Professional Documents
Culture Documents
Marked Up P&ID For Urea - Master - 151130
Marked Up P&ID For Urea - Master - 151130
U-EA102 U-EA103
NOTES:
NO.1 AMMONIA PREHEATER NO.2 AMMONIA PREHEATER 1. FOR MATERIAL
1. THE GENERAL NOTES
OF TRIMAND
FORSYMBOLS
SPV-2113,SEE DRAWINGS
2114 AND 2115 SHALL BE
S-13F-1 62-D001, 62-D002 &OR
62-D003.
E-U-5A-2
E-U-5A-2
E-U-21-2
E-U-21-2
E-U-21-2
21 HIGH Cr AUSTENITIC DUPLEX S.S SEE H-171 FOR DETAIL 21
E-U-5K
DUTY : 2.2715 Gcal/hr DUTY : 4.5606 Gcal/hr
SPECIFICATION.
SHELL DES./OPR. PRESS.: 14 kg/cm² G / 9 kg/cm² G S-21-1 SHELL DES./OPR. PRESS.: 8.0 kg/cm² G& F.V. / 4.5 kg/cm² G
S-5A-1 S-13G-1
S-5K-1
NHG21745-3"-B1A2
SHELL DES./OPR. TEMP.: 200 ° C/ 155 ° C/ 155 °C
TO SPV- 2021
SHELL DES./OPR. TEMP.: 170 ° C/ 138 ° C/ 50 ° C 2. PIPE ROUTING
TO RV 21270
TO RV 24420
TO RV 24420
S-21-1
TO U-EA101
TO U-FA104
S-21-1 TUBE DES./OPR. PRESS.: 250 kg/cm² G / 200 kg/cm² G
TUBE DES./OPR. TEMP.: 110 ° C/ 38 ° C/ 77 °C
TUBE DES./OPR. PRESS.: 250 kg/cm² G / 200.0 kg/cm² G
TUBE DES./OPR. TEMP.: 170 ° C/ 77 ° C/ 138 °C
S-13G-2
FOR PRESSURE INSTRUMENT SHALL BE AS SHOWN BELOW.
3032
2722
3034
3035
3039
3040
I/P MATERIAL(SHELL/TUBE) : C.S. / C.S. FROM SIDE OF PIPE
20
PY
MATERIAL(SHELL/TUBE) : C.S. / C.S.
S-13F-1 S-21-1
20
NHL21830-1"-M1J1-TM
RV21222-10"-A1A2 101 NH3 OR CO2 LINE
SHC29083-1/2"-M1J1
NOTE 11 MG21210-4"-M1J2-TM
E-U-5A-2 3251
19
4" FROM U-EA101
S-13A-3 19
(JM) PT
MIN.
MIN. S-5K-1
FXY
GLO CHE GLO 106 S-5K-2
PG
GLO
18 18
4M6
S-5A-1
RV27542-14"-A1A2
RV21842-16"-A1A2
HS I I I/P
VENT
S
SET @ 28.0 kg/cm^2g 106 5 2
GLO
HY HIC
PRV FV 106 106 FROM SIDE OF PIPE
2001 106 I HXY
17 (JL) 4P6 3 106 17
SET @ 14.0 kg/cm^2g TSO MIN.
FC 1" I FROM SIDE OF PIPE
TI TT NOTE 9 PRV 6R10 FZL FZSC FZSC
S
VENT
119 119 2002 5
L
MIN. SET @ 8.0 kg/cm^2g 106 C 106 106 3. DELETED.
NOTE 14
MIN
PRV SPV I SPV
#150 SPV NHL21821-1"-N1J1-TM MIN 4. NO POCKETS AND NO HORIZONTAL PORTION SHALL BE PERMITTED
6" x 4"
16 SIDE OR TOP MG21221-6"-B1J1-TM #300 2004 2030 6 2031 UNDER OPERATING CONDITION. 16
#300 2026 AGV MIN AGV B4
OF PIPE
3/4MIN1
#150
S-5K-2 B4
TSO 5. STRAIGHT LENGTH FROM STEAM TRAP AND BYPASS VALVE TO
A1
FIRST ELBOW SHALL BE 10 TIMES OF NORMAL PIPING OUTSIDE
CHE
SET @ 250.0 kg/cm^2g #150 SPV FC US21160-10"-M1J2-TM
HV
SHC29082-1/2"-M1J1
#300
MIN
DR21822-3/4"-N1J1 SPV DIAMETER AS MINIMUM.
MIN
SLC27541-6"-ASA2-HC
PRV P3 SPV MIN
2029
SPV 6. BLOCK VALVE BLEEDER AND PRESSURE GAUGE FOR HIGH
AGV
2003 AGV
15 2027 (JM)
S-5A-1
E-U-5A-2 3252 15
GLO
SL21841-10"-ASA2-HC
2025 A2 T1 A1
FROM U-EA101 LOCATED NEAR EVERY FLUSHING POINT.
AGV
FE S-13F-1HZSC HZSC 10" MIN.
MIN
NOTE 10
SHC29081-1/2"-M1J1
U-EA102 U-EA103 I/P 106 106 106 1-1/2"
7. DELETED .
AT 5183 E-U-5A-2
FY FIC FT 101 8. PIPING LENGTH OF MG 21230-3"-B1J1-TM (FROM BRANCH POINT TO
C
1"
H
14
GLOCHE 106 106 106 NOTE 1 TO AX-101 U-DA201) SHALL HAVE SHORTEST ROUTE. 14
L NOTE 15,16 SPV SSC
GLO
GLO
GLO
NHL21800-6"-G1A2-HC
2113 2001 9. PRV-2001 SHALL BE LOCATED NEAR PV-101.
HZL
US21170-10"-M1J2-TM
1" N4 N3 SPECIAL B6
106 1/2"
C MIN 10. DOUBLE ORIFICE TAP VALVES SHALL BE PROVIDED TO ORIFICE
ASA2
SML27171-3/4"-BSA2-HC
GAT N6 ASA2 C
13 VE 2033 13
SHC29075-1/2"-M1J1 AGV SPV 11. LENGTH TO DOWNSTREAM EQUIPMENT SHOULD BE MINIMIZED.
N6 GAT STA
AGV
N1
2059 B4
2007 12. TRACING STEAM SHALL BE 5 KG/CM2G FOR "TS" AND 20 KG/CM2G
FZL FOR "TM". JACKETING STEAM SHALL BE 2.5 KG/CM2G FOR "JL".
HC 101
N2 N1 C SHC29084-1/2"-M1J1 5KG/CM2G FOR "JS" AND 20KG/CM2G FOR "JM".
S-13F-1
2847 E-U-5A-4
SHC29076-1/2"-N1J1-TM
12 N7 TO SPV-2115 13. LENGTH BETWEEN U-EE101 AND U-DC101 SHOULD BE MINIMIZED. 12
SHC29077-1/2"-M1J1
SHC29071-1/2"-M1J1
HS
NHL21744-3"-G1A2
(MAX SLOPE)
HC N7 1" 101
MIN
GAT N5 101 5
S-13G-1 ASA2
15. AT-101 SHALL BE LOCATED NEAR HV-106. OFF-LIMITS AREA
SLC27530-4"-ASA2-HC
DR DR
NOTE 4,7
E-U-13G-2
MIN
E-U-13F
N5 GAT ASA2 N2
FROM SMLC 29020
SL21850-3"-ASA2-HC
VENDOR INFORMATION FOR ACCESS OF HV-106.
FROM SML 27170
11 11
I
FZSC 2 16. CLAMP ON TYPE N/C METER.
SL21840-10"-ASA2-HC
S-13G-1 S-5K-2 101
DR21823-3/4"-A1A2
I
S
3048
3047
NHL21010-6"-G1A2-HC C
N3 N4
H
VENT
10 TT FXY NOTAS: 10
TSO
SLC27550-4"-ASA2
GLO
NHL21740-6"-G1A2
B.V
NHL21742-3/4"-G1A2 NHL21020-6"-N1J1-TM US21030-10"-M1J2-TM
GLOGLO
FV
101 6" NOTE 13
S-5A-1
2904 E-U-5A-3
NOTE 2
MIN
(JM) TO U-DC101
9 HS NHL21743-3/4"-A1A2 TIC SPV STA PT B.V 9
MIN
104A 118 2034 2008
107 AGV
U-EE101
AGV
I/P W3 FL(O)
MIN 1/2"
HS PY PIC CASCADE
AGV
LP I/P
111 111 111 SPV PV
PY
GAT
AGV 107
MIN
I CHE 2132
PXY SPV SPV
A1 107
GAT
GLO GLO
PG
NC NC
2036 SPV
LV GAT B4 102
LXY PZL I VENT
NHL21012-3/4"-N1J1 AGV 2039
S
A1
2"
AGV
AGV
NHL21011-3/4"-A1A2
GAT
GAT
7 2125 7
AGV
FC MIN 2040 A1 A1 BY BY
PZSC PZSC SST A2
S-13F-1
2"
LY FE SPV
GAT
FY SHC29072-1/2"-M1J1
104A I/P 101 2035 101 2905 E-U-5A-3 INTERNAL APPROVALS
GAT
6 INTERLOCK LY 6
3"
FT B4 AGV TO SPV-2054
104B NOTE 10 6"
101
NHL21013-3/4"-A1A2 1/2" PG EXPORT COMPLIANCE
DR21161-2"-A1K1
LZSC SPV 1THIS SEP.
DOCUMENT FOR CONSTRUCTION
26.14 CONTAINS (IFC-1) THAT IS SUBJECT TO U.S.
TECHNICAL INFORMATION
NHL21820-1"-G1A2 113 PG SHK HGK JJY
104A LZSC LV 2120 EXPORTSEP.CONTROL PARA CONSTRUCCIÓN
26.14 REGULATIONS. (IFC-1)
IT MAY NOT BE EXPORTED OR RE-EXPORTED EXCEPT
IN VIEW SPV
NORMAL
GAT
3" 1/2"
NC
104A 3" 1/2" NOTE 6 SPV
NOTE 6 HXA HS
OPERATION
OWNER : OF THE PLANT WITHIN OWNER'S CONTRACTUAL OBLIGATIONS, IS TO BE
SL28811-1/2"-ASA2-HC
SML27982-1"-BSA2-HC
C PROPIETARIO:
MADE WITHOUT PRIOR WRITTEN CONSENT OF KELLOGG BROWN & ROOT LLC.
HS 2046 AGV YACIMIENTOS PETROLIFEROS
MG21220-4"-B1J1-TM
MG21230-3"-B1J1-TM
CHE
SLC27220-3"-ASA2-HC
SPV
SL27210-10"-ASA2-HC
NHG21743-2"-A1A2
4 4
S1 Engineering Services by KBR Technical Services, Inc.
CHE
SPV CONTRACTOR :
(TWO PHASE)
A1 CONTRATISTA:
SAMSUNG ENGINEERING CO., LTD.
C 2049
104B I HSB
S1 SHC29070-1/2"-NSA2 YACIMIENTOS PETROLIFEROS FISCALES
SEOUL, KOREA BOLIVIANOS
2 102
HSB
DR21824-2"-A1A2
AGV
CARRASCO, BOLIVIA
AGV LICENSOR :
TO DR 21033
104A SPV SPV BYPASS LICENCIADOR: 1,200 MTPD AMMONIA PLANT
3082
3
I
BYPASS
LZL 2045
A3
2048
A3
S-22-1 3
5 104B C
S-13F-1
TO U-DA201
TO U-FA103
TO U-FA103
TO U-EA401
TO DR 21062
TO SLC 27240
3055
3057
3058
3063
3081
TO U-DA503
TO DR 21033
3078
E-U-13F
PROYECTO:
E-U-5A-3
S-5K-2
E-U-13G-1
E-U-13G-1
E-U-13C-2
E-U-13A-1
E-U-5L
FROM U-GA110A/B
FROM U-GA101A/B
E-U-13C-2
E-U-13C-2
FROM SL 27350
E-U-13C-1
E-U-5E-2
E-U-5B-1
E-U-5A-2
S-13G-2 U-EE101
FROM LIC-104
S-13G-1 S-13G-2
E-U-5H-3
E-U-5A-3
3080
HP CARBAMATE EJECTOR
P
3050
3051
3061
3062
2640
3079
3401
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
U-EA101
NOTES:
CARBAMATE CONDENSER 1. FOR GENERAL
1. ELEVATION OF NOTES ANDNOZZLE
GAS FEED SYMBOLS SEE DRAWINGS
CENTRE LINE TO U-EA 101
21 62-D001,
SHALL BE62-D002
HIGHER&THAN
62-D003.
TOP TANGENT LINE OF U-DA101 BY 21
DUTY : 44.180 Gcal/hr
MORE THAN 1000MM.
SHELL DES./OPR. PRESS.: 171 kg/cm² G / 155 kg/cm² G
E-U-21-2
E-U-21-2
E-U-21-2
SHELL DES./OPR. TEMP.: 210° C/ 180° C/ 180° C 2. PAD NOZZLE FOR PRV CONNECTION SHALL BE HEATED BY
TUBE DES./OPR. PRESS.: 8 kg/cm² G & F.V. / 5 kg/cm² G STEAM TRACE AS FOLLOWS.
TUBE DES./OPR. TEMP.: 200° C/ 158° C/158° C
S-21-1 S-21-1 S-21-1
TO RV21270
TO RV21270
TO RV29510
20 MATERIAL(SHELL/TUBE) : C.S. + 25CR DUPLEX S.S. LINING / DP28W 20
3253
3254
3256
U-EA101 SHELL
SLL27651-3/4"-ASA2-HC STEAM TRACE
V21260-12"-A1A2
19 19
I/P 3. PIPE ROUTING FOR PRESSURE INSTRUMENT SHALL BE AS BELOW.
HY HIC FROM SIDE OF PIPE
103 103
SLL27651-1/2"-ASA2-HC
SLL27652-1/2"-ASA2-HC
MG21250-4"-M1J2-TM
RV21211-14"-A1A2
FC
RV21212-14"-A1A2
18 SPV MIN. TSO HV 18
R1 103 SLL27650-1"-ASA2-HC
2003
NH3 OR CO2 LINE
SHC29042-1/2"-M1J1
(JM)
AGV
SPV 4"
DIRECT TO NOZZLE I/P
2004 FXY
17 R1 104 FY 17
SPV 104
NOTE 10
S-5A-1
E-U-5A-1 3251
MG21210-4"-M1J2-TM
2008
AGV
GLO
I HS
MIN.
TO PV-101 MIN. VENT PT
S
SPV
MIN. 6 104
2006 B4 AGV V21260-12"-A1A2 B4
PG
AGV
3J4 FROM SIDE OF PIPE
16 3J4 FIC
16
SPV
SHC29041-1/2"-M1J1
SET @ 171.0 kg/cm^2g SET @ 179.5 kg/cm^2g AGV 104
GLO
GLO
TI 2005 L
MIN.
#300 200K #300 200K FROM SIDE OF PIPE
PRV 120 B4
PRV FC
2005A 2005B TSO 4. NO POCKETS AND NO HORIZONTAL PORTION SHALL BE PERMITTED
AC24140-6"-M1J1-TS FZSC I FZL UNDER OPERATING CONDITIONS.
15
N7A N7B SHC29048-1/2"-M1J1 104 6 104 C 15
(JM) (JM) 6"
S-13F-1 TT
120
N41A
(JM) SPV
2007
FV FT
104
5. DELETED.
DIRECT TO DIRECT TO MH
N1B N12 DIRECT TO NOZZLE 104 6. FOR HYDROSTATIC PRESSURE TEST PURPOSE.
P1
S-13G-1 NOZZLE NOZZLE 20
AGV
HSB
104 NOTE 12
MIN.
TI TT TI TT SHC29041-1/2"-M1J1 7. BLOCK VALVE,BLEEDER AND PRESSURE GAUGE FOR HIGH
3" 3" HH PRESSURE STEAM CONDENSATE FLUSHING SYSTEM SHALL BE
14 S-16-1 122
L
122 123
L
123 8
N3A N41B
CW28531-1"-12CS2S01
# 16-1
STA
2001
SPV
2010
BYPASS
S-5M-1 LOCATED NEAR EVERY FLUSHING POINT.
14
AC24130-6"-M1J1-TS
S-13A-3 NOTE 11 NOTE 11 NOTE 2 TM TT
121
TI
121 AI
8. DELETED.
AGV
AGV A2 SPV IN VIEW
113A PG 9. 304SS SHALL BE USED FOR ONLY ELBOW ON SL 27430-32"-ASA2-HC.
S-22-1 NOTE 2 TM AT 113
LEAK DETECTION COMMON FAULT
SPV
MIN.
2011 115 SPV
13 2009 B4 10.LENGTH TO DOWNSTREAM EQUIPMENT SHOULD BE MINIMIZED. 13
SYSTEM FOR AGV 2012 A1
S-5A-1 PI
N33B
U-EA101 AXA DR24132-3/4"-A1A2
A1 SPV
11. SKIN THERMOMETER.
N33A 113B
AGV
N1A MH SPV 2014
102A
S-5M-1 B.V
AGV
20 H 6" 12. CLAMP ON TYPE ULTRASONIC FLOWMETER.
U-EA101 N41C C 2013
AI 1/2" 1/2" S1 A3
PI I PAHH TT TI 113C 13. DELETED.
S-13A-1
AGV
12 102B 2 102 106 106 NOTE 7 CHE 12
S-5A-1 AI
SPV
S-21-1 PI
102C N45
113D L
2121 A1
9
PSHH H S-16-1
CW28521-1"-12CS2S01
102 LI LT 8
# 16-1
DR24133-2"-A1A2
11 101 101 11
L 7
H 2 OUT OF 3
E-U-5A-1 3250 PIC RADIO 6 NOTE 6
101 ACTIVE NOTAS:
TO PV-101 L TYPE 5 TT TI
SPV TI TT 107 107 REFERIRSE AL PLANO DE DTI NO.E-U-4E-1
SPV SPV H.P.
SPV SPV 110 110 4 N41D
10 A1 2019 2020 LINING 10
2016 2018 A1 A1 A1 2017
A1
1/2" 1/2" 1/2" 1/2" 3
PT PT PT PT SPV
1/2" PG TI TT NEAR U-EA101 STA
2000 MM
AGV
AGV
AGV
AGV
SPV 2
AGV
2021
AGV
109 109
AGV
AGV
101 TT TI 2002
AGV
2015 A1 A1 SHELL
AGV MIN. N41F,G 1 108 108
AGV
9
NOTE 3 N18 PI 9
SPV SPV SPV SPV SPV N41E N3B HH 8 U-FA102 103
MIN.
MIN.
NHL21830-1"-M1J1-TM
FROM FV-106 N13
8 8
N83 SPV
SL27340-32"-ASA2-HC NOTE 9
N92 2001 N45A
N96B N2 (TWO PHASE) STRAIGHT
SPV N20
MIN.
SPECIAL LIC
MH
AGV
2022
AGV
AGV 103
SHC29083-1/2"-M1J1
ASA2 20 SPV
GAT
P2
DR
AGV
GAT
(MAX. SLOPE)
P1 BY BY
DR
SHC29040-1/2"-NSA2
AC24130-6"-M1J1-TS
EXPORT IT MAY NOT BE EXPORTED OR RE-EXPORTED EXCEPT
SLL27650-1"-ASA2-HC
P1
AGV
5 KELLOGG
REV.NO. BROWN & ROOT LLC.
DATE THIS INFORMATION IS TO BEDRN
DESCRIPTION HELD IN CONFIDENCE.
CHECKED APPROVED 5
N° REV FECHA
NO DISCLOSURE DESCRIPCION
OR OTHER USE ELABORADO
OF THIS DOCUMENT, EXCEPT VERIFICADO FOR
AS NECESSARY APROBADO
AI
NOTE 8
OPERATION
OWNER : OF THE PLANT WITHIN OWNER'S CONTRACTUAL OBLIGATIONS, IS TO BE
101B
S-5A-1 US21160-10"-M1J2-TM (MAX SLOPE) PROPIETARIO:
MADE WITHOUT PRIOR WRITTEN CONSENT OF KELLOGG BROWN
YACIMIENTOS & ROOT LLC.
PETROLIFEROS
MG21050-10"-M1J2-TM
E-U-5A-13252
US21051-3"-M1J1-TM
NOTE 4, 8 f(x) FISCALES BOLIVIANOS
TO HV-106 SEE DETAIL "B" OF "STEAM SYSTEM"
4 (#13B-2) 4
5183 E-U-5A-1 AX CONTRACTOR :
Engineering Services by KBR Technical Services, Inc.
( License No. F-2397 )
101 CONTRATISTA:
SAMSUNG ENGINEERING CO., LTD.
FROM AT-101 RADIO
ACTIVE YACIMIENTOS PETROLIFEROS FISCALES
SEOUL, KOREA BOLIVIANOS
C DR21062-4"-A1A2
TYPE CARRASCO, BOLIVIA
AI LICENSOR :
3 101A
LICENCIADOR: 1,200 MTPD AMMONIA PLANT 3
TO DR 21081
METER) DR21063-4"-A1K1U C PROJECT :
S-5M-1 S-13G-1
5193
S-13F-1 PROYECTO:
TO DR29110
TO US21641
2851
E-U-13G-1
E-U-5A-1
E-U-13F
E-U-5M
E-U-5E-2
FROM U-GA102A/B
2 N° DEL CONTRATO: DLG 0304 2
FROM SHC29082
E-U-5A-4
FROM U-GA105
E-U-5A-4
TITLE: PIPING AND INSTRUMENT DIAGRAM
JOB NO.
PIPINGDWG.
AND INSTRUMENTATION DIAGRAM
S-22-1 S-13F-1 N° DE PROYECTO
SYNTHESIS SECTION (2/4)
FROM DR 21823
FROM U-DA101
E-U-5A-4
E-U-22-1
LIC-401
3040
3260
2597
3262
2881
SECCION DE SINTESIS
3063
2854
1 1
D I
SCALE
F264 DWG.NO. :
N° DEL DIBUJO: E-U-5A-2
1 OF 1SH 1/1
HOJA
ESCALA 1/1000
22X34 CLASS JOB NO. DOCUMENT NO. REV. 1
SHT NO. REV
REVISION
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
N8
3/4" NOTES:
MH
20" 1.1. FOR GENERAL
LOCATION NOTES SHALL
OF HV-105 AND SYMBOLS
BE NEARSEE DRAWINGS
U-DA101.
21 U-DC101 TT N1
62-D001, 62-D002 & 62-D003. 21
2.
REACTOR 101 FLANGE FOR BOTTOM CO2
DIMENSION (I.D. X T-T) : 2950 mm x 14800 mm FEED NOZZLE OF U-DC101 SHALL BE INSTALLED TO PURGE AIR
DES. / OPER. PRESS. : 171kg/cm² G / 155kg/cm² G FOR INSPECTION OF U-DC101 INTERNAL
DES. / OPER. TEMP. : 210 ° C/ 182 °C N41A N18 (MAX. SLOPE) US21040-12"-M1J2-TM
2846 E-U-5A-4 3. SOLUTION LINE FROM U-DC101 TO U-DA101 SHALL BE ROUTED
20 MATERIAL : C.S. + 25CR DUPLEX S.S. LINING 20
TI NOTE 3, 6, 8 (TWO PHASE) TO U-DA101 AS SHORT AS POSSIBLE WITH MAX SLOPE.
101
5 S-5A-1 4. NEAR SPOOL PIECE PLANT AIR SHALL BE INJECTED AS
PASSIVATION AIR BEFORE START-UP THROUGH THIS HOSE
CONNECTION.
S
2 3 4
S-13F-1 B.V
112B
8. DELETED.
H
AI I I
S-22-1 3
112C 5 6 NOTE 1
9. HOSE CONNECTION SHALL BE USED FOR FLUSHING BY LP
STEAM OR STEAM CONDENSATE.
BYPASS HZC
HSB
17 105 17
S-13G-1 TT TI
AI
112D
105 10. LENGTH BETWEEN U-EE 101 AND U-DC 101 SHOULD BE MINIMIZED.
104 104 L
FC 11. DOUBLE ORIFICE TAP VALUES SHALL BE PROVIDED TO ORIFICE
HV
S-5A-1 U-DC101 2
LINING
105 S-5A-1 FLOW METER ( TOTAL 4 VALUES FOR EACH FLOW METER)
HZL I HZSC CO21660-4"-M1J1-AC
105 5 105 TSO 2848 E-U-5A-4
16 C 16
6" MIN. SPV TO U-DA101
I
MIN.
TT TI AGV 2069
6
105 105 SPV B4
SHELL SPV
2067 W3 MIN. NOTAS:
1 2065 AGV
CHE
B4 1. LA LOCALIZACION DEL HV-105 DEBE SER CERCA DE U-DA101.
15 TT TI SPV
SHC29064-1/2"-M1J1
15
N41,CD
103 103 MIN. 2066 2. LA BRIDA PARA LA BOQUILA DEALIMENTACION DE CO2 DEL
FONDO DE U-DC101 DEBE SER INSTALADA PARA PURGAR ELAIRE
AGV B4 PARA LA INSPECCION DE U-DC101 INTERNO.
SHC29061-1/2"-M1J1 3. LA LINEA DE SOLUCION DESDE U-DC101 HASTA U-DA101 DEBE
S-5A-1
AGV
14 N41B SER RUTEADO LO MAS CORTO COMO SEA POSIBLE 14
CON LA PENDIENTE MAXIMA.
HS 3/4" x 1/2"
105A 4. EL AIRE DE PLANTA CERTA DEL TRAMO DE CAÑE
RIA DEBE
N11 N12
I/P
SPV
2068 A2
S-13F-1 SER INJECTADO COMO AIRE DE PASIVASION ANTE DEL ARRANQUE
MIN. SHC29062-1/2"-M1J1 A TRAVES ESTA CONEXION DE MANGUERA.
FY 2849 E-U-5A-4
13
4000 mm 105 13
NOTE 8,10
DR21621-3/4"-A1A2
I I I I I
SHC29061-3/4"-M1J1
VENT CONDICIONES DE OPERACION.
S
2006 2 3 4 5 6
US21030-10"-M1J2-TM
12
2904 S-5A-1
E-U-5A-1
LP
FZL
FIC
105
7. LA VALVULA DE BLOQUEO DE PURGADO E INDICADOR DE PRESION
PARA EL SISTEMA LAVADO DE CONDENSADO DE VAPOR DE ALTA 12
NOTE 2
FROM U-EE 101 105 PRESION DEBEN SER LOCALIZADOS CERCA DE CADA PUNTO DE
C CO21620-6"-F1A2-AC LAVADO.
FV
105 FC FZSC
f(x) 8. ELIMINADO.
TSO 105
MIN. FX 9. LA CONEXION DE MANGUERA DEBE SER USADA PARA EL LAVADO
FZSC
MIN.
2052
MIN.
9 9
P1 2053
AGV
AGV AGV
B4
CHE
AGV
NOTE 11
FT FE
105 SPV
SPV MIN. 105
MIN.
2060 Q5
8 2051
A2
SHC29073-1/2"-M1J1 MIN.
CO21630-3"-F1A2-AC S-13F-1 8
SHC29066-1/2"-M1J1
5197 E-U-5A-4
GLO 3"
TO SPV-2114
SHC29065-1/2"-M1J1
AGV
2905 E-U-5A-1
7 TO SPV-2077 7
FROM SHC29071 SPV BY BY
S-13F-1 SHC29063-3/4"-M1J1
2842 E-U-5A-4 APP APP APP APP
SPOOL
2054 B4
DR21032-3/4"-A1A2
PIECE
CHK CHK
SHC-SL TO SPV - 2079
RS
GAT
NOTE 4
AGV
GAT
GAT GAT CHE
GAT
GLO
GLO
1" FROM DR 21231 AS AUTHORIZED
B5 1/2" PG 2118
A1 0 MAR.14.14 UNDER
FORAPPLICABLE U.S. EXPORT
CONSTRUCTION (IFC) CONTROL REQUIREMENTS
SBL JJY
SPV SHK
111 NOTE 5 THIS MAR.14.14 PARA CONSTRUCCIÓN (IFC) IS PROPRIETARY TO
DR21642-3/4"-A1A2
DR21643-3/4"-A1A2
DR21622-4"-A1K1U
SML27971-1"-BSA2-HC
CONTRATISTA:
FT
SAMSUNG ENGINEERING CO., LTD.
FROM NHL 21743 2062 6"
A1 155 YACIMIENTOS PETROLIFEROS FISCALES
SEOUL, KOREA BOLIVIANOS
CARRASCO, BOLIVIA
CHE
SPV
FE NOTE 11
LICENSOR :
C 2063
155
LICENCIADOR: 1,200 MTPD AMMONIA PLANT
3
DR21033-4"-A1K1U C S1 NOTE 7 3
DR21034-2"-A1K1
TO DR29110
TO DR 29180
SPV
SHC29060-3/4"-NSA2
5194
3030
2
2064
A3 S-13F-1 N° DEL CONTRATO: DLG 0304 2
E-U-13G-1
E-U-5P-2
E-U-13F
E-U-5P-2
FROM SHC29040
N° DE PROYECTO
SYNTHESIS SECTION (3/4)
S-22-1 S-22-1
FROM U-GB101
E-U-22-1
E-U-22-1
E-U-22-1
FROM PIC-153
2901
2900
1 1
2906
D I
SCALE
F264 DWG.NO. :
N° DEL DIBUJO: E-U-5A-3
1 OF 1SH 1/1
HOJA
ESCALA 1/1000
22X34 CLASS JOB NO. DOCUMENT NO. REV. 1
SHT NO. REV
REVISION
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
U-DA101 NOTES:
FROM U-EA101
2851
1.1.FOR GENERAL
ELEVATION OFNOTES AND NOZZLE
GAS FEED SYMBOLS SEE DRAWINGS
CENTER LINE TO U-EA101 SHALL
REACTOR 62-D001, 62-D002
THAN& TOP
62-D003.
E-U-5A-2
E-U-21-2
E-U-21-2
21 BE HIGHER TANGENT LINE OF U-DA101 BY MORE THAN 21
E-U-5A-2
T.T (SHELL/TUBES) : 9682 / 8000 mm
SHELL DES./OPR. PRESS.: 25kg/cm² G & F.V. / 20 kg/cm² G 2. U-DA101 SHALL BE INSTALLED WITH MAXIMUM DEVIATION FROM
TO RV24420
TO RV24420
S-21-1 S-21-1
TO U-EA101
THE VERTICAL OF 1/1000.
SHELL DES./OPR. TEMP.: 240 ° C/ 214 °C / 214 ° C
TUBE DES./OPR. PRESS.: 171 kg/cm² /G155 kg/cm² G
S-5B-1
2852
2853
2854
3. CONTROL VALVE LV-102 SHALL BE SUPPORTED STRONGLY.
20
S-5A-1 TUBE DES./OPR. TEMP.: 210 ° C/ 182 ° C/ 171 °C
MATERIAL(SHELL/TUBE) : C.S. / DP28W S-13F-1 4. THE RADIUS OF BEND FOR LV-102 OUTLET FIRST BEND SHALL BE
20
MG21050-10"-M1J2-TM
RV27154-24"-A1A2 MORE THAN 5 TIMES OF THE NOMINAL OUTSIDE DIAMETER.
CW28522-1"-12CS2S01 S-16-1
NOTE 12
# 16-1 5. THE MATERIAL OF TRIM FOR SPV-2113, 2114, AND 2115,SHALL BE
6Q8 RV27152-24"-A1A2
HIGH Cr AUSTENITIC OR DUPLEX S.S SEE H-171 FOR DETAIL
19 SET @ 26.2 kg/cm^2g CW28532-1"-12CS2S01
S-16-1 S-21-1 SPECIFICATION. 19
# 16-1
PRV
2006B S-13A-4 6. DELETED .
MIN.
SET @ 25.0 kg/cm^2g AI
17 2006A 17
111C FROM SIDE OF PIPE
SHC29084-1/2"-M1J1 SSC #150
2847 E-U-5A-1 N77 BSA2
2003 #600 VE AI
#600
FROM SHC29081 GAT 111D
S-13F-1 NOTE 5, 10 B6
#300 L
NO POCKETS
N33B N75B NOTE 11
SPECIAL
N75A
S-13A-4
SMLC27160-8"-BSA2-HC
HC
15
TI TT GAT PT 15
NOTE 11 PG
112 112 DR NOTE 13
BSA2 CW28714-1/2"-12CS2S01
E-U-16-1 3983 FROM SIDE OF PIPE
STA
GAT N76
N41B FROM CW28520
CO21660-4"-M1J1-AC
2004
S-16-1
14
2848 S-5A-1
E-U-5A-3
N11 CW28730-1/2"-12CS2S01
3984 E-U-16-1 U-FA101
14
MIN.
FROM HV - 105 TO CW28530 FROM SIDE OF PIPE
PIC
106
AGV
N45A N12 N7 9. SML LINE SHALL BE LOCATED NEAR 5D BEND.
GAT
GAT
13 NOTE 8 13
AGV
AGV
1/2" SPV
PG PT
H LIC
110 105 2073 LT LIC 11. NO POCKETS AND NO HORIZONTAL PORTION SHALL BE
B4 106 PERMITTED UNDER OPERATING CONDITION.
S-13F-1 H N41C N93 102 102 N11
AGV
TI TT
AGV
12
SHC29062-1/2"-M1J1 113 113 RADIO
N45B
12.DELETED 12
2849 E-U-5A-3 2071 A1 SPV 2072 A1 L ACTIVE
SPV 1/2"
TYPE 13. ELEVATION DIFFERENCE BETWEEN NOZZLE NO.75A OF U-DA101
FROM SHC29061 2126 H 2131
PI A1 SEE DETAIL "A" OF "STEAM SYSTEM" AND CENTER LINE OF U-FA101 SHALL BE MORE THAN 2000mm.
A1 N45B
S-13A-1
US21051-3"-M1J1-TM
US21080-8"-M1J2-TM
DR21661-3/4"-M1J2-PP
20" REFERIRSE AL PLANO DE DTI NO.E-U-4E-1
BYPASS
I/P HSB
102B
LY
10 102 10
LXY
MIN. SPV 102
2074 I I I
A2 VENT
S
AGV
3 5 6
AGV
9 STA 9
NOTE 5
SPV 2005
2076 A1 1/2" LZL
SPV SSC
AGV 102 C
2114 2002
S-13F-1 SPV
SPECIAL
B6
8 SHC29065-1/2"-M1J1 2077 B4 8
5198 E-U-5A-3 MIN. MIN. LZSC
C LZSC FC
FROM SHC 29061 102 102 TSO
SHC29066-1/2"-M1J1
5197 E-U-5A-3 LV
AGV
FROM SHC 29061 LP 102
7 S-13F-1 7
DR21041-2"-A1A2
US21031-1"-M1J1-TM NOTE 3
2844 E-U-5A-3 SPV SIDE OF PIPE 8" BY BY
APP APP APP APP
FROM SPV-2050 2078 CHK CHK
S-5A-1
DR21662-3/4"-A1A2
SPV R1
SPV ISS REV DATE SYSTEMS CSE CSS PROJ
2075 MIN.
MIN.
US21641-3"-M1J1-TM P1 2079 B4 NOTE 4 (TWO PHASE)
2845 E-U-5A-3 INTERNAL APPROVALS
AGV
MIN.
MIN.
6 AGV MIN. LP 6
FROM SPV-2052 EXPORT COMPLIANCE
1THIS SEP. FOR CONSTRUCTION
26.14 CONTAINS
DOCUMENT (IFC-1) THAT IS SUBJECT TO U.S.
TECHNICAL INFORMATION
CHE GLO
HGK JJY
NC
SHK
GLO
STD SEP.CONTROL PARA CONSTRUCCIÓN
26.14 REGULATIONS. (IFC-1)
MIN.
EXPORT IT MAY NOT BE EXPORTED OR RE-EXPORTED EXCEPT
2002 AS AUTHORIZED
MAR.14.14 UNDER
FORAPPLICABLE U.S. EXPORT
CONSTRUCTION (IFC) CONTROL REQUIREMENTS
AGV
US21641-3"-M1J1-TM 0 SHK SBL JJY
THIS MAR.14.14 PARA CONSTRUCCIÓN
DOCUMENT CONTAINS (IFC) IS PROPRIETARY TO
INFORMATION WHICH
5 KELLOGG
REV.NO. BROWN & ROOT LLC.
DATE THIS INFORMATION IS TO BEDRN
DESCRIPTION HELD IN CONFIDENCE.
CHECKED APPROVED 5
SPV
S-13F-1 2081
NOTE 9 GLO N° REV FECHA
NO DISCLOSURE DESCRIPCION
OR OTHER USE ELABORADO
OF THIS DOCUMENT, EXCEPT VERIFICADO FOR
AS NECESSARY APROBADO
AGV
P1 OPERATION
OWNER : OF THE PLANT WITHIN OWNER'S CONTRACTUAL OBLIGATIONS, IS TO BE
SHC29063-3/4"-M1J1
GLO
DR21644-1"-BSA2
DR21624-4"-A1K1
2842 E-U-5A-3 PROPIETARIO:
MADE WITHOUT PRIOR WRITTEN CONSENT OF KELLOGG BROWN & ROOT LLC.
RS YACIMIENTOS PETROLIFEROS
MIN. SPV
FROM SMC29061 SPOOL FISCALES BOLIVIANOS
SML27970-2"-BSA2-HC
PIECE 2080 Q5 DR21121-3/4"-A1A2
US21120-8"-B1J1-HC
4 4
SMLC29360-1"-BSA2 CONTRACTOR :
Engineering Services by KBR Technical Services, Inc.
CONTRATISTA: ( License No. F-2397 )
SAMSUNG ENGINEERING CO., LTD.
GLO
GLO
NC
DR21623-2"-A1K1U
TO DR29110
TO U-DA201
S-5B-1
2836
2834
TO DR21232
TO DR29180
S-13F-1 S-13G-1 PROJECT :
2840
2838
PROYECTO:
E-U-13G-1
C PROYECTO DE AMONIACO/UREA DE YPFB
E-U-13F
S-22-1
FROM SMLC29020
FROM SML27170
2 N° DEL CONTRATO: DLG 0304 2
E-U-5B-1
E-U-22-1
TITLE: PIPING AND INSTRUMENT DIAGRAM
E-U-5A-3
PIPINGDWG.
E-U-22-1
JOB NO.
DR21081-2"-A1K1
S-22-1 N° DE PROYECTO AND INSTRUMENTATION DIAGRAM
MISCELLANOUS STEAM AND
S-22-1 STEAM CONDENSADE SYSTEM (1/2)
P
2837
SC2566 TITULO DEL DIBUJO: DIAGRAMS DE TUBERÌ S
A E INSTRUMENTACIÒ
N
2839
SECCION DE SINTESIS
1 1
D I
SCALE
F264 DWG.NO. :
N° DEL DIBUJO: E-U-5A-4
1 OF 1SH 1/1
HOJA
ESCALA 1/1000
22X34 CLASS JOB NO. DOCUMENT NO. REV.
SHT NO. REV
REVISION
1
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
NOTES:
U-FA203 U-DA201 1. 1.
FOR GENERAL NOTES AND
STEAM TRACE SHALL BE SYMBOLS
PROVIDEDSEE
FORDRAWINGS
LINE FROM PRV OUTLET
CONDENSATE POT 62-D001, 62-D002 & 62-D003.
E-U-21-2
E-U-21-2
21 TO MAIN HEADER CONNECTED TO U-FA701. REFER TO P&ID 21
FOR HP DECOMPOSER HP DECOMPOSER DWG. NO. 21-1.
DIMENSION (I.D. X T-T) : 800 mm x 1000 mm I.D (SHELL/TUBE) : (1950 / 1850) mm / 27.8 mm 2. PIPING LENGTH OF MG21230-3"-B1J1-TM (FROM BRANCH POINT
TO RV24420
TO RV24420
DES. / OPER. PRESS. : 8.0kg/cm² G & F.V. / 4.5kg/cm² G T.T (SHELL/TUBE) : 12000 / 7000 mm TO U-DA201) SHALL HAVE SHORTEST ROUTE.
DES. / OPER. TEMP. : 200 ° C/ 155 °C SHELL 1 DES./OPR. PRESS.: 8.0kg/cm² & GF.V. / 4.5 kg/cm² G
SHELL1 DES. / OPER. TEMP.: 200 ° C/ 155 °C / 155 ° C
2633
2634
MATERIAL : C.S. 3. 14 DEGREE TAPER SPECIAL REDUCER SHALL BE REQUIRED.
20 SHELL2 DES./OPR. PRESS.: 25 kg/cm² G / 20 kg/cm² G 20
SHELL2 DES. / OPER. TEMP.: 240 ° C/ 214 °C / 158 ° C 4. THE RADIUS OF FIRST BEND FOR LV-201 OUTLET SHALL BE MORE
THAN 5 TIMES OF THE NOMINAL DIAMETER.
TUBE DES. / OPER. PRESS.: 20 kgcm² G / 16.5 kgcm² G
S-21-1
RV22310-18"-A1A2-TS
S-21-1
NOTE 1
RV22202-16"-A1A2
TUBE DES. / OPER. TEMP.: 190 °C / 136 °C / 152 ° C
5. CONTROL VALVE LV-201 SHALL BE SUPPORTED STRONGLY.
MATERIAL(SHELL/TUBE) : C.S. / DP3
19
6R10 NOTE 8 S-5B-1 6. STRAIGHT LENGTH FROM LV-208 TO FIRST ELBOW SHALL BE 10 19
SET @ 20.0 kg/cm^2g TIMES OF NORMAL PIPING OUTSIDE DIAMETER AS MINIMUM .
PRV TT TI S-5B-2 7. DELETED.
(JS) 2007 125 125
L
MG22050-10"-B1J1-HC
S-13A-3 8. SKIN THERMOMETER
H
18
PI PT DIRECT TO 6"
S-21-1 18
17 N37 1-1/2"
S-13G-1 LINEA DESDE LA SALIDA DE PRV AL CABEZAL PRINCIPAL
CONECTADO AL U-FA701. REFERIRSE AL PLANO DE DTI 17
N41B
US21120-8"-B1J1-HC
TT
201
TI
201
S-13F-1 NO.21-1.
GRADOS.
PV 24"
202
FC
N1 MH
PRV
GAT
GAT
2008 4. EL RADIO DEL PRIMER DOBLADO PARA LA SALIDA DE LV-201
GAT DEBE SER 5 VECES MAYOR QUE EL DIAMETRO NOMINAL.
SL22240-3/4"-ASA2-HC 12" SL22200-12"-ASA2-HC
15 N77 GAT 5. LA VALVULA DE CONTROL LV-102 DEBE SER SUJETADA 15
N65
GAT
VE FUERTEMENTE.
3/4" ASA2
6. EL LARGO RECTO DESDE LV-208 HASTA EL PRIMER CODO DEBE
HC SER 10 VECES EL DIAMETRO EXTERIOR DELA TUBERIA NORMAL.
CASCADE SL22201-8"-ASA2-HC
7. ELMINADO.
14 14
N34
S-5B-1 S-13A-3 8. TERMOMETRO PARA PIEL
SLC22210-4"-ASA2-HC
GAT
500 MM
N76 GAT
MIN.
N75 DR
13 3/4" ASA2 13
N16
SMLC22230-6"-BSA2-HC N79 GAT
HC VE
N73 3/4" BSA2
3/4" 1"
12 ASA2 ASA2 HC N78 GAT 12
N45A N44A SMLC27140-6"-BSA2-HC DR
GAT GAT 3/4" BSA2
U-FA203 N63
LP (JS)
FI N12
11 201 48A.2" 11
MIN.
LT LG GLO MIN
208 HH N3A N3B HH 202
8" 8" 3" IN VIEW SG
MAG
GLO
NC
3/4" N11
ASA2 ASA2 1-1/2" N45A
TIC TT 3" H
10 N45B N44B LT LIC
10
GAT GAT 202 202
N41A 201 201
1" L
48B.2"
3"
N17 SG N45B
DR21231-3/4"-A1A2
9 9
SLC22220-4"-ASA2-HC
N18
I/P
MIN FOR
LY
PIPING
MIN
201
8 8
GLO
GAT
FC
LV
LIC
H
C
S-5B-1 201
208 US22010-6"-B1J1-HC NO POCKETS LP
L
7 7
GAT
6" NOTE 5
SIDE OF PIPE BY BY
DR22221-4"-ASA2-PP
GLO
NC
GAT CHK CHK
1/2" SRE-2002
AGV
US22020-10"-A1L1-HC ISS REV DATE SYSTEMS CSE CSS PROJ
I/P FC INTERNAL APPROVALS
6 NOTE 4 LP 6
LY
GLO
MIN.
2082 2004 EXPORT IT MAY NOT BE EXPORTED OR RE-EXPORTED EXCEPT
GLO
LV PHASE
NC
A1 AS AUTHORIZED
MAR.14.14 UNDER
FORAPPLICABLE U.S. EXPORT
CONSTRUCTION (IFC) CONTROL REQUIREMENTS
208 S-5B-2 0 SHK SBL JJY
GLO
THIS MAR.14.14 PARA CONSTRUCCIÓN
DOCUMENT CONTAINS (IFC) IS PROPRIETARY TO
INFORMATION WHICH
5 US22011-1"-B1J1-HC KELLOGG
REV.NO. BROWN & ROOT LLC.
DATE THIS INFORMATION IS TO BEDRN
DESCRIPTION HELD IN CONFIDENCE.
CHECKED APPROVED 5
NOTE 6
GAT
N° REV FECHA
NO DISCLOSURE DESCRIPCION
OR OTHER USE ELABORADO
OF THIS DOCUMENT, EXCEPT VERIFICADO FOR
AS NECESSARY APROBADO
CHE
OPERATION
OWNER : OF THE PLANT WITHIN OWNER'S CONTRACTUAL OBLIGATIONS, IS TO BE
PROPIETARIO:
MADE WITHOUT PRIOR WRITTEN CONSENT OF KELLOGG BROWN & ROOT LLC.
YACIMIENTOS PETROLIFEROS
FISCALES BOLIVIANOS
SMLC22230-6"-BSA2-HC
SMLC27140-6"-BSA2-HC
SL27941-3/4"-ASA2-HC
MG22050-10"-B1J1-HC
SLC27240-4"-ASA2-HC
GLO
SL27230-12"-ASA2-HC
S-5B-1
MG21230-3"-B1J1-TM
US21120-8"-B1J1-HC
4 4
GLO
GLO Engineering Services by KBR Technical Services, Inc.
CONTRACTOR :
(TWO PHASE)
CONTRATISTA:
SAMSUNG ENGINEERING CO., LTD.
2652 E-U-5B-2
YACIMIENTOS PETROLIFEROS FISCALES
SEOUL, KOREA BOLIVIANOS
TO US22032
US22021-1"-B1J1-HC LICENSOR :
CARRASCO, BOLIVIA
LICENCIADOR: 1,200 MTPD AMMONIA PLANT
3
S-5B-1 S-13A-3 S-5B-1
SMLC29371-3/4"-BSA2 3
PROJECT :
TO U-FA102
TO SLC27490
TO DR-21622
TO U-EA301
PROYECTO:
S-13G-2 S-13G-2 S-13F-1
2628
2629
2632
2635
S-22-1 PROYECTO DE AMONIACO/UREA DE YPFB
E-U-13G-2
E-U-13C-1
E-U-13A-1
E-U-5A-4
E-U-5A-1
E-U-13F
2 N° DEL CONTRATO: DLG 0304 2
E-U-13C-1
FROM U-DA101
FROM U-EA101
FROM SL27350
E-U-5D-1
FROM SL27943
FROM U-FA101
E-U-5A-3
N° DE PROYECTO
S-13G-1
NOTE 2
2627
2630
3055
2636
2637
1 1
D I
SCALE
F264 DWG.NO. :
N° DEL DIBUJO: E-U-5B-1
1 OF 1SH 1/1
HOJA
ESCALA 1/1000
22X34 CLASS JOB NO. DOCUMENT NO. REV. 1
SHT NO. REV
REVISION
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
U-DA202 NOTES:
6R8 1. FOR GENERAL
1.STEAM NOTESBE
TRACE SHALL AND SYMBOLS
PROVIDED SEE
FOR DRAWINGS
LINE FROM PRV OUTLET
NOTE 4 LP DECOMPOSER 62-D001, 62-D002 CONNECTED
& 62-D003.
21 SET @ 4.0 kg/cm^2g TO MAIN HEADER TO U-FA701.REFER TO P&ID 21
E-U-21-2
PRV
S-21-1 2009
126 126 L
H
S-21-1 T-T (SHELL / TUBE) : APPROX 14500mm / 3000mm
SHELL DES./OPR. PRESS.: 8.0 kg/cm² G& F.V. / 4.0 kg/cm² G
2. STRAIGHT LENGTH FROM STEAM TRAP AND BYPASS VALVE
RV22330-14"-A1A2-TS TO FIRST ELBOW SHALL BE 10 TIMES OF NORMAL PIPING
PT PI SHELL DES./OPR. TEMP.: 200 ° C/ 151 ° C/ 151 °C
E-U-21-2 2697 OUTSIDE DIAMETER AS MINIMUM.
TO RV22310
( JS ) 212 212 L TUBE DES./OPR. PRESS.: 4 kg/cm² G / 2.6 kg/cm² G
NOTE 1
DIRECT TO
20 TO RV22310 2" 3. DELETED. 20
TUBE DES./OPR. TEMP.: 165 ° C/ 125 ° C/ 138 °C
2696
MG22060-16"-A1L1-HC
NOZZLE
MATERIAL(SHELL/TUBE) : C.S. / 316 S.S.
4. SKIN THERMOMETER.
6"
N37 S-5B-2
MG25392-4"-A1A2
N33 N7
19 NOTAS: 19
I/P 3. ELIMINADO.
GLO
PY PIC
CHE
4. TERMOMETRO PARA PIEL
17 205 205 1 17
GLO
NC
GLO
NC
3
PT PG
MIN.
4
CASCADE
205 204 N12
MG25391-10"-A1L1-HC
N50
16 16
MIN. CHE GAT
PV 20"
SL27948-3/4"-ASA2-HC
GAT
GAT
205 N2A MH
S-13A-3
SL22090-8"-ASA2-HC ASA2
VE S-5B-2
MG22140-16"-A1L1-HC
GAT FC 8" N65 GAT 3/4"
GAT
15
N77 S-5B-1 15
HC
S-5J-1
TIC
14 205 S-5N-1 14
ASA2
( TWO PHASE )
2"
4" x 3" 3"
T
GAT
SLC22130-3"-ASA2-HC
N75
GAT
DR S-13A-3
GAT 3" N76 3/4"
S-5B-2 S-21-1
GAT
GAT
NOTE 2 SST N6 1-1/2"
STR TT 24"
N41B
205 MH
13
NC
2002 2202
N2B S-13G-1 13
3"
HSB
202
S-13G-2
GLO BYPASS
12
20"
MH S-20-1 12
I N2C
6
GLO
GLO
S-22-1
N45A
I 48A 2" 3"
5
GLO CHE
GLO H
11 SG LT LIC 2550 E-U-5C 11
I/P VENT I 202 202
L
S
3 TO LV-202
FY FXY 48B 2" 3"
202 202 CO21460-4"-A1L1-HC N45B
MIN
SG
N13
10 MIN N41C 10
MIN. FOR
4" FC GLO CHE
GAT
PIPING
FIC TT TI
202 S-5B-2 N18
204 204
FV 1-1/2"
MIN.
FZSC 202
S-5B-2 202
GLO
9 9
2651 E-U-5B-1 FT 4"
MIN.
FROM U-DA201 202 GLO
GLO
202
GLO
US22031-4"-B1J1-TS
FZL
202 GLO
7 C GLO CHE 7
LP MIN.
BY BY
S-5B-1 MIN.
SPV CHK
APP
CHK
APP APP APP
NC AGV
US22021-1"-B1J1-HC ISS REV DATE SYSTEMS CSE CSS PROJ
2652 E-U-5B-1 2083
MIN.
FROM U-DA201 GLO 1/2" INTERNAL APPROVALS
MIN. A1
GLO
6 6
DR22023-3/4"-A1A2 GLO
EXPORT COMPLIANCE
NC
( TWO PHASE )
MIN.
1THIS SEP. FOR CONSTRUCTION
26.14 CONTAINS
DOCUMENT (IFC-1) THAT IS SUBJECT TO U.S.
TECHNICAL INFORMATION SHK HGK JJY
SSC SEP.CONTROL PARA CONSTRUCCIÓN
26.14 REGULATIONS. (IFC-1)
DR22022-3/4"-A1A2
NC
2005 S-5J-1 EXPORT IT MAY NOT BE EXPORTED OR RE-EXPORTED EXCEPT
( TWO PHASE )
B3 AS AUTHORIZED
MAR.14.14 UNDER
FORAPPLICABLE U.S. EXPORT
CONSTRUCTION (IFC) CONTROL REQUIREMENTS
0 SHK SBL JJY
GLO
THIS MAR.14.14 PARA CONSTRUCCIÓN
DOCUMENT CONTAINS (IFC) IS PROPRIETARY TO
INFORMATION WHICH
5 KELLOGG
REV.NO. BROWN & ROOT LLC.
DATE THIS INFORMATION IS TO BEDRN
DESCRIPTION HELD IN CONFIDENCE.
CHECKED APPROVED 5
N° REV FECHA
NO DISCLOSURE DESCRIPCION
OR OTHER USE ELABORADO
OF THIS DOCUMENT, EXCEPT VERIFICADO FOR
AS NECESSARY APROBADO
GLO
OPERATION
OWNER : OF THE PLANT WITHIN OWNER'S CONTRACTUAL OBLIGATIONS, IS TO BE
PROPIETARIO:
MADE WITHOUT PRIOR WRITTEN CONSENT OF KELLOGG BROWN & ROOT LLC.
YACIMIENTOS PETROLIFEROS
N29880-3/4"-01CB1S01
SL27944-3/4"-ASA2-HC
SL27945-3/4"-ASA2-HC
SL27946-3/4"-ASA2-HC
FISCALES BOLIVIANOS
SL27948-3/4"-ASA2-HC
SLC27710-4"-ASA2-HC
MG25390-10"-A1K1-HC
MG22060-16"-A1L1-HC
CO21450-4"-A1A2-HC
SL27250-8"-ASA2-HC
US22030-8"-A1L1-HC
4 Engineering Services by KBR Technical Services, Inc. 4
C
DR22024-4"-A1K1U
CONTRACTOR :
CONTRATISTA: ( License No. F-2397 )
SAMSUNG ENGINEERING CO., LTD.
US22032-4"-A1K1-TS YACIMIENTOS PETROLIFEROS FISCALES
SEOUL, KOREA BOLIVIANOS
LICENSOR :
CARRASCO, BOLIVIA
3
LICENCIADOR: 1,200 MTPD AMMONIA PLANT 3
S-5B-2
TO U-FA401
TO U-FA202
TO U-EA402
TO SLC27380
TO DR29110
PROJECT :
S-13G-1 S-5B-2
2695
2660
2553
2686
S-5N-1
2689
E-U-13G-2
E-U-13G-2
E-U-13G-2
E-U-13A-1
E-U-20-2
E-U-5J-2
E-U-5N
2
S-20-1 N° DEL CONTRATO: DLG 0304 2
E-U-13C-1
FROM U-GB101
FROM U-DA501
FROM SL27350
FROM SL27943
FROM SL27943
FROM SL27945
FROM SL27940
JOB NO.
PIPINGDWG. TITLE: PIPING AND INSTRUMENT DIAGRAM
E-U-22-1
E-U-5G
E-U-5C
S-13G-2
E-U-5F
N° DE PROYECTO
PURIFICATION SECTION ( 2/3 )
P SC2566 TITULO DEL DIBUJO: DIAGRAMS DE TUBERÌ S
A E INSTRUMENTACIÒN
2692
2694
2693
2691
2690
2688
2684
2687
SECCION DE PURIFICATION
1 1
D I
SCALE
F264 DWG.NO. :
N° DEL DIBUJO: E-U-5B-2
1 OF 1SH 1/1
HOJA
ESCALA 1/1000
22X34 CLASS JOB NO. DOCUMENT NO. REV. 1
SHT NO. REV
REVISION
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
GLO
TI DIMENSION (I.D. X T-T) : 13000 mm X 9100 mm
NC
GLO
GLO
DES. / OPER. TEMP.: 140 ° C/ 97 °C
MATERIAL:304 S.S. 213 WORKING VOLUME : 962m³
MG22080-14"-A1K0V-HC MIN DES. / OPER. PRESS.: F.L.+250mmH2O(-30mmH2O) / ATM
TEMP. (DT/OT) : 140° C/ 93° C
H.P MATERIAL : 304 S.S.
20 20
TT
I/P US22040-14"-A1K0V-TS 213
LY N7
2550 E-U-5B-2 U-FA202
FROM LIC-202
202 US26021-4"-A1K0-TS H.P S-5B-3
FC LV N1 24"
MH
19 202 NEAR U-FA201
US26120-3"-A1K0 H.P
S-5B-2 19
SL27674-3/4"-ASA2-HC
MIN.
S-22-1
GLO
GLO
BRV
16 2001 MIN. MIN. 16
MG22300-12"-A1K0-TS MIN
DIRECT TO NOZZLE
ISK-2006
US22160-6"-A1K0-TS
ISK-2007
NOTAS:
ISK-2007
MIN. 5000 MM GLO
ISK-2001
6" 1. ELIMINADO.
15 15
MIN. N52 H.P GLO CHE GLO
US22118-4"-A1K0-TS
GLO
MIN.
DR22105-3/4"-A1K0 S-13G-2 2. LV-202 DEBE SER LOCALIZADO CERCA DEL U-FA202.
GLO
MIN. GLO MIN.
N53
ISK-2005 3. EL FILTRO TEMPORAL DEBE SER PROVISTO CON
ISK-2010 N8 ARREGLOS REMOVIBLES..
N1C N34 N20 N51 SL27680-3/4"-A1K0-HC
GLO
N13 N12
14 N11 ISK-2011 SL27678-3/4"-A1K0-HC 4. LA VALVULA DE CONTROL LV-202 DEBE SER SUJETADA 14
FUERTEMENTE.
S-5B-3 U-FA201 GLO
GLO
N50
MIN. 5. LA PLACA DE PARTICION SER DISEÑA
DO PARA AMBOS LADOS
GLO A ALTURA DE LIQUIDO LLENO CON GRAVIDAD ESPECIFICA Y NO
N35B
(TS)
S-5B-3 LIQUIDO EN EL OTRO COMPARTIMIENTO.
13 ISK-2002 H 13
HC LT LI 6. NO SE PERMITEN BOLSILLOSV PORCIONES HORIZONTALES EN
SXH SXH N45B 204 204 CONDICIONES DE OPERACION SOBRE LA LINEA DE SOLUCION DESDE
MH 2051 2052 MH 4" U-DA202 HASTA U-FA201.
N1B
N1A SXH
24" 24"
NOTE 5 GAT 2054 7. EL LARGO RECTO DESDE LA TRAMPA DE VAPOR Y LA VALVULA
N27 SL27675-2"-ASA2-HC
6000 MM
(TS)
DE DESVIO AL PRIMER CODO DEBE SER DE 500MM COMO MINIMO.
12 ISK-2002 A1K0 N35A 12
ISK-2005
S-13G-1
SLC29451-3/4"-ASA2
SLC29452-1/2"-A1K0
8. ELIMINADO
DR22106-6"-A1K0
US22110-8"-A1K0-TS
9. U-FA202 DEBE SER LOCALIZADO SOBRE LA PLATAFORMA DE U-EA101,
LI LT N45A US22003-8"-A1K0-TS GAT POR EJEMPLO PISO 5TO DE LA SECCION DE SINTESIS, PARA TENER
203 203 N16A N16B
N41A
SL27772-1"-ASA2-HC
MIN N31A MIN 10.LA ALTURA DEADECUADA SELLO DE 500 MM DEBE SER
NOTE 10
GAT N31B
DETERMINADA DESDE LA PARTE INFERIOR DE LA LINEA DE REBALSE
SLC29453-3/4"-ASA2
GLO MIN
GLO MIN
SCP-2001
GLO ISK-2002
SXH
A1K0
A1K0
500 MM
TT TT (DR 22106-6"-A1K0)
NC
10 10
NC
DR22108-6"-A1K0
12 INCH
GAT
304S.S SEAL POT H
TI TI 1"
206 210
NOTE 7 US22110-3/4"-A1K0-TS
GLO
NC
9 3/4" 9
GLO
IN VIEW 1" SST
SLC29453-3/4"-ASA2 T SSC
GA1 2003
2006
US22100-8"-A1K0-TS
S-13G-2 B4
GAT
JCK-2014
(TOW PHASE)
DR22107-3/4"-A1K0 1"
8 8
SLC27773-1"-ASA2-PP
SLC29456-3/4"-A1K0 MIN MIN
GLO
GLO
NC
7 7
BY BY
DR22101-1"-A1A2
DR22103-2"-A1A2
GLO
GAT
NC
MIN CHK CHK
GLO
201
NC
MIN
US22110-8"-A1K0-TS
US22111-8"-A1K0-TS
US22200-8"-A1K0-TS
DR 22113 3/4" A1A2 MIN GLO
STOP STOP
INTERNAL APPROVALS
GAT
6 XHS MIN NC 6
DR22116-3/4"-A1A2
SLC29457-3/4"-A1K0 200 EXPORT COMPLIANCE
PG PG
FOR CONSTRUCTION (IFC-1) THAT IS SUBJECT TO U.S.
MIN
(TWO PHASE)
GLO MIN NOTE 3 AS AUTHORIZED
MAR.14.14 UNDER
FORAPPLICABLE U.S. EXPORT
CONSTRUCTION (IFC) CONTROL REQUIREMENTS
0 SHK SBL JJY
STS 8" x 4" THIS DOCUMENT PARA CONSTRUCCIÓN
MAR.14.14 CONTAINS (IFC) IS PROPRIETARY TO
INFORMATION WHICH
5 GAT D NOTE 3 KELLOGG BROWN & ROOT LLC. THIS INFORMATION IS TO BEDRNHELD IN CONFIDENCE. 5
US22100-8"-A1K0-TS 2001 GLO D REV.NO. DATE DESCRIPTION CHECKED APPROVED
SLC29453-3/4"-ASA2
N° REV FECHA
NO DISCLOSURE DESCRIPCION
OR OTHER USE ELABORADO
OF THIS DOCUMENT, EXCEPT VERIFICADO FOR
AS NECESSARY APROBADO
NC
S M S M OPERATION
OWNER : OF THE PLANT WITHIN OWNER'S CONTRACTUAL OBLIGATIONS, IS TO BE
GLO
AT
PROPIETARIO:
MADE WITHOUT PRIOR WRITTEN CONSENT OF KELLOGG BROWN & ROOT LLC.
STS BA YACIMIENTOS PETROLIFEROS
SLC29455-3/4"-ASA2
PG T BA G
GA L 2002
L
FISCALES BOLIVIANOS
1015A
SLC27773-1"-ASA2-PP
MG22080-14"-A1K0V-HC
DR22115-1/2"-A1A2
SL27942-3/4"-ASA2-HC
SL27674-3/4"-ASA2-HC
SL27677-3/4"-ASA2-HC
N
MG22300-12"-A1K0-TS
C E NC
SL27675-2"-ASA2-HC
US22040-8"-A1L1-HC
US22160-6"-A1K0-TS
US22110-8"-A1K0-TS
AC24250-2"-A1K1-TS
US26021-4"-A1K0-TS
SLC29451-3/4"-ASA2
SLC29458-3/4"-ASA2
4 1/2" B.V. CH Engineering Services by KBR Technical Services, Inc. 4
BAL E CONTRACTOR :
CH A1A2 1/2" ( License No. F-2397 )
DR22112-1/2"-A1A2-
US26120-3"-A1K0
B.V. CONTRATISTA:
SAMSUNG ENGINEERING CO., LTD.
BAL
SLL26101-1/2"-ASA2-HC
XL
200 LICENSOR :
CARRASCO, BOLIVIA
B.V. LICENCIADOR: 1,200 MTPD AMMONIA PLANT
3
B.V. W RUNNING PG XL
3
1015B
GAT
201
U-GA201A /B
6" RUNNING S-13G-1 PROJECT :
TO U-DA503
TO U-FA401
TO U-EA506
TO SLC27774
TO U-EA301
DR22109-6"-A1K1U
PROYECTO:
S-13G-1 S-5B-2 S-5B-3 S-13G-2 UREA SOLUTION PUMP S-13G-2 S-5B-3 S-5E-4
2552
2555
2573
2577
2578
TO DR29110
E-U-G13-1
(FROM GRANULATION
(FROM GRANULATION
E-U-13G-2
E-U-13G-2
E-U-13G-1
E-U-13G-2
E-U-13G-2
E-U-13C-1
E-U-13C-1
E-U-13C-1
E-U-13C-1
E-U-5B-2
E-U-6A-1
CAPACITY : 141 m³ h
/
2
S-22-1 N° DEL CONTRATO: DLG 0304 2
E-U-5G
E-U-6J
FROM U-GA604A,B
FROM LSS27680
DIFFERENTIAL HEAD : 31 m
U-GA201A /B
FROM SLC 29450
JOB NO.
FROM SLC29450
FROM SLC29450
FROM SLC27670
FROM SLC29450
AND INSTRUMENTATION DIAGRAM
FROM SL 27670
POWER : 30 kW
E-U-13C-1
FROM U-GA403
FROM U-DA202
FROM SL27940
E-U-5H-1
FROM SL27670
E-U-5H-3
E-U-5D-1
N° DE PROYECTO
E-U-5G
S-13G-1
FROM HV-601
S-5B-3 S-13C-1 S-13G-2 MATERIAL (CASING / IMPELLER) : 304 S.S. / 316 S.S.
S-6G-1 PURIFICATION SECTION (3/3)
E-U-22-1
2553
2554
2861
2566
2570
4931
2862
2576
2575
2579
3003
2581
UNIT)
UNIT)
1 1
D I
SCALE
F264 DWG.NO. :
E-U-5C
1 OF 1SH 1/1
REVISION
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
DES. / OPER. PRESS. : 8.0kg/cm² G & F.V. / 4.5kg/cm² G DES. / OPER. TEMP.: 170 ° C/ 132 °C
DES. / OPER. TEMP. : 200 ° C/ 155 °C
MATERIAL : C.S.
SHELL DES./OPER. TEMP.: 200 ° C/ 117.9 °C / 113.3 °C
TUBE DES./OPER. PRESS.: 1.75kg/cm² G & F.V. / -0.56 kg/cm² G
MATERIAL:304 S.S. S-5B-1 2. TT-301 SHALL BE LOCATED NEAR U-EA301.
GLO
TUBE DES./OPER TEMP : 170° 1
/ 03° C
/132° C FLUID VISCOSITY : 0.66 cP
MATERIAL (SHELL/TUBE) : C.S./304 S.S. 301 302 ALLOWABLE PRESSURE LOSS : 3.0 kg/cm²
GLO GLO IN VIEW S-13G-2 NOZZLE MATERIAL : 304SS
FI
303
S-5H-1 GLO
NEAR HIGH
S-20-1 6. SPECIFICATION OF SPRAY NOZZLE IS AS FOLLOWS
GLO
GLO
PC25305-1"-A1K0 FI PC25305-1"-A1K0
TYPE : FULL CONE
NEE POINT
18 1/2" SEE DETAIL " A " 304 FLOW RATE : 21000 kg/h 18
H.P
IA29721-1/2"-A1K0V INJ-2001 S-22-1 SPRAY ANGLE : 30°
GLO
STEAM TRACE 10M MIN. FLUID DENSITY : 1078 kg/m³
MG2304 FLUID VISCOSITY : 3.64 cP
SL28844-1/2"-ASA2-HC SL28846-1/2"-A1K0V-HC US23051-1"-A1A2-TS
0-48"-A
1K0V-P
P
S-5H-1 ALLOWABLE PRESSURE LOSS : 1.0 kg/cm²
MIN. NOZZLE MATERIAL : 316LSS
MIN.
17
GLO 17
US23070-1"-A1K0V-TS (MAX.
J J J SLOPE) 7. DELETED.
J
TI N50 MIN.
(JL)
PC25305-1"-A1K0
304 N35 N7
GAT
JCK-2001
J
N27A~S
J
16 JCK-2002 16
TT HC
SEE DETAIL " D "
304 NOTAS
SL23021-1"-ASA2-HC S-13G-2
J
I/P
DR23071-3/4"-A1A2
48" T
PY PIC 1. EL LARGO RECTO DESDE LV-302 HASTA EL PRIMER CODO DEBE
1-1/2" N92/N11
SL27960-1"-ASA2-HC
N41 SLC23021-1"-ASA2-PP SER MINIMO 10 VECES EL DIAMETRO EXTERIOR DE TUBERIA
302 302
J
15 NORMAL. 15
MH SST
N1
J
24" 2068 2. TT-301 DEBE SER LOCALIZADO CERCA DEL U-EA301.
C
PG PT U-FA301
303 302 3. ELIMINADO.
J
MIN.
INJ-2001
4. ELIMINADO.
PV
J
14 14
302 DETAIL "A"
GAT
GAT
5. SE INDICA LA ESPECIFICACION DE LA BOQUILLA ROCIADORA
FO DR23072-2"-A1A2 A CONTINUACION.
J
SG N45A NOTE 5 TIPO : HOLLOW CONE
GAT SG GASTO : 3500 kg/h
SL23200-14"-ASA2-HC H
J
4" ANGULO DE ROCIO : 120°
TT N41 LT LIC
12" 303 301 301 DENSIDAD DE FLUIDO : 985 kg/m³
AC24341-3"-B1J1-TS
13 13
FIC
GAT
J
N45B LI
305 I/P N65
N28A~S PERDIDA PERMISIBLE DE PRESION : 3.0 kg/cm²
N77B ASA2 303 MATERIAL DE LA BOQUILLA : 304SS
FY
J
N47 4" LL
305 3/4" H
SL23230-3/4"-ASA2-HC GAT TI 6. SE INDICA LA ESPECIFICATION DE LA BOQUILLA ROCIADORA
S-5D-1
MIN. 500 MM
J
DE ROCIO ES COMO A CONTINUACION
12 305 FV HC L LS LSLL TIPO : CONO HUECO 12
FO
305 NOTE 2 303 303 GASTO : 21000 kg/h
GAT
MIN.
SLC23210-4"-ASA2-HC
J
A1K0
MIN.
EXP ANGULO DE ROCIO : 30°
TI TT N76B ASA2 CAPACITANCE DENSIDAD DE FLUIDO : 1078 kg/m³
U-FA302 N16 2001
MG22050-10"-B1J1-HC
301 301
J
MIN.
GLO
3" DR
NC
(10)
GLO
J
11 N77A B1J1 11
J
H GAT 3/4" GAT AC24341-3"-B1J1-TS
(MAX SLOPE)
HH LG
LIC LT HH N62 3/4" 7. ELIMINADO.
SLC27775-2"-ASA2-PP
GLO SL27820-1"-ASA2-HC
J
J
302 302 N3B 304 MIN. VE
8" 8" INJ 2002 INJ-2003
L N3A SEE DETAIL "B" GAT D
ASA2 N45B N11 1" 1500MM STRAIGHT INJ-2002
18
J
J
MIN.
I/P GAT 3/4" N44B GAT DETAIL "B"
10 2250MM STRAIGHT NC 10
LY ASA2 N76A
J
J
C SEE DETAIL "C" NOTE 6
J
J
302
AC24340-3"-B1J1-TS
FC HC DR
NOTE 1. (TWO PHASE) N72
DR22051-3/4"-A1A2
J
J
9 9
J
J
4" GAT SLC23220-4"-ASA2-HC I/P
GAT
U-EA301
FIC FY N83
J
J
GAT
GAT
NC
301 301
DR24341-3/4"-A1A2
J
J
8 8
GLO US22120-8"-A1K0V-TS
MG22050-10"-B1J1-HC
FV
J
J
301
4" DR23221-4"-ASA2-PP
S-5B-3 FC
S-5D-1 (10)
CASCADE
J
J
C
7 MIN. 8" MIN. 7
SL23022-1"-ASA2-HC
AUTO
J
J
INJ-2003 BY BY
STOP:LL APP APP APP APP
GLO
GLO
NC
DETAIL "C"
NC
CHK CHK
J
J
FT M 4" ISS REV DATE SYSTEMS CSE CSS PROJ
NOTE 6
S-13G-2 C 301 (TS)
DR22122-3/4"-A1A2
DR22121-3/4"-A1A2
J
J
INTERNAL APPROVALS
6
S-5D-1 EXPORT COMPLIANCE
6
IA29721-1/2"-A1K0V
SLC23022-1"-ASA2-PP
SL27775-2"-AS2A-HC
J
FOR CONSTRUCTION (IFC-1) THAT IS SUBJECT TO U.S.
J
SL
T EXPORT IT MAY NOT BE EXPORTED OR RE-EXPORTED EXCEPT
28
J
AS AUTHORIZED
MAR.14.14 UNDERFORAPPLICABLE U.S. EXPORT
CONSTRUCTION (IFC) CONTROL REQUIREMENTS
8
0 SHK SBL JJY
46
PARA CONSTRUCCIÓN
MAR.14.14 CONTAINS (IFC) IS PROPRIETARY TO
J
-1
J
DR22052-2"-A1A2
5 5
/2"
SST KELLOGG
REV.NO. BROWN & ROOT LLC.
DATE THIS INFORMATION IS TO BEDRN
DESCRIPTION HELD IN CONFIDENCE.
CHECKED APPROVED
MG23040-48"-A1K0V-PP
-A1
N° REV FECHA
NO DISCLOSURE DESCRIPCION
OR OTHER USE ELABORADO
OF THIS DOCUMENT, EXCEPT VERIFICADO FOR
AS NECESSARY APROBADO
J
2069
IA29720-1/2"-12CS1T02
K0
MG22050-10"-B1J1-HC
SLC27280-6"-ASA2-HC
SL27270-14"-ASA2-HC
OWNER :
US22110-8"-A1K0-TS
C
MG23060-8"-B1J1-HC
AC24341-4"-B1J1-TS
SLC29403-1"-ASA2
V
PROPIETARIO:
MADE WITHOUT PRIOR WRITTEN CONSENT OF KELLOGG BROWN & ROOT LLC.
YACIMIENTOS PETROLIFEROS
DR22123-4"-A1A2
DR23072-2"-A1A2
PC25305-1"-A1K0
J
N51 N50
DR24342-2"-A1A2
FISCALES BOLIVIANOS
J
(TWO PHASE)
( TWO PHASE )
J
CONTRACTOR :
CONTRATISTA: ( License No. F-2397 )
SAMSUNG ENGINEERING CO., LTD.
J
J
DETAIL "D" CARRASCO, BOLIVIA
J
LICENSOR :
J
3
LICENCIADOR: 1,200 MTPD AMMONIA PLANT 3
C
J
TO DR25318
TO U-EA501
TO PY-301
(TO GRANULATION
UNIT)
TO PIC-607
TO U-GA301A/B
TO SL 27490
TO DR23066
TO U-EA401
TO SLC27670
TO U-GA301A/B
S-20-1 S-13A-3
2754
S-5E-2 S-5B-1 S-13G-2 S-5H-2
5120
2751
2755
2758
2741
5119
2744
5275
2747
S-5B-3 DR22053-4"-A1K1U
S-13G-1 S-13A-3
( FROM GRANULATION
PROJECT :
E-U-13G-1
E-U-13G-1
E-U-13C-1
TO DR29110
E-U-13A-1
E-U-5H-2
E-U-5D-2
E-U-5D-2
E-U-5E-2
E-U-5B-1
E-U-20-2
PROYECTO:
E-U-5C
5118
FROM U-GA501A/B
S-22-1
FROM U-GA201A/B
FROM U GA404A/B
FROM SLC29400
S-22-1
E-U-5H-1
E-U-5D-2
E-U-6A-1
FROM SL 27110
E-U-13C-1
E-U-13C-1
S-5D-1
FROM US23024
FROM U-DA201
S-5D-1
E-U-5H-3
E-U-5H-1
FROM SL28810
FROM SL28810
E-U-5E-2
E-U-5E-2
E-U-5D-2
FROM IA34524
2
S-5D-1 N° DEL CONTRATO: DLG 0304 2
JOB NO.
PIPINGDWG.
N° DE PROYECTO ANDTITLE: PIPING AND INSTRUMENT DIAGRAM
INSTRUMENTATION DIAGRAM
E-U-22-1
2816
2753
2738
2739
2740
2742
2635
2578
5274
2748
D I
SCALE
F264 DWG.NO. :
N° DEL DIBUJO: E-U-5D-1
1 OF 1SH 1/1
HOJA
ESCALA 1/1000
22X34 CLASS JOB NO. DOCUMENT NO. REV. 1
SHT NO. REV
REVISION
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
NOTES:
1. TEMPORARY STRAINER SHALL BE PROVIDED WITH REMOVABLE
FROM U-FA301
FROM LS-303
21 ARRANGEMENT. 21
2755
2747
2. OUTLET LINE FROM U-FA301 TO BLIND FLANGE SHALL BE STRAIGHT
E-U-5D-1
AND VERTICAL.
E-U-5D-1
E-U-5D-1
3. NO POCKETS SHALL BE PERMITTED UNDER OPERATING CONDITION
ON SOLUTION LINE FROM U-GA301A,B DISCHARGE TO PV-607.
TO U-FA301
20
S-5D-1 4. U-GA301 SHALL BE SURROUNDED BY SPILL WALL, DRAINAGE FROM
20
2749
U-FA301 BOTTOM
S-5D-1 PUMP AND PIPE SHALL BE COLLECTED IN THE BASIN WHICH INSIDE
IS COATED BY EPOXY PAINT.
US(SL) 23050-1"(2")
-B1K0J (ASA2J)-JS
J
J
19 19
6. HORIZONTAL LINE LENGTH TO U-GA301A,B SHALL BE MINIMUM.
J
J
7. PIPING LENGTH OF STEAM JACKET PIPE SHALL BE FINALIZED AT
J
DETAIL DESIGN STAGE. THE NUMBER OF STEAM TRAP FOR JACKET
J
PIPE SHALL BE ALSO FINALIZED IN ACCORDANCE WITH JACKET PIPE
18 LENGTH. 18
J
J
SL27820-1"-ASA2-HC 2" x 1"
E-U-5D-1 2748
STEAM
J
TO US 23020
J
J
US(SL) 23020-8"(10")-A1K0J(ASA2J)-JS
J
17
S-13G-2 SLC29406-2"-ASA2
17
J
CHE GLO T
GLO
SLC29047-2"-B1K0-TS
J
D
J
J
16 LENGTH TO BE FINALIZED 16
HIC
J
301 JCK-2007 AT DETAIL DESIGN STAGE.
SL28892-1"-ASA2-HC
MIN.
J
D
MIN.
1" 8. DELETED.
J
MIN.
I/P (JL)
FC
JCK-2008
15 15
NOTAS
J
HY
(JL)
1" FT FIC
301
(JL)
302 302
J
L 1. EL FILTRO (STRAINER) TEMPORAL DEBE SER PROVISTO CON
JCK-2006
GAT
D
S-5D-1
MIN.
ARREGLOS REMOVIBLE.
MIN.
JCK-2004 D D
J
(JL)
14 (JL) 2. LA LINEA DE SALIDA DESDE U-FA301 HASTA LA BRIDA CIEGA DEBE 14
M J J
SER RECTA Y VERTICAL.
JCK-2010
MIN. MIN.
MIN.
J
MIN. D 3" (TS)
(JL)
J
HV 3. NO SE PERMITEN BOLSILLOS EN BAJO CONDICION DE OPERACIÓN
(JL)
JCK-2003
JCK-2005
3/4
JCK-2009 I D SOBRE LA LINEA DE SOLUCION DE LA DESCARGA DE U-GA301A/B A
301
J
(JL) PV-607.
US23024-3/4"-B1K0-TS
MIN.
J
D
13 (JL) MIN. 13
SSC 4. U-GA301 DEBE SER RODEADO POR EL MURO DE DERRAME, EL
J
2007
J
CHE GLO DRENAJE DESDE LA BOMBA Y TUBERIA DEBE SER RECOLECTADO
B4 EN EL BASIN CUYO INTERIOR ESTA REVESTIDO POR
MIN. 6000MM
SL27961-1"-ASA2-HC
PINTURA EPOXICA.
MIN.
J
GLO
GLO
NC
NOTE 2
5. EL VASTAGO DE LA VALVULA DEBE SER HORIZONTAL.
J
D D
J
12 12
12 INCH PIPE
6. EL LARGO DE LA LINEA HORIZONTAL A U-GA301A,B DEBE
x 100H
J
SER COMO MINIMO.
J
(JL)
7. EL LARGO DE LA TUBERIA DEL TUBO ENCHAQUETADO DE VAPOR
J
DEBE SER DETERMINADO EN LA ETAPA DE DISEÑODE DETALLE.
JCK-2011 D EL NUMERO DE LA TRAMPA DE VAPOR PARA EL TUBO
J
11 11
ENCHAQUETADO DEBE SER TAMBIEN DETERMINADO CONFORME
J
AL LARGO DEL TUBO ENCHAQUETADO.- EL LARGO SERA FINALIZADO
J
SL23028-1"-ASA2-HC EN LA ETAPA DE DISEÑODE DETALLE.
J
D D 8. ELIMINADO.
J
J
D
10 10
MIN.
NOTE 3, 7
CHE GLO
J
MIN. A1K0 MIN.
MIN.
GLO
NC
J
US23024-4"-B1K0-TS
J
9 NOTE 6 NOTE 6 9
US23023-4"-B1K0-TS
MIN.
SLC29495-1"-ASA2-PP
S-5D-1
SL23030-1"-ASA2-HC
SL28847-1"-B1K0-TS
US23021-8"-B1K0-TS
J
(JL)
SL29495-1"-ASA2-HC
(JL)
US23032-8"-B1K0-TS
J
MIN. MIN.
8 8
S-13G-1
J
GLO
GLO
D D
GLO
S-5D-1 S-13G-2
J
SL28845-1"-A1K0V-HC STOP
GLO GLO
GLO
XHS I
J
S-13C-1
GLO
D STOP STS
7 D 203 SST 7
XHS STS 2004 T
NOTE 1 2005
202 2003
PG A
S-13G-1 S-22-1
J
NOTE 1 PG T
8" x 4"
305B SST
8" x 4"
PG I
CHE
CHE
US23026-1"-A1K0
301B
US23027-3/4"-A1K0
PG 2070
301A
DR23028-2"-A1K0
US23025-1"-A1K0
AD23029-1"-A1K0
US23028-1"-A1K0
J
305A
US(SL) 23030-4"(6")-B1K0J(ASA2J)-JS
DR21096-3/4"-A1K0
6 6
DR21097-3/4"-A1K0
U-GA301A/B S
SLC22301-1"-ASA2-PP
SL28820-3/4"-ASA2-HC
4" x 3" S 4" x 3"
J
SEP. 26.14 FOR CONSTRUCTION (IFC-1)
D M S-5D-1 M D 1
SEP. 26.14 PARA CONSTRUCCIÓN(IFC-1)
SHK HGK JJY
SL27820-2"-ASA2-HC
NC
SL28839-1"-ASA2-HC
J
V. MAR.14.14 FOR CONSTRUCTION (IFC)
B.
B. C
SLC29405-1"-ASA2
SLC29406-2"-ASA2
2" 2" 0 SHK SBL JJY
V.
D N GA D
G
LO
J
LO
AUTO STOP
G N° REV FECHA DESCRIPCION ELABORADO VERIFICADO APROBADO
O HOA LO
GL HOA
J
AIA2
OWNER :
RUNNING RUNNING PROPIETARIO:
HS HS YACIMIENTOS PETROLIFEROS
AIA2
I XL FISCALES BOLIVIANOS
J
XL I
10 203
CHE
CHE
4 202 10 4
J
CONTRACTOR :
NOTE 4 CONTRATISTA:
SAMSUNG ENGINEERING CO., LTD.
GAT
SEOUL, KOREA
B.V.
GAT
J
SLC23011-1/2"-ASA2-PP
GAT
GAT
B.V.
B.V. D D
SL28834-1/2"-ASA2-HC B.V. LICENSOR :
J
D W D LICENCIADOR:
SLC23010-1/2"-ASA2-PP
3 3
SL28833-1/2"-ASA2-HC
J
U-GA301A /B PROJECT :
(TO GRANULATION
GRANULATION UNIT)
UNIT)
TO U-MA601
TO FY-351 (TO
TO SLC27760
TO SLC27766
TO U-AP703
TO SLC 27760
S-5D-1 PROYECTO:
2830
5247
5248
5249
5269
(FROM GRANULATION
E-U-13G-1
E-U-13G-1
E-U-13G-1
E-U-13G-1
E-U-13C-1
E-U-13C-1
E-U-6A-1
2 N° DEL CONTRATO: DLG 0304 2
E-U-6L
FROM U-GA351A,B
CAPACITY : 95 m³ h
/
E-U-13G-1
E-U-13C-1
E-U-6L
FROM SL28810
FROM SL28810
FROM SL28810
FROM SL28810
E-U-6A-1
N° DE PROYECTO
E-U-22-2
S-13G-1
POWER : 75 kW
MATERIAL (CASING / IMPELLER) : 304 S.S. / 304 S.S.
S-13G-1 S-13G-2 CONCENTRATION SECTION (2/2)
SC2566 TITULO DEL DIBUJO: DIAGRAMS DE TUBERÌ S
A E INSTRUMENTACIÒN
SECCION DE CONCENTRATION (2/2)
2822
2823
2824
4929
4930
2825
2828
2827
UNIT)
UNIT)
D
1
S-13G-2 DWG.NO. : SH 1/1
1
SCALE
ESCALA 1/1000
N° DEL DIBUJO: E-U-5D-2 HOJA
22X34 REV. 1
REVISION
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
U-DA401 NOTES:
I/P 1. FOR GENERAL NOTES AND SYMBOLS SEE DRAWINGS
WASHING COLUMN
21
PY PIC
H
S-5E-1 62-D001, 62-D002 & 62-D003. 21
GLO
401 FC
1/2"
GLO
MIN. 4"
401
MG24191-8"-A1K0 MG24180-6"-B1K1
19 E-U-21-1 S-21-1
2717
3"
S-5H-2 19
GLO GLO
GLO
TO MG24190
GLO
2"
TT TI S-13G-1
405 405
GLO
GLO
3" N33
N37 S-13G-2
GLO
18 N7 18
1-1/2"
SL28843-3/4"-ASA2-HC N41A S-13F-1
SL28823-3/4"-ASA2-HC DIRECT TO
PC25230-3"-B1K0
B1K1 S-5E-1
NOZZLE
U-DA401
S-22-1
N11
17
CHE I/P 17
HH LY
8" 403
N3A LV
FC 403
16 16
N18 AC24200-3"-B1K1 AC24210-3"-B1K1
GLO 1" GLO
GLO
NC
N45A
3" H
15 1" 15
LT LIC
H 1-1/2" 403 403
TI TT L GLO
406 406 N41B
N45B
N12 3" AC24050-3"-B1K1 AC24050-3"-B1K1
14 14
CHE 3/4MIN1
DR24201-3/4"-A1A2
GLO
HH PRV
MIN.
8"
N3B
S-5E-1 2035
CW28207-1"-12CS2S01
13 13
N19 AC24260-8"-B1J1-TS
CW28206-1"-12CS2S01
12
SG
N35 S-5E-1 S-13F-1 SMLC29025-3/4"-BSA2 12
MIN. 5500 MM
4BA.2"
AC24270-10"-B1J1-TS
MH GLOCHE GLO
GLO
24" SG SG N45C B1J1
N1 4"
4BB.2" 4BC. 2"
H
I/P
11 11
LT LIC LY
PP 405 405 405
L
N23 AC24070-8"-B1J1-TS
N21 HIC
10 401 10
N45D
4"
TI
409
I/P
MIN. 1000 MM
L
IN VERTICAL
N63 N50
HY
MIN.1000 MM
N61 MIN. 401
9 MIN. 9
AC24320-3"-B1J1-TS
MIN.
1000 MM
TT HV
GAT
VE
N13
MIN.
CSO N76
CW28200-12"-12CS2S01 MIN. 8" x 6" FO
S-16-1
GLO
NC
GLO CW28205-12"-12CS2S01
BUV N84 NC
RO
8 N96 N94 8
403 MIN. DR24325-3/4"-A1A2 10"
12CS2S01
GAT
GLO
GAT
MIN.
3/4"
1"
DR24322-3/4"-A1A2
DR24321-3/4"-A1A2
AC24280-3"-A1K1-HC
DR
GLO MIN.
GLO MIN.
7
S-5E-2 7
MG24100-8"-B1J1-TS
NC
BY BY
SLC29461-3/4"-ASA2 APP APP APP APP
CHK CHK
SL28822-3/4"-ASA2-HC
ISS REV DATE SYSTEMS CSE CSS PROJ
INTERNAL APPROVALS
6 6
EXPORT COMPLIANCE
1THIS SEP. FOR CONSTRUCTION
26.14 CONTAINS
DOCUMENT (IFC-1) THAT IS SUBJECT TO U.S.
TECHNICAL INFORMATION SHK HGK JJY
EXPORTSEP.CONTROL PARA CONSTRUCCIÓN
26.14 REGULATIONS. (IFC-1)
IT MAY NOT BE EXPORTED OR RE-EXPORTED EXCEPT
C AS AUTHORIZED
0 MAR.14.14 UNDER
FORAPPLICABLE U.S. EXPORT
CONSTRUCTION (IFC) CONTROL REQUIREMENTS
JJY
SHK SBL
THIS MAR.14.14 PARA CONSTRUCCIÓN
DOCUMENT CONTAINS (IFC) IS PROPRIETARY TO
INFORMATION WHICH
5 KELLOGG
REV.NO. BROWN & ROOT LLC.
DATE THIS INFORMATION IS TO BEDRN
DESCRIPTION HELD IN CONFIDENCE.
CHECKED APPROVED 5
N° REV FECHA
NO DISCLOSURE DESCRIPCION
OR OTHER USE ELABORADO
OF THIS DOCUMENT, EXCEPT VERIFICADO FOR
AS NECESSARY APROBADO
OPERATION OF THE PLANT WITHIN OWNER'S CONTRACTUAL OBLIGATIONS, IS TO BE
CW28210-12"-12CS2S01
OWNER :
CW28200-12"-12CS2S01
SMLC29025-3/4"-BSA2
PROPIETARIO:
MADE WITHOUT PRIOR WRITTEN CONSENT OF KELLOGG BROWN & ROOT LLC.
YACIMIENTOS PETROLIFEROS
SL28822-3/4"-ASA2-HC
SL28823-3/4"-ASA2-HC
AC24070-6"-B1J1-TS
AC24280-3"-A1K1-HC
FISCALES BOLIVIANOS
SLC29461-3/4"-ASA2
DR24323-4"-A1A2
AC24050-3"-B1K1
AC24210-3"-B1K1
PC25230-3"-B1K0
LICENSOR :
CARRASCO, BOLIVIA
3
LICENCIADOR: 1,200 MTPD AMMONIA PLANT 3
TO U-FA401
TO U-GA404
TO LV-405
TO CW28680
TO U-EA402
TO DR24324
2735
2669
2736
2733
2725
2759
E-U-13G-1
E-U-13C-1
E-U-5H-2
E-U-5E-2
E-U-5E-2
PROYECTO:
E-U-16-1
E-U-13F
E-U-5F
FROM U-GA503 A/B
FROM U-GA402A/B
PROYECTO DE AMONIACO/UREA DE YPFB
S-13F-1
FROM SLL29459
E-U-5E-2
FROM CW28110
S-5E-1
FROM U-EA401
S-5H-2
FROM SL28810
FROM SL28810
E-U-5E-2
E-U-16-1
E-U-22-1
S-13G-1
E-U-5G
E-U-5F
JOB NO.
PIPINGDWG.
N° DE PROYECTO ANDTITLE: PIPING AND INSTRUMENT DIAGRAM
INSTRUMENTATION DIAGRAM
2712
2715
2716
2737
2734
2730
2721
RECOVERY SECTION (1/4)
2713
2858
D I
SCALE
F264 DWG.NO. :
N° DEL DIBUJO: E-U-5E-1
1 OF 1SH 1/1
HOJA
ESCALA 1/1000
22X34 CLASS JOB NO. DOCUMENT NO. REV. 1
SHT NO. REV
REVISION
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
NOTES:
S-5D-1
FROM U-DA401
FROM LY405
U-EA401
2735
2736
1. 1.
FOR GENERAL
TT-402 NOTES AND
CONNECTION SYMBOLS
SHALL SEE DRAWINGS
BE LOCATED NEAR U-EA401.
21 62-D001, 62-D002 & 62-D003. 21
S-5E-2 HP ABSORBER
E-U-5E-1
E-U-5E-1
2. TEMPORARY STRAINER SHALL BE PROVIDED WITH REMOVABLE
ARRANGEMENT.
E-U-5E-1
DUTY : 5.776 Gcal/hr
S-13F-1
E-U-5E-1
SHELL DES./OPR. PRESS.: 20 kg/cm² G / 15.8 kg/cm² G 3. LOW PRESSURE DROP CHECK VALVE SHALL BE UTILIZED.
TO U-DA401
TO U-DA401
SHELL DES./OPR. TEMP.: 140 ° C/ 106 °C / 106 °C
S-5E-2 S-5E-2 S-5E-2 ( ALLOWABLE PRESSURE DROP SHALL BE LESS THAN 0.1kg/cm² )
S-22-1 TUBE DES./OPR. PRESS.: 15.5 kg/cm² G / 4 kg/cm² G
2737
2734
20 20
TUBE DES./OPR. TEMP.: 140 ° C/ 96.2 ° C/ 100.9 °C 4. STEAM BATH FOR SAMPLING NOZZLE SHALL BE ARRANGED AS
FOLLOWS. HOWEVER THE DIMENSIONS CAN BE ADJUSTED AT
S-13C-2 MATERIAL(SHELL/TUBE) : 316L S.S. / 316L S.S.
DETAIL DESIGN STAGE.
GLO
BY PIPING
S-5A-1 S-13F-1 MIN
18 18
SL28841-1/2"-ASA2-HC
SLC 28842-3/4"-ASA2-PP 6 INCHDIA
2881 E-U-5A-2
MG24100-8"-B1J1-TS
CASCADE TO FIC-104
MIN
VE
GAT
GLO
17 AC24131-6"-B1J1-HC H.P 17
CHE
H NOT WELD
AC24311-3"-B1J1-TS
GLO
B1J1
LIC
3/4"
10 (S401) OUTLET
401 12CS2S01 STEAM COND.
L
GAT
3/4"
AC 24090-8"-B1J1-HC
VE
U-EA401
MINGLO
LO
16 16
GLO
14
12CS2S01 FC - OUTLET STEAM CONDENSATE. 14
GAT
3/4"
- SECTION VIEW
DR
MG23060-6"-B1J1-HC
MG23060-6"-B1J1-HC
AC24330-3"-B1J1-TS 4" x 3" MIN - VIEW "A"
(TWO PHASE)
(TWO PHASE)
TW28215-8"-12CS2S04-PP H
TIC MIN. MIN.
MIN
H
AC24090-8"-B1J1-HC
TI AI AI 3"
GLO
402
NC
L NOTAS
401 401A 401B
13 PG AC24091-3/4"-B1J1-TS
GLO 13
SCV
GLO
406 NOTE 1
NC
DEN. VIS.
AC24070-6"-B1J1-TS
2001 1. LA CONEXION DE TT-402 DEBE SER LOCALIZADA CERCA
IN VIEW TT DEL U-EA401.
DR24318-3/4"-A1A2
NOTE 3 402 TT AT AT
NC NC
GAT
L.P 401 401A 401B 2. EL FILTRO (STRAINER) TEMPORAL DEBE SER PROVISTO
MIN.
CHE
CON ARREGLO REMOVIBLE.
NC MIN.
NC MIN
MIN
GLO MIN
GLO
12 12
1/2" B.V 3. SE DEBE UTILIZAR VALVULA DE RETENCION DE BAJA CAIDA
GLO
GLO
GLO
GLO
NC
GLO
VERTICAL
GLO DE PRESION. (LA CAIDA PERMISIBLE DE PRESION DEBE SER
2" STR
SPV
500MM
GLO
SLC28842-3/4"-ASA2-PP
MENOR A 0.1KG/CM2)
MIN
SL28841-1/2"-ASA2-HC
NC
MIN
GLO
2084
MIN.
2001
NC
SSC
CHE
GLO
SIDE OF PIPE GLO
NC
11 H MIN 11
GLO MIN
PIC DIMENSIONES PUEDEN AJUSTARSE EN LA ETAPA DE
AC24290-1"-B1J1-HC
B3
DR23061-3/4"-A1A2
B.V
GLO
GLO
I/P MIN MIN. DISEÑODE DETALLE.
209
NC
GLO
GLO
GLO
MIN
NC
NC
GLO
NC
GLO
MIN
NOTE 4 DR29411-3/4"-A1A2 -TINA DE VAPOR
PG
GLO
209 GLO GLO
MIN
NC
-POR TUBERIA
GLO
GLO
GLO
202
NC
NC
MIN -DIA. DE 6 PULGADAS
NC - NO SOLDADO
10 10
PT - CONDENSADO DE VAPOR DE SALIDA
209 MIN. 1" C
DR24117-3/4"-A1A2
GLO S-5E-2 - VISTA DE SECCION
AC24110-6"-B1J1-HC
NC - VISTA "A"
PV
DR23065-3/4"-A1A2
MIN
MIN
FO AC24071-6"-B1J1-TS
3" x 1"
209 GLO
DR24318-3/4"-A1A2
CHE
GLO
GLO
MIN
MIN
NC
STOP
STOP
DR24114-3/4"-A1A2
DR24115-3/4"-A1A2
DR24116-3/4"-A1A2
C
AC24311-4"-B1J1-TS
9 9
AC24310-4"-B1J1-TS
DR24316-3/4"-A1A2
DR24312-1/2"-A1A2
DR24313-3/4"-A1A2
DR24114-3/4"-A1A2
DR24113-3/4"-A1A2
XHS
AC24092-8"-B1J1-HC
RO GLO STOP
XHS
MIN
GLO
AC24070-6"-B1J1-TS
GLO
GLO STOP GLO
NC
AC24111-6"-B1J1
204 PG PG
XHS 407B
NC
PG
NOTE 2 407A PG
205 NOTE 2 PG
8 AC24090-8"-B1J1-HC PG GLO
401B STS 404A 404B 8
401A NOTE 2
CHE
STS
MIN 5500MM
DR23066-2"-A1A2
2007
DR21095-1/2"-A1A2
PG STS 2008
C C GLO 405A 6" x 3" 6" x 3"
2006 4" x 2" 4" x 2"
D D D D
CHE 8" x 4" CHE CHE 6" x 3" CHE
GLO
NC
7 S M S M S M S M 7
DR23062-2"-A1A2
BY BY
DR24319-2"-A1A2
NC
2005 2"
A1A2
GLO
CHE GAT
NC
G
AT B.V. 3/ T -1 206
AT
NOTE 2 4" 3 INTERNAL APPROVALS
PG 09
A1A2
G
3/
A1A2
GAT
6 21 B.V. XL 6
AT
4" DR21092-1/2"-A1A2
405B DR RUNNING EXPORT COMPLIANCE
207
1THIS SEP. FOR CONSTRUCTION
26.14 CONTAINS (IFC-1) THAT IS SUBJECT TO U.S.
4" x 2"
CHE GAT
DR21094-1/2"-A1A2 DOCUMENT TECHNICAL INFORMATION SHK HGK JJY
RO I XL PARA CONSTRUCCIÓN (IFC-1)
A1A2
RUNNING EXPORTSEP.CONTROL
26.14 REGULATIONS. IT MAY NOT BE EXPORTED OR RE-EXPORTED EXCEPT
CHE
1004 6 205 AS AUTHORIZED
0 MAR.14.14 UNDERFORAPPLICABLE U.S. EXPORT
CONSTRUCTION (IFC) CONTROL REQUIREMENTS
SBL JJY
SHK
GAT
DR24314-4"-A1K1U
5 RO W KELLOGG BROWN & ROOT LLC. THIS INFORMATION IS TO BEDRNHELD IN CONFIDENCE. 5
TW28217-8"-12CS2S04-PP
TW28215-8"-12CS2S04-PP
SMLC29384-3/4"-BSA2
U-GA401A /B DR24112-3/4"-A1A2 C C 1006 DR24312-1/2"-A1A2 N° REV FECHA
NO DISCLOSURE DESCRIPCION
OR OTHER USE ELABORADO
OF THIS DOCUMENT, EXCEPT VERIFICADO FOR
AS NECESSARY APROBADO
AC24110-6"-B1J1-HC
C C
SMLC29020-1"-BSA2
SLL26102-1/2"-ASA2-HC
SL28840-3/4"-ASA2-HC
DR24001-4"-A1K1U
MG23060-8"-B1J1-HC
AC24300-3"-A1K1-HC
W
SLC29440-3/4"-ASA2
SMLC29382-1"-BSA2
SMLC29383-1"-BSA2
AC24131-6"-B1J1-HC
CHE
SMLC29390-1"-BSA2
AC24340-4"-B1J1-TS
PROPIETARIO:
MADE WITHOUT PRIOR WRITTEN CONSENT OF KELLOGG BROWN & ROOT LLC.
RO U-GA404A /B YACIMIENTOS PETROLIFEROS
DR24317-4"-A1K1U
HN29850-1"-BNA2
DR24342-2"-A1A2
C
DR21042-1"-A1K1U
XL I RO B.V.
4 4
(TWO PHASE)
LICENSOR :
CARRASCO, BOLIVIA
S-13C-2 SLL26103-1/2"-ASA2-HC LICENCIADOR: 1,200 MTPD AMMONIA PLANT
3
S-5A-1 HSB
3
TO DR23067
TO U-GA102A/B
TO DR29180
TO DR29180
TO TV-402
TO U-FA401
TO DR29180
TO DR29180
TO U-EA301
TO TY-402
TO DR29180
2873
2586
S-13F-1
5251
S-13G-1
2863
2667
2876
2877
2742
S-5D-1
2882
401
S-13G-1BYPASS PROJECT :
E-U-13G-1
E-U-13G-2
E-U-13G-2
E-U-13G-2
E-U-13G-2
E-U-13D-3
E-U-13C-1
E-U-5D-1
E-U-5A-1
S-22-1
E-U-20-2
PROYECTO:
E-U-13F
E-U-13F
E-U-13F
E-U-13F
E-U-13F
E-U-5M
FROM U-GA-304A/B
FROM SMLC29020
FROM SMLC29020
S-13F-1
E-U-13D-3
FROM SLC29400
FROM SLL27690
FROM SLL27690
FROM SLL27690
FROM SLL27690
S-13G-2 S-13F-1
E-U-13D-3
FROM HN29810
S-22-1
FROM DR24341
FROM U-GA104
FROM U-EA101
FROM U-EA301
FROM SL28810
E-U-22-1
E-U-5D-1
S-5E-2
E-U-22-1
E-U-22-1
E-U-22-1
E-U-22-1
E-U-22-1
U-GA401A /B U-GA404A /B
E-U-5M
E-U-5G
U-GA401A/B
CARBAMATE
NO.2 HP ABSORBENT PUMP
JOB NO.
N° DE PROYECTO PIPINGDWG.
ANDTITLE: PIPING AND INSTRUMENT DIAGRAM
INSTRUMENTATION DIAGRAM
RECOVERY SECTION (2/4)
BOOST-UP PUMP
2874
2864
2865
2744
2867
2868
5119
3316
2871
2872
4889
2879
2596
4892
2875
4905
4906
CAPACITY : 84 m³ h
/ CAPACITY : 51 m³ h
/ S-5E-2 P SC2566 TITULO DEL DIBUJO: DIAGRAMS DE TUBERÌ S
A E INSTRUMENTACIÒ
N
DIFFERENTIAL HEAD : 77 m DIFFERENTIAL HEAD : 46 m SECCION DE RECUPERIACION (2/4)
1 POWER : 45 kW POWER : 15 kW 1
D MATERIAL (CASING / IMPELLER) : 316L S.S. / 316L S.S. MATERIAL (CASING / IMPELLER) : 316L S.S. / 316L S.S.
SCALE
I F264 DWG.NO. :
N° DEL DIBUJO: E-U-5E-2
1 OF 1SH 1/1
HOJA
ESCALA 1/1000
22X34 CLASS JOB NO. DOCUMENT NO. REV. 1
SHT NO. REV
REVISION
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
NOTES:
U-EA402
1. FOR GENERAL
1. LOW PRESSURE NOTES
DROPAND SYMBOLS
CHECK VALVE SEE DRAWINGS
SHALL BE UTILIZED.
62-D001, 62-D002
(ALLOWABLE & 62-D003.
PRESSURE DROP SHALL BE LESS THAN 0.1 kg/cm² )
21
LP ABSORBER 21
E-U-21-2
DUTY : 12.697 Gcal/hr 2. TEMPORARY STRAINER SHALL BE PROVIDED WITH REMOVABLE
I/P ARRANGEMENT.
H SHELL DES./OPR. PRESS.: 4 kg/cm² G / 2.4 kg/cm² G
PY PIC
TO RV 24420
SHELL DES./OPR. TEMP.: 80 ° C/ 45.5 ° C/ 45.5 °C
402 402
TUBE DES./OPR. PRESS.: 8.0 kg/cm² G & F.V. / 4.5 kg/cm² G
20 NOTAS 20
2782
TUBE DES./OPR. TEMP.: 80 ° C/ 32 ° C/ 36 °C
PV
S-21-1 MATERIAL(SHELL/TUBE) : 304 S.S. / 304 S.S.
RV24410-10"-A1A2
MG24030-4"-A1K0 H.P AC24230-2"-A1K1-TS H.P MENOR A 0.1KG/CM2)
E-U-5G 2666
19 19
GAT
GAT 1-1/2" GAT FROM U-GA403 2. EL FILTRO TEMPORAL DEBE SER PROVISTO CON ARREGLOS
REMOVIBLES.
MG24020-3"-A1K0 PT
402
GLO 3/4MIN1
1-1/2"
SET @ 8.0 kg/cm^2g
18 2" 18
PRV CW28112-1"-12CS2S01 6Q8
2036 N37 SET @ 4.0 kg/cm^2g
I/P GLO
N71 PC25295-1"-A1K0
HIC HY CW28211-1"-12CS2S01 N11
402 402 SVB GLO
PRV SL28829-3/4"-ASA2-HC
17 2001 17
H.P 2011 PC25294-3/4"-A1K0
NC
4"
HV TG 10" x 8"
GLO
GAT
402 412 4"
LO
DIRECT TO
GLO
GAT
NOZZLE
VE
16
CW28110-24"-12CS2S01
FO
6"
12CS2S01 S-5E-1 16
3/4"
GAT
GAT
VE
24"
N13 N35
N97
S-5E-3
N94 N20 N33
U-EA402 SG SG
CW28105-24"-12CS2S01 N45A H FI S-5E-4
1"
LT LIC
15 48A 2" 48B 2" 4" 402 15
402 402
N84 N61B N73 N45B
4" L NC S-5H-2
GAT
N61A N12
S-13F-1
12CS2S01
DR
IN VIEW GAT
3/4"
CW28100-24"-12CS2S01
MIN.
N96
GAT
S-16-1
GLO
CSO
DR
14 D 14
GLO
I/P
H
FY FIC CASCADE
MG22060-14"-A1L1-HC
AC24010-6"-A1K1
S-22-1
MG22060-14"-A1L1-HC
401 401
AC24210-3"-B1K1
L
13 13
FT FT FSLL S-13G-1
FO 401A 401B 401B SCV
MIN.
D 2002 S-13G-2
AC24080-1-1/2"-A1K1
AC24050-3"-B1K1 D
14
S-5B-2
MIN.
12
GLO 3" 14 L.P MG22060-16"-A1L1-HC C 12
AC24040-3"-B1K1
FV 3"
MIN.
GLO
NC
401 CHE
HIC
S-5E-3 NOTE 1 S-5B-2
GLO
403
MIN. 8000MM
DR22061-3/4"-A1A2 NC
DR24051-2"-A1A2
CLOSE
11 11
DR24052-2"-A1A2 COS
C 403
AC24210-3"-B1K1 L.P
SL28828-3/4"-ASA2-HC
GLO
DR24211-3/4"-A1A2
NC
MIN.
CHE GLO
10 10
HY GAT
NC I/P H
GLO 403
TI TT 1/2"
HV 403 403
GLO
NC
GAT
MIN.
3"
9 SSC 9
MIN. 1" 2025 SPV
MIN. 2085 A1
AC24060-2"-B1K1-HC B3
MIN.
S-5E-3
8 RO 8
GLO
GLO
NC
NC
402
STOP
MIN. MIN.
GLO STOP XHS
GLO
NC
7 209 7
XHS
MIN.
BY BY
208 MIN. B1K1 A1K1 APP APP APP APP
MIN.
GLO
NC
MIN.
B1K1 A1K1
GLO
GLO
RO INTERNAL APPROVALS
DR24046-3/4"-A1A2
6 MIN. RO GLO 6
NC 998A
GLO CHE
GLO CHE
999A EXPORT COMPLIANCE
AC24041-3"-B1K1
DR24043-3/4"-A1A2
CHE
PG PG AS AUTHORIZED
MAR.14.14 UNDER
FORAPPLICABLE U.S. EXPORT
CONSTRUCTION (IFC) CONTROL REQUIREMENTS
402B 402A 0 SHK SBL JJY
998 999 THIS MAR.14.14 PARA CONSTRUCCIÓN (IFC) IS PROPRIETARY TO
AC24010-6"-B1K1
NOTE 2 DOCUMENT CONTAINS INFORMATION WHICH
PRV PRV
DR24042-1/2"-A1A2
GLO
STS
NC
CW28110-24"-12CS2S01
CW28100-24"-12CS2S01
2009 OPERATION
OWNER : OF THE PLANT WITHIN OWNER'S CONTRACTUAL OBLIGATIONS, IS TO BE
SL28828-3/4"-ASA2-HC
SL28830-3/4"-ASA2-HC
SMLC29386-3/4"-BSA2
PROPIETARIO:
MADE WITHOUT PRIOR WRITTEN CONSENT OF KELLOGG BROWN & ROOT LLC.
RO 2010 RO YACIMIENTOS PETROLIFEROS
SLC29433-3/4"-A2A2
C 998F 999F
D D
S-5E-3 FISCALES BOLIVIANOS
MG24030-4"-A1K0
DR24052-2"-A1A2
AC24210-3"-B1K1
AC24050-3"-B1K1
1/2" 1/2"
DR24047-4"-A1K1U
SL28829-3/4"-ASA2-HC
MG22060-16"-A1L1-HC
GLO
AC24060-2"-B1K1-HC
SLC29430-3/4"-ASA2
4
GAT M S GAT3/4" M S Engineering Services by KBR Technical Services, Inc. 4
DR24044-4"-A1K1U
CONTRACTOR :
( License No. F-2397 )
DR22062-4"-A1A2
DR25293-2"-A1A2
PC25295-1"-A1K0
GLO
CONTRATISTA:
NC 3/4
" NC SAMSUNG ENGINEERING CO., LTD.
AT GLO NC 300 # T GLO NC 300 # YACIMIENTOS PETROLIFEROS FISCALES
SEOUL, KOREA BOLIVIANOS
G GA
CARRASCO, BOLIVIA
GLO CHE GAT PG GLO CHE GAT PG LICENSOR :
3/ AT
3/ AT
LICENCIADOR:
4"
408B
G
3 VE VE 408A 3
300 # 300 #
RO
RO
998E
TO DR 29180
TO U-DA503
TO CW 28190
TO U-DA401
TO DR 24053
TO DR29180
TO U-FA401
TO DR 22063
TO DR 25294
999E
SLL26108-1/2"-ASA2-HC
PROJECT :
SLL26109-1/2"-ASA2-HC
S-5E-3 S-13G-1 S-22-1
2771
S-22-1 S-13G-1
2603
2895
2721
2765
2772
2668
2775
2779
S-22-1 S-13F-1 S-13G-1 S-13G-1 S-13G-2 S-22-1 PROYECTO:
PROYECTO DE AMONIACO/UREA DE YPFB
E-U-13G-1
E-U-13G-1
E-U-13G-1
E-U-13C-1
E-U-13C-1
E-U-5H-2
E-U-5E-1
E-U-5B-2
E-U-16-1
E-U-13F
E-U-13G-2
E-U-13G-2
FROM SMLC 29020
FROM U-GA501A/B
2 N° DEL CONTRATO: DLG 0304 2
S-16-1 S-5E-3 S-5E-1 S-13G-2
FROM SLC 29430
FROM SL 28810
FROM SL 28810
A1A2
FROM U-DA401
FROM U-DA202
E-U-22-1
E-U-5H-3
E-U-5E-1
E-U-22-1
E-U-22-1
E-U-22-1
E-U-22-1
JOB NO.
AND INSTRUMENTATION DIAGRAM
FROM SLL27690
FROM SLL27690
E-U-5G
XL 209 N° DE PROYECTO
RECOVERY SECTION (3/4)
A1A2
2725
2767
2768
2894
2770
2897
2686
2777
2778
CAPACITY : 40 m³ h
/ SECCION DE RECUPERACION(3/4)
5211
D POWER : 45 kW
MATERIAL (CASING / IMPELLER) : 316 S.S. / 316 S.S. W
W I
SCALE
F264 DWG.NO. :
N° DEL DIBUJO: E-U-5F
1 OF 1SH 1/1
HOJA
ESCALA 1/1000
22X34 CLASS JOB NO. DOCUMENT NO. REV. 1
SHT NO. REV
REVISION
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
U-FA401 NOTES:
S-5B-3 1. FOR GENERAL NOTES AND SYMBOLS SEE DRAWINGS
21
CARBONATE SOLUTION TANK MG24240-12"-A1K0-TS 1. LT-404 SHALL
62-D001, HAVE
62-D002 LOCAL INDICATION ON GROUND LEVEL.
& 62-D003. 21
DIMENSION (I.D. X T-T) : 8500 mm X 9300 mm
2. DELETED.
WORKING VOLUME : 448m³
DES. / OPER. PRESS.: F.L.+250 mmH2O (-50mmH2O) / ATM DR29122-1-1/2"-A1K1 H.P 3. STRAIGHT LENGTH FROM STEAM TRAP AND BYPASS VALVE TO
TEMP. (DT/OT) : 120° C/60 °C FIRST ELBOW SHALL BE 500MM AS MINIMUM.
MATERIAL : 304 S.S.
20
US22160-6"-A1K0-TS H.P 4. SEAL HEIGHT OF 500MM SHALL BE DETERMINED FROM THE BOTTOM 20
AC24280-3"-A1K1-HC OF OVERFLOW LINE DR 24237-6"-A1K1 TO THE EDGE OF INSERT LINE
DR 24235-6"-A1K1.
BRV
US22032-4"-A1K1-TS H.P
2002
AC24300-3"-A1K1-HC H.P
19
NOTAS: 19
SLC29480-3/4"-ASA2
1. LT-404 DEBE TENER LA INDICACION LOCAL A NIVEL DEL SUELO.
MIN
TO NOZZLE
2. ELIMINADO.
ISK-2011
3" SLL27691-3/4"-ASA2-HC
DIRECT
ISK-2001 N52 3. EL LARGO DESDE LA TRAMPA DE VAPOR Y LA VALVULA DE DESVIO
SLC29481-1/2"-A1K1 GLO
ISK-2008
18 AL PRIMER CODO DEBE SER DE 500 MM COMO MINIMO. 18
ISK-2007
MIN.
N8 ISK-2004 4. LA ALTURA DEL SELLO DE 500MM DEBE SER DETERMINADO DESDE
DR24234-3/4"-A1K1 N34 LA PARTE INFERIOR DE LA LINEA DE DERRAME. (6DR 24237 A1K1) AL
N13
ISK-2006 BORDEDE LA LINEA DE INSERCION (6DR 24235 A1K1).
N53 N1B N12
N11 N51
17 17
U-FA401
N50
MIN.
SLC29482-3/4"-ASA2
16 IN VIEW ISK-2002 16
A1K1
N35 LI
404A
GLO
TS
15
NOTE 1 S-5B-2 15
H
LT LI
N45 S-5B-3
S-5E-4 ISK-2005 4" SXH
404 404
L
2057 S-5E-4
GLO
TG N40
SXH N27
14 IN VIEW
2056
407 S-5E-2 14
MIN.
GAT
ISK-2006 24"
N17
N1A
MH
SXH
2058
S-13G-1
GLO
AC24230-2"-A1K1-TS
MIN.
N28 S-22-1
13 13
GLO GAT 2" x 1"
ISK-2005 S-13G-2
GLO
GLO
N31
A1K1
GLO
MIN.
TS
DR24235-6"-A1K1
12
GLO 12
NO POCKETS
DR29122-1-1/2"-A1K1
US22032-4"-A1K1-TS
US22160-6"-A1K0-TS
MG24240-12"-A1K0-TS
SLL27790-1"-ASA2-HC
403
2"
FI
GLO
11 11
IN VIEW
SCP-2002
10 GLO GAT 10
NOTE 4
GAT
AC24220-3"-A1K1-TS
1"
500 MIN.
MIN. STR
DR24238-2"-A1A2
DR24237-6"-A1K1
2206
MIN.
NOTE 3
AC24230-2"-A1K1-TS
GLO
GLO
NC
NC SST
1"
9
GLO MIN. 304S.S 9
STOP 12 INCH GAT 2006
PG XHS
403 210
GAT
GLO
PG
1"
409 DR24236-3/4"-A1K1
DR24232-3/4"-A1A2
8 8
STR
2" x 1" 2002
CHE D
3" x 1-1/2"
GAT
U-GA403 M S
7 7
BY BY
APP APP APP APP
L
DR29122-1-1/2"-A1K1
MG24240-12"-A1K0-TS
DOCUMENT CONTAINS INFORMATION WHICH
US22160-6"-A1K0-TS
5
6" 5
SLL27692-3/4"-ASA2-HC
KELLOGG
REV.NO. BROWN & ROOT LLC.
DATE THIS INFORMATION IS TO BEDRN
DESCRIPTION HELD IN CONFIDENCE.
CHECKED APPROVED
N° REV FECHA
NO DISCLOSURE DESCRIPCION
OR OTHER USE ELABORADO
OF THIS DOCUMENT, EXCEPT VERIFICADO FOR
AS NECESSARY APROBADO
AC24280-3"-A1K1-HC
AC24060-2"-B1K1-HC
AC24300-3"-A1K1-HC
AC24230-2"-A1K1-TS
AC24250-2"-A1K1-TS
SLC29480-3/4"-ASA2
SLC29481-3/4"-ASA2
OPERATION
OWNER : OF THE PLANT WITHIN OWNER'S CONTRACTUAL OBLIGATIONS, IS TO BE
PROPIETARIO:
MADE WITHOUT PRIOR WRITTEN CONSENT OF KELLOGG BROWN & ROOT LLC.
SLL27691-3/4"-ASA2-HC
YACIMIENTOS PETROLIFEROS
GAT
DR24239-8"-A1K1U NC
8"
SLC27809-1"-ASA2-PP
SLL27690-2"-ASA2-HC
FISCALES BOLIVIANOS
US22032-4"-A1K1-TS
(TWO PHASE)
4 Engineering Services by KBR Technical Services, Inc. 4
CONTRACTOR :
CONTRATISTA: ( License No. F-2397 )
SAMSUNG ENGINEERING CO., LTD.
YACIMIENTOS PETROLIFEROS FISCALES
SEOUL, KOREA BOLIVIANOS
LICENSOR :
CARRASCO, BOLIVIA
3
LICENCIADOR: 1,200 MTPD AMMONIA PLANT 3
TO DR29110
TO U-EA402
TO U-FA201
TO U-DA503
TO SLC27670
S-13G-2 S-13G-2 S-22-1
4917
S-5E-2 S-5E-4
2666
2579
2608
3319
S-5E-2 S-5B-2 S-22-1 PROJECT :
E-U-13G-2
E-U-13G-2
E-U-13G-2
E-U-13C-1
E-U-13C-1
E-U-5E-1
E-U-5E-2
E-U-5B-2
E-U-22-1
PROYECTO:
E-U-5C
E-U-5F
FROM U-GA402A/B
FROM U-GA201A/B
PROYECTO DE AMONIACO/UREA DE YPFB
S-13G-1 S-5B-3
FROM SLC 29490
FROM SLC29400
S-5E-4 S-13G-1
FROM SLL27510
FROM SLL27690
FROM SLL27600
S-5B-3 U-GA403
FROM U-GA504
E-U-13C-1
FROM U-DA401
FROM U-DA202
E-U-22-1
FROM U-EA401
E-U-5H-3
2
E-U-5C
2658
2669
2668
2667
2665
3320
5180
2659
2660
2577
2661
CAPACITY : 10 m³ h
/
DIFFERENTAIL HEAD : 45 m P SC2566 TITULO DEL DIBUJO: DIAGRAMS DE TUBERÌ S
A E INSTRUMENTACIÒ
N
SECCION DE RECUPERACION (4/4)
POWER : 5.5 kW
1 1
D
MATERIAL (CASING / IMPELLER) :304 S.S. / 316 S.S.
I
SCALE
F264 DWG.NO. :
N° DEL DIBUJO: E-U-5G
1 OF 1SH 1/1
HOJA
ESCALA 1/1000
22X34 CLASS JOB NO. DOCUMENT NO. REV. 1
SHT NO. REV
REVISION
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
2954 E-U-13A-1
GAT
SL27291-3/4"-ASA2-HC
5. SPECIFICATION OF SPARY NOZZLE IS AS FOLLOWS.(DETAIL"B")
FROM SL 27110 3"
8" x 4"
S-5B-3 TYPE : FULL CONE
3" SL25160-2"-ASA2-HC GLO MG25060-8"-A1K0V-PP FLOW RATE : 1350 kg/h
18
GAT
S-5H-1 SPARY ANGLE
FLUID DENSITY
: 120°
: 985 kg/m³ 18
SL25170-3/4"-ASA2-HC
SL25171-3"-ASA2-HC
FLUID VISCOSITY : 0.66 cP
NC
S-5H-2 ALLOWABLE PRESSURE LOSS : 3.0 kg/m²
NOTE 1
MIN
6" x 4"
NOZZLE MATERIAL : 304SS
U-EE501
S-13A-3
NO POCKETS
I/P SST
MIN GLO
17
PY T 17
2754 E-U-5D-1
301
2007 S-16-1
MG25150-6"-A1K0V-PP
MIN A
FROM PIC-301 SPRAY NOZZLE
PV
301 SLC29494-3/4"-ASA2-PP S-21-1 FOR SURFACE CONDENSER
MG25067-4"-A1K0V-TS
16
GLO S-13G-2 ( 10 )
16
MIN
I/P GLO SPN
3" FO
HY HIC D
MG 23040 58 A1K0V ( PP )
GLO
501 501 MG25065-4"-A1K0V-TS
STR
GLO
A1K0V
2046
15 MG25122-4"-A1K0V- MG25122-4"-A1K0V 15
6" x 4" 6" x 4"
NOTE 1 NOTE 1 AIR ( NOTE 4 )
(MAX SLOPE) MG23040-48"-A1K0V-PP A25135-2"-01CB1S01
U-EE502 S-21-1
56" x 48"
HV
MG25121-3"-A1K0V
MG25121-3"-A1K0V
4" x 3"
501
MG25120-3"-A1K0V SEE DETAIL 'A'
MG25020-4"-A1K0V HP MG25030-6"-A1K0V
NOTE 1 DETAIL "A"
GLO
13 MG22080-14"-A1K0V-HC FC MG25030-6"-A1K0V 13
6" STR
S-5H-1 GLO
PC25231-1"-A1K0
STR 2005
PC25227-1-1/2"-A1K0 PC25301-1-1/2"-A1K0
2004
GAT GAT 1-1/2" x 1"
2" x 1" PC25296-2"-A1K0
S-5H-1 GAT GAT S-5H-2 SPRAY NOZZLE
FOR SURFACE CONDENSER
GAT
12 12
PR
GAT
INJ-2004
GLO
MG25090-8"-A1K0V-PP
GAT DR
V25110-6"-A1K0
PC25299-1"-A1K0
SEE DETAIL " B " 2" ( 10 )
PC25229-1"-A1K0
PC25228-1"-A1K0
NO POCKETS
1-1/2" 3/4MIN1
INJ-2005 3/4MIN1 GAT SPN
PC25298-1"-A1K0
PC25297-1"-A1K0
NC SET @ 8.0 kg/cm^2g 3/4MIN1
MG25020-4"-A1K0V
MG 22080 14 A1K0V ( HC )
11
PC25296-1"-A1K0
MG25080-4"-A1K0V
PI 2037 2039 CW28132-1"-12CS2S01 CW28152-1"-12CS2S01
PRV 2040
503
2038
CW28131-1"-12CS2S01
( NOTE 5 )
TG TG CW28032-1"-12CS2S01
PC25225-1-1/2"-B1K0
PC 25231 1 A1K0
501 415
PG PT S-5H-1 PG PG
NEAR
N71D
8" x 6"
N50B
CW28151-1"-12CS2S01
GAT
12CS2S01
GAT
12CS2S01
GAT
VE
12CS2S01
VE
GAT
CW28291-1"-12CS2S01
VE 3/4" 3/4" 3/4" VE VE
A1K0V
VE
N50D
12CS2S01
A1K0V
A1K0V
A1K0V
GAT
GAT
GAT
N61
GAT
3/4"
N25A
N25C
3/4"
A1K0V
3/4"
GLO
GLO
GLO
GLO
3/4"
GLO
N63 CW28031-1"-12CS2S01 1" 1"
9
S-5B-3 N2 N1 N1 N2 9
N97 N71 N37 N25B N38 N94 N97 N71A N36 N71B N71C N94 N7 N8 N5 N8 N7
N5
TG DETAIL "B"
N50A
416
N84 N96 N96 N84 N6 N4 N6 N4
N73 N73
12CS2S01
12CS2S01
N3
12CS2S01
8 N3 8
3/4"
3/4"
TG
GAT
GAT
GAT
GAT
6. DELETED.
GAT
GAT
1"
1"
GLO
GAT
CSO
GAT
BUV
BUV
CSO
GAT
(MAX SLOPE)
357
BUV
CSO
BUV
DR DR U-EA502 DR
CSO
BUV
DR
U-EA506 U-EA501 U-EA509
BUV
7
NOTAS: 7
REFERIRSE AL PLANO DE DTIBYNO.E-U-4E-1. BY
PC25010-3"-A1K0V
MIN. 8000 MM
ISS REV DATE SYSTEMS CSE CSS PROJ
PC25100-3"-A1K0V
INTERNAL APPROVALS
S-5B-3
CW28280-16"-12CS2S01
CW28290-16"-12CS2S01
CW28020-26"-12CS2S01
CW28030-26"-12CS2S01
6 6
CW28120-4"-12CS2S01
CW28130-4"-12CS2S01
CW28150-8"-12CS2S01
CW28140-8"-12CS2S01
MG22080-14"-A1K0V-HC
MG23040-48"-A1K0V-PP
EXPORT COMPLIANCE
SLC29459-3/4"-ASA2
1THIS SEP. FOR CONSTRUCTION
26.14 CONTAINS
DOCUMENT (IFC-1) THAT IS SUBJECT TO U.S.
TECHNICAL INFORMATION
PC25040-6"-A1K0V
PC25070-2"-A1K0V
SHK HGK JJY
PC25296-2"-A1K0
EXPORTSEP.CONTROL PARA CONSTRUCCIÓN
26.14 REGULATIONS. (IFC-1)
IT MAY NOT BE EXPORTED OR RE-EXPORTED EXCEPT
AS AUTHORIZED
MAR.14.14 UNDERFORAPPLICABLE U.S. EXPORT
CONSTRUCTION (IFC) CONTROL REQUIREMENTS
0 SHK SBL JJY
PARA CONSTRUCCIÓN
MAR.14.14 CONTAINS
THIS DOCUMENT (IFC) IS PROPRIETARY TO
INFORMATION WHICH
5 KELLOGG
REV.NO. BROWN & ROOT LLC.
DATE THIS INFORMATION IS TO BEDRN
DESCRIPTION HELD IN CONFIDENCE.
CHECKED APPROVED 5
NOTE 2 FECHA DESCRIPCION ELABORADO VERIFICADO FOR
APROBADO
N° REV
NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT, EXCEPT AS NECESSARY
OPERATION
OWNER : OF THE PLANT WITHIN OWNER'S CONTRACTUAL OBLIGATIONS, IS TO BE
TG PROPIETARIO:
MADE WITHOUT PRIOR WRITTEN CONSENT OF KELLOGG BROWN & ROOT LLC.
512
YACIMIENTOS PETROLIFEROS
FISCALES BOLIVIANOS
(MAX SLOPE)
TO CW28110
2961
S-16-1 YACIMIENTOS PETROLIFEROS FISCALES
SEOUL, KOREA BOLIVIANOS
TO U-FA501
CARRASCO, BOLIVIA
2806
S-16-1
TO U-FA501
E-U-13C-1
E-U-5H-2
E-U-16-1
3 3
FROM U-GA501A/B
E-U-16-1
TO U-FA501
TO U-FA501
TO CW28110
TO CW28680
TO CW28110
FROM CW28011
S-16-1 U-FA501 TOP
S-5H-1 S-16-1 U-FA501 TOP
2803
2956
2804
2958
2960
E-U-5H-2
E-U-5H-2
PROJECT :
U-EE501 U-EE502
S-5H-1 S-5H-2
E-U-5D-1
E-U-5H-2
E-U-16-1
E-U-16-1
E-U-16-1
PROYECTO:
E-U-5C
FROM U-GA503A/B
FIRST EJECTOR
FROM CW28190
FROM CW28011
2952
2807
2951
E-U-5H-2
E-U-5H-2
FROM U-FA301
FROM U-FA202
E-U-16-1
E-U-16-1
E-U-16-1
2
S-5H-2 S-16-1
SUCTION LOAD : 240 kg/h SUCTION LOAD : 220 kg/h
N° DEL CONTRATO: DLG 0304
TITLE: PIPING AND INSTRUMENT DIAGRAM
2
2552
2802
2955
2957
2959
DES. TEMP. : 200 ° C DES. TEMP. : 200 ° C P SC2566 TITULO DEL DIBUJO: DIAGRAMS DE TUBERÌ S
A E INSTRUMENTACIÒ
N
MATERIAL : 304 S.S. MATERIAL : 304 S.S. SECCION DE SUPERCIE (1/3)
1 1
D I
SCALE
F264 DWG.NO. :
N° DEL DIBUJO: E-U-5H-1
1 OF 1SH 1/1
HOJA
ESCALA 1/1000
22X34 CLASS JOB NO. DOCUMENT NO. REV. 1
SHT NO. REV
REVISION
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
NOTES:
FROM U-EA506
FROM U-EA501
FROM U-EA509
FROM U-DA503
FROM U-EA502
U-FA501 S-5H-2
2803
2804
2599
2806
2953
1.1. FOR
TEMPORARY
GENERALSTRAINER
NOTES ANDSHALL BE PROVIDED
SYMBOLS WITH REMOVEABLE
SEE DRAWINGS
PROCESS CONDENSATE ARRANGEMENT.
62-D001, 62-D002 & 62-D003.
E-U-5H-1
E-U-5H-1
21 21
S-5B-3 S-5H-1 TANK S-5H-1 S-5H-1 S-5H-3 2. INDICATOR OF TG-501, TG-354, TG-503 AND TG-512 SHALL BE
E-U-5H-1
E-U-5H-1
DIMENSION (I.D. X T-T) : 8800 mm X 7300 mm
E-U-5H-3
E-U-5H-1
E-U-5H-1
S-5H-2 PLACED ON ACCESSIBLE LOCATION.
TO U- EA506
WORKING VOLUME : 347m³
TO U-EA501
U-EA501/506 DES. / OPER. PRESS.: F.W.+250mmH2O(-50mmH2O) / ATM U-EA502/509 3. DELETED
BOTTOM TEMP. (DT/OT) : 110° C/48 °C BOTTOM
2802
2807
20 MATERIAL : 304 S.S. 20
4. SEAL HEIGHT OF 500MM SHALL BE DETERMINED FROM THE BOTTOM
OF OVERFLOW LINE DR 25013-4"-A1K0 TO THE EDGE OF INSERT LINE
DR 25012-4"-A1K0.
5. DELETED
MIN.8000mm
PC25010-3"-A1K0V
PC25040-6"-A1K0V
PC25070-2"-A1K0V
PC25100-3"-A1K0V
19 19
MIN.8000mm
PC25225-1-1/2"-B1K0
NOTAS:
18 1. EL FILTRO (STRAINER) TEMPORAL DEBE SER PROVEIDO CON 18
ARREGLOS REMOVIBLES.
355
PC25296-2"-A1K0
)
SLOPE
8" x 6"
DR29121-1-1/2"-A1K1 ( MAX.
15
S-5H-2 S-5H-1 15
SLC29471-2"-A1K0
S-5H-3
GLO V25050-6"-A1K0
2600 E-U-5H-3
S-5H-2
DIRECT TO
ISK-2006
MIN.
ISK-2008
BRV
ISK-2008
TO U-DA503
ISK-2005
I/P
NOZZLE
ISK-2008
ISK-2006
14 14
GLO 2003
H
S-13G-2
ISK-2005
FY FIC PC25300-4"-A1K0
2601 E-U-5H-3
506 506 SLC29472-1/2"-A1K0 ISK-2001 N11 N12
L N51
N56 N8
N52
1-1/2" TO U-DA503
S-22-1
N55 N54
N53 N13 N44A/B/C
S-5H-2
MIN.
FV N33
N57 S-5B-3
PC25300-4"-A1K0
13 N1B 13
DR25011-3/4"-A1K0
506 FT
ISK-2004
ISK-2009
FC 506
N50
H
LI
DR25012-4"-A1K0
GAT GAT GAT 505 LG
L 501
12 12
NC 1-1/2"
1-1/2" GAT
S-5H-2 LT N45
GAT
GAT
505 3"
1-1/2"
SXH
GAT
11 24" 2060 11
6" x 4"
MH GAT
GAT
B1K0 A1K0
ISK-2006 N1A N17
GAT
N18 PC25281-8"-A1K0
GLO U-FA501
1-1/2" PC25701-3/4"-B1K0 GAT GAT S-5H-2 N31
N41 GAT
ISK-2009
GAT
A1K0
GAT
10 10
PC25226-1-1/2"-B1K0
A1K0
PC25220-3"-B1K0
GAT
NC
SXH
GAT
PC25221-3"-B1K0
PC25210-3"-B1K0
DR25243-3/4"-A1A2
PC25225-1-1/2"-B1K0
2059
SEAL POT FIC FT 3"
B1K0
SCP-2003 L
504
500MM
IEW
9 9
GAT
12INCH
MIN.
PC25280-8"-A1K0
PC25290-6"-A1K0
PC25291-6"-A1K0
PC25281-8"-A1K0
BY SUPPLIER 304S.S.
GLO
NC
PC25702-3"-B1K0 GAT
RO I/P
CSO
GAT
DR25016-3/4"-A1K0
1002A PC25702-3/4"-B1K0 STOP FC
TI FY
GLO
3"
3"
CHE
CSO
GAT
GAT
RO PRV PG
3/4"
502A PG RO PG PG
2956 511B
3/4"
7
505B 504A NOTE 1 7
B.V. NOTE 1 BY BY
CHE
GAT
GAT
GAT
GAT
STS CHK CHK
GAT
PG
GAT
GAT GAT 2013
1002 2012 6" x 3" 6" x 3" ISS REV DATE SYSTEMS CSE CSS PROJ
NC GAT
3" x 2"
PG
D GAT 3" x 1-1/2" D D D INTERNAL APPROVALS
3" x 1-1/2" 1003 8" x 4"
GAT
CHE CHE 8" x 4" CHE CHE
NC
3" x 2"
GAT
6 6
#300 NOTE 1 NC
DR25013-4"-A1K0
DR25014-2"-A1A2
M S M S S M NC S M EXPORT COMPLIANCE
NC
GAT
NC
BAL
NC
NC BA
1THIS SEP. FOR CONSTRUCTION
26.14 CONTAINS (IFC-1) THAT IS SUBJECT TO U.S.
GAT
GAT
L DOCUMENT TECHNICAL INFORMATION
T NC HGK JJY
DR25315-3/4"-A1A2
STS SHK
S-5H-2 S-5H-2 PARA CONSTRUCCIÓN (IFC-1)
DR25245-2"-A1A2
SEP.CONTROL
26.14 REGULATIONS.
DR25312-3/4"-A1A2
TNC GA EXPORT IT MAY NOT BE EXPORTED OR RE-EXPORTED EXCEPT
1A
2 GA #300 AT 2015 B.V. B.V AS AUTHORIZED
MAR.14.14 UNDER
FORAPPLICABLE U.S. EXPORT
CONSTRUCTION (IFC) CONTROL REQUIREMENTS
DR25222-3/4"-A1A2
-A T A1A2
DR25223-3/4"-A1A2
/4" GA VE G
DR25242-3/4"-A1A2
A1A2
VE PARA CONSTRUCCIÓN
MAR.14.14 CONTAINS (IFC) IS PROPRIETARY TO
1-3 2" A1A2 2" 1/2" THIS DOCUMENT INFORMATION WHICH
24
DR25314-1/2"-A1A2
5 25 2014 1/2" KELLOGG BROWN & ROOT LLC. THIS INFORMATION IS TO BEDRNHELD IN CONFIDENCE. 5
DR25316-4"-A1K1U
DR REV.NO. DATE DESCRIPTION CHECKED APPROVED
DR25311-1/2"-A1A2
STOP N° REV FECHA
NO DISCLOSURE DESCRIPCION
OR OTHER USE ELABORADO
OF THIS DOCUMENT, EXCEPT VERIFICADO FOR
AS NECESSARY APROBADO
NOTE 1
STOP XHS XL OPERATION
OWNER : OF THE PLANT WITHIN OWNER'S CONTRACTUAL OBLIGATIONS, IS TO BE
XHS 211 212 PROPIETARIO:
MADE WITHOUT PRIOR WRITTEN CONSENT OF KELLOGG BROWN & ROOT LLC.
213 XL B.L. YACIMIENTOS PETROLIFEROS
XHS W
213 STOP RUNNING FISCALES BOLIVIANOS
214 XL
A1A2
C W W C
214 C
PC25295-1"-A1K0
4 RUNNING Engineering Services by KBR Technical Services, Inc. 4
PC0013-1-1/2"-01CB1S01-N
CONTRACTOR :
CONTRATISTA: ( License No. F-2397 )
RUNNING SAMSUNG ENGINEERING CO., LTD.
DR29121-1-1/2"-A1K1
U-GA501A /B
SLC29474-3/4"-ASA2
U-GA503A/B
DR25313-4"-A1K1U
C C C
PC25330-4"-A1K0
PC25305-1"-A1K0
SLC29470-2"-ASA2
DR25015-6"-A1K1U
DR25224-4"-A1K1U
PC25230-3"-B1K0
TO DR29110
CARRASCO, BOLIVIA
2817
U-GA503A/B S-22-1 LICENSOR :
LICENCIADOR: 1,200 MTPD AMMONIA PLANT
DR25244-4"-A1K1U
3 LP ABSORBENT 3
PUMP
E-U-22-1
CAPACITY : 13 m³ h
/
TO U-EA402
PROJECT :
S-5H-2
2778
DIFFERENTIAL HEAD : 223 m PROYECTO:
S-5H-2
TO U-DA401
TO DR29170
TO DR29170
TO DR29170
TO DR29170
TO U-EA504
TO U-FA301
POWER : 30 kW PROYECTO DE AMONIACO/UREA DE YPFB
S-13G-2 S-22-1 S-5H-2 S-5H-2
2713
5250
2812
2814
2815
2621
2816
S-22-1
TO DR 25316
S-22-1 MATERIAL (CASING / IMPELLER) : 304L S.S. / 304L S.S.
S-22-1
2820
2 N° DEL CONTRATO: DLG 0304 2
E-U-13C-1
E-U-13C-2
E-U-13C-2
E-U-13C-1
E-U-22-1
E-U-5F
FROM SCL 29470
N° DE PROYECTO
SURFACE CONDENSER SECTION (2/3)
PROCESS CONDENSATE
FROM U-GA504
E-U-5D-1
E-U-5E-1
E-U-22-1
E-U-22-1
E-U-22-1
E-U-22-1
E-U-5J-1
FROM AV-702
FROM AV-701
73-D102
E-U-22-1 PUMP P SC2566 TITULO DEL DIBUJO: DIAGRAMS DE TUBERÌ S
A E INSTRUMENTACIÒ
N
CAPACITY : 123 m³ /h SECCION DE SUPER FICIE ( 2/3)
FROM 338-J
2808
2809
2617
2810
2811
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
U-DA503 U-EA507
NOTES:
FINAL ABSORBER
FINAL ABSORBER 1. FOR GENERAL NOTES AND SYMBOLS SEE DRAWINGS
21
COOLER 1. DELETED
62-D001, 62-D002 & 62-D003. 21
DIMENSION (I.D. X T-T) : 1100 mm x 2800 mm DUTY : 1.04 Gcal/h
DES. / OPER. PRESS. : F.W. / ATM HOT SIDE DES. / OPER. PRESS. : 12 kg/cm² G / 4 kg/cm² G 2. SPOOL PIECE SHALL BE PROVIDED ON CW LINE IN CONSIDERATION
DES. / OPER. TEMP. : 140 ° C/ 48 °C HOT SIDE DES. / OPER. TEMP. : 110 ° C/ 70 °C / 45 °C OF BYPASS OPERATATION DURING CW CIRCULATION OPERATION
MATERIAL : 304 S.S. COLD SIDE DES. / OPER. PRESS. : 8.0 kg/cm² G & F.V. / 3.5 kg/cm² G AT PRECOMMISSIONING STAGE.
COLD SIDE DES. / OPER. TEMP. : 80 ° C/ 36 °C / 45 °C
20 MATERIAL(PLATES) : 316 S.S. V25130-12"-A1K0 20
2612 E-U-21-1
3/4MIN1
NOTAS:
TO MG24190
SEE DETAIL "C"
SET @ 8.0 kg/cm^2g 1. ELIMINADO.
PRV
CW28332-1"-12CS2S01
S-21-1 2. EL TRAMO DE CAÑE
RIA DEBE SER PROPORCIONADO EN LA LINEA
19
S-21-1 2041 CW CONSIDERANDO LA OPERACION DE DESVIO DURANTE LA
OPERACION DE CIRCULACION DE CW EN LA ETAPA DE
19
V25110-6"-A1K0 PRECOMISIONADO.
2598 E-U-5H-1
CW28331-1"-12CS2S01
FROM U-EA509
18 18
N7
S-5B-3
GAT
VE
RO
17
IN VIEW
503
S-5E-3 17
GAT
S-5H-2 U-DA503 S-5H-3 N51 S-5K-1
15 2600 E-U-5H-2
V25050-6"-A1K0
N50
BUV GAT
S-5H-3 S-16-1 15
GAT
PDG
GAT
FROM U-FA501
518
4" S-22-1
STR
S-6A-5
PC25310-4"-A1K0
N3A 12" 2047
HH GAT
S-21-1
RS
14 14
GA1
GAT
NOTE 2 VE
HH N3B
S-5E-3
RS
12"
N4 N1
MG24030-4"-A1K0
13 2603 E-U-5F 4" 13
N13 TG
FROM U-EA402 428
N11
12 12
SAMPLING NOZZLE
4" SSC
CW28330-6"-12CS2S01
2101
MG22300-12"-A1K0-TS
100 MM
N3 N2
NHG21885-3"-A1K0
(4)
N18
GAT
11 1/2" 11
RS
NOTE 2
DR
S-5H-3 U-EA507
GAT
(MAX SLOPE)
NC
PC25120-6"-A1K0
V25130-12"-A1K0
10 E-U-5H-2 2599 10
TO U-FA501
DR25317-3/4"-A1A2
TT
502
9 9
BUV
CSO
DETAIL " C "
TI
502
8 GAT STR 8
2006
PDG
BUV
NC
6"
517
7
GAT 7
BY BY
CSO
BUV
GAT
C APP APP APP APP
CHE
CHE
CHE
CHE
H.P
H.P
H.P
H.P
CHK CHK
DR
ISS REV DATE SYSTEMS CSE CSS PROJ
INTERNAL APPROVALS
6 6
EXPORT COMPLIANCE
1THIS SEP. FOR CONSTRUCTION
26.14 CONTAINS
DOCUMENT (IFC-1) THAT IS SUBJECT TO U.S.
TECHNICAL INFORMATION SHK HGK JJY
EXPORTSEP.CONTROL PARA CONSTRUCCIÓN
26.14 REGULATIONS. (IFC-1)
IT MAY NOT BE EXPORTED OR RE-EXPORTED EXCEPT
AS AUTHORIZED
MAR.14.14 UNDER
FORAPPLICABLE U.S. EXPORT
CONSTRUCTION (IFC) CONTROL REQUIREMENTS
0 SHK SBL JJY
THIS MAR.14.14 PARA CONSTRUCCIÓN
DOCUMENT CONTAINS (IFC) IS PROPRIETARY TO
INFORMATION WHICH
5 5
MG24240-12"-A1K0-TS
MG22300-12"-A1K0-TS
KELLOGG
REV.NO. BROWN & ROOT LLC.
DATE THIS INFORMATION IS TO BEDRN
DESCRIPTION HELD IN CONFIDENCE.
CHECKED APPROVED
CW28330-6"-12CS2S01
CW28320-6"-12CS2S01
N° REV FECHA
NO DISCLOSURE DESCRIPCION
OR OTHER USE ELABORADO
OF THIS DOCUMENT, EXCEPT VERIFICADO FOR
AS NECESSARY APROBADO
NHG26401-2"-A1A2
NHG21743-2"-A1A2
NHG21752-2"-A1A2
NHG21880-3"-A1A2
OPERATION
OWNER : OF THE PLANT WITHIN OWNER'S CONTRACTUAL OBLIGATIONS, IS TO BE
DR25318-2"-A1A2
DR23072-2"-A1A2
PROPIETARIO:
MADE WITHOUT PRIOR WRITTEN CONSENT OF KELLOGG BROWN & ROOT LLC.
YACIMIENTOS PETROLIFEROS
FISCALES BOLIVIANOS
4 Engineering Services by KBR Technical Services, Inc. 4
CONTRACTOR :
CONTRATISTA: ( License No. F-2397 )
SAMSUNG ENGINEERING CO., LTD.
YACIMIENTOS PETROLIFEROS FISCALES
SEOUL, KOREA BOLIVIANOS
LICENSOR :
CARRASCO, BOLIVIA
3
LICENCIADOR: 1,200 MTPD AMMONIA PLANT 3
S-22-1
TO CW 28680
TO DR 25319
S-5B-3 S-16-1
2856
2610
S-6A-5 S-5K-2 S-16-1 PROJECT :
FROM U-EA102/EA103
GRANULATION UNIT)
E-U-5D-1
E-U-5A-1
E-U-6F-1
E-U-16-1
PROYECTO:
E-U-5G
E-U-5C
E-U-5K
E-U-5L
FROM U-GA101A/B
S-5K-2 S-5K-1
FRON CW 28190
FROM DR 23071
FROM U-FA604
FROM U-FA104
FROM U-FA401
FROM U-FA201
E-U-16-1
E-U-22-1
2 N° DEL CONTRATO: DLG 0304 2
NH3 DRAIN
JOB NO.
PIPINGDWG.
N° DE PROYECTO ANDTITLE: PIPING AND INSTRUMENT DIAGRAM
INSTRUMENTATION DIAGRAM
SURFACE CONDENSER SECTION (3/3)
2604
2605
2606
2607
2608
2555
2857
5120
P SC2566 TITULO DEL DIBUJO: DIAGRAMS DE TUBERÌ S
A E INSTRUMENTACIÒ
N
SECTION DESUPERCIE (3/3)
1 1
D I
SCALE
F264 DWG.NO. :
N° DEL DIBUJO: E-U-5H-3
1 OF 1SH 1/1
HOJA
ESCALA 1/1000
22X34 CLASS JOB NO. DOCUMENT NO. REV. 1
SHT NO. REV
REVISION
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
PC25340-4"-A1K0-HC NOTES:
2613 E-U-5J-2
1. FOR GENERAL NOTES AND SYMBOLS SEE DRAWINGS
1. DELETED.
U-EA508 TT TI
TO U-DA501
62-D001, 62-D002 & 62-D003.
21 21
PROCESS CONDENSATE 506 506 S-5H-2 2. AV-501 FAILURE ACTION IS A TO C.
COOLER 3/4MIN1
DUTY : 1.43 Gcal/h PRV PC25342-1"-A1K0
SET @ 12 kg/cm^2g
SHELL SIDE DES. / OPER. PRESS. : 14 kg/cm² G / 9 kg/cm² G 2049
SHELL SIDE DES. / OPER. TEMP. : 175 ° C/ 74 °C / 50 °C TG
20 STR 429
NOTAS: 20
TUBE SIDE DES. / OPER. PRESS. : 8.0 kg/cm² G & F.V. / 3.5 kg/cm² TO SAFE
2048 LOCATION
TUBE SIDE DES. / OPER. TEMP. : 80 ° C/ 36 °C / 47 °C
MATERIAL(SHELL/TUBE) : C.S. / C.S.
S-5H-2 1. ELIMINADO
PC25341-1"-A1K0
GAT PC25370-6"-B1K0-HC 2. LA ACCION DE FALLA DEL AV-501 ES DE A a C.
E-U-6A-3 5139
FROM U-EA604 (FROM
19 GRANULATION UNIT) 19
GAT
GAT
GAT
PDG
U-EA504 520
PREHEATER FOR
GAT
PROCESS CONDENSATE STRIPPER PC25465-6"-B1K0-HC
PC25335-4"-A1K0-HC
DUTY : 1.57 Gcal/h N4 N1 E-U-5J-2 2614
4"
18 HOT SIDE DES. / OPER. PRESS. : 14 kg/cm² G / 7 kg/cm² G 18
PC25375-6"-B1K0-PP
FROM HV-502
HOT SIDE DES. / OPER. TEMP. : 175 ° C/ 107 °C / 74 °C
COLD SIDE DES. / OPER. PRESS. : 12.0 kg/cm² G & F.V. / 6.5 kg/cm² G S-5H-2
COLD SIDE DES. / OPER. TEMP. : 175 ° C/ 48 °C / 85 °C
MATERIAL(PLATES) : 304 S.S.
17 17
4"
N3 N2
GAT
15
GAT 15
S-5H-2
S-16-1
GAT
DR25590-1/2"-A1A2-PP
S-22-1
DR25541-3/4"-A1A2
DR25331-3/4"-A1A2
14 14
H 3/4MIN1
TI
GLO 509 PRV SET @ 8.0 kg/cm^2g S-62-14-01
2042
CW28312-1"-12CS2S01
PC25600-1/2"-A1A2
13 13
TT FE
509 TO SAFE
LOCATION 510
PC25330-4"-A1K0
6" x 4"
12 12
4"
CW28311-1"-12CS2S01
DR25590-1/2"-A1A2-PP
FT
PC25550-6"-A1A2
C 510
11 11
TG
FI
GAT
418
GAT
VE
510 L
NC
12CS2S01
GAT
GAT
10 10
VE
PP
N2 5