NDP KMR Terminal B


Underground Piping Modification Project NDP SHELL

Misc Civil Works at NDP

Construction Of Treench NDP

Dimensions (meter) Quantity


No's of
S.No Discription Dia of bar C/C Nos Shapes
bars Total Unit Total
Length Length kg
Weight Weight

1 Trench BBS At NDP


Footing main bar T/B & Both way 1/2" 150mm 13 2 24 624 0.302 188.448 kg 6" 6"

23'
2 Footing dist. bar T/B & Both way
1/2" 150mm 2 44 6.25 550 0.302 166.1 kg 6" 6"

5'3"
3 Vertical bar long wall side
1/2" 150mm 2 47 6.58 618.52 0.302 186.793 kg
4'7"

2'

4 5"
Vertical bar long wall inside 1/2" 150mm 2 47 5.42 509.48 0.302 153.863 kg
4'7"

2'

Prepared By:Hafiz
NTS

5
Vertical bar foam tank wall inside 1/2" 150mm 2 12 6.08 145.92 0.302 44.06784 kg
. 4'7"

6 5''
Vertical bar foam tank wall side 1/2" 150mm 2 12 4.92 118.08 0.302 35.66016 kg
. 4'2''

2'

7
Horizontal Bar Long wall Both ways
1/2" 150mm 2 19 20.17 766.46 0.302 231.4709 kg
25'

8
Horizontal Bar Foam Tank wall 1/2" 150mm 2 19 6 228 0.302 68.856 kg 6" 6"
5'

9 Steel Chairs For Double Mesh 2'


1/2" 300mm 6 5 7 210 0.302 63.42 kg
6" 6"
2' 2'
10 Trench Pipe Support
Vertical Bar 1/2" 150mm 18 2 2.75 99 0.302 29.898 kg
9"

2'
11 Trench Support
Horizontal Bar 1/2" 150mm 4 2 6 48 0.302 14.496 kg 6" 6"
5'

12 Steel Used For Anchor Lugs in


Plates & Grating Angle

Prepared By:Hafiz
NTS

1/2" 800mm 8 8 1.5 96 0.302 28.992


1'6"

Total weight kg
1212.065