You are on page 1of 5

RESUME

PERSONAL DETAILS

Name : EKA YULIZAL PUTRA

Position : QA/QC Manager

Date of Birth : 9 February 1984

Gender : Male

Nationality : Indonesian

EDUCATION BACKGROUND

 Bachelor’s Degree in Mechanical Engineering


Batam University, Indonesia

EXECUTIVE SUMMARY
More than Seventeen (17) years experiences in :
 Engineering, Procurement, Construction, Commissioning of LNG Jetty
 Design and Fabrication of Pressure Vessels, Heat Exchanger, Coolers, CO2 Removal Packages,
H2S Removal Packages, Gas Compressor Packages, Air Compressor Packages, Metering Skid,
Steel Structure, etc.
 Fabrication of Piping for FPSO
 Design and fabrication of Exhaust Gas Cleaning System and Inert Gas Generator
 Maintenance and troubleshooting of Manufacturing Machineries and Equipment

SOFTWARE LITERACY

Knowledge of Microsoft Office such as MS Word, MS Excel & PowerPoint and AutoCAD.

QAQC Manager - Eka Yulizal Putra.doc Page 1 of 5


WORK EXPERIENCE

PERIOD : November 2019 to Present

POSITION : Project Quality Manager

COMPANY : BAC HAI VIET NAM. JSC

RESPONSIBILITIES
 Ensuring the preparation of the PQP and ensure that all employees are made aware of the PQP
requirements related to their scope of work
 Prepare and maintain the Project Audit Schedule and Carry out report audits in accordance with the
Project Audit Schedule
 Establish and plan the controls for inspection and testing of construction works, materials and
equipment onsite and offsite
 Establish Supplier/Subcontractor quality requirements and include in subcontract documents, and
provision of appropriate resource for Implementation of Surveillance and inspection on
procurement material and equipment
 Identify all project hold and witness points and incorporate those into applicable ITPs
 Assist in providing suitably qualified personnel to meet the inspection and test requirements
nominated on the ITP
 Monitor the use of ITPs, verification checklists and CEPs at regular intervals
 Evaluate the inspection and test results
 Ensure all inspection and test reports are submitted to the Contractor and Company for review
 Ensure measuring and testing equipment is suitably calibrated
 Maintain the project non-conformance system
 Ensure the site MDR Index is submitted for approval and the MDR is compiled progressively
 Manage Handover document and dossier
 Ensure that redline mark-ups are progressively compiled during the construction phase of the works
 Report monthly to senior management on quality performance

PERIOD : April 2019 to November 2019

POSITION : Assistant QA/QC Manager

COMPANY : Feen Marine Inc.

PROJECTS : 1. Exhaust Gas Cleaning System (EGCS)


2. Inert Gas Generator (IGG)
3. N2 PSA Generator

RESPONSIBILITIES

QAQC Manager - Eka Yulizal Putra.doc Page 2 of 5


 ISO 9001 : 2015 Audit & Certification
 Ensures implementation of Quality Management System in accordance with ISO 9001: 2015
 Arranges Quality Issue Meeting with Management
 Preparing QA/QC Procedures and submit to Client for approval
 Qualify Procedure Qualification Record for Welding Procedure Specification in accordance with
ASME IX, AWS D1.1, and Rules of Classifications
 Qualify and certify Welder and Welding Operator
 Certify Manufacturer’s Data Report
 Maintain qualification record of welding procedures and welder’s performance. Qualify new
welding procedures and welders when required
 Review subcontractor’s NDE procedures, ensure that the procedures are in accordance with the
applicable Code and the NDE operators are qualified
 Issuance of Non-Conformity Report for non-conforming products
 In close coordination with Project Coordinator and Engineering Team, recommends solution for
any product non-conformities
 Liaise with third party in term of inspection such as: Authorized Inspector, Client, Auditor, Class
Surveyor, etc.
 Reviewing of QC Dossier for the project and handing over to clients

PERIOD : February 2015 to April 2019

POSITION : QA/QC Manager

COMPANY : PT INOFAB

PROJECTS : 1. Gas Compressor Package for Chevron Indonesia


2. Flare System for Chevron Indonesia and other Companies
3. Gas Compressor Package for Expro Resources Limited
4. Air Compressor Package for Chevron Indonesia
5. Metering Skid Package for Expro Resources Limited
6. LPG Pump Package
7. Blower Package for PERTAMINA
8. Serpentine Cooler
9. Chemical Injection Package
10. Gas Compressor Package for Bangladesh Oil Company

RESPONSIBILITIES
 Establishing Quality Management System for PT. INOFAB in accordance with ISO 9001
 Establishing Quality Management System in accordance with ASME VIII Div. 1
 Preparing all documentations and resources required for first ASME Joint Review on July 2016
 Liaise with third party in term of inspection such as: Authorized Inspector, Client, Auditor, etc.
 Identify product non-conformity, recommend solutions through designated channels, verify the
implementation of solutions, and control further processing of non-conforming product until the
deficiency has been corrected, and initiate corrective action to prevent recurrence of product non-
conformity
 Reviewing of QC Dossier for the project and handing over to clients
 Review subcontractor’s NDE procedures, ensure that the procedures are in accordance with the
applicable Code and the NDE operators are qualified
 Certify Manufacturer’s Data Report

QAQC Manager - Eka Yulizal Putra.doc Page 3 of 5


PERIOD : February 2014 to January 2015

POSITION : QA/QC Manager

COMPANY : PT Transalindo Eka Persada

PROJECTS : Involved in various Projects of Pressure Vessels including supply to Chevron


Indonesia, Petronas, ONGC, PERTAMINA, CNOOC, etc.

RESPONSIBILITIES
 Monitoring the implementation of Quality Management System Ensure the items of inspection are
ready for client verification
 Quality Management Representative
 Preparing QA/QC Procedures and submit to Client for approval
 Identify product non-conformity, recommend solutions through designated channels, verify the
implementation of solutions, and control further processing of non-conforming product until the
deficiency has been corrected, and initiate corrective action to prevent recurrence of product non-
conformity
 Qualify Procedure Qualification Record for Welding Procedure Specification in accordance with
ASME IX and AWS D1.1
 Qualify and certify Welder and Welding Operator
 Certify Manufacturer’s Data Report
 Maintain qualification record of welding procedures and welder’s performance. Qualify new
welding procedures and welders when required
 Review subcontractor’s NDE procedures, ensure that the procedures are in accordance with the
applicable Code and the NDE operators are qualified
 Prepare hydrostatic test and heat treatment specification and ensure that they are conducted in
accordance with Code requirements
 Liaise with third party in term of inspection such as: Authorized Inspector, Client, Auditor, etc.
 Reviewing of QC Dossier for the project and handing over to clients

PERIOD : May 2013 to January 2014

POSITION : QC Inspector

COMPANY : PT Nexus Engineering Indonesia

PROJECTS : 1. Process Module for Tan Burrup Project - PT. Nippon Steel for Technicas
Reunidas
2. Pipe Spool for Banyu Urip MT Gagak Rimang FSO Project Exxon Mobil
Cepu Limited

RESPONSIBILITIES
 Carry out daily inspection
 Issuance NCR for non-conformities
 NCR Close Out

QAQC Manager - Eka Yulizal Putra.doc Page 4 of 5


 Report submission

PERIOD : October 2006 to May 2013

POSITION : Maintenance Troubleshoot Lead

COMPANY : PT Panasonic Electronic Devices Batam

PERIOD : August 2006 to October 2006

POSITION : Production Trainee

COMPANY : PT Bioworld Biosciences

TRAININGS & CERTIFICATIONS


 IRCA Certified ISO 9001: 2015 Lead Auditor
 Total Station Survey
 CSWIP 3.1 Welding Inspector TWI
 Coating Inspector
 Welding Inspector
 RI ASNT Level II

REFEREES
Name : Neil McCallum
Position : Project Director
Company : McConnell Dowell Indonesia
Handphone : +62 811 1964 3096

Name : V. Dwijatmoko
Position : CEO
Company : PT Transalindo Eka Persada
Handphone : +62 811-7771-418

QAQC Manager - Eka Yulizal Putra.doc Page 5 of 5