The inspection report certifies that the materials used for the construction of an additional watertank in Tuba, Benguet were inspected on December 14, 2018 and found to be in accordance with the project specifications. The report was prepared by Engineering Assistant Moises Rogelio B. Luis Jr. and certified by Engineer IV and MT & QC Division Chief Teofilo B. Lacaden.
The inspection report certifies that the materials used for the construction of an additional watertank in Tuba, Benguet were inspected on December 14, 2018 and found to be in accordance with the project specifications. The report was prepared by Engineering Assistant Moises Rogelio B. Luis Jr. and certified by Engineer IV and MT & QC Division Chief Teofilo B. Lacaden.
The inspection report certifies that the materials used for the construction of an additional watertank in Tuba, Benguet were inspected on December 14, 2018 and found to be in accordance with the project specifications. The report was prepared by Engineering Assistant Moises Rogelio B. Luis Jr. and certified by Engineer IV and MT & QC Division Chief Teofilo B. Lacaden.