRETE VIBRATOR
2 Tenaga Pw 6.2
3 Kapasitas Cp 24.0
4 Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 12,500,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 1,250,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 915.44
W

b. Asuransi, dll = 0.002 x B F 12.50


W

Biaya Pasti per Jam = (E+F) G 927.94


C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 7,440.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 8,370.00

Biaya bengkel (6.25% dan 8.75%) x B J 547


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 1,093.75


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 56,022.05

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 56,950.00

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan STONE CRUSHER
2 Tenaga Pw 215.0
3 Kapasitas Cp 74.0
4 Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 172,320,000
B. BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 17,232,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 12,619.93
W

b. Asuransi, dll = 0.002 x B F 172.32


W

Biaya Pasti per Jam = (E+F) G 12,792.25

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 206,400.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 241,875.00

Biaya bengkel (6.25% dan 8.75%) x B J 5,385


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 10,770.00


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 2 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 503,001.43

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 515,793.68

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan WATER PUMP 70-100 mm
2 Tenaga Pw 7.4
3 Kapasitas Cp -
4 Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 7,467,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 746,700

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 546.85
W

b. Asuransi, dll = 0.002 x B F 7.47


W

Biaya Pasti per Jam = (E+F) G 554.32

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 7,104.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 8,325.00

Biaya bengkel (6.25% dan 8.75%) x B J 233


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 466.69


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 54,700.46

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 55,254.78

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan WATER TANKER 3000-4500 L.
2 Tenaga Pw 115.0
3 Kapasitas Cp 4,500.0
4 Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 178,158,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 17,815,800

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 13,047.48
W

b. Asuransi, dll = 0.002 x B F 178.16


W
Biaya Pasti per Jam = (E+F) G 13,225.64

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 110,400.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 129,375.00

Biaya bengkel (6.25% dan 8.75%) x B J 5,567


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 11,134.88


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 295,048.74

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 308,274.38

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan PEDESTRIAN ROLLER
2 Tenaga Pw 9.2
3 Kapasitas Cp 855.0
4 Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 66,738,056

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 6,673,806

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 4,887.59
W

b. Asuransi, dll = 0.002 x B F 66.74


W

Biaya Pasti per Jam = (E+F) G 4,954.33

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 8,832.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 10,350.00

Biaya bengkel (6.25% dan 8.75%) x B J 2,086


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 4,171.13


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 64,010.12

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 68,964.45

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan TAMPER
2 Tenaga Pw 5.1
3 Kapasitas Cp 135.0
4 Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 22,400,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 2,240,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 1,640.47
W

b. Asuransi, dll = 0.002 x B F 22.40


W

Biaya Pasti per Jam = (E+F) G 1,662.87

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 6,120.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 6,885.00

Biaya bengkel (6.25% dan 8.75%) x B J 980


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 1,960.00


perbaikan = W
4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57
5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 54,516.43

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 56,179.30

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan JACK HAMMER
2 Tenaga Pw 0.0
3 Kapasitas Cp 1,250.0
4 Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 24,680,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 2,468,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 1,807.45
W
b. Asuransi, dll = 0.002 x B F 24.68
W

Biaya Pasti per Jam = (E+F) G 1,832.13

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 0.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 0.00

Biaya bengkel (6.25% dan 8.75%) x B J 771


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 1,542.50


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 40,885.18

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 42,717.31

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan FULVI MIXER
2 Tenaga Pw 341.0
3 Kapasitas Cp 1,990.0
4 Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 216,440,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 21,644,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 15,851.08
W

b. Asuransi, dll = 0.002 x B F 216.44


W

Biaya Pasti per Jam = (E+F) G 16,067.52

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 409,200.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 460,350.00

Biaya bengkel (6.25% dan 8.75%) x B J 9,469


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 18,938.50


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 936,529.18

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 952,596.69

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan CONCRETE PUMP
2 Tenaga Pw 97.0
3 Kapasitas Cp 7.9
4 Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 168,052,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 16,805,200

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 12,307.36
W

b. Asuransi, dll = 0.002 x B F 168.05


W

Biaya Pasti per Jam = (E+F) G 12,475.41

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 93,120.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 109,125.00

Biaya bengkel (6.25% dan 8.75%) x B J 5,252


W
3 Perawatan dan (12,5 % - 17,5 %) x B K 10,503.25
perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 256,571.30

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 269,046.72

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan TRAILER 20 TON
2 Tenaga Pw 172.0
3 Kapasitas Cp 20.0
4 Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 433,195,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 43,319,500

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 31,725.22
W

b. Asuransi, dll = 0.002 x B F 433.20


W

Biaya Pasti per Jam = (E+F) G 32,158.42

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 165,120.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 193,500.00

Biaya bengkel (6.25% dan 8.75%) x B J 13,537


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 27,074.69


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 437,803.46

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 469,961.88

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan PILE DRIVER + HAMMER
2 Tenaga Pw 25.5
3 Kapasitas Cp 2.5
4 Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 373,450,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 37,345,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 27,349.77
W

b. Asuransi, dll = 0.002 x B F 373.45


W

Biaya Pasti per Jam = (E+F) G 27,723.22

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 24,480.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 28,687.50

Biaya bengkel (6.25% dan 8.75%) x B J 11,670


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 23,340.63


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 126,749.87

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 154,473.09

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan CRANE ON TRACK 35 TON
2 Tenaga Pw 132.0
3 Kapasitas Cp 35.0
4 Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 1,479,080,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 147,908,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 108,321.06
W

b. Asuransi, dll = 0.002 x B F 1,479.08


W

Biaya Pasti per Jam = (E+F) G 109,800.14

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 126,720.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 148,500.00

Biaya bengkel (6.25% dan 8.75%) x B J 46,221


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 92,442.50


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 452,455.18

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 562,255.31

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan WELDING SET
2 Tenaga Pw 43.0
3 Kapasitas Cp 220.0
4 Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 26,140,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 2,614,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 1,914.37
W

b. Asuransi, dll = 0.002 x B F 26.14


W

Biaya Pasti per Jam = (E+F) G 1,940.51

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 41,280.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 48,375.00

Biaya bengkel (6.25% dan 8.75%) x B J 817


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 1,633.75


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 130,677.05

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 132,617.57

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.


A. URAIAN PERALATAN
1 Jenis Peralatan BORE PILE MACHINE
2 Tenaga Pw 175.0
3 Kapasitas Cp 2,500.0
4 Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 3,361,000,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 336,100,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 246,144.27
W

b. Asuransi, dll = 0.002 x B F 3,361.00


W

Biaya Pasti per Jam = (E+F) G 249,505.27

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 168,000.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 196,875.00

Biaya bengkel (6.25% dan 8.75%) x B J 105,031


W

3 Perawatan dan (12,5 % - 17,5 %) x B K 210,062.50


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 718,540.18

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 968,045.45

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISA ALAT

No. U RAIAN KODE KOEF.

A. URAIAN PERALATAN
1 Jenis Peralatan ASPHALT LIQUID MIXER
2 Tenaga Pw 6.2
3 Kapasitas Cp 1,000.0
4 Alat Baru : a. Umur Ekonomis A 4.0
b. Jam Kerja Dalam 1 Tahun W 2,000.0
c. Harga Alat B 6,720,000

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C 672,000

2 Faktor Angsuran Modal = i x (1 + i)^A D 0.16275


(1 + i)^A - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 492.14
W

b. Asuransi, dll = 0.002 x B F 6.72


W

Biaya Pasti per Jam = (E+F) G 498.86

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (12%-15%) x Pw x Ms H 5,952.00

2 Pelumas = (2.5%-3%) x Pw x Mp I 6,975.00


Biaya bengkel (6.25% dan 8.75%) x B J 210
W

3 Perawatan dan (12,5 % - 17,5 %) x B K 420.00


perbaikan = W

4 Operator = ( 1 Orang / Jam ) x U1 L 21,428.57


5 Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86

Biaya Operasi per Jam = (H+I+K+L+M) P 52,128.43

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 52,627.29

E. LAIN - LAIN
1 Tingkat Suku Bunga i 10.00
2 Upah Operator / Sopir U1 21,428.57
3 Upah Pembantu Operator / Pmb.Sopir U2 17,142.86
4 Bahan Bakar Bensin Mb 6,500.00
5 Bahan Bakar Solar Ms 8,000.00
6 Minyak Pelumas Mp 45,000.00
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
SATUAN KET.

MIXING PLANT E01


HP
T/Jam
Tahun
Jam
Rp

liter

Rp

Rp

Rp

Rp

Rp
Rp Khusus AMP

Rp

Rp

Rp

Rp
Rp
Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Rp./liter
Rp./liter
Rp./liter

Rp/kg
SATUAN KET.

LT FINISHER E02
HP
Ton
Tahun
Jam
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

LT SPRAYER E03
HP
Liter
Tahun
Jam
Rp

Liter

Rp

Rp

Rp
Rp

Rp
Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

ZER 100-150 HP E04


HP
-
Tahun
Jam
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

OR 4000-6500 L\M E05


HP
CPM/(L/m)
Tahun
Jam
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

MIXER 0.3-0.6 M3 E06


HP
Liter
Tahun
Jam
Rp

Rp

Rp
Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

E 10-15 TON E07


HP
Ton
Tahun
Jam
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

RUCK 3.5 TON E08


HP
Ton
Tahun
Jam
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

RUCK 10 TON E09


HP
Ton
Tahun
Jam
Rp

Rp

-
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.
TOR 80-140 HP E10
HP
M3
Tahun
Jam
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

D TRUCK 3-4 M3 E11


HP
M3
Tahun
Jam
Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

RATOR SET E12


HP
KVA
Tahun
Jam
Rp

Rp
-

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.
RADER >100 HP E13
HP
-
Tahun
Jam
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

OADER 75-100 HP E14


HP
M3
Tahun
Jam
Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

OADER 1.0-1.6 M3 E15


HP
M3
Tahun
Jam
Rp
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.

EEL ROLLER 6-8 T E16


HP
Ton
Tahun
Jam
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp
Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

ROLLER 6-8 T. E17


HP
Ton
Tahun
Jam
Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

OLLER 8-10 T. E18


HP
Ton
Tahun
Jam
Rp
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.

Y ROLLER 5-8 T. E19


HP
Ton
Tahun
Jam
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp
Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

TE VIBRATOR E20
HP
-
Tahun
Jam
Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

E CRUSHER E21
HP
T/Jam
Tahun
Jam
Rp
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.

UMP 70-100 mm E22


HP
-
Tahun
Jam
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

NKER 3000-4500 L. E23


HP
Liter
Tahun
Jam
Rp

Rp

Rp

Rp
Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

RIAN ROLLER E24


HP
Ton
Tahun
Jam
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN KET.

AMPER E25
HP
Ton
Tahun
Jam
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

K HAMMER E26
HP
-
Tahun
Jam
Rp

Rp

Rp
Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

VI MIXER E27
HP
-
Tahun
Jam
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

RETE PUMP E28


HP
M3
Tahun
Jam
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

LER 20 TON E29


HP
Ton
Tahun
Jam
Rp

Rp

Rp
Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

VER + HAMMER E30


HP
Ton
Tahun
Jam
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

N TRACK 35 TON E31


HP
Ton
Tahun
Jam
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

DING SET E32


HP
Amp
Tahun
Jam
Rp

Rp

-
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.
LE MACHINE E33
HP
Meter
Tahun
Jam
Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN KET.

LIQUID MIXER E34


HP
Liter
Tahun
Jam
Rp

Rp

Rp

Rp

Rp

Rp

Rp
Rp

Rp

Rp
Rp

Rp

Rp

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter