NTS

NDP KMR Terminal B


Main Gate Pipe Supports

Misc Civil Works at NDP

Main Gate Pipe Supports

Dimensions (meter) Quantity


No's of
S.No Discription Dia of bar C/C Nos Total Unit Total Shapes
bars Length Lengt Weigh kg
Weight
h t
1 Pipe Sport main Gate
Footing main bar T/B & Both way
1/2" 150mm 20 4 1.35 108 0.96 103.68 kg 200 200

1350

Vertical Bar for Column 5/8" 8 4 1.675 53.6 1.576 84.474 kg


1375

300

Rings for column 3/8" 125mm 9 4 1.48 53.28 0.56 29.837 kg


. 370 75

370

Rings for column 3/8" 125mm 9 4 0.97 34.92 0.56 19.555 kg 205
. 205
75

237.55
Total weight kg