You are on page 1of 2

Project Company Stage Item code Information Document Work Document Revision Unique

code code code type type type format Number


NEM SD5 I DAM1 B.1 1.1 D: drawing A: Appr CO DWG 01 025
TV1 II SPW2 2.4 R: report I: infor EQ PDF 02 001
SDC III INT1 1.3 ER JPG 03
VHS IV TUN1 3.1 TE
HY
Ex: NEM.SD5.III.1.1.D.A.CO.01-001 or NEM-SD5-III-B.1-D-A-CO-01-006
Stage: I is propose; II: technical design stage 1; III: Detail technical design; IV: Construction design; V: Completion
design.
Work type: TG: Topographical Survey; GE: Geological; HD: hydrology; HP: Hydropower; CO is contruction; EQ:
equipment; EL: Electrical; HY: Hydraulic; HM: Hydrotecnics-Mechanical; HE: Hydraulic-Equipment; EIA:
Environmental Impact assessment; TE: Testing; ER: Erection; ST: Structural; SB: Stability; RF: Reinforcement; AR:
Architectural; FF: Firefighting; IF: Information system; SD: SCADA; RS: Result…
STT Main item name Major item code Sub item code Major item code
A Project 0 PRJ
B Main dam 1 DAM1
1. Left bank 1.1
2. Right bank 1.2
3. Intake 1.3
4. Spillway 1.4
5. Upstream diversion 1.5
6. Downstream diversion 1.6
C Second dam 2 DAM2
1. Left bank 2.1
2. Right bank 2.2
3. Intake 2.3
4. Spillway 2.4
5. Upstream diversion 2.5
6. Downstream diversion 2.6
D Tunnel of main dam 3 TUN1
1. Audit A 3.1
2. Audit 1 3.2
3. Audit 2 3.3
4. Audit 3 3.4
5. Audit 4 3.5
6. Audit 5 3.6
E Tunnel of second dam 4 TUN2
1. Audit A 4.1
2. Audit 1 4.2
3. Audit 2 4.3
4. Audit 3 4.4
5. Audit 4 4.5
6. Audit 5 4.6
F Temporary tunnel 5 5.1;5.2;5.3;5.4 CVT
G Penstock 6 PST
H Power house 7 PWH
J Switchyard 8 SWY
K Shaft 9 SHA
L Valve house 10 VLH
N Equipment 11 EQM