You are on page 1of 6

15- 1

GROUP 15
INTAKE DAN
EXHAUST
DAFTAR ISI

SPESIFIKASI SERVICE ............................................................................................................. 15-3


AIR CLEANER ............................................................................................................................ 15-3
INLET MANIFOLD ...................................................................................................................... 15-4
EXHAUST MANIFOLD ................................................................................................................ 15-5
EXHAUST PIPE AND MAIN MUFFLER ....................................................................................... 15-6

Maret 2008 - PWPES-CR 0308


15- 2

PWPES-CR 0308 - Maret 2008


INTAKE & EXHAUST - Spesifikasi Service / Air Cleaner 15- 3

SPESIFIKASI SERVICE
Item Nilai standar Limit
Distorsi/ketidakrataan permukaan manifold (mm) 0,15 atau kurang 0,20

AIR CLEANER
PELEPASAN DAN PEMASANGAN <4M40>

Urutan pelepasan
1. Air cleaner element
2. Accelerator cable clamp
3. Air cleaner cover
4. Breather hose connection
5. Air intake hose
6. Resonator
7. Radiator condenser tank hose
8. Air duct
9. Air cleaner body

Maret 2008 - PWPES-CR 0308


15- 4 INTAKE & EXHAUST - Inlet Manifold

INLET MANIFOLD <4M40>


PELEPASAN DAN PEMASANGAN
Pekerjaan sebelum pelepasan Pekerjaan setelah pem asangan
• Pelepasan Breather Hose dan Air Intake • Pem asangan Exhaust M anifold Cover and
Hose Exhaust Manifold Heat Insulator
• Pelepasan EGR Valve and EG R Valve Pipe • Pem asangan EGR Valve and EG R Valve Pipe
(Refer to G ROUP 17 - EG R Valve). (Refer to G RO UP 17 - EGR Valve).
• Pelepasan Exhaust M anifold Cover and • Pem asangan Breather H ose and Air Intake
Exhaust Manifold Heat Insulator Hose

Urutan pelepasan INSPECTION


Periksa beebrapa hal berikut; ganti part jika ditemukan
1. EGR solenoid valve No.1 connector masalah.
2. EGR solenoid valve No.2 connector
PEMERIKSAAN INTAKE MANIFOLD
3. Throttle solenoid valve connector 1. Periksa apakah terdapat kerusakan atau keretakan
pada psrt.
4. Earth connection
2. Periksa apakah negative pressure (vacuum) outlet port,
5. Vacuum hose connection exhaust gas recirculation passages tersumbat.
6. Vacuum pipe 3. Gunakan straight edge dan feeler gauge, periksa dis-
tortion pada permukaan cylinder head.
7. Solenoid valve assembly
Nilai standar : 0,15 mm atau kurang
8. Inlet manifold assembly Limit : 0,20 mm
9. Inlet manifold gasket

PWPES-CR 0308 - Maret 2008


INTAKE & EXHAUST - Exhaust manifold 15- 5

EXHAUST MANIFOLD <4M40>


PELEPASAN DAN PEMASANGAN
Pekerjaan sebelum pelepasan dan setelah pemasangan
• Pelepasan dan pemasangan Front Exhaust Pipe

Urutan pelepasan
1. Exhaust manifold cover
2. Exhaust manifold heat insulator
· EGR valve and EGR valve pipe
(Refer to GROUP 17 - EGR Valve)
· Inlet manifold
3. Exhaust manifold assembly
4. Exhaust manifold gasket

Maret 2008 - PWPES-CR 0308


15- 6 INTAKE & EXHAUST - Exhaust Pipe dan Main Muffler

EXHAUST PIPE DAN MAIN MUFFLER <4M40>


PELEPASAN DAN PEMASANGAN

Urutan pelepasan Exhaust main


muffler
1. Exhaust main muffler
3. Exhaust pipe gasket
4. Exhaust muffler hanger
5. Exhaust muffler hanger
Urutan pelepasan Centre exhaust
pipe
· Under skid plate and engine room
under cover (Refer to GROUP 51 -
Under Cover)
2. Centre exhaust pipe
3. Exhaust pipe gasket
7. Seal ring
8. Exhaust muffler hanger
9. Centre under floor heat protector
Urutan pelepasan Front exhaust
pipe
· Under skid plate and engine room
under cover (Refer to GROUP 51 -
Under Cover)
6. Front exhaust pipe
7. Seal ring
10. Exhaust pipe gasket
11. Front exhaust pipe bracket
12. Front under floor heat protector

PWPES-CR 0308 - Maret 2008

You might also like