Elite Engineering Private Limited

F.D.T Test Report by Sand Replacement Method


Name of Project : Watch Tower (NDP)_ Date :
Material : Flooring Of Watch Tower
Identification : soil compaction

Weight of wet Material (g)


Weight of Cone + Sand (Before Used) Grams
Weight of Cone + Sand ( After Used ) Grams
Weight of Sand to Fill Hole & Cone (g)
Field Density Weight of Sand to Fill Cone (g)
Weight of Sand to Fill Hole (g)
Unite Weight of Sand (g/c.c )
Volume of Hole (c.c )
Wet Density (g/c.c )

Moisture Content % Moisture Content %

Dry Density (g/c.c )

Maximum Dry Density ( g/c.c )

Lab Density & O.M.C Optimum Moisture Content %

Compaction Obtained %

Result Compaction Required %

( pass \ Fail )

___________________________

Elite Engineering Pvt. Ltd. Representative

Site Engineer ______________ Client Representative ___________